Tool Selection Matrix

Tool Definition When to Use Key Questions to Answer Notes:

4 Quadrant Analysis A tool used to compare multiple improvement ideas Use this tool when you need a quick Do I have a long list of good
against two key variables in order to select the items method to determine the improvement ideas?
that a Kaizen team will immediately begin to work. improvement ideas to be
Usually the ideas are judged against significant implemented during the Kaizen run Do I need to determine what a
impact (to improvement metrics) and timing. week. limited group of resources need to
work on in order to make an
immediate impact?

5 Why's The process of asking "Why" five times in order to Anytime that a problem is first being Do you really understand what the A very simple, but powerful tool.
drive the problem statement down to the root cause studied. root cause of the problem is? Can be used out in the Genba with a
level. flipchart to drive to the correct
When the process was in a steady Is your course of action really going problem statement.
state and some change has occurred to resolve the situation?
for the worse or better.
Why is that a problem?

5-S Enabler for making sure you have the right material This is a foundational tool. How much time do I spend Will highlight problems with flow
at the right time searching for items? and equipment operation.
Should be used in an ongoing basis
Key ingredient for organizing a workplace to enable in all departments. Is everything in its place and a place Improves morale.
flow for everything?
Frees up floor space.
As a building block to any Kaizen or Does the place look neat, clean, and
improvement effort. organized?
What method is in place to sustain
the 5S? Can I readily tell when
there is a problem?

Affinity Diagram The affinity diagram is the product of a team's When you need to identify key ideas Do you need to maximize the Assemble post it notes, craft paper,
brainstorming and consensus activities. This process for process improvement. creativity of your breakthroughs? etc. ahead of time.
groups large amounts of data into logical elements
based on the natural relationships among items. When you need to identify patterns Do you need to reduce a long list of Allow people to move ideas into
among seemingly unrelated factors. improvement ideas or potential affinity groups without much debate
problems down to a manageable at first.
level?

Do you need to decide which single


improvement idea may have the
greatest overall impact?

C and E Matrix Matrix that identifies a few key process input When you need to see what effect Do you understand which of your This tool really focuses the efforts of
variables that must be addressed to improve the key various inputs and outputs have on process steps have the biggest the team.
process output variables. Similar to a fishbone ranked customer priorities. impact on your customer?
diagram but in matrix form.

Cellular A manufacturing cell or transactional work cell This is a foundational tool. Can you get to one piece flow? All work cells do not have to be in
Manufacturing comprises a group of equipment or processes, an "U" shape. Select a shape that
usually laid out in the shape of a U, that is Use this tool when trying to Do you need a process that will vary will maximize your resources, but
dedicated to the complete production of a family of maximize flow and flexibility while output to match demand? always consider the "U" first.
parts or services. reducing inventory.

Control Charts Control charts are line graphs that display a dynamic Use this tool when you need to Do I have a stable, in control You must select the correct control
picture of process behavior. A process variable or make a realtime process process? chart system for the type of data
attribute can be measured on some given frequency performance visible and you need being collected.
and that value is plotted verses time on the line to react to issues quickly. Does the associate know when to
graph. make adjustments to the process Control Charts are still somewhat
and when to contact additional reactive in nature so look for the
resources for assistance? mistake proofing opportunity.

Corrective Action A collection of quality improvement tools used to When there is a great deal of Have you completed a Cause and Eliminates easier to see quality
Kaizen reduce readily identifiable variation and or defects variation or defects within a process Effect Diagram? issues and prepares the way for
resulting in a sustained stable process. either transactional or other tools such as standard work or
manufacturing but the root cause is Does your control chart a DMAIC project.
known with relative certainty. demonstrate how you have changed
your noises to constants?
What does the Pareto show is the
root cause of the 80%?

How are you measuring


sustainability?

Daily Management Management process and tools which drive To manage daily process through Do we understand how to manage \
improvement in Value Stream KPIs at the Genba. conversion of batch to lean the factory floor on a daily basis?
manufacturing, and beyond
Examples include production control boards, conversion to make continuous Are we having difficulty with OTD,
communication boards, KPI's and daily "Green Area" incremental improvement. If a Past Due, quality, efficiency etc.?
meetings. process area lacks sound daily
management then most Do the Associates at the cell know
improvement activities will only be what they need to produce today
marginally realized. and in what sequence?

Solution Need/ Want A Decision Analysis tool that is used to compare When there are several good Do you have multiple good The highest want is valued at a 10
Comparison several solutions to understand which one is the solutions that could be solutions? and then the rest of the wants are
most balanced. It is rooted in understanding what implemented but resources only scaled proportionally to the highest
are customer requirements (needs) and what the allow for one option. Have you thoroughly evaluated want.
customer finds favorable (wants). what is important to the customer?
Needs are considered "Musts."

