2.0 - SUPERESTRUTURA
2.1- EXCECUO DE PILARES
2.1.1 - CONCRETO P/VIBR., FCK 20 MPa COM AGREGADO ADQUIRIDO (M)
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAS
I0109 AREIA MEDIA M3 0.8527
I0805 CIMENTO PORTLAND KG 336
I1605 PEDRISCO M3 0.836
MO DE OBRA
I2543 SERVENTE H 6
EQUIPAMENTOS (CHORARIO)
I0682 BETONEIRA ELTRICA 580L (CHP) H 0.714
2.4-PISO
2.4.1-CONCRETO P/VIBR., FCK 10 MPa COM AGREGADO ADQUIRIDO(M)
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I0109 AREIA MEDIA M3 0.9197
I0805 CIMENTO PORTLAND KG 254
I1605 PEDRISCO M3 0.836
MO DE OBRA
I2543 SERVENTE H 6
EQUIPAMENTOS (HORARIO)
I0682 BETONEIRA ELTRICA 580L (CHP)Z H 0.714
2.5- CONTRAPISO
2.5.1-REGULARIZAO DE BASE C/ ARGAMASSA CIMENTO E AREIA S/ PENEIRAR, TRAO 1:5 - ESP= 3cm, C/IMPERMEABILIZANTE (M)
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I0109 AREIA MEDIA M3 0.0365
I0805 CIMENTO PORTLAND KG 8.76
I1249 IMPERMEABILIZANTE KG 0.6
MO DE OBRA
2391 PEDREIRO H 0.25
I2543 SERVENTE H 0.55
3.2- CHAPISCO C/ ARGAMASSA DE CIMENTO E AREIA S/PENEIRAR TRAO 1:3 ESP.= 5mm P/ PAREDE (M)
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I0109 AREIA MEDIA M3 0.0061
I0805 CIMENTO PORTLAND KG 2.43
MO DE OBRA
I2391 PEDREIRO H 0.1
I2543 SERVENTE H 0.15
3.3- REBOCO C/ACABAMENTO.LISO.C/ARGAMASSA DE CIMENTO E AREIA PENEIRADA E ADITIVO IMPERMEABILIZANTE TRAO 1:1.5 ESP=5 mm
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I0109 AREIA MEDIA M3 0.0061
I0805 CIMENTO PORTLAND KG 4.77
I1249 IMPERMEABILIZANTE KG 0.1
MO DE OBRA
I2391 PEDREIRO H 0.8
I2543 SERVENTE H 0.96
4.0 - COBERTURA
4.1- COBERTURA TELHA CERMICA (RIPA, CAIBRO, LINHA) - M2
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I0405 CAIBRO DE 2"x1" M 3,5000 2,8400 9,9400 M 3.5
I1724 PREGO KG 0,1200 9,4000 1,1280 KG 0.12
I1824 RIPA DE PEROBA (MADEIRA DE 1A QUALIDADE) DE 1X5CM M 3,5000 1,3500 4,7250 M 3.5
I2045 TELHA CERMICA COLONIAL UN 33
I65194 LINHA DE MASSARANDUBA 12 x 6 CM ( 5" x 2 1/2") M 1.33
MO DE OBRA
I0041 AJUDANTE DE CARPINTEIRO H 1
I0498 CARPINTEIRO H 1
I2391 PEDREIRO H 1.1
I2543 SERVENTE H 1.1
5.0 - REVESTIMENTO
5.1-IMPERMEABILIZAO P/ REBAIXO BANHEIRO E COZINHA C/TINTA ASFLTICA (M)
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I2089 TINTA ASFLTICA KG 1.02
MO DE OBRA
I2543 SERVENTE H 0.4
5.2-CERMICA ESMALTADA C/ ARG. PR-FABRICADA ACIMA DE 30x30 cm (900 cm) - PEI-5/PEI-4 - P/ PISO - M2
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I6500 CERMICA ESMALTADA DIMENSES ACIMA DE 30x30cm (900 cm) - PEI-5/PEI-4 M2 1.1
I6508 ARGAMASSA COLANTE PR-FABRICADA P/ CERMICAS E PORCELANATOS M2 8
MO DE OBRA
I1328 LADRILHISTA H 0.6
I2543 SERVENTE H 0.6
5.3-CERMICA ESMALTADA C/ ARG. CIMENTO E AREIA ACIMA DE 30x30cm (900 cm) - PEI-5/PEI-4 P/ PAREDE - M2
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I6500 CERMICA ESMALTADA DIMENSES ACIMA DE 30x30cm (900 cm) - PEI- M2 1.1
5/PEI-4
MO DE OBRA
I1328 LADRILHISTA H 1.4
I2543 SERVENTE H 1.4
SERVIOS
