CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CR

PENDIENTE
TRAMO COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD (m) DE TUBERIA DIAMETRO LONGITUD
DEL AL DEL AL DEL AL DEL AL (m/m) (mm) (m)

0 + 0.00 0 + 14.43 2,807.00 2,805.58 2,807.00 2,805.58 0.00 0.00 0.09841 250 14.43
0 + 14.43 0 + 33.62 2,805.58 2,804.97 2,805.58 2,804.97 0.00 0.00 0.03179 250 19.19
0 + 33.62 0 + 64.17 2,804.97 2,804.76 2,804.97 2,804.76 0.00 0.00 0.00687 250 30.55
0 + 64.17 0 + 112.74 2,804.76 2,803.97 2,804.76 2,803.97 0.00 0.00 0.01627 250 48.57
0 + 112.74 0 + 139.55 2,803.97 2,802.76 2,803.97 2,802.76 0.00 0.00 0.04513 250 26.81
0 + 139.55 0 + 150 2,802.76 2,800.35 2,802.76 2,800.04 0.00 0.31 0.26029 250 10.45
0 + 150.00 0 + 168.1 2,800.35 2,795.00 2,800.04 2,792.73 0.31 2.27 0.40387 250 18.1
0 + 168.10 0 + 178.2 2,795.00 2,795.00 2,792.73 2,790.27 2.27 4.73 0.24356 250 10.1
0 + 178.20 0 + 197.39 2,795.00 2,793.04 2,790.27 2,790.28 4.73 2.76 -0.00052 250 19.19
0 + 197.39 0 + 219.64 2,793.04 2,796.02 2,790.28 2,794.59 2.76 1.43 -0.19371 250 22.25
0 + 219.64 0 + 325.17 2,796.02 2,796.06 2,794.59 2,794.37 1.43 1.69 0.00208 250 105.53
0 + 325.17 0 + 355.95 2,796.06 2,796.26 2,794.37 2,796.26 1.69 0.00 -0.06140 250 30.78
0 + 355.95 0 + 391.8 2,796.26 2,795.34 2,796.26 2,795.34 0.00 0.00 0.02566 250 35.85
0 + 391.80 0 + 480.37 2,795.34 2,795.13 2,795.34 2,795.13 0.00 0.00 0.00237 250 88.57
0 + 480.37 0 + 725.13 2,795.13 2,794.74 2,795.13 2,794.74 0.00 0.00 0.00159 250 244.76
0 + 725.13 0 + 833.85 2,794.74 2,793.64 2,794.74 2,792.52 0.00 1.12 0.02042 250 108.72
0 + 833.85 0 + 876.1 2,793.64 2,792.57 2,792.52 2,791.03 1.12 1.54 0.03527 250 42.25
0 + 876.10 1 + 172.81 2,792.57 2,789.69 2,791.03 2,787.97 1.54 1.72 0.01031 250 296.71
1 + 172.81 1 + 200.13 2,789.69 2,788.30 2,787.97 2,788.03 1.72 0.27 -0.00220 250 27.32
1 + 200.13 1 + 240.13 2,788.30 2,787.97 2,788.30 2,787.97 0.00 0.00 0.00825 250 40
1 + 240.13 1 + 318.37 2,787.97 2,787.92 2,787.97 2,787.92 0.00 0.00 0.00064 250 78.24
1 + 318.37 1 + 392.46 2,787.92 2,785.91 2,787.92 2,785.91 0.00 0.00 0.02713 250 74.09
1 + 392.46 1 + 432.39 2,785.91 2,781.99 2,785.91 2,781.99 0.00 0.00 0.09817 250 39.93
1 + 432.39 1 + 530.05 2,781.99 2,779.71 2,781.99 2,779.71 0.00 0.00 0.02335 250 97.66
1 + 530.05 1 + 619.15 2,779.71 2,779.74 2,779.71 2,779.74 0.00 0.00 -0.00034 250 89.1
1 + 619.15 1 + 681.68 2,779.74 2,775.78 2,779.74 2,775.78 0.00 0.00 0.06333 250 62.53

373281116.xlsx 1/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CR

PENDIENTE
TRAMO COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD (m) DE TUBERIA DIAMETRO LONGITUD
DEL AL DEL AL DEL AL DEL AL (m/m) (mm) (m)

