Sei sulla pagina 1di 6

INSPECTION REPORT

IR # TUV/KUB/01501/2013/023.

TV Inspector: Razu.Selvakumar
TV Coordinator: N.A
Approval #

Type of Visit: Initial Insp. In-Process Insp. Final Insp. Order Status

Client/Project Information

Client: RAS LAFFAN OLEFINS COMPANY Charge No.: TBA


Contact: Ketan Kulkarni - +974 - 44572337 Project: Technip/32W-Coils for RLOC Plant

Equipment/Material Description

Purchase Order No.: 4500057417/418 Tag / (Unit Model): Coil No. 69, 70, 71 & 72 Radiant Coil (Hydro
15Th December 2013 Test).
Description: Witness Inspection for Weld joint Fit-up, Mechanical Test and Hydro test.

Primary Supplier: KUBOTA SAUDI ARABIA Location: N.A


Location: 2nd Industrial city - Dammam Location: N.A
Contact: Mr. MASAYUKI TOMITA Contact: N.A
Shop Order No.: 13C0011 Shop Order No.: N.A

Progress

Engineering: N.A. Engineering: N.A.


Material: N.A Material: N.A.
Fabrication: N.A Fabrication: (N.A)
PO Delivery Date PO Delivery Date
Scheduled Completion Date: Scheduled Completion Date:

SUMMARY
Date of Last Visit: 14th December 2013
Date(s) of this Visit 15th December 2013 1 MAN-DAY
Next Scheduled Visit: 16th December 2013.

Non-Conformity Report Issued During This Visit: No Yes NCR No.:

Outstanding Non-Conformity Report: No Yes NCR No.:

Inspection Release Issued during this Visit No Yes Release No.:


Action Points: (NCRS, clarifications, pending approvals, etc.)

Any holder of this inspection report is advised that information contained hereon reflects the companys findings at the date and time of the inspection only and within the limits of
clients instructions and specifications, if any. The companys sole responsibility is to its client and this document does not exonerate parties to a transaction from exercising all their
rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders
Hydro Static Test, Liquid Penetrate Test, Macro Test, Visual Dimensional Test and welding Fit-up Inspection.
may be prosecuted to the fullest extent of the law

NATIONAL INSPECTION AND TECHNICAL TESTING CO. LTD. (FAHSS / TV NORD SAUDI ARABIA) P.O BOX 10771 JUBAIL 31961
JUBAIL: (03) 340 7607 / 7608 / 7609 FAX: (03) 340 7605 - JEDDAH: (02) 652 0212 / 614 3438 FAX: (02) 652 0822
YANBU: TEL / FAX (04) 325 1475 EMAIL: info@fahsstuv.com
Page 1 of 5
INSPECTION ACTIVITIES

1. Inspection Activities Identification: (Place an x mark in each of the boxes below that corresponds with an Inspection
activity verified or performed. Each activity marked must be fully explained below at section 3. Inspection Details.
Mechanical testing ( charpy impact, tensile, guided
Material identification and traceability
bends)
Review of Welding Procedure Specification and Procedure Pressure/Leak test (hydro-static, air, helium, etc.)

Qualification Record Balancing of rotating parts

Review of Welder/Welding Operator Qualification Records Shaft / Rotor run out

Visual inspection of weld joint fit-up/back gauge preparations Clearance Checks

Control of welding consumables (filler metals, rods, wire, etc.) Vibration Noise

In-process welding inspection (adherence to WPS essential Mechanical running tests


variables) Over-speed trip test
Check of trip systems (low / high oil pressure,
Visual inspection of completed welds for detection of defects
vibration, etc)
Discontinuities Load / No load test

Full dimensional inspection for compliance with design drawing Operational Test

Review of radiographs NPSH test

Magnetic particle/Liquid penetrant tests Cleaning/Sandblasting/Painting


Marking and Identification (name plate data,
Ultrasonic testing
tags, etc.)
Vendor data review (CMTR, test records,
NDE test reports
data sheets,
Internal inspection QC records

Verification of specified post weld heat-treatment

Hardness test: HV HB HRC


2. Reference Drawings/Specifications: ( include revision no.s)
DRAWING NO.03102CB0004 REV. 2 APPROVED ON JULY, 02nd 2013.
MANUFACTURING & INSPECTION PROCEDURE DOC. No. EG13C006-1 REV.1 APPROVED ON JULY, 02nd 2013.
INSPECTION & TEST PLAN DOC. No. EG13C006-2 REV.1 APPROVED ON JULY, 02nd 2013.
WPS & PQR DOC. No. EG13C006-3 REV.1 APPROVED ON JULY, 02nd 2013.
3. Inspection Activities: (Provide complete details of activities performed and tests witnessed, as per section (1) above
including any activities/inspections that are not listed. Use continuation pages as necessary).