C4429 ARGAMASSA DE CIMENTO E AREIA PEN. TRAO 1:5 M3 0.02
6.0 - ACABAMENTO
6.1 -FORRO PVC - LAMBRI (100x6000 OU 200x6000)mm - FORNECIMENTO E MONTAGEM - M2
CDIGO DESCRIO UNIDADE COEFICIENTE
MATERIAIS
I8293 FORRO PVC - LAMBRI (100x6000 OU 200x6000)mm M2 1
REFERNCIA: C1937
PREO UNITRIO PREO TOTAL
9.4 1.41
29.5 30.09
12 12.00
14.79 66.56
4.88 9.76
TOTAL MATERIAIS 110.06
TOTAL MO DE OBRA 9.76
TOTAL SIMPLES 119.82
ENCARGOS 11.35
BDI -
TOTAL GERAL 131.17
REFERNCIA: C2102
PREO UNITRIO PREO TOTAL
4.88 1.22
TOTAL MO DE OBRA 1.22
TOTAL SIMPLES 1.22
ENCARGOS 1.42
BDI -
TOTAL GERAL 2.64
REFERNCIA: C2317
PREO UNITRIO PREO TOTAL
9.4 2.82
6.18 6.80
1.35 4.46
6.66 3.33
14.79 46.59
4.88 4.88
7.2 7.20
TOTAL MATERIAIS 63.99
TOTAL MO DE OBRA 12.08
TOTAL SIMPLES 76.07
ENCARGOS 14.05
BDI -
TOTAL GERAL 90.12
REFERNCIA: C1630
PREO UNITRIO PREO TOTAL
9.4 0.11
14.6 0.29
14.79 0.59
20.6 0.19
4.88 0.63
7.2 0.94
TOTAL MATERIAIS 1.18
TOTAL MO DE OBRA 1.57
TOTAL SIMPLES 2.75
ENCARGOS 1.83
BDI -
TOTAL GERAL 4.58
REFERNCIA: C0842
PREO UNITRIO PREO TOTAL
46 39.22
0.5 168.00
63.2 52.84
4.88 29.28
13.8268 9.87
TOTAL MATERIAIS 260.06
TOTAL MO DE OBRA 29.28
TOTAL DE EQUIPAMENTOS 9.87
TOTAL SIMPLES 299.21
ENCARGOS 40.04
BDI -
TOTAL GERAL 339.25
REFERNCIA: C0216
PREO UNITRIO PREO TOTAL
3.96 4.55
9.97 0.20
7.2 0.58
5.6 0.45
TOTAL MATERIAIS 4.75
TOTAL MO DE OBRA 1.02
TOTAL SIMPLES 5.78
ENCARGOS 1.19
BDI -
TOTAL GERAL 6.97
REFERNCIA: C0842
PREO UNITRIO PREO TOTAL
46 39.22
0.5 168.00
63.2 52.84
4.88 29.28
13.8268 9.87
TOTAL MATERIAIS 260.06
TOTAL MO DE OBRA 29.28
TOTAL DE EQUIPAMENTOS 9.87
TOTAL SIMPLES 299.21
ENCARGOS 40.04
BDI -
TOTAL GERAL 339.25
REFERNCIA: C0216
PREO UNITRIO PREO TOTAL
3.96 4.55
9.97 0.20
7.2 0.58
5.6 0.45
TOTAL MATERIAIS 4.75
TOTAL MO DE OBRA 1.02
TOTAL SIMPLES 5.78
ENCARGOS 1.19
BDI -
TOTAL GERAL 6.97
REFERNCIA: C1401
PREO UNITRIO PREO TOTAL
6.6 1.12
14.79 44.37
9.4 1.88
4.74 7.25
6.18 17.55
5.6 8.40
7.2 10.80
TOTAL MATERIAIS 72.18
TOTAL MO DE OBRA 19.20
TOTAL SIMPLES 91.38
ENCARGOS 22.33
BDI -
TOTAL GERAL 113.71
REFERNCIA: C4455
PREO UNITRIO PREO TOTAL
4.1400 3.0636
14.7900 19.2270
9.4000 0.2820
4.7400 4.5978
6.1800 4.0170
30.0000 30.0000
7.2000 2.5200
4.8800 1.7080
279.7987 11.1919
75.0400 3.0016
TOTAL MATERIAIS 61.1874
TOTAL MO DE OBRA 4.2280
TOTAL DE SERVIOS 14.1935
TOTAL SIMPLES: 79.61
ENCARGOS 10.01
BDI -
TOTAL GERAL 89.62
REFERNCIA: C0838
PREO UNITRIO PREO TOTAL
46 42.31
0.5 127.00
63.2 52.84
4.88 29.28
13.8268 9.87
TOTAL MATERIAIS 222.14
TOTAL MO DE OBRA 29.28
TOTAL EQUIPAMENTO 9.87
TOTAL SIMPLES 261.29
ENCARGOS 40.05
BDI -
TOTAL GERAL 301.34
7.2 1.80
4.88 2.68
TOTAL MATERIAIS 9.96
TOTAL MO DE OBRA 4.48
TOTAL SIMPLES 14.44
ENCARGOS 5.22
BDI -
TOTAL GERAL 19.66
REFERNCIA: C0074
PREO UNITRIO PREO TOTAL
46 1.8998
0.5 3.095
0.42 19.74
7.2 10.8
4.88 8.9792
TOTAL MATERIAIS 24.73
TOTAL MO DE OBRA 19.78
TOTAL SIMPLES 44.51
ENCARGOS 23.67
BDI -
TOTAL GERAL 68.18
REFERNCIA: C0776
PREO UNITRIO PREO TOTAL
46 0.28
0.5 1.22
7.2 0.72
4.88 0.73