1 + 681.68 1 + 927.41 2,775.78 2,774.25 2,775.78 2,774.25 0.00 0.00 0.00623 250 245.73
1 + 927.41 2 + 155.28 2,774.25 2,773.81 2,774.25 2,773.81 0.00 0.00 0.00193 250 227.87
2 + 155.28 2 + 260.14 2,773.81 2,772.38 2,773.81 2,772.38 0.00 0.00 0.01364 250 104.86
2 + 260.14 2 + 342.04 2,772.38 2,771.93 2,772.38 2,771.93 0.00 0.00 0.00549 250 81.9
2 + 342.04 2 + 449.07 2,771.93 2,772.05 2,771.93 2,772.05 0.00 0.00 -0.00112 250 107.03
2 + 449.07 2 + 568.85 2,772.05 2,773.14 2,772.05 2,773.14 0.00 0.00 -0.00910 250 119.78
2 + 568.85 3 + 202.51 2,773.14 2,770.79 2,773.14 2,770.79 0.00 0.00 0.00371 250 633.66
3 + 202.51 3 + 340.61 2,770.79 2,770.33 2,770.79 2,770.33 0.00 0.00 0.00333 250 138.1
3 + 340.61 3 + 397.81 2,770.33 2,768.42 2,770.33 2,768.42 0.00 0.00 0.03339 250 57.2
3 + 397.81 3 + 491.98 2,768.42 2,767.48 2,768.42 2,767.48 0.00 0.00 0.00998 250 94.17
3 + 491.98 3 + 649.77 2,767.48 2,767.17 2,767.48 2,767.17 0.00 0.00 0.00196 250 157.79
3 + 649.77 3 + 691.39 2,767.17 2,766.85 2,767.17 2,766.85 0.00 0.00 0.00769 250 41.62
3 + 691.39 3 + 912.84 2,766.85 2,762.07 2,766.85 2,762.07 0.00 0.00 0.02159 250 221.45
3 + 912.84 3 + 928.7 2,762.07 2,746.35 2,762.07 2,746.35 0.00 0.00 0.99117 250 15.86
3 + 928.70 3 + 958.98 2,746.35 2,724.00 2,746.35 2,724.00 0.00 0.00 0.73811 250 30.28
3 + 958.98 3 + 988.04 2,724.00 2,700.70 2,724.00 2,700.70 0.00 0.00 0.80179 250 29.06
3 + 988.04 3 + 999.03 2,700.70 2,678.08 2,700.70 2,678.08 0.00 0.00 2.05823 250 10.99
3 + 999.03 4 + 38.18 2,678.08 2,678.20 2,678.08 2,678.20 0.00 0.00 -0.00307 250 39.15
4 + 38.18 4 + 56.88 2,678.20 2,700.70 2,678.20 2,700.70 0.00 0.00 -1.20321 250 18.7
4 + 56.88 4 + 103.17 2,700.70 2,758.73 2,700.70 2,758.73 0.00 0.00 -1.25362 250 46.29
4 + 103.17 4 + 163.92 2,758.73 2,757.77 2,758.73 2,756.67 0.00 1.10 0.03391 250 60.75
4 + 163.92 4 + 400.15 2,757.77 2,757.49 2,756.67 2,756.17 1.10 1.32 0.00212 250 236.23
4 + 400.15 4 + 449.59 2,757.49 2,757.97 2,756.17 2,757.97 1.32 0.00 -0.03641 250 49.44
4 + 449.59 4 + 649.84 2,757.97 2,756.20 2,757.97 2,756.20 0.00 0.00 0.00884 250 200.25
4 + 649.84 4 + 879.89 2,756.20 2,755.99 2,756.20 2,755.99 0.00 0.00 0.00091 250 230.05
4 + 879.89 5 + 46.1 2,755.99 2,751.23 2,755.99 2,751.23 0.00 0.00 0.02864 250 166.21

373281116.xlsx 2/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CR

PENDIENTE
TRAMO COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD (m) DE TUBERIA DIAMETRO LONGITUD
DEL AL DEL AL DEL AL DEL AL (m/m) (mm) (m)

