Proposed Design
Overall Depth of
Name of Span Total Bridge allignement Type of Type of Type of Camber + Dia. Of Well Discharge Discharge for Afflux above
S.No Bridge Cd No. Km Bridge Skew Angle Superstructure Foundation Wings H.F.L
Crossing Arrangement Length w.r.t existing Superstructure Substructure Foundation Wearing Coat foundation (Cumecs) scour HFL
Depth below GL
bridge (Cumecs)
PCCWall type
1 69/2 68.6 Existing 4 x 13.21 52.84 Right d/s RCC T Girder Piers
RCC Wall Type
0.421
Proposed 2x 26.4 m 52.8 Right d/s P.S.C Voided Slab Piers Well Foundation 1.25 6 11,13 Straight 158 158 3.168 0.1
PCCWall type
2 77/1 76.2 Existing 7 x 16.16 113.12 Right d/s RCC T Girder Piers
RCC Wall Type
0.421
Proposed 3 x 32.4 +1 x 16.2 113.4 Right d/s P.S.C Voided Slab Piers Well Foundation 1.25 6 8 Straight 887 887 5.244 0.1
PCCWell type
3 105/1 104.2 Existing 5 x 6.74 33.7 Right d/s RCC Slab Piers
1 x 20.55 + 1x Precast PSC RCC Wall Type
Proposed 13.7 34.25 Right d/s Beam Piers Open Foundation 1.2 0.421 Open 5 Straight 39 50.7 26.101 0.1
PCCWall type
5 117/1 116.4 Existing 6 x 5.67 34.02 Right RCC Slab Piers
Precast PSC RCC Wall Type
Proposed 2 x 17.4 34.8 Right Beam Piers Open Foundation 1.2 0.421 Open 5 Straight 9.38 12.2 24.755 0.1
PCCWall type
6 131/2 130.6 Existing 3 x 5.78 17.34 Right RCC Slab Piers Open Foundation 0.7
Precast PSC RCC Wall Type
Proposed 1 x 17.2 17.2 Right Beam Piers Open Foundation 1.2 0.421 Open 5 Straight 9.4 12.22 7.125 0.1
PCCWall type
7 131/3 130.85 Existing 3 x 5.69 17.07 Right RCC Slab Piers Open Foundation 0.65 Open
Precast PSC RCC Wall Type
Proposed 1 x 17.25 17.25 Right Beam Piers Open Foundation 1.2 0.421 Open 5 Straight 9.5 12.35 7.155 0.1
8 Existing
Proposed
9 Existing
Proposed
10 Existing
Proposed
11 Existing
Proposed
12 Existing
Proposed
13 Existing
Proposed
14 Existing
Proposed
15 Existing
Proposed
1 2 3 4 5 6 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Difference in
Eff. Linear Formation Proposed Max Scour Safe founding
Name of Span Vertical Regime width Levels Lowest Bed Max. Scour Safe founding PCC In Well
S.No Bridge Cd No. Km Bridge watreway,Leff Db Silt factor dsm Levels/existing Formation Level level,Abutmen
Crossing Arrangement Clearance W = 4.8 x Q0.5 (existing/propo Level Level, Pier level,Pier foundation
(m) /required Level Abutment t
sed)
Proposed 2x 26.4 m 0.7 60.34 49.6 3.2 1.25 2.693 5.446 -1.2 -2.218 -0.252 M25
Proposed 3 x 32.4 +1 x 16.2 0.7 142.96 108 8.22 1.25 5.058 7.538 2.18 -4.872 -1.180 M25
Proposed 2 x 21.92
Proposed 2 x 17.4 14.70 31 0.394 1.25 0.669 28.65 23.08 23.417 23.905
Proposed 1 x 17.2 14.72 16.4 0.744 1.25 1.022 10.937 6.37 5.081 5.827
Proposed 1 x 17.25 14.79 16.45 0.751 1.25 1.028 10.866 6.48 5.099 5.849
8 Existing
Proposed
9 Existing
Proposed
10 Existing
Proposed
11 Existing
Proposed
12 Existing
Proposed
13 Existing
Proposed
14 Existing
Proposed
15 Existing
Proposed
1 2 3 4 5 6 37 38 39 40
R.C.C. in
Name of Span RCC in PSC in RCC in Road,
S.No Bridge Cd No. Km Bridge Substructure &
Crossing Arrangement Superstructure Superstructure Kerb & Railing
fndn.
Proposed 2 x 21.92
8 Existing
Proposed
9 Existing
Proposed
10 Existing
Proposed
11 Existing
Proposed
12 Existing
Proposed
13 Existing
Proposed
14 Existing
Proposed
15 Existing
Proposed