SERIAL H H B wt/m A Tf Tw
NUMBER SECTIONS CM mm mm kN/m mm2 mm mm
1 ISMC 75 7.5 75 40 0.0681 867 7.30 4.40
2 ISMC 100 10 100 50 0.0918 1170 7.50 4.70
3 ISMC 125 12.5 125 65 0.1271 1619 8.10 5.00
4 ISMC 150 15 150 75 0.1639 2088 9.00 5.40
5 ISMC 175 17.5 175 75 0.1914 2438 10.20 5.70
6 ISMC 200 20 200 75 0.2214 2821 11.40 6.10
7 ISMC 225 22.5 225 80 0.2591 3301 12.40 6.40
8 ISMC 250 25 250 80 0.3036 3867 14.10 7.10
9 ISMC 300 30 300 90 0.3583 4564 13.60 7.60
10 ISMC 350 35 350 100 0.4212 5366 13.50 8.10
11 ISMC 400 40 400 100 0.4940 6293 15.30 8.60
SERIAL H B wt/m A Tf Tw
NUMBER SECTIONS mm mm kN/m mm 2
mm mm
1 BOXMC75 75 80 0.136 1734.0 7.50 4.80
2 BOXMC100 100 100 0.184 2340.0 7.70 5.00
3 BOXMC125 125 130 0.254 3238.0 8.20 5.00
4 BOXMC150 150 150 0.328 4176.0 9.00 5.70
5 BOXMC175 175 150 0.383 4876.0 10.20 6.00
6 BOXMC200 200 150 0.443 5642.0 11.40 6.20
7 BOXMC225 225 160 0.518 6602.0 12.40 6.50
8 BOXMC250 250 160 0.607 7734.0 14.10 7.20
9 BOXMC300 300 180 0.717 9128.0 13.60 7.80
10 BOXMC350 350 200 0.842 10732.0 13.50 8.30
11 BOXMC400 400 200 0.988 12586.0 15.30 8.80
9 10 11 12 13 14 15 16 17
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-2
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-2
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-3
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-3
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-4
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-4
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-5
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-5
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
BHEL - 2x350 MW CCPP AT PIPAVAV PE-DC-292-612-C019
Design Calculation for GTG Building - Side Girts A-6
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-6
Design Calculation for GTG Building - Side Girts
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-7
Design Calculation for GTG Building - Side Girts
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-7
Design Calculation for GTG Building - Side Girts
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-8
Design Calculation for GTG Building - Side Girts
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-8
Design Calculation for GTG Building - Side Girts
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-9
Design Calculation for GTG Building - Side Girts
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-9
Design Calculation for GTG Building - Side Girts
A-9 DESIGN OF SIDE GIRT : CR1 - Gable End - 6 & 6.5m Span
Design Data:
Design Wind Pressure, Pd = = 2.576 kN/m2 Refer Doc.PE-DC-292-612-
C013-Annexure A7 - Wind
External pressure coeff = 0.7 Load Calculation
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
A-10
Design Calculation for GTG Building - Side Girts
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
C-1
Design Calculation for GTG and STG Buildings - Bracket Supporting Gutter
Live load:
Water weight in the gutter (Load applied on bracket) = 10.00 kN/m3
= 0.6 x (0.8-2x0.15) x 11 x 10
= 33.00 kN
Udl on Bracket Beam = 33/1.65 kN/m
= 20.00 kN/m
Wind Load:
Design wind pressure, including pressure coeff., (refer to cladding runner design)
(3.16 x 0.9) = 2.84 kN/m2
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls
PE-DC-292-612-C019
BHEL - 2x350 MW CCPP AT PIPAVAV
C-2
Design Calculation for GTG and STG Buildings - Bracket Supporting Gutter
file:///conversion/tmp/scratch/374179910.xls
RMB 12/11/2017
374179910.xls