Any holder of this inspection report is advised that information contained hereon reflects the companys findings at the date and time of the inspection only and within the limits of
clients instructions and specifications, if any. The companys sole responsibility is to its client and this document does not exonerate parties to a transaction from exercising all their
rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders
may be prosecuted to the fullest extent of the law

NATIONAL INSPECTION AND TECHNICAL TESTING CO. LTD. (FAHSS / TV NORD SAUDI ARABIA) P.O BOX 10771 JUBAIL 31961
JUBAIL: (03) 340 7607 / 7608 / 7609 FAX: (03) 340 7605 - JEDDAH: (02) 652 0212 / 614 3438 FAX: (02) 652 0822
YANBU: TEL / FAX (04) 325 1475 EMAIL: info@fahsstuv.com

Page 2 of 5
Review of QC records

Review of WPS and PQR.


Review of Radiography Procedure.
Review of Hydro static Procedure.
Reviewed LPT Procedure.

Witness of Hydro Static test Inspection for the equipment Coil No. 69, 70, 71 &72:

Hydrostatic test Inspection witnessed of Radiant coil work no 13C0011, Coil no 69, 70, 71, 72 as per approved drawing found satisfactory
and accepted.
Hydro test carried out as per approved procedure EG13C006-1 and approved Drawing No 03102CB0001 the equipment test in Horizontal
condition.
Water quality Lab test reports verified the actual values are meet the requirements.
Temperature of the water during hydro test measured @ 20 C and found within acceptable limits as per approval procedure.
Pressure Gauge reading measured at Top of the offered Radiant coil and actual obtained pressure readings are 90 bars as per requirement
of the requirement drawing 87.3 bar. Pressure gauge had valid calibration sticker and same has been verified with the original calibration
certificate.

Review of Radiography Film

Review of RT film of Tube to Tube & coils 100% as per the approved drawings, approved procedure, acceptable criteria ASTM
E446, EG13COO6-1 C3.6 Radiography films are found satisfactory and accepted.
All inspection reports were reviewed endorsed.

Witness and Review of NDT reports

Reviewed Liquid penetrant test inspection record As per ASME SEC VIII Div-1, Appendix 8 and reviewed report found acceptable.
.
Visual Inspection of dimensional Tube assembly report was reviewed as per MSS-SP-55 and Approved Drawing of each fitting found
acceptable..
All inspection reports were reviewed endorsed.

Page 3 of 5
4. Attachments: (Each attachment must reference the corresponding Attachment no., TV Assignment no., and clients PO no.)

Hydro test 100% Witness Inspection for 4


nos of Radiant coil No 69, 70, 71 & 72. .

Inspectors Signature:

Date:15th December 2013

Any holder of this inspection report is advised that information contained hereon reflects the companys findings at the date and time of the inspection only and within the limits of
clients instructions and specifications, if any. The companys sole responsibility is to its client and this document does not exonerate parties to a transaction from exercising all their
rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may
be prosecuted to the fullest extent of the law

NATIONAL INSPECTION AND TECHNICAL TESTING CO. LTD. (FAHSS / TV NORD SAUDI ARABIA) P.O BOX 10771 JUBAIL 31961
JUBAIL: (03) 340 7607 / 7608 / 7609 FAX: (03) 340 7605 - JEDDAH: (02) 652 0212 / 614 3438 FAX: (02) 652 0822
YANBU: TEL / FAX (04) 325 1475 EMAIL: info@fahsstuv.com

Page 4 of 5
5. PHOTOS

Hydro Test Radiant coil no-71. Hydro Test Radiant coil no-69.

Hydro Test Radiant coil no-72. Full View of Hydro Test Radiant coil no-70.

Any holder of this inspection report is advised that information contained hereon reflects the companys findings at the date and time of the inspection only and within the limits of
clients instructions and specifications, if any. The companys sole responsibility is to its client and this document does not exonerate parties to a transaction from exercising all their
rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders
may be prosecuted to the fullest extent of the law

NATIONAL INSPECTION AND TECHNICAL TESTING CO. LTD. (FAHSS / TV NORD SAUDI ARABIA) P.O BOX 10771 JUBAIL 31961
JUBAIL: (03) 340 7607 / 7608 / 7609 FAX: (03) 340 7605 - JEDDAH: (02) 652 0212 / 614 3438 FAX: (02) 652 0822
YANBU: TEL / FAX (04) 325 1475 EMAIL: info@fahsstuv.com

Page 5 of 5
Any holder of this inspection report is advised that information contained hereon reflects the companys findings at the date and time of the inspection only and within the limits of
clients instructions and specifications, if any. The companys sole responsibility is to its client and this document does not exonerate parties to a transaction from exercising all their
rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders
may be prosecuted to the fullest extent of the law

NATIONAL INSPECTION AND TECHNICAL TESTING CO. LTD. (FAHSS / TV NORD SAUDI ARABIA) P.O BOX 10771 JUBAIL 31961
JUBAIL: (03) 340 7607 / 7608 / 7609 FAX: (03) 340 7605 - JEDDAH: (02) 652 0212 / 614 3438 FAX: (02) 652 0822
YANBU: TEL / FAX (04) 325 1475 EMAIL: info@fahsstuv.com

Page 6 of 5