5 + 46.10 5 + 81.57 2,751.23 2,752.44 2,751.23 2,752.44 0.00 0.00 -0.03411 250 35.47
5 + 81.57 5 + 264.03 2,752.44 2,748.42 2,752.44 2,748.42 0.00 0.00 0.02203 250 182.46
5 + 264.03 5 + 292.32 2,748.42 2,750.26 2,748.42 2,750.26 0.00 0.00 -0.06504 250 28.29
5 + 292.32 5 + 524.7 2,750.26 2,750.67 2,750.26 2,750.67 0.00 0.00 -0.00176 250 232.38
5 + 524.70 5 + 658.14 2,750.67 2,751.68 2,750.67 2,751.68 0.00 0.00 -0.00757 250 133.44
5 + 658.14 5 + 701.59 2,751.68 2,750.17 2,751.68 2,750.17 0.00 0.00 0.03475 250 43.45
5 + 701.59 5 + 854.56 2,750.17 2,750.54 2,750.17 2,750.54 0.00 0.00 -0.00242 250 152.97
5 + 854.56 5 + 924.72 2,750.54 2,749.04 2,750.54 2,749.04 0.00 0.00 0.02138 250 70.16
5 + 924.72 6 + 2.46 2,749.04 2,749.43 2,749.04 2,749.43 0.00 0.00 -0.00502 250 77.74
6 + 2.46 6 + 722.93 2,749.43 2,745.29 2,749.43 2,745.29 0.00 0.00 0.00575 250 720.47
6 + 722.93 6 + 740.91 2,745.29 2,739.33 2,745.29 2,739.33 0.00 0.00 0.33148 250 17.98
6 + 740.91 6 + 766.01 2,739.33 2,739.36 2,739.33 2,739.36 0.00 0.00 -0.00120 250 25.1
6 + 766.01 6 + 796.03 2,739.36 2,744.98 2,739.36 2,744.98 0.00 0.00 -0.18721 250 30.02
6 + 796.03 7 + 50.67 2,744.98 2,744.13 2,744.98 2,744.13 0.00 0.00 0.00334 250 254.64
7 + 50.67 7 + 107.49 2,744.13 2,744.68 2,744.13 2,744.68 0.00 0.00 -0.00968 250 56.82
7 + 107.49 7 + 428.82 2,744.68 2,742.59 2,744.68 2,742.59 0.00 0.00 0.00650 250 321.33
7 + 428.82 7 + 472 2,742.59 2,742.72 2,742.59 2,742.72 0.00 0.00 -0.00301 250 43.18
7 + 472.00 7 + 535.24 2,742.72 2,740.00 2,742.72 2,740.00 0.00 0.00 0.04301 250 63.24
7 + 535.24 7 + 775.63 2,740.00 2,740.69 2,740.00 2,740.69 0.00 0.00 -0.00287 250 240.39
7 + 775.63 7 + 843.27 2,740.69 2,735.99 2,740.69 2,735.99 0.00 0.00 0.06949 250 67.64
7 + 843.27 7 + 989.88 2,735.99 2,736.16 2,735.99 2,736.16 0.00 0.00 -0.00116 250 146.61
7 + 989.88 8 + 50.17 2,736.16 2,732.84 2,736.16 2,732.84 0.00 0.00 0.05507 250 60.29
8 + 50.17 8 + 249.2 2,732.84 2,729.45 2,731.64 2,728.13 1.20 1.32 0.01764 250 199.03
8 + 249.20 8 + 574.45 2,729.45 2,730.71 2,728.13 2,729.11 1.32 1.60 -0.00301 250 325.25
8 + 574.45 8 + 726.4 2,730.71 2,727.27 2,729.11 2,725.87 1.60 1.40 0.02132 250 151.95
8 + 726.40 8 + 834.48 2,727.27 2,727.55 2,725.87 2,725.80 1.40 1.75 0.00065 250 108.08

373281116.xlsx 3/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CR

PENDIENTE
TRAMO COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD (m) DE TUBERIA DIAMETRO LONGITUD
DEL AL DEL AL DEL AL DEL AL (m/m) (mm) (m)

