PLANILLA DE METRADOS
ITEM: 1.01
PARTIDA: MOVIMIENTO DE TIERRAS
VOLUMEN EXCAVADO ZAPATAS
METRADO
DECRIPCION UNIDAD
N VECES ALTURA ANCHO LONGITUD PARCIAL
ZAPATAS
Tipo Z - 1 m3 2.00 2.25 1.50 1.40 9.450
Tipo Z - 2 m3 2.00 2.25 1.40 1.40 8.820
Tipo Z - 3 m3 2.00 2.25 1.60 1.60 11.520
Tipo Z - 4 m3 2.00 2.25 1.40 2.30 14.490
Tipo Z - 5 m3 2.00 2.25 1.50 2.60 17.550
Tipo Z - 6 m3 1.00 2.25 1.60 2.80 10.080
Tipo Z - 7 m3 1.00 2.25 1.60 2.90 10.440
TOTAL
ITEM: 1.02
PARTIDA: CONCRETO ARMADO
ENCOFRADO ZAPATA
METRADO
DECRIPCION UNIDAD
N VECES A B C D
Z-1 m2 2 1.5 1.4 0 0
Z-2 m2 2 1.4 1.4 0 0
Z-3 m2 2 1.6 16 1.6 0
Z-4 m2 2 1.4 2.3 1.4 0
Z-5 m2 2 1.5 2.6 1.5 0
Z-6 m2 1 1.6 2.8 1.6 2.8
Z-7 m2 1 1.6 2.9 1.6 2.9
CONCRETO ZAPATAS
DECRIPCION UNIDAD METRADO
N VECES LONGITUD ANCHO ALTURA PARCIAL
CA - ZAPATAS
Z-1 m3 2.00 1.50 1.40 0.40 1.680
Z-2 m3 2.00 1.40 1.40 0.40 1.568
Z-3 m3 2.00 1.60 1.60 0.40 2.048
Z-4 m3 2.00 1.40 2.30 0.40 2.576
Z-5 m3 2.00 1.50 2.60 0.40 3.120
Z-6 m3 1.00 1.60 2.80 0.40 1.792
Z-7 m3 1.00 1.60 2.90 0.40 1.856
TOTAL
PLANILLA DE METRADOS
ITEM: 1.03 VIGAS DE CONEXIN
PARTIDA: CONCRETO VIGAS DE CONEXIN
METRADO DE CONCRETO EN VIGAS DE CONEXIN
DECRIPCION UNIDAD
N VECES LONGITUD ANCHO ALTURA PARCIAL
CA - VIGAS DE CONEX.
EJE 1 - 1 m3 1.00 6.50 0.25 0.40 0.650
EJE 2 - 2 m3 1.00 6.50 0.25 0.40 0.650
EJE 3 - 3 m3 1.00 6.50 0.25 0.40 0.650
EJE 4 - 4 m3 1.00 6.50 0.25 0.40 0.650
EJE A - A m3 1.00 10.00 0.25 0.40 1.000
EJE B - B m3 1.00 10.00 0.25 0.40 1.000
EJE C - C m3 1.00 10.00 0.25 0.40 1.000
TOTAL
DESCRIPCION METRADO
UND
ENCOFRADO- VIGAS N VECES LONGITUD ALTURA PARCIAL TOTAL (m2)
EJE 1 - 1 m2 1 3.60 0.40 1.440
EJE 2 - 2 m2 2 3.75 0.40 3.000
EJE 3 - 3 m2 2 3.75 0.40 3.000
EJE 4 - 4 m2 1 5.75 0.40 2.300
EJE A - A m2 1 10.00 0.40 4.000
EJE B - B m2 2 10.00 0.40 8.000
EJE C - C m2 1 10.00 0.40 4.000
TOTAL 25.740
DECRIPCION METRADO
ACERO LONG. V. C. 5/8" UNIDAD N VECES N ELEM. DISEO LONGITUD Kg/ml
EJE 1 - 1 kg 4.00 1.00 6.58 1.56
EJE 2 - 2 kg 4.00 1.00 6.58 1.56
EJE 3 - 3 kg 4.00 1.00 6.58 1.56
EJE 4 - 4 kg 4.00 1.00 6.58 1.56
EJE A - A kg 4.00 1.00 11.48 1.56
EJE B - B kg 4.00 1.00 11.48 1.56
EJE C - C kg 4.00 1.00 11.48 1.56
TOTAL
DECRIPCION METRADO
ACERO LONG. V. C. 1/2" UNIDAD N VECES N ELEM. DISEO LONGITUD Kg/ml
EJE 1 - 1 m3 0.00 1.00 6.58 0.99
EJE 2 - 2 m3 0.00 1.00 6.58 0.99
EJE 3 - 3 m3 0.00 1.00 6.58 0.99
EJE 4 - 4 m3 0.00 1.00 6.58 0.99
EJE A - A m3 1.00 1.00 11.48 0.99
EJE B - B m3 1.00 1.00 11.48 0.99
EJE C - C m3 1.00 1.00 11.48 0.99
TOTAL
DECRIPCION METRADO
ESTRIBOS V. C. 3/8" UNIDAD N VECES N ELEM. DISEO LONGITUD Kg/ml
EJE 1 - 1 m3 39.00 1.00 1.18 0.56