TOTAL MATERIAIS 1.50
TOTAL MO DE OBRA 1.45
TOTAL SIMPLES 2.95
ENCARGOS 1.69
BDI -
TOTAL GERAL 4.64
1:1.5 ESP=5 mm (M) REFERNCIA: C2110
PREO UNITRIO PREO TOTAL
46 0.28
0.5 2.39
6.5 0.65
7.2 5.76
4.88 4.68
TOTAL MATERIAIS 3.32
TOTAL MO DE OBRA 10.44
TOTAL SIMPLES 13.76
ENCARGOS 12.15
BDI -
TOTAL GERAL 25.91
REFERNCIA: C4466
PREO UNITRIO PREO TOTAL
2.84 9.9400
9.4 1.1280
1.35 4.7250
0.46 15.1800
21.88 29.1004
5.6 5.6000
7.2 7.2000
7.2 7.9200
4.88 5.3680
TOTAL MATERIAIS 60.0734
TOTAL MO DE OBRA 26.0880
TOTAL SIMPLES 86.16
ENCARGOS 30.35
BDI -
VALOR GERAL 116.51
REFERNCIA: C1472
PREO UNITRIO PREO TOTAL
6.26 6.39
4.88 1.95
TOTAL MATERIAIS 6.39
TOTAL MO DE OBRA 1.95
TOTAL SIMPLES 8.34
ENCARGOS 2.27
BDI -
TOTAL GERAL 10.61
M2 REFERNCIA: C3001
PREO UNITRIO PREO TOTAL
32.61 35.871
2 16
7.2 4.3200
4.88 2.9280
TOTAL MATERIAIS 51.8710
TOTAL MO DE OBRA 7.2480
TOTAL SIMPLES 59.1190
ENCARGOS 8.4300
BDI -
TOTAL GERAL 67.55
M2 REFERNCIA: C4434
PREO UNITRIO PREO TOTAL
32.61 35.871
7.2 10.0800
4.88 6.8320
360.292 7.2058
TOTAL MATERIAIS 35.8710
TOTAL MO DE OBRA 16.9120
TOTAL SERVIOS 7.21
TOTAL SIMPLES 59.99
ENCARGOS 23.3600
BDI -
TOTAL GERAL 83.35
REFERNCIA: C2103
PREO UNITRIO PREO TOTAL
2.95 1.9175
7.2 1.6560
4.88 1.1224
TOTAL MATERIAIS 1.9175
TOTAL MO DE OBRA 2.7784
TOTAL SIMPLES 4.70
ENCARGOS 3.2300
BDI -
TOTAL GERAL 7.93
REFERNCIA: C4468
PREO UNITRIO PREO TOTAL
36 36.0000
TOTAL SIMPLES 36.00
ENCARGOS -
BDI -
TOTAL GERAL 36.00
REFERNCIA: C2461
PREO UNITRIO PREO TOTAL
10.07 1.9133
7.48 2.3188
5.6 1.1200
7.2 2.1600
TOTAL MATERIAIS 4.2321
TOTAL MO DE OBRA 3.28
TOTAL SIMPLES 7.51
ENCARGOS 3.82
BDI -
TOTAL GERAL 11.33
REFERNCIA: C1208
PREO UNITRIO PREO TOTAL
0.55 0.2200
5.26 3.6820
5.6 1.1200
7.2 2.1600
TOTAL MATERIAIS 3.9020
TOTAL MO DE OBRA 3.28
TOTAL SIMPLES 7.18
ENCARGOS 3.82
BDI -
TOTAL GERAL 11.00
REFERNCIA: C1628
PREO UNITRIO PREO TOTAL
4.88 3.42
TOTAL MO DE OBRA 3.42
TOTAL SIMPLES 3.42
ENCARGOS 3.97
BDI -
TOTAL GERAL 7.39
REFERNCIA: C0702
PREO UNITRIO PREO TOTAL
4.88 3.51
18.2453 4.38
TOTAL MO DE OBRA 3.51
TOTAL EQUIPAMENTOS CHORARIO 4.38
TOTAL SIMPLES 7.89
ENCARGOS 6.32
BDI -
TOTAL GERAL 14.21
REFERNCIA: C1083
PREO UNITRIO PREO TOTAL
14.4 14.40
TOTAL MO DE OBRA 14.40
TOTAL SIMPLES 14.40
ENCARGOS 16.75
BDI -
TOTAL GERAL 31.15
MATERIAIS UNID. QUANTIDADE DE MATERIAL
PREGO KG 53.48
CHAPA M 2.04
ESMALTE SINTTICO L 2.00
PONTALETE M 456.26
TBUA M 170.51
RIPA M 755.01
FERRAGEM KG 3.85
ARAME KG 2.17
AREIA M 39.11
CIMENTO PORTLAND KG 14710.81
PEDRISCO M 24.36
AO KG 35.63
DESMOLDANTE L 1.33
SARRAFO M 15.57
LAJE PR-FABRICADA M 3.74
IMPERMEABILIZANTE KG 76.93
CAL HIDRATADA KG 1074.71
TIJOLO CERMICO UM 8160.14
CAIBRO M 319.41
TELHA CERMICA UM 3011.58
LINHA DE MASSARANDUBA M 121.38
TINTA ASFLTICA KG 32.62
CERMICA ESMALTADA M 145.42
ARGAMASSA PR-FABRICADA M 648.73
FORRO PVC M 53.79
SELADOR ACRLICO L 21.18
TEXTURA ACRLICA KG 34.56
LIXA UM 68.13
MASSA CORRIDA/PVA KG 119.23
EQUIPAMENTOS UNID. QUANTIDADE DE EQUIP.