Page 1 of 4
Tool Selection Matrix
Tool Definition When to Use Key Questions to Answer Notes:

Design For Six Sigma A process to ensure designs can be manufactured at When designing or redesigning any Have I completed a DFSS as part of This tool will yield a more robust
required Sigma levels to meet the customer product or service that developing a new product or design and an effective product
expectations and manufacturing capabilities. demonstrates variability concerns. process? launch with reduced engineering
changes post product launch.

Design of DOE is the purposeful changing of Inputs to a process As part of new product/process Have you first done an MSA / Gage A DOE is mathematical model that
Experiments to observe the corresponding changes in the Outputs development R&R? describes the relationship between
the inputs and outputs of a process.
To tackle an on-going quality Is standard work in place? It generally takes someone with
problem that has an unknown root extensive training to complete and
cause. Do you need to first do a corrective analyze properly such as a Six Sigma
action kaizen to reduce the number Green Belt.
of inputs?

DMAIC A variation reduction methodology used primarily for To understand and reduce the Have we done a corrective action Typically a DMAIC project and can
the reduction of variation in complex processes. variation of a complex process. This kaizen first? take up to several months to
DMAIC stands for define, measure, analyze, improve variation may be leading to a wide complete. Often the Improve phase
and control. variety of issues such as, defects, Do we have GB/BB resources can be accomplished utilizing a
over usage of raw materials or lead available? Kaizen event.
time issues.
Have we tried other Lean tools first
that may eliminate "background
noise"?

Fishbone Diagram The Fishbone diagram typically displays major generic To assist a team to reach a common Have we investigated all aspects of Do not overload categories.
categories such as manning, methods, materials, understanding of a problem and its the problem? Establish another category if more
equipment, measurement and mother nature that root causes. detail is desired.
cause an effect, often perceived as a problem. Have you organized the x's into
To expand the team's thinking and affinity groups? This tool is more effective when
consider all potential causes. used in conjunction with other
decision making tools such as the 4
Quadrant Analysis.

FMEA A failure mode effect analysis (FMEA) is a technique When you need to develop and plan Do you understand which process This tool can get a little long.
that allows a cross-functional team to identify possible solutions or change. deficiencies will impact you the Remember to only focus on the high
potential failure modes that may occur as a result of most? RPN's typically something over 200.
design or process deficiencies. When you need to evaluate a
quality system for protection of your Are you certain that you understand
customers. what all of your liabilities are and
where they exist?

Measurement A methodology for determining if a Measurement Before performing a DOE and after a Is standard work in place? You have to develop a confidence in
System Analysis system is capable of measuring a product or process corrective action kaizen. the ability of your measurement
(Gage R&R) Do you need to first do a corrective system to decide between 'good'
When there is a process/product action event to reduce the number and 'bad' products or services.
with poor quality out of a machine / of inputs?
test equipment.
Is the issue really a problem?
When a product or service passes
your test and fails at the customer
(or supplier)

Mistake Proofing Mistake-proofing the process is to change the When a process has a low First Pass Can we design the process or Use devices or inspection
method or equipment to ensure that a particular Yield. product so that it cannot be techniques that detect errors during
error cannot happen. incorrectly performed or made? the work process rather than at the
When a defect occurrence becomes end of the process.
the largest source of waste or Do we frequently blame the
variation. employee for making an error?
When defects create the demand
for excessive inventory or impede
the ability to meet customer
demand.

Pareto Diagram A Pareto Diagram is a bar chart arranged in a Pareto Diagrams can be used almost Do you understand what the most You can "stack" Paretos as you build
descending order of importance from left to right. anytime and for almost any significant problem is? to root case.
The Pareto Principle states that 80% of issues are question.
created by only 20% of the potential root causes. By Are you working on the issue that Paretos work really well when using
determining the "Pareto" you can determine the root will yield the largest amount of the "5 Why" technique.
cause to attack first. improvement?

Policy Deployment A process that facilitates the creation of results- This is a foundational business How are you communicating goals Creates management accountability.
oriented business processes with sustained management tool. and objectives to all parts of the Creates direct linkages for all
improvement that result in sustained competitive organization? objectives from top to bottom of
advantage. When you need to drive the the organization.
strategic initiatives to point of Does your current Policy
The organization is aligned to the same goals and impact. Deployment give you the continuity
objectives. to be successful?
When you need total organizational
alignment on business priorities.

Potential Problem The potential problem analysis (PPA) is a tool used for Use in situations where an incorrect Have we thought through all the This tool can take as little as 15
Analysis (PPA) minimizing the probability of solution change could have serious impact to possible ways this action plan may minutes or as long as a day
implementation failure by identifying potential the business. fail? depending on the complexity of the
problems and possible countermeasures. It is a process change and the level of
simpler version of a FMEA and can be applied to less Use if there is a good deal of anxiety Do I have a contingency plan if the preparation for the tool use.
complex changes quickly. over process improvements new process does not work as
implementation. planned?