EJE 2 - 2 m3 39.00 1.00 1.18 0.56
EJE 3 - 3 m3 39.00 1.00 1.18 0.56
EJE 4 - 4 m3 39.00 1.00 1.18 0.56
EJE A - A m3 60.00 1.00 1.18 0.56
EJE B - B m3 60.00 1.00 1.18 0.56
EJE C - C m3 60.00 1.00 1.18 0.56
TOTAL
PLANILLA DE METRADOS
ITEM: 1.04
PARTIDA: COLUMNAS
CONCRETO EN COLUMNAS M3 1ER PISO
METRADO
DECRIPCION UNIDAD
N VECES ALTURA 1 ALTURA 2 ALTURA TOTAL ANCHO
METRADO
DECRIPCION UNIDAD
N VECES ALTURA 1 ALTURA 2 ALTURA TOTAL ANCHO
METRADO
DECRIPCION UNIDAD
N VECES ALTURA 1 ALTURA 2 ALTURA TOTAL ANCHO
METRADO
DECRIPCION UNIDAD
N VECES ALTURA 1 ALTURA 2 H AZOTEA 1 H AZOTEA 2
5.44
DECRIPCION METRADO
ACERO LONG. V. C. 3/4" UNIDAD N VECES N ELEM. DISEO LONGITUD Kg/ml
C-1 kg 4.00 4.00 5.42 2.24
C-2 kg 6.00 5.00 5.42 2.24
C-3 kg 4.00 2.00 5.42 2.24
C-4 kg 4.00 1.00 5.52 2.24
1.44
DECRIPCION METRADO
ACERO LONG. V. C. 3/4" UNIDAD N VECES N ELEM. DISEO LONGITUD Kg/ml
C-1 kg 4.00 4.00 2.70 2.24
C-2 kg 6.00 5.00 2.70 2.24
C-3 kg 4.00 2.00 2.70 2.24
C-4 kg 2.00 1.00 2.70 2.24
DECRIPCION METRADO
ACERO LONG. V. C. 3/4" UNIDAD N VECES N ELEM. DISEO LONGITUD Kg/ml
C-1 kg 4.00 4.00 4.10 2.24
C-2 kg 4.00 5.00 4.10 2.24
C-3 kg 4.00 2.00 4.10 2.24
C-4 kg 0.00 1.00 4.10 2.24
ME
DECRIPCION UNIDAD
N VECES 1/2 V N vigueta ANCHO V long
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
CONCRETO EN VIGAS
DECRIPCION UNIDAD METRADO
N VECES LONGITUD ANCHO ALTURA PARCIAL
CONCRETO EN VIGAS
EJE 1-2-3-4 m3 4.00 6.50 0.25 0.40 2.600
EJE A-A m3 1.00 8.82 1.40 0.40 4.939
EJE B-B m3 1.00 8.92 1.60 0.40 5.709
EJE C-C m3 1.00 8.82 2.30 0.40 8.114
TOTAL
ENCOFRADO EN VIGAS
DECRIPCION UNIDAD METRADO
N VECES LONGITUD PERALTE LONGITUD PERALTE
TAPA
EJE 1-2-3-4 m2 2.00 6.50 0.40 11.00 0.4
TOTAL
ENCOFRADO EN VIGAS
DECRIPCION UNIDAD METRADO
N VECES LONGITUD PERALTE LONGITUD PERALTE
FONDO
EJE 1-2 m2 3 3 0.25 3.14 0.25
EJE 2-3 m2 3 3 0.25 3 0.25
EJE 3-4 m2 3 3.00 0.25 3.25 0.25
EJE A-B-C m2 1 2.95 0.25 2.66 0.25
EJE A-B-C m2 3 3.02 0.25 2.73 0.25
EJE 1'-1 m2 1 0.60 0.20 0 0
EJE A'-B'-C' m2 2 2.15 0.20 0 0
TOTAL
ENCOFRADO EN VIGAS
DECRIPCION UNIDAD METRADO
N VECES PERALTE LOSA LONGITUD PERALTE
TAPA INTERIOR
EJE A-B-C m2 6.00 0.40 0.20 3.02 0.4
EJE 1-2-3 m2 4.00 0.40 0.20 3 0.4
EJE 3-4 m2 2.00 0.40 0.20 3 0.4
EJE A'-B'-C' m2 2.00 0.40 0.20 2.95 0.4
EJE 1'-1 m2 1.00 0.40 0.20 0.6 0.4
TOTAL
TOTAL
82.350
7.664
90.014
ADO
METRADO
PERIMETRO ALTURA SUBTOTAL TOTAL
2.9 0.4 2.32
2.8 0.4 2.24
19.2 0.4 15.36
5.1 0.4 4.08
5.6 0.4 4.48
8.8 0.4 3.52
9 0.4 3.6
35.6
TOTAL (m3)
14.640
KG TOTAL
2.03 28.392
2.18 26.208
2.03 24.336
2.03 24.336
2.34 32.76
2.34 32.76
3.43 41.184
2.03 40.56
3.90 54.6
2.18 48.048
4.21 29.484
2.34 28.08
4.37 30.576
2.34 28.08