BETONEIRA ELTRICA H 20.81
CAMINHO BASCULANTE H 0.00
5.60 12.80
5.60 576.60
7.20 4984.05
7.20 1146.28
7.20 608.71
5.60 315.63
14.00 1117.20
TOTAL DE MO DE OBRA SEM ENCARGOS 18003.22
ENCARGOS SOCIAIS 21544.46
TOTAL DE MO DE OBRA COM ENCARGOS 39547.68
1.0 SERVIOS PRELIMINARES
2.00
1.1 PLACA DE OBRA M Coef. Preo Unit.
PREGO 15X15 KG 0.15 9.40
CHAPA DE AO GALVANIZADA ESP. 0.3MM M 1.02 29.50
ESMALTE SINTETICO L 1.00 12.00
PONTALETE / BARROTE DE 3"x3" M 4.50 14.79
SERVENTE H 2.00 4.88
1.2 RASPAGEM DO TERRENO M 200.00
SERVENTE H 0.25 4.88
1.3 TAPUME M 132.00 7.70
PREGO KG 0.30 9.40
TABUA DE 1" DE 3A. - L = 30cm M 1.10 6.18
RIPA DE PEROBA (MADEIRA DE 1A QUALIDADE) DE 1X5CM M 3.30 1.35
FERRAGEM PARA PORTAO DE TAPUME KG 0.50 6.66
PONTALETE / BARROTE DE 3"x3" M 3.15 14.79
SERVENTE H 1.00 4.88
CARPINTEIRO H 1.00 7.20
1.4 LOCAO DA OBRA M 79.80
PREGO KG 0.01 9.40
ARAME GALVANIZADO N.16 BWG KG 0.02 14.60
PONTALETE / BARROTE DE 3"x3" M 0.04 14.79
TABUA DE VIROLA DE 12"x 1" M2 0.01 20.60
SERVENTE H 0.13 4.88
CARPINTEIRO H 0.13 7.20
2.0 SUPERESTRUTURA
2.1 PILARES 1.20
2.1.1 CONCRETO M Coef. Preo Unit.
AREIA MEDIA M 0.85 46.00
CIMENTO PORTLAND KG 336.00 0.50
PEDRISCO M 0.84 63.20
SERVENTE H 6.00 4.88
BETONEIRA ELTRICA 580L (CHP) H 0.71 13.83
2.1.2 ARMADURA CA-50A MDIA D= 6,3 A 10,0mm M 21.60
AO CA-50\ KG 1.15 3.96
ARAME RECOZIDO N.18 BWG KG 0.02 9.97
ARMADOR/FERREIRO H 0.08 7.20
AJUDANTE DE ARMADOR/FERREIRO H 0.08 5.60
2.1.3 FORMA DE TBUAS 0.72
DESMOLDANTE PARA FORMAS L 0,1700 6,6000 1,1220 L 0.17 6.60
PONTALETE / BARROTE DE 3"x3" M 3,0000 14,7900 44,3700 M 3.00 14.79
PREGO 18X27 KG 0,2000 9,4000 1,8800 KG 0.20 9.40
SARRAFO DE 1"X4" M 1,5300 4,7400 7,2522 M 1.53 4.74
TABUA DE 1" DE 3A. - L = 30cm L 2.84 6.18
AJUDANTE DE CARPINTEIRO H 1.50 5.60
CARPINTEIRO H 1.50 7.20
2.2 VIGAS 23.72
2.2.1 CONCRETO M Coef. Preo Unit.
AREIA MEDIA M 0.85 46.00
CIMENTO PORTLAND KG 336.00 0.50
PEDRISCO M 0.84 63.20
SERVENTE H 6.00 4.88
BETONEIRA ELTRICA 580L (CHP) H 0.71 13.83
2.2.2 ARMADURA CA-50A MDIA D= 6,3 A 10,0mm M 6.98
AO CA-50 KG 1.15 3.96
ARAME RECOZIDO N.18 BWG KG 0.02 9.97
ARMADOR/FERREIRO H 0.08 7.20
AJUDANTE DE ARMADOR/FERREIRO H 0.08 5.60
2.2.3 FORMA DE TBUAS 7.09
DESMOLDANTE PARA FORMAS L 0,1700 6,6000 1,1220 L 0.17 6.60
PONTALETE / BARROTE DE 3"x3" M 3,0000 14,7900 44,3700 M 3.00 14.79
PREGO 18X27 KG 0,2000 9,4000 1,8800 KG 0.20 9.40
SARRAFO DE 1"X4" M 1,5300 4,7400 7,2522 M 1.53 4.74
TABUA DE 1" DE 3A. - L = 30cm L 2.84 6.18
AJUDANTE DE CARPINTEIRO H 1.50 5.60
CARPINTEIRO H 1.50 7.20
2.3 LAJE 3.74
2.3.1 LAJE PR-FABRICADA M Coef. Preo Unit.
AO CA-60 KG 0.74 4.14
PONTALETE / BARROTE DE 3"x3" M 1.30 14.79
PREGO 18X27 KG 0.03 9.40
SARRAFO DE 1"X4" M 0.97 4.74
TABUA DE 1" DE 3A. - L = 30cm M 0.65 6.18
LAJE PR-FABRICADA TRELIADA P/ FRRO, DE 8 cm DE
ALTURA E 2 cm DE CAPEADO - VO AT 3 m M 1.00 30.00
PEDREIRO H 0.35 7.20
SERVENTE H 0.35 4.88
CONCRETO P/VIBR., FCK 15 MPa COM AGREGADO ADQUIRIDO
M 0.04 279.80