8 + 834.48 8 + 987.37 2,727.55 2,729.08 2,725.80 2,727.11 1.75 1.97 -0.00857 250 152.89
8 + 987.37 9 + 182.17 2,729.08 2,726.61 2,727.11 2,725.20 1.97 1.41 0.00980 250 194.8
9 + 182.17 9 + 263.06 2,726.61 2,724.81 2,725.20 2,722.62 1.41 2.19 0.03190 250 80.89
9 + 263.06 9 + 315.05 2,724.81 2,723.58 2,722.62 2,722.09 2.19 1.49 0.01019 250 51.99
9 + 315.05 9 + 394.68 2,723.58 2,724.00 2,722.09 2,721.59 1.49 2.41 0.00628 250 79.63
9 + 394.68 9 + 422.36 2,724.00 2,722.80 2,721.59 2,721.42 2.41 1.38 0.00614 250 27.68
9 + 422.36 9 + 500.16 2,722.80 2,722.21 2,721.42 2,720.60 1.38 1.61 0.01054 250 77.8
9 + 500.16 9 + 524.83 2,722.21 2,721.47 2,720.60 2,721.47 1.61 0.00 -0.03527 250 24.67
9 + 524.83 9 + 664.42 2,721.47 2,721.40 2,721.47 2,721.40 0.00 0.00 0.00050 250 139.59
9 + 664.42 9 + 779.64 2,721.40 2,719.11 2,721.40 2,719.11 0.00 0.00 0.01988 250 115.22
9 + 779.64 9 + 810.45 2,719.11 2,716.66 2,719.11 2,716.66 0.00 0.00 0.07952 250 30.81
9 + 810.45 9 + 854.64 2,716.66 2,716.49 2,716.66 2,716.49 0.00 0.00 0.00385 250 44.19
9 + 854.64 9 + 876.37 2,716.49 2,718.57 2,716.49 2,718.57 0.00 0.00 -0.09572 250 21.73
9 + 876.37 10 + 11.82 2,718.57 2,717.02 2,718.57 2,717.02 0.00 0.00 0.01144 250 135.45
10 + 11.82 10 + 102.86 2,717.02 2,716.69 2,717.02 2,716.69 0.00 0.00 0.00362 250 91.04
10 + 102.86 10 + 111.89 2,716.69 2,713.94 2,716.69 2,713.94 0.00 0.00 0.30454 250 9.03
10 + 111.89 10 + 153.44 2,713.94 2,714.39 2,713.94 2,714.39 0.00 0.00 -0.01083 250 41.55
10 + 153.44 10 + 224.01 2,714.39 2,716.24 2,714.39 2,716.24 0.00 0.00 -0.02622 250 70.57
10 + 224.01 10 + 402.01 2,716.24 2,716.02 2,716.24 2,716.02 0.00 0.00 0.00124 250 178
10 + 402.01 10 + 458.21 2,716.02 2,717.88 2,716.02 2,717.88 0.00 0.00 -0.03310 250 56.2
10 + 458.21 10 + 504.89 2,717.88 2,713.00 2,717.88 2,713.00 0.00 0.00 0.10454 250 46.68
10 + 504.89 10 + 515.93 2,713.00 2,707.44 2,713.00 2,707.44 0.00 0.00 0.50362 250 11.04
10 + 515.93 10 + 535.99 2,707.44 2,707.56 2,707.44 2,707.56 0.00 0.00 -0.00598 250 20.06
10 + 535.99 10 + 546.89 2,707.56 2,712.19 2,707.56 2,712.19 0.00 0.00 -0.42477 250 10.9
10 + 546.89 10 + 662.11 2,712.19 2,710.26 2,712.19 2,708.91 0.00 1.35 0.02847 250 115.22
10 + 662.11 10 + 771.2 2,710.26 2,710.26 2,708.91 2,708.26 1.35 2.00 0.00596 250 109.09

373281116.xlsx 4/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CR

PENDIENTE
TRAMO COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD (m) DE TUBERIA DIAMETRO LONGITUD
DEL AL DEL AL DEL AL DEL AL (m/m) (mm) (m)

