LEE
Owner
OWNERS ENGINEER
MAIN CONTRACTOR
SUB CONTRACTOR
Therefore, it is recommendable that the presence of DOOSANs field engineers be requested for
the supervision of the installation of GAH, because it is in interest of every party concerned.
But, regarding minor parts of GAH, they has to be installed according as site conditions and judgment
of field engineer refer to erection drawings.
Table of Contents
Page
1. General arrangement drawing for air preheater 1
2. General arrangement drawing notes for air preheater(1/3) 2
3. General arrangement drawing notes for air preheater(2/3) 3
4. General arrangement drawing notes for air preheater(3/3) 4
5. Piping & instrumentation diagram for air preheater(1/2) 5
6. Piping & instrumentation diagram for air preheater(2/2) 6
7. Erection procedure for air preheater(1/2) 7
8. Erection procedure for air preheater(2/2) 8
9. Centering of foundation and rubbing of support frame 9
10. Setting of support bearing (assembly on the ground) 11
11. Installation of lower side (cold side) center section 13
12. Installation of main pedestals 14
13. Installation of rotor post 15
14. Installation of upper side (hot side) center section 17
15. Installation of guide bearing 18
16. Installation of side pedestals 20
17. Assembly of rotor 21
18. Installation of pocket rings 26
19. Installation of rotor housing panels 28
20. Installation of Axial seal access door 30
21. Installation of lower (cold) side connecting duct 31
22. Installation of upper (hot) side connecting duct 33
23. Installation of pin rack segments 35
24. Temporary installation of rotor driving unit 37
25. Installation of elements 38
26. Installation of rotor angles and T-bars and adjustment of bypass seal angle 39
27. Adjust and Install rotor tire 40
28. Installation of sensor drive system 47
29. Adjustment of sector plates, axial plates and static spools 48
30. Installation and adjustment of static seals and relative seals 50
31. Installation of oil circulating system 51
32. Installation of soot blower 52
33. Final installation of rotor driving system 53
34. Installation of high pressure pump 54
34. Installation of air seal, service air and accessories 55
35. Electrical conduit, wiring and connection 56
36. Rotor bearing lubricating oil system flushing procedure 57
37. Final check list 61
39. Setting for sensor drive system 62
40. Cold running test 63
41. Instructions for long-term on-site storage of has air heater 65