Sei sulla pagina 1di 5

THIS SUBMISSION IS DECLARED TO BE SIGNATURE:

STRICTLY IN ACCORDANCE WITH THE PHASE - 12


REQUIREMENTS OF THE CONTRACT

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE - 12 SUBSTATIONS


PACKAGE S1, S2, S6 &S7
CONTRACT No. GTC/643A/2014

CONSULTANT:

ENERGOPROJEKT-ENTEL - QATAR Branch office


Tel : (974) 447 8571, 447 7321
Fax : (974) 447 8572

SUBSTATION NAME PROJECT DRAWING NUMBER


Common for all Substations PH12-3A-10-22-P007

A - 05.07.2017 Issued for Construction KD AW YAP

0 B 27.07.2016 Issued for Comments ARK AW YAP


REV. STAT. DATE MODIFICATION DRAWN CHECKED APPROVED

SUBCONTRACTOR NAME CONTRACTOR NAME

SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL

MANUFACTURERS DRAWING NO.


DRAWING/DOCUMENT TITLE

SAT Forms for 132/11kV 40MVA Power


Transformer OLTC ACDC Checks
DATE NAME SIGNATURE
DRAWN 05.07.2017 KD
CHECKED 05.07.2017 AW SIZE REV
APPROVED 05.07.2017 YAP A4 Sheet 1 of 5 A
SITE ACCEPTANCE TEST PROCEDURE FOR 132/11kV, 40MVA TRANSFORMER OLTC ACDC CHECKS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 &S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

List of Content

S.No Description Page No

1. Purpose of Test. 2

2. Reference Drawing and Documents. 2

3. Initial Checks. 2

4 List of Schematic Drawings... 2

5 5.1. AC Circuit Check.. 3

5.1.1. Heater & Illumination circuit... 3

5.1.3. Power Socket Circuits 3

5.2. DC Circuit Checks 4

6 Instruments Used. 4

7 Remarks 5

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature

Name Name
Date Date
Doc.No. PH12-3A-10-22-P007 Rev. A Annexure 1 Page No. 1 of 4
SITE ACCEPTANCE TEST PROCEDURE FOR 132/11kV, 40MVA TRANSFORMER OLTC ACDC CHECKS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 &S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

1. PURPOSE OF TEST:

These tests are intended to check the equipment for AC/DC Circuits Voltage through, Equipment
Healthy & Earth fault Check.

2. REFERENCE DRAWING AND DOCUMENTS :

40MVA Tx OLTC Electrical drawing.

3.INITIAL CHECKS: Checked ( )

40MVA Tx Internal and External Wiring Tightness Checked :

40MVA Tx Internal and External Wiring Ferrules Checked :

4.LIST OF SCHEMATIC DRAWINGS:


Drawing No. Category

40MVA Tx OLTC Drawings PH12-3A-10-22-2023 -RA I

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature

Name Name
Date Date
Doc.No. PH12-3A-10-22-P007 Rev. A Annexure 1 Page No. 2 of 4
SITE ACCEPTANCE TEST PROCEDURE FOR 132/11kV, 40MVA TRANSFORMER OLTC ACDC CHECKS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 &S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

5.1. AC CIRCUITS CHECKS:

5.1.1. HEATER & ILLUMINATION CIRCUITS:

NOTE: Q1 : OLTC MOTOR PROTECTION / 3.2A / 3POLE / 415V.

S.No Item Type Confirm operation

1. Door operated switch-S10 at OLTC

2. Lamp-E1 (220-240V) AC 4W

Measured Voltages in Volts (measured on load side)


Main source Status
X2:3-8
F14-ON in TCC
F14-OFF in TCC

5.1.2. HEATER CIRCUITS:

S.No Item Type Confirm operation

1. Heater -R1 (1 2) (220-240V) AC 50W

Measured Voltages in Volts (measured on load side)


Main source Status
X1:3-8 X1:1-4
F14-ON in TCC
F14-OFF in TCC

MOTOR VOLTAGE CIRCUIT:

S.No Item type Confirm operation


1. AC MCB protective switch -Q1 (2.2-3.2A) 3RV1011

Measured Voltages in Volts (measured on load side)


Main source Status
X1:1-5 X1:5-6 X1:6-1
F13-ON in TCC
F13-OFF in TCC

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature

Name Name
Date Date
Doc.No. PH12-3A-10-22-P007 Rev. A Annexure 1 Page No. 3 of 4
SITE ACCEPTANCE TEST PROCEDURE FOR 132/11kV, 40MVA TRANSFORMER OLTC ACDC CHECKS
CLIENT: CONSULTANT: MAIN CONTRACTOR:

SIEMENS AG & SIEMENS WLL CONSORTIUM

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/643A/2014


PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 &S7 Date :
Name of Substation : Bay Number :
Name of Equipment : Manufacturer :

Measured Voltages in Volts (measured on load side)


MCB Status
U3:L1-L2 U3:L2-L3 U3:L3-L1
Q1-ON
Q1-OFF

Measured Voltages in Volts (measured on load side)


MCB Status
K1:1-3 K1:3-5 K2:5-1
Q1-ON
Q1-OFF

Measured Voltages in Volts (measured on load side)


MCB Status
K2:1-3 K2:3-5 K2:5-1
Q1-ON
Q1-OFF

5.2. DC CIRCUIT CHECKS:

Measured Voltage in Volts With Respect to Earth


DC Source Status X1:29 K1:A2 X1:31 K30:A2
F23-ON in TCC
F23-OFF in TCC

Measured Voltage in Volts With Respect to Earth


DC Source Status U5:11 U5:10 U6:11 U6:10 U7:11 U7:10
F23-ON in TCC
F23-OFF in TCC

6. INSTRUMENT USED:
Equipment Calibration Calibration Due
S.No Description Make
S.No Date Date
1

AC/DC Circuits found healthy : YES / NO

All termination point tightness were check properly : YES / NO

7. REMARKS:

SIEMENS ENERGOPROJEKT-ENTEL/KAHRAMAA
Signature Signature

Name Name
Date Date
Doc.No. PH12-3A-10-22-P007 Rev. A Annexure 1 Page No. 4 of 4