Page 2 of 4
Tool Selection Matrix
Tool Definition When to Use Key Questions to Answer Notes:

Production A tool used to establish the best design or the best Used to eliminate barriers to flow Is 3P being incorporated into our Proactively remove barriers to flow
Preparation Process process taking quality, flow, and speed into for developing new products or product development system? while building in quality.
3P consideration. processes. Significantly reduces start-up costs.
Have you done a 3P to determine if
Assists in thinking 'outside the box' and is used Also used to improve an existing a Capital Appropriation is
during a Kaizen week as a substitute for a DFSS product or process. Must be used necessary?
project. in the development stages of a new
product or process.

Pull - Kanban A process to transition businesses from the This is a foundational tool. Why is one-piece flow not possible? Can be used anywhere that 1 pc
traditional Push System to a Pull System. A Kanban is flow does not exist and materials
a signal in the system that indicates when work is to When one-piece flow is not Are you experiencing Stock-outs or must be transported to the cell.
be done and when it is to end. This allows for possible. poor OTD? Eliminates running out of inputs
minimal inventory and no overproduction. while reducing carrying costs.
To ensure that materials are Is inventory creating lead time,
available when needed and in the quality or cash flow issues?
quantities needed.

Quick Changeover Changeovers are situations where one process must If your set-up time is longer than How much set-up scrap do we Can be done anywhere that a
(SMED) be stopped and reconfigured to run a different your Takt time (customer demand have? process must be changed over from
product or service. We define the changeover time in seconds) one product to another or a
as the amount of time between the last good piece Is our set-up time within our Takt machine must be stopped to load
(A) of the current run and the first good piece (B) of If your set-up is internal to the time? supplies. Great productivity
the next run. machine. booster! The goal is to have the
Are we doing things while the change occur in less than 10
If a long changeover time creates a machine is off that can be done minutes.
need to build excessive inventory. while it is running?

SIPOC Map A form of process mapping that separates out the Use this mapping technique when Do you need to better describe the Limit the number of process step
process into key inputs and outputs and gives a high you need to define and control the process scope of your event? mapped to 5-7. Include the step
level view of key process steps. scope of your project or event. just below and beyond the process
Do I understand the real needs of in order to better define the scope.
my customer?

Spaghetti Diagram A spaghetti diagram is a map of the physical flow of This is a special standard work tool How many times does the work or Try to "straighten out" the spaghetti
either the material, people or information in a and should be used anytime the worker cross paths during one Takt? during your process improvements.
process. flow of a process needs to be
documented. How much non value added motion
exists in the process?

Stakeholder Analysis A stakeholder analysis is a matrix that captures how Use this tool early in the change Do I know how all the key "players" Use caution in documenting
all key customers, process owners and senior process to understand key concerns feel about the work that I am "personal" reasons or bias that are
management is impacted by and feels toward the and roadblocks that you may have attempting to do? true roadblocks, but need to be
potential process change. to the improvement handled delicately.
implementation. Do I know what issues may come up
at the last minute and prevent or
delay success?

Standard Work A process to maximize performance with minimum This is a foundational tool. Do products and materials flow With Standard Work in place, you
waste through the best combination of people and through the operation or cell? are able to see problems much
process. It captures the key elements needed to When there is too much / too little faster and once you see the
meet cost, quality delivery and safety objectives. capacity. Are we using Standard Work, do we problem, you are able to solve it
have a set of Standard Work much faster.
Often deployed while implementing cellular flow. When we need to improve documents posted?
productivity and or quality. Increases predictability and
Are Standard worksheets posted in therefore control over the outcomes
Every process should have every work place of processes.
documented standard work.

Total Productive A series of methods, used to ensure that all Always on critical pieces of Is your OEE low? Increased OEE and reduced
Maintenance equipment is always able to perform its required equipment within the site. Do you have key pieces of equipment downtime. Move from
tasks so that the process is never interrupted due to equipment that you are dependent unplanned to planned downtime.
that equipment being down for un-planned repairs. It on?
places much of the responsibility on the actual Do you have equipment down time
person running the process. issues?

Value Stream Value Stream Mapping is a method that visually Use VSM to provide the focus and Where is your future state map? Maps and action plans should be
Mapping shows the product, material and information flows direction to the objectives updated every 6 months.
within a product or service determined by Policy Deployment. What is the status of your VSM
Action Plan?
Use to communicate how
improvements in Lead Time, On- How do you know which
time Delivery, Inventory Reductions, improvements will take you closer
etc. will impact the process. to your vision of the future?

Visual Management Visual Management is a powerful tool that uses Use visual management in almost Can I perform a 2 min 360 and Examples range from color codes
visual techniques to communicate information all situations where it is better, understand how well the process is files to overhead realtime displays.
broadly. Think in terms of can a new person enter faster and cheaper to communicate operating?
into the process area and understand how it is directly to associates.
performing in less than 2 mins, without any Is the information that is important
explanation? to users obvious?

Lean Methods Group. You may freely modify, distribute and/or reproduce this only if Lean Methods Group's logo is not altered or removed.