LANAMENTO E APLICAO DE CONCRETO C/ ELEVAO M 0.04 75.04
2.4 PISO 4.22
2.4.1 CONCRETO M Coef. Preo Unit.
AREIA MEDIA M3 0.92 46.00
CIMENTO PORTLAND KG 254.00 0.50
PEDRISCO M3 0.84 63.20
SERVENTE H 6.00 4.88
BETONEIRA ELTRICA 580L (CHP)Z H 0.71 13.83
2.5 CONTRAPISO 70.35
2.5.1 REGULARIZAO BASE M Coef. Preo Unit.
AREIA MEDIA M3 0.04 46.00
CIMENTO PORTLAND KG 8.76 0.50
IMPERMEABILIZANTE KG 0.60 6.50
PEDREIRO H 0.25 7.20
SERVENTE H 0.55 4.88
4.0 PAREDES E VEDAES
173.62
4.1 ALVENARIA DE TIJOLO CERMICO M Coef. Preo Unit.
AREIA MEDIA M 0.04 46.00
CAL HIDRATADA KG 6.19 0.74
CIMENTO PORTLAND KG 12.38 0.50
TIJOLO CERMICO FURADO 9X19X19CM UN 47.00 0.42
PEDREIRO H 1.50 7.20
SERVENTE H 1.84 4.88
4.2 CHAPISCO COM ARGAMASSA M 347.24
AREIA MEDIA M3 0.01 46.00
CIMENTO PORTLAND KG 2.43 0.50
PEDREIRO H 0.10 7.20
SERVENTE H 0.15 4.88
4.3 REBOCO M 347.24
AREIA MEDIA M3 0.01 46.00
CIMENTO PORTLAND KG 4.77 0.50
IMPERMEABILIZANTE KG 0.10 6.50
PEDREIRO H 0.80 7.20
SERVENTE H 0.96 4.88
5.0 COBERTURA
91.26
5.1 COBERTURA M Coef. Preo Unit.
CAIBRO DE 2"x1" M 3,5000 2,8400 9,9400 M 3.50 2.84
PREGO KG 0,1200 9,4000 1,1280 KG 0.12 9.40
RIPA DE PEROBA (MADEIRA DE 1A QUALIDADE) DE 1X5CM M M 3.50 1.35
3,5000 1,3500 4,7250
TELHA CERMICA COLONIAL UN 33.00 0.46
LINHA DE MASSARANDUBA 12 x 6 CM ( 5" x 2 1/2") M 1.33 21.88
AJUDANTE DE CARPINTEIRO H 1.00 5.60
CARPINTEIRO H 1.00 7.20
PEDREIRO H 1.10 7.20
SERVENTE H 1.10 4.88
6.0 REVESTIMENTO
31.98
6.1 REVESTIMENTO M Coef. Preo Unit.
TINTA ASFLTICA KG 1.02 6.26
SERVENTE H 0.40 4.88
6.2 CERMICA PISO M 70.35
CERMICA ESMALTADA DIMENSES ACIMA DE 30x30cm (900 M 1.10 32.61
cm) - PEI-5/PEI-4
ARGAMASSA COLANTE PR-FABRICADA P/ CERMICAS E M 8.00 2.00
PORCELANATOS
LADRILHISTA H 0.60 7.20
SERVENTE H 0.60 4.88
6.3 CERMICA PAREDE M 61.85
CERMICA ESMALTADA DIMENSES ACIMA DE 30x30cm (900
cm) - PEI-5/PEI-4 M 1.10 32.61
50.00 244.00
39.60 372.24
145.20 897.34
435.60 588.06
3.85 25.64
415.80 6149.68
132.00 644.16
132.00 950.40
0.96 9.00
1.60 23.30
3.19 47.21
0.72 14.79
10.37 50.63
10.37 74.69
24.84 98.37
0.43 4.31
1.73 12.44
1.73 9.68
0.12 0.80
2.15 31.72
0.14 1.34
1.09 5.19
2.03 12.55
1.07 6.01
1.07 7.72
8.03 31.79
0.14 1.39
0.56 4.02
0.56 3.13
1.20 7.95
21.26 314.47
1.42 13.32
10.84 51.40
20.13 124.39
10.63 59.54
10.63 76.55
3.74 112.20
1.31 9.42
1.31 6.39
0.15 41.86
0.15 11.23
2.12 97.44
843.79 421.90
34.72 250.01
52.09 254.18
2.12 97.44
1656.33 828.17
34.72 225.71
277.79 2000.10
333.35 1626.75
319.41 431.20
3011.58 1385.33
121.38 2655.70
91.26 511.06
91.26 657.07
100.39 722.78
100.39 489.88
77.39 2523.52
562.80 1125.60
42.21 303.91
42.21 205.98
68.04 2218.62
86.59 623.45
86.59 422.56
1.24 445.68
85.93 253.49
30.41 218.92
30.41 148.38
53.79 1936.44
21.18 213.29
34.56 258.50
22.30 124.86
33.44 240.80
68.13 37.47
119.23 627.16
34.07 190.77
51.10 367.91
140.00 683.20
0.00 0.00
0.00 0.00
79.80 1149.12
SERVIOS EQUIPE TIMA DURAO (H)
PLACA DE OBRA 1 SERVENTE 2
RASPAGEM DO TERRENO 3 SEVENTES 16.67
3 SERVENTES 44
TAPUME
3 CARPINTEIROS 44
