Sei sulla pagina 1di 2

DOCUMENT/DRAWING TRANSMITTAL LETTER

Portonovi Resort, Pizzarotti Montenegro d.o.o.

***To confirm receipt of this document, please sign/stamp and return copy to Pizzarotti Montenegro d.o.o.***

Project: Portonovi Resort Soft Copy Check Box


To: Bemax Hard Copy Check Box
Attention: Mr Vesko Kovacevic, Mr Arnel Nurkovic, Mr Andrija Zarubica A0 Check Box
Transmital Number: P1-PZ-GCOR-EN_DTR_0042 A0+ Check Box
Date: Wednesday, May 04, 2016 A2 Check Box
Subject: FW- RC FRAME - formwork A3 Check Box
Reason status: Issued for information A4 Check Box

Document Number: Document Title: Revision:


P1-DA-ST-FW01-AL-GR-001-01 G1elev. +1.45 (Building 1)
Plan oplate AB ploce prizemlja koti +1.45 (Lamela 1) / Formwork plan of R/C ground slab at
P1-DA-ST-FW01-AL-GR-006-01 G1elev. +1.45 (Building 6)
Plan oplate AB ploce prizemlja koti +1.45 (Lamela 2) / Formwork plan of R/C ground slab at
P1-DA-ST-FW01-AL-GR-011-01 G1elev. +1.45 (Building 3)
Plan oplate AB ploce prizemlja koti +1.45 (Lamela 3) / Formwork plan of R/C ground slab at
P1-DA-ST-FW01-AL-L1-002-01 G1+6.15- Level 01 (Building 1)
Plan oplate AB ploce na koti +6.15- Level 01 (Lamela 1) / Formwork plan of R/C slab at elev.
P1-DA-ST-FW01-AL-L1-007-01 G1at elev. +6.15- Level 01 (Buildin
Plan oplate AB ploce na koti +6.15- Level 01 (Lamela 2) / Formwork plan of R/C ground slab
P1-DA-ST-FW01-AL-L1-012-01 G1 +6.15 - Level 01 (Building 3)
Plan oplate AB ploce na koti +6.15 - Level 01 (Lamela 3) / Formwork plan of R/C slab at elev.
P1-DA-ST-FW01-AL-L2-003-01 G1 +9.90- Level 02 (Building 1)
Plan oplate AB ploce na koti +9.90 - Level 02 (Lamela 1) / Formwork plan of R/C slab at elev.
P1-DA-ST-FW01-AL-L2-008-01 G1 +9.90 - Level 02 (Building 2)
Plan oplate AB ploce na koti +9.90 - Level 02 (Lamela 2) / Formwork plan of R/C slab at elev.
P1-DA-ST-FW01-AL-L2-013-01 G1 +9.90 - Level 02 (Building 3)
Plan oplate AB ploce na koti +9.90 - Level 02 (Lamela 3) / Formwork plan of R/C slab at elev.
P1-DA-ST-FW01-AL-L3-004-01 Plan oplate AB ploce na koti +13.65, +14.89 - Level 03 (Lamela 1) / Formwork plan of R/C G1
slab at elev. +13.65, +14.89 - Leve
P1-DA-ST-FW01-AL-L3-009-01 G1(Building 2)
Plan oplate AB ploce na koti +13.65 (Lamela 2) / Formwork plan of R/C slab at elev. +13.65
P1-DA-ST-FW01-AL-L3-014-01 G1- Level 03 (Building 3)
Plan oplate AB ploce na koti +13.65 (Lamela 3) / Formwork plan of R/C slab at elev. +13.65
P1-DA-ST-FW01-AL-RF-005-01 Plan oplate AB ploce krova (Lamela 1) / Formwork plan of R/C roof slab (Building 1) G1
P1-DA-ST-FW01-AL-RF-010-01 Plan oplate AB krovne ploce (Lamela 2) / Formwork plan of R/C roof slab at (Building 2) G1
P1-DA-ST-FW01-AL-RF-015-01 Plan oplate AB ploce krova (Lamela 3) / Formwork plan of R/C roof slab (Building 3) G1
P1-DA-ST-FW01-GA-GR-001-01 Formwork plan of RC ground slab at elev. +1.45 P1
P1-DA-ST-FW01-GA-GR-002-02 Formwork plan of RC ground slab at elev. +1.45 P1
P1-DA-ST-FW01-GA-GR-003-03 Formwork plan of RC ground slab at elev. +1.45 P1
P1-DA-ST-FW01-GA-L1-001-04 Formwork plan of RC slab at elev. +6.15 P1
P1-DA-ST-FW01-GA-L1-002-05 Formwork plan of RC slab at elev. +6.15 P1
P1-DA-ST-FW01-GA-L1-003-06 Formwork plan of RC slab at elev. +6.15 P1
P1-DA-ST-FW01-GA-L2-001-07 Formwork plan of RC slab at elev. +9.90 P1

The above listed items have been prepared by: M.Arch. Marija Proroi
checked by: Bojan Mlinar
approved by:

Transmitted by:
(Name/Signature)

Received by:
(Date, Stamp/Signature) Pizzarotti Montenegro d.o.o. Sub Contractor

P1-PZ-GCOR-EN_DTR_0042 This document is property of Pizzarotti Montenegro d.o.o. It can not be reproduced or distributed without preliminary written authorization. 1
DOCUMENT/DRAWING TRANSMITTAL LETTER
Portonovi Resort, Pizzarotti Montenegro d.o.o.

***To confirm receipt of this document, please sign/stamp and return copy to Pizzarotti Montenegro d.o.o.***

Project: Portonovi Resort Soft Copy Check Box


To: Bemax Hard Copy Check Box
Attention: Mr Vesko Kovacevic, Mr Arnel Nurkovic, Mr Andrija Zarubica A0 Check Box
Transmital Number: P1-PZ-GCOR-EN_DTR_0042 A0+ Check Box
Date: Wednesday, May 04, 2016 A2 Check Box
Subject: FW- RC FRAME - formwork A3 Check Box
Reason status: Issued for information A4 Check Box

Document Number: Document Title: Revision:


P1-DA-ST-FW01-GA-L2-002-08 Formwork plan of RC slab at elev. +9.90 P1
P1-DA-ST-FW01-GA-L2-003-09 Formwork plan of RC slab at elev. +9.90 P1
P1-DA-ST-FW01-GA-L3-001-10 Formwork plan of RC slab at elev. +13.65,+14.85 P1
P1-DA-ST-FW01-GA-L3-002-11 Formwork plan of RC slab at elev. +13.65,+14.85 P1
P1-DA-ST-FW01-GA-L3-003-12 Formwork plan of RC slab at elev. +13.65,+14.85 P1
P1-DA-ST-FW01-GA-RF-001-13 Formwork plan of roof slab P1
P1-DA-ST-FW01-GA-RF-002-14 Formwork plan of roof slab P1
P1-DA-ST-FW01-GA-RF-003-15 Formwork plan of roof slab P1

The above listed items have been prepared by: M.Arch. Marija Proroi
checked by: Bojan Mlinar
approved by:

Transmitted by:
(Name/Signature)

Received by:
(Date, Stamp/Signature) Pizzarotti Montenegro d.o.o. Sub Contractor

P1-PZ-GCOR-EN_DTR_0042 This document is property of Pizzarotti Montenegro d.o.o. It can not be reproduced or distributed without preliminary written authorization. 2

Potrebbero piacerti anche