Technical Requirements
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
Out of scope
Radiating Systems supply, installation and commissioning (RF cables, Antennas,
Filters, Multiplexing)
Transmission Network
EPC
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
FWA User
TACid = Y (IMSI range B)
Allowed
Profile type
PLMN
Mobile User
(WCDMA / LTE- 222-99
FDD)
HSS/HLR
FWA User
222-xx
(LTE-TDD)
MME
LTE FDD Carrier RNC
WCDMA Carriers Iub
S1
LTE TDD Carrier eNodeB
NodeB
PLMN id = 222-99
Mobile User
(PLMN FDD)
FWA User
PLMN id = 222-xx
(PLMN TDD)
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
5.1 HW
This document describe requirements to be fulfilled by E-UTRAN HW equipment.
While out of scope for this document, specific requirements to be imposed on EPC to
better exploit advanced E-UTRAN features must be highlighted by the equipment vendors.
Nokia Response: Compliant
Two configurations are depicted, with Basic Configuration being the target for first
deployment.
5.1.2 Evolution
After initial deployment, network shall be easily scalable by upgrading to advanced
features.
Capacity/coverage increase shall be obtained by expanding Multi Antenna System
capabilities supporting 8T8R at eNodeB side for Beam Forming (BF) and other MIMO
techniques.
Nokia Response: Compliant
Flexi Multiradio 10 BTS supports various MIMO techniques in order to increase the capacity
of the base station. Transmission mode 8 is a new transmission mode introduced in Rel 9.
Two code words are transmitted simultaneously in beamforming mode, which is also known
as dual layer beamforming. Comparing with single layer beamforming, one additional code
word is weighted by a vector, and combined with the first precoded code word to form the
transmitted data for each antenna. A total of two weighting vectors should be derived for dual
layer beamforming.
Dual Stream beamforming introduces capacity gain (~10% compared to single stream
beamforming).
The Downlink SU MIMO (8x4) with TM9 feature comprises the following aspects:
up to four spatial multiplexing layers in downlink using transmission mode 9 (TM9)
dynamic switching between 14 spatial layers for TM9 UEs, based on RI/PMI reports
from UEs (fast MIMO mode switch)
pre-configured 8 port CSI-RS resource allocation and dynamic CSI-RS on/off
switch,based on the availablity of TM9 UEs in the network
4Rx UEs (category 5 and higher; 3GPP Rel. 10 UE capabilities) with up to four
spatial multiplexing layers and TM9 UE's capability based transmission mode
configuration and codebook restriction of TM9 to 4 layers
Flexi Multiradio BTS applies eight antenna ports to support interconnection with antenna
systems with an 8Tx antenna in a downlink direction and provides 10 MHz, 15 MHz, and 20
MHz bandwidths.
The Vendors shall describe and offer any new technology evolution which brings a significant Commented [MS(-I2]: Carlo
improvements in terms of both capacity and coverage. The reference timeframe is 5 years
from now.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
5.2 SW
Considering the two architectures decribed in Section 4 the Vendor shall offer all radio
functionalities necessary to fully interoperate with the two solutions identified. Any missing
functionality not priced and listed in the Vendors proposal which prevents in part or totally
the correct interwork with the two solutions will be completely free of charge for H3G. Commented [MS(-I3]: Carlo
5.3 OSS
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
5.4 Services
5.4.1 Installation and commissioning
The vendor shall ensure and shall be responsible for
correct installation of HW, using qualified and certified personnel
correct configuration of eNodeBs parameters as by design phase
correct integration of eNodeB in H3G Network
eNodeB visibility in OSS
Nokia Response: Compliant
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
Second line support include network monitoring, fault management, fault diagnosis and/or
monitoring made necessary to solve the system problem. The fault analysis may lead to a remote
action (3rd level support escalation) to solve the problem and/or coordination with first line
management for troubleshooting and/or problem fix.
Report Operating Period (ROP) files should be available with 15 min. granularity.
Since the LTE-TDD FWA service should perceived by customers as a solid ADSL
alternative, any other enriched diagnostic, e.g. to troubleshoot / analyze end-user
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
The main requirements for CPEs defined above are listed in the enclosed Excel file.
The vendors shall fill in all the field of the relevant worksheets
3ITA-CTO-TH-Technic
al requirements CPE TDD_v5.xlsx
3ITA-CTO-TH-Technic
al requirements LTE TDD External antenna_v5.xlsx
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All the values shall be as measured from real networks, if available. If figures coming
from live networks are not available, the Vendors shall provide results from simulations,
specifying the simulation process and tools adopted.
Nokia Response: Compliant
For real networks data, the technical solution shall be fully characterized by providing the
relevant set of data as the Inter Site Distance, EUTRAN configuration, RF configuration,
Bandwidth, CPEs charateristics, typical land usage data etc.