2 SERVENTES 5.19
LOCAO DA OBRA
2 CARPINTEIROS 5.19
CONCRETO P/ PILARES 1 SERVENTE 7.2
1 ARMADOR 1.73
ARMADURA CA-50A MDIA D= 6,3 A 10,0mm
1 AJUDANTE 1.73
1 CARPINTEIRO 1.07
FORMA DE TBUAS
1 AJUDANTE 1.07
CONCRETO P/VIGAS 4 SERVENTES 35.58
1 ARMADOR 0.56
ARMADURA CA-50A MDIA D= 6,3 A 10,0mm
A AJUDANTE 0.56
2 CARPINTEIROS 5.32
FORMA DE TBUAS
2 AJUDANTES 5.32
1 PEDREIRO 1.31
LAJE PR-FABRICADA
1 SERVENTE 1.31
CONCRETO P/ PISO 2 SERVENTES 12.66
3 SERVENTES 12.8
REGULARIZAO BASE/ CONTRA PISO
3 PEDREIROS 12.8
6 SERVENTES 53.24
ALVENARIA DE TIJOLO CERMICO
5 PEDREIROS 52
2 PEDREIROS 17.36
CHAPISCO COM ARGAMASSA
3 SERVENTES 17.36
6 SERVENTES 55.56
REBOCO
5 PEDREIROS 55.56
4 PEDREIROS 25.1
COBERTURA
4 SERVENTES 25.1
REVESTIMENTO 2 SERVENTES 6.4
3 LADRILHISTAS 14.07
CERMICA PISO
3 SERVENTES 14.07
3 LADRILHISTAS 28.86
CERMICA PAREDE
3 SERVENTES 28.86
2 LADRILHISTAS 15.21
REJUNTAMENTO
2 SERVENTES 15.21
3 PINTORES 11.15
TEXTURA ACRLICA EXTERNA
2 AJUDANTES 11.15
3 PINTORES 17.03
EMASSAMENTO INTERNO
2 AJUDANTES 17.03
LIMPEZA GERAL 4 SERVENTES 35
CLCULO DOS ENCARGOS SOCIAIS
TABELA A TABELA B
INSS 20.00% Repouso Semanal Remunerado 17.84%
SESI 1.50% Feriados 3.95%
SENAI 1.00% Auxilio - Enfermidade 0.92%
INCRA 0.20% 13 Salrio 11.02%
SEBRAE 0.60% Licena Paternidade 0.08%
Salrio Educao 2.50% Faltas Justificadas 0.73%
Seguro Contra Acidentes de
3.00% Dias de Chuvas 1.20%
trabalho
FGTS 8.00% Auxilio Acidente de Trabalho 0.12%
Total 36.80% Frias Gozadas 12.46%
Salrio Maternidade 0.03%
Total 48.35%
TABELA C
REINCIDNCIA DE GRUPO A SOBRE GRUPO B 17.79%
Total 18.51%
8.03 31.79
0.14 1.39
0.56 4.02
0.56 3.13
1.20 7.95
21.26 314.47
1.42 13.32
10.84 51.40
20.13 124.39
10.63 59.54
10.63 76.55
3.74 112.20
1.31 9.42
1.31 6.39
0.15 41.86
0.15 11.23
2.12 97.44
843.79 421.90
34.72 250.01
52.09 254.18
2.12 97.44
1656.33 828.17
34.72 225.71
277.79 2000.10
333.35 1626.75
319.41 431.20
3011.58 1385.33
121.38 2655.70
91.26 511.06
91.26 657.07
100.39 722.78
100.39 489.88
77.39 2523.52
562.80 1125.60
42.21 303.91
42.21 205.98
68.04 2218.62
86.59 623.45
86.59 422.56
1.24 445.68
85.93 253.49
30.41 218.92
30.41 148.38
53.79 1936.44
21.18 213.29
34.56 258.50
22.30 124.86
33.44 240.80
68.13 37.47
119.23 627.16
34.07 190.77
51.10 367.91
140.00 683.20
0.00 0.00
0.00 0.00
79.80 1149.12
ORAMENTO DETALHADO DA OBRA
DESCRIO UNID.
SERVIOS PRELIMINARES
PLACAS DE OBRA M
RASPAGEM DO TERRENO M
TAPUME M
LOCAO DA OBRA M
SUPERESTRUTURA
CONCRETO - PILARES M
ARMADURA - PILARES M
FORMA DE TABUAS - PILARES M
CONCRETO - VIGAS M
ARMADURA - VIGAS M
FORMA DE TABUAS - VIGAS M
LAJE PR-FABRICADA M
CONCRETO - PISO M
REGULARIZAO BASE - CONTRAPISO M
PAREDES E VEDAES
ALVENARIA DE TIJOLO CERMICO M
CHAPISCO COM ARGAMASSA M
REBOCO M
COBERTURA
COBERTURA M
REVESTIMENTO
REVESTIMENTO M
CERAMICA PISO M
CERAMICA PAREDE M
REJUTAMENTO M
ACABAMENTO
FORRO PVC M
TEXTURA ACRILICA EXTERNA M
EMASSAMENTO INTERNO M
SERVIOS FINAIS
LIMPEZA GERAL M
CAMINHO BASCULANTE M
AS BUILT M
OUTROS
PORTAS UNID.