469.40
CONEXIN
TOTAL (m3)
5.600
ADO
kg Sub Total TOTAL
10.2648 41.059
10.2648 41.059
10.2648 41.059
10.2648 41.059
17.9088 71.635
17.9088 71.635
17.9088 71.635
379.142
ADO
kg Sub Total TOTAL
0.000
0.000
0.000
0.000
11.365
11.365
11.365
34.096
R PISO
R PISO
AZOTEA
ADO
kg Sub Total TOTAL
8.4552 67.642
8.4552 0.000
8.4552 67.642
8.4552 33.821
169.104
ADO
kg Sub Total TOTAL
12.1408 194.253
12.1408 364.224
12.1408 97.126
12.3648 49.459
705.062
ADO
kg Sub Total TOTAL
4.212 33.696
4.212 0.000
4.212 33.696
4.212 25.272
92.664
ADO
kg Sub Total TOTAL
6.048 96.768
6.048 181.440
6.048 48.384
6.048 12.096
338.688
ADO
kg Sub Total TOTAL
4.212 33.696
4.212 42.120
4.212 0.000
4.212 33.696
109.512
ADO
kg Sub Total TOTAL
6.048 96.768
6.048 120.960
6.048 72.576
6.048 0.000
290.304
ADO
kg Sub Total TOTAL
6.396 0.000
6.396 63.960
6.396 12.792
6.396 38.376
6.396 38.376 153.504
ADO
kg Sub Total TOTAL
9.184 146.944
9.184 183.680
9.184 73.472
9.184 0.000
404.096
METRADO
ALTURA ALTURA 1 LI LOSA L2 LOSA VOLUMEN LONG * ALTURA PARCIAL TOTAL
TOTAL 4.524
51.097
48.392
48.392
ETRADO TECHO
ALTURA AREA 2 PARCIAL TOTAL (m2)
0.6 1.86 10.728
0.6 1.89 9.888
1.45 1.972 7.569
1.32 3.554 6.725
0.5 0.675 8.183
0.92 1.978 5.300
48.392
TOTAL
20.748
TOTAL
17.513
TOTAL
20.732
TOTAL
15.414
TOTAL
20.701
TOTAL
17.474
TOTAL
30.611
TOTAL (m3)
21.362
METRADO
LONGITUD PERALTE PARCIAL TOTAL (m2)
3 0.25 6.855
3 0.25 6.750
3.00 0.25 6.938
0 0 1.403
0 0 4.313
0 0 0.120
0 0 0.860
26.258
METRADO
LOSA LONGITUD PARCIAL TOTAL (m2)
CONCRETO
C= 64.34471
ENOCFRADO
E= 530.122
ACERO
A= 4167.58
acero 5/8" 1322.10
acero 3/8" 992.22
acero 3/4" 1738.15
acero 1/2" 115.1073
CANTIDAD DE LADRILLO
_=1/((+))
=1+
DONDE:
_=
=
=
=h
=
=h
=
=
A= 0.3
V= 0.25
L= 0.3
CL= 6.06 LAD/m2
APORTE UNITARIO
APORTE DE MANO DE OBRA
.=(#
=#
8h
8)/
=1/(+)(+)
=1++
DONDE:
=
=
2
=
=
=
=
=
=
=
=
2
=
=
=
=
=
=
_=_
=
DONDE:
_=
=3
3/
2 2
=
_=
=
=
=
=
ladrillo kimkom de 9x12x24, junta del mortero de 0.12 cm, muro de soga
L= 0.24 Lmuro= 1
J= 0.012 Amuro= 1
H= 0.09 Hmuro= 0.12
C= 38.91 Lladrillo= 0.09
Aladrillo= 0.12
Hladrillo= 0.24
VMEZCLA= 0.02
ANALISIS DE PRECIOS UNITARIO
Movimiento de Tierras
PARTIDA: excavacion de zanjas jornada 8
CUADRILLA:
RENDIMIENTO: 3.5 m3/dia UND: m3 COSTO:
S/. 26.96
TOTAL
26.17
0.79
horas
###
TOTAL
36.84
272.53
11.12
horas
S/. 4.80
TOTAL
0.77
3.89
0.14
horas
S/. 77.01
TOTAL
14.33
60.11
2.57
UND METRADPRECIO PARCIAL TOTAL
Excavacion de Zanjas m3 90.0135 26.96 S/. 2,426.76
Concreto f'c=210 kg/cm2 m3 64.34471 320.49 S/. 20,621.84
Acero fy=4200 grado 60 kg 4167.58 4.8 S/. 20,004.37
Encofrado y Desencofrado m2 530.122 77.01 S/. 40,824.70
S/. 83,877.67