For simulations purpose the following assumptions shall stand:
Bandwidth 20MHz
Downlink-to-
Uplink- Subframe number
Uplink
downlink
Switch-point
configuration
periodicity
0 1 2 3 4 5 6 7 8 9
1 5 ms D S U U D D S U U D
2 5 ms D S U D D D S U D D
Special subframe configuration The best configuration supported by UTRAN equipments shall be selected from table
4.2-1 in 3GPP TS36.211 in order to maximize DL cell throughput, still matching with
ISD constraints
CPE Both indoor and outdoor CPEs, with both 2R and 4R, as from previous section 6, shall
be considered in simulations
ISD Varying in the range [800m 2000m] with special focus on ISD=1400m
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
CPE A B C D
2R (MIMO 22)
Indoor
4R (MIMO 44)
4T4R
2R (MIMO 22)
Outdoor
4R (MIMO 44)
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
10.1 EUTRAN
For EUTRAN deployment, four main scenarios shall be considered
A. 1000 sites deployed in 2 years
B. 2000 sites deployed in 2 years
C. 3000 sites deployed in 3 years
D. 4000 sites deployed in 3 years
Nokia Response: Compliant
For details refer to the pricing file.
The deployement can be assumed to be linear in time, so sites per year are easily derived
from figures above.
Foar each of the 4 scenarios above, 4 subscenarios shall be considered, each with a
varying percentage of 4T4R eNodeBs supporting MIMO 44,
1. 0% of eNodeBs shall support MIMO 44 (All eNodeBs shall support 2T2R
only)
2. 30% of eNodeBs shall support MIMO 44
3. 60% of eNodeBs shall support MIMO 44
4. 100% of eNodeBs shall support MIMO 44
Nokia Response: Compliant
For details refer to the pricing file.
The table 10.1-I below summarizes the above scenarios and provide the canvas for the
matrix to fullfill by vendors for commercial proposal
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
For each case above, an additional splitting over the number of receive antenna shall be
considered
1. 100% 2R CPEs
2. 50% 2R CPEs + 50% 4R CPEs
3. 100% 4R XCPEs
The table 10.2-I below summarizes the above scenarios and provide the canvas for the
matrix to fullfill by vendors for commercial proposal
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
B
100000 B.I.2 50000 50000
CPEs
B.I.3 0 100000
N.A.
C.I.1 200000 0
C
200000 C.I.2 100000 100000
CPEs
C.I.3 0 200000
D.I.1 400000 0
D
400000 D.I.2 200000 200000
CPEs
D.I.3 0 400000
A.S.1 20000 0 30000 0
A
50000 A.S.2 10000 10000 15000 15000
40%Indoor / 60%Outdoor CPEs
CPEs
A.S.3 0 20000 0 30000
B.S.1 40000 0 60000 0
B
100000 B.S.2 20000 20000 30000 30000
CPEs
B.S.3 0 40000 0 60000
C.S.1 80000 0 120000 0
C
200000 C.S.2 40000 40000 60000 60000
CPEs
C.S.3 0 80000 0 120000
D.S.1 160000 0 240000 0
D
400000 D.S.2 80000 80000 120000 120000
CPEs
D.S.3 0 160000 0 240000
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.
10.4.1 Definitions
The SLAs defined in tables 10.4.1-I and 10.4.1-II shall be applicable in the scenarios A
and B as described in section 5.4.2.
The following classifications for incidents will stand
Critical incidents are problems which severely affect service, capacity/traffic, billing,
and data process capabilities. Critical problems require immediate corrective action,
regardless of time of the day or day of the week.
For example:
- A total system failure
- 15% or more reduction in traffic capacity or data process capability
- Any harm to person due to the use of the equipment
Major incidents are problems which seriously affect system operation, maintenance
and administration. Major problems require immediate attention and succeeding
planned corrective action. The urgency of major severity is less than of critical
severity because of a less immediate or impending impact on system performance,
end-users, operation and revenue.
For example:
- 10% to 15 % reduction in traffic, capacity or data process capability
- Reduction in measurement function for capacity/traffic
- Any loss of diagnostic capability and/or visibility of management or
maintenance
- Degradation of the systems ability to raise critical or major alarm
- Billing error rate exceeds acceptable value
- Performance reduction of billing or system databases
Minor incidents are problems that are not viewed as critical or major. A minor
problem may have impact on one or limited number of users. Minor problems neither
significantly impair the functioning of the system nor significantly affect service to
end-users. These problems are tolerable during system use.
Incident type
Critical Major Minor
Service Availability 7x24 7x8 5x8
Response Time 15min 30min 30min
Restoration Time 4 HH 8 HH 10 CD
Official Fix Time 3 CD 15 CD 30 CD
Official Fix Time
30 CD 90 CD <180 CD
(if escalated to R&D)
On-Time Delivery 100% 98% 95%
Language English/Italian
All material in this document is confidential information. The confidential may not be disclosed to third parties other than employees and authorized
contractors of H3G except with the express written authorization of H3G. The confidential information must be kept safe and it must not be reproduced or
used for purposes other than those, which H3G has authorized.