JANELAS UNID.
CAIXAS D'AGUA UNID.
CHUVEIRO UNID.
TORNEIRAS UNID.
TANQUE DE LAVAR UNID.
FOSSA UNID.
TOTAL DE CUSTO DIRE
BDI (29
TOTAL GERAL DA OB
A OBRA
QUANTIDADE CUSTO TOTAL (R$)
10,330.77
2.00 239.63
200.00 244.00
132.00 9,627.52
79.80 219.63
10,750.89
1.20 359.05
21.30 124.79
0.72 65.33
23.72 7,097.30
6.98 40.33
7.09 647.62
3.74 297.74
4.22 1,102.66
70.35 1,016.07
14,862.84
173.62 9,061.16
347.24 1,023.52
347.24 4,778.16
7,863.09
91.26 7,863.09
8,756.75
31.98 266.62
70.35 4,159.02
61.85 3,710.31
132.20 620.80
3,997.20
53.79 1,936.44
111.48 837.45
170.33 1,223.31
1,832.32
200.00 683.20
-
79.80 1,149.12
3,416.55
7.00 1,253.00
7.00 833.00
1.00 208.58
2.00 13.00
4.00 102.60
1.00 219.00
79.80 787.37
OTAL DE CUSTO DIRETO 61,810.42
BDI (29%) 17,925.02
TOTAL GERAL DA OBRA 79,735.45
CRONOGRAMA FSICO-FINANCEIRO
TEM DESCRIO 10 32 40 48 61
10,330.77
1.0 SERVIOS PRELIMINARES
100.00%
549.18 8,887.91 1,016.07 297.74
2.0 SUPERESTRUTURA
5.11% 82.67% 9.45% 2.77%
10,084.68 4,778.16
3.0 PAREDES E VEDAES
67.85% 32.15%
7,863.09
4.0 COBERTURA
100.00%
4,159.02 266.62 4,331.11
5.0 REVESTIMENTO
47.50% 3.04% 49.46%
1,936.44 2,060.76
6.0 ACABAMENTO
48.44% 51.56%
3,416.55
7.0 OUTROS
100.00%
1,832.32
8.0 SERVIOS FINAIS
100.00%
CUSTO TOTAL SEM BDI 10,879.95 18,972.59 9,953.25 10,363.89 11,640.74
BDI 3,155.19 5,502.05 2,886.44 3,005.53 3,375.81
TOTAL GERAL COM BDI 14,035.14 24,474.65 12,839.69 13,369.42 15,016.55
R$ TOTAL
10,330.77
10,750.89
14,862.84
7,863.09
8,756.75
3,997.20
3,416.55
1,832.32
61,810.42
17,925.02
79,735.45
2 2.25
(B) Placa de
obra padro
0 2 7.5 8.15 8.15 9.4
7.25 7.5
(A) Limpeza (E) Execuo
terreno (D) Locao pilares
2 7.5
2 7.5
26.06 28.23 28.23 35.18 45.18
(F)
Assentament (H) Execuo
o de de vigas (Z) laje (L) Cobertura
alvenaria
41.76 46.94 46.94 47.1 47.1 50.24
19.4 26.06
26.06 27.64 34.64 36.24 36.24
(M) Cermico
(I) Piso (K) Contrapiso (com (Piso)
impermeabilizante)
44.05 45.63
47.23
45.63 47.23
45.98 45.98 49.59 49.59 50.24 50.24 52.24
(X) (Q)
(O) (U) Ceramica Rejuntamento
mpermeabilizao (Parede) Esquadrias
de paredes (Parede)
45.98 49.59 49.59 50.24 50.24 52.24
45.98
44.54 46.54
50.24 52.24
38
38 39.25 39.25 41.25
(M) Cermico
(Piso) (Y) Rejuntamento (P) Louas e
- (Piso) metais
DIA
ATIVIDADE
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C 3 3 3
D 2
E 1
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
CARPINTEIROS 0 3 3 3 3 0 0 0 0 0 0
ACUMULADO 0 3 6 9 12 12 12 12 12 12 12
DIA
ATIVIDADE
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C
D
E 1
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
AJUDANTE DE CARPINTEIRO0 0 0 0 1 0 0 0 0 0 0
ACUMULADO 0 0 0 0 1 1 1 1 1 1 1
ATIVIDADE DIA
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C
D
E 1
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
ARMADOR/FERREIRO 0 0 0 0 1 0 0 0 0 0 0
ACUMULADO 0 0 0 0 1 1 1 1 1 1 1
ATIVIDADE DIA
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C
D
E 1
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
AJUDANTE ARMADOR 0 0 0 0 1 0 0 0 0 0 0
ACUMULADO 0 0 0 0 1 1 1 1 1 1 1
ATIVIDADE DIA
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C
D
E
F 5
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
PEDREIRO 0 0 0 0 0 0 0 0 0 0 5
ACUMULADO 0 0 0 0 0 0 0 0 0 0 5
ATIVIDADE DIA
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
PINTOR 0 0 0 0 0 0 0 0 0 0 0
ACUMULADO 0 0 0 0 0 0 0 0 0 0 0
ATIVIDADE DIA
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
AJUDANTE PINTOR 0 0 0 0 0 0 0 0 0 0 0
ACUMULADO 0 0 0 0 0 0 0 0 0 0 0
ATIVIDADE DIA
0-2 2-4 4-6 6-8 8-10 10-12 12-14 14-16 16-18 18-20 20-22
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
X
Z
LADRILHISTA 0 0 0 0 0 0 0 0 0 0 0
ACUMULADO 0 0 0 0 0 0 0 0 0 0 0
HISTOGRAMA
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
6 6
3
4 4 4
2
6 6 6 6
3
