Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Save it.
With this setting the System will create Batch during PO creation.
Cler the field Substitute Scheduler:
Save it and
Now Batch formation will happen at Order realse.
MSC3N -
Enter and then give the Class system will fetch charcterstic automatically.
Now we will create Batch.
Enter.
For reference Characteristic no need to give values it will be automatically picked up from the table.
Now dont give any values andgo to Additional Data.
Now we will test this and assign this to the class.
Now we will create new batch.
Now we will see standard charcterstic:
System will claculate the Expiery date.
This is maintained in General Plant Data / Storage 1 view
Checking the Expire date characterstic:
The moment we enter the date of manufacturing system will automatically calculate Expire date
SLED/BBD.; Self life expiery date or best before date.
Make a FERT and Raw and packing maerial with Classification view.
Then make a Bom and routing.
Now we will make condition table
Select the criteria which you want:
Now we will create the Acess Sequence:
Now check the fields:
MSC2N
Thus give the expiery dates for the 4 batches for the two materials.
This is for VERT : GR Date
Thus when we will do Batch Detwerminnation the system will choose the batch as per FEFO our
condition.
Now we will create a Production Order to test the Batch Determination:
CO01
For Header Material we will be creating a Batch
Save the PO.
GO to the change mode to check for the components selected:
Now we will do the Batch Determination for the respective material:
Batch Determination can be automated for during Realease with the data in MRP2 View.
Save it we will have to maintain this for FER , VERT and header materials.