4 4
3
2 2
2
1
2
3 3
1
1
1
6 6 5 6 6 10 10 7 4 4 6 2 8 5
28 34 39 45 51 61 71 78 82 86 92 94 102 107
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
2 2 2
0 0 0 0 0 2 2 2 0 0 0 0 0 0
12 12 12 12 12 14 16 18 18 18 18 18 18 18
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
2 2 2
0 0 0 0 0 2 2 2 0 0 0 0 0 0
1 1 1 1 1 3 5 7 7 7 7 7 7 7
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
1 1 1
0 0 0 0 0 1 1 1 0 0 0 0 0 0
1 1 1 1 1 2 3 4 4 4 4 4 4 4
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
1 1 1
0 0 0 0 0 1 1 1 0 0 0 0 0 0
1 1 1 1 1 2 3 4 4 4 4 4 4 4
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
5 5
2
5 5 5 5
3
4 4
1
5 5 2 5 5 5 5 3 1 4 4 0 0 1
10 15 17 22 27 32 37 40 41 45 49 49 49 50
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
22-24 24-26 26-28 28-30 30-32 32-34 34-36 36-38 38-40 40-42 42-44 44-46 46-48 48-50
3
3 3
0 0 0 0 0 0 0 3 0 0 0 0 3 3
0 0 0 0 0 0 0 3 3 3 3 3 6 9
MAS
50-52 52-54 54-56 56-58 58-60
HISTOGRAMA P/ SERVENTE
10
TABALHADORES 5
2
2
4 4 1
0
2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4
0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5 0-5 2-5
1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4 5 5
DIAS
0
2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4
0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5 0-5 2-5
1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4 5 5
DIAS
0 0 2 4 4
107 107 109 113 117
0
2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8
0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5
4 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4
0 0 0 0 4
18 18 18 18 22
50-52 52-54 54-56 56-58 58-60 HISTOGRAMA AJUDANTE CARPINTEIRO
2
1.8
1.6
1.4
1.2
0.8
0.6
0.4
0.2
0
4 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0
0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5 0
0 0 0 0 4 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4 5
7 7 7 7 11
50-52 52-54 54-56 56-58 58-60 HISTOGRAMA ARMADOR/FERREIRO
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
4 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0
0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5 0
0 0 0 0 4 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4 5
4 4 4 4 8
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
4 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0
0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5 0
0 0 0 0 4 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4 5
4 4 4 4 8
4.5
HISTOGRAMA PEDREIRO
5
4.5
3.5
2.5
1.5
0.5
4 0
2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0
0 0 0 0 4 0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5 0-5
1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4 5
50 50 50 50 54
2.5
HISTOGRAMA PINTOR
2.5
1.5
0.5
3 3
4 0
0 3 3 0 4
0 3 6 6 10
1.5
2
1.5
0.5
2 2
0
2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0
4 0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5
1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4
0 2 2 0 4
0 2 4 4 8
2.5
1.5
2
1.5
0.5
0
4 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0 2 4 6 8 0
0- 2- 4- 6- 8-1 0-1 2-1 4-1 6-1 8-2 0-2 2-2 4-2 6-2 8-3 0-3 2-3 4-3 6-3 8-4 0-4 2-4 4-4 6-4 8-5
0 0 0 0 4 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 4
9 9 9 9 13
4 6 8 0 2 4 6 8 0
- 4 -4 -5 -5 - 5 - 5 -5 -6
44 46 48 50 52 54 56 58
4 6 8 0 2 4 6 8 0
- 4 -4 -5 -5 - 5 - 5 -5 -6
44 46 48 50 52 54 56 58
2 4 6 8 0 2 4 6
-4 2-4 4-4 6-4 8-5 0-5 2-5 4-5
40 4 4 4 4 5 5 5
4 46 48 50 52 54 56
-4 - - - - - -
42 44 46 48 50 52 54
4 46 48 50 52 54 56
-4 - - - - - -
42 44 46 48 50 52 54
2 4 46 48 50 52 54 56
-4 - - - - - -
42 44 46 48 50 52 54
4 46 48 50 52 54 56
-4 - - - - - -
42 44 46 48 50 52 54
42 44 46 48 50 52 54 56
0- 42- 44- 46- 48- 50- 52- 54-
42 4 6 8 0 2 4
-4 4-4 6-4 8-5 0-5 2-5 4-5
6
42 4 4 4 5 5 5