10 + 771.20 11 + 88.31 2,710.26 2,708.19 2,708.26 2,706.56 2.00 1.63 0.00536 250 317.11
11 + 88.31 11 + 315.36 2,708.19 2,699.47 2,706.56 2,697.19 1.63 2.28 0.04127 250 227.05
11 + 315.36 11 + 389.01 2,699.47 2,677.47 2,697.19 2,674.97 2.28 2.50 0.30170 250 73.65
11 + 389.01 11 + 437.27 2,677.47 2,666.62 2,674.97 2,664.12 2.50 2.50 0.22482 250 48.26
11 + 437.27 11 + 483.66 2,666.62 2,656.90 2,664.12 2,655.27 2.50 1.63 0.19077 250 46.39
11 + 483.66 11 + 521.83 2,656.90 2,659.75 2,655.27 2,655.44 1.63 4.31 -0.00445 250 38.17
11 + 521.83 11 + 527.49 2,659.75 2,662.87 2,655.44 2,659.87 4.31 3.00 -0.78269 250 5.66
11 + 527.49 11 + 626.83 2,662.87 2,719.26 2,659.87 2,711.18 3.00 8.08 -0.51651 250 99.34
11 + 626.83 11 + 727.87 2,719.26 2,765.37 2,711.18 2,762.47 8.08 2.90 -0.50762 250 101.04
11 + 727.87 11 + 783.29 2,765.37 2,775.09 2,762.47 2,772.86 2.90 2.23 -0.18748 250 55.42
11 + 783.29 11 + 793 2,775.09 2,776.24 2,772.86 2,775.75 2.23 0.49 -0.29763 250 9.71

Tuberia expuesta de HDPE

Tuberia enterrada de PVC

373281116.xlsx 5/90
CCION DE AGUA CRUDA

PENDIENTE PRESION (m)


CAUDAL VELOCIDAD HIDRAULICA PERDIDA DE COTA PIEZOMETRICA
(l/s) (ms) (%0) CARGA (m) DEL AL DEL AL

28.36 0.58 1.18 0.01699 2,808.00 2,807.98 1.00 2.40


28.36 0.58 1.18 0.02259 2,807.98 2,807.96 2.40 2.99
28.36 0.58 1.18 0.03596 2,807.96 2,807.92 2.99 3.16
28.36 0.58 1.18 0.05718 2,807.92 2,807.87 3.16 3.90
28.36 0.58 1.18 0.03156 2,807.87 2,807.84 3.90 5.08
28.36 0.58 1.18 0.01230 2,807.84 2,807.82 5.08 7.78
28.36 0.58 1.34 0.02421 2,807.82 2,807.80 7.78 15.07
28.36 0.58 1.34 0.01351 2,807.80 2,807.79 15.07 17.52
28.36 0.58 1.34 0.02567 2,807.79 2,807.76 17.52 17.48
28.36 0.58 1.34 0.02976 2,807.76 2,807.73 17.48 13.14
28.36 0.58 1.34 0.14115 2,807.73 2,807.59 13.14 13.22
28.36 0.58 1.34 0.04117 2,807.59 2,807.55 13.22 11.29
28.36 0.58 1.18 0.04220 2,807.55 2,807.51 11.29 12.17
28.36 0.58 1.18 0.10427 2,807.51 2,807.40 12.17 12.27
28.36 0.58 1.18 0.28814 2,807.40 2,807.11 12.27 12.37
28.36 0.58 1.34 0.14541 2,807.11 2,806.97 12.37 14.45
28.36 0.58 1.34 0.05651 2,806.97 2,806.91 14.45 15.88
28.36 0.58 1.34 0.39685 2,806.91 2,806.51 15.88 18.54
28.36 0.58 1.34 0.03654 2,806.51 2,806.48 18.54 18.45
28.36 0.58 1.18 0.04709 2,806.48 2,806.43 18.18 18.46
28.36 0.58 1.18 0.09211 2,806.43 2,806.34 18.46 18.42
28.36 0.58 1.18 0.08722 2,806.34 2,806.25 18.42 20.34
28.36 0.58 1.18 0.04701 2,806.25 2,806.20 20.34 24.21
28.36 0.58 1.18 0.11497 2,806.20 2,806.09 24.21 26.38
28.36 0.58 1.18 0.10489 2,806.09 2,805.98 26.38 26.24
28.36 0.58 1.18 0.07361 2,805.98 2,805.91 26.24 30.13

373281116.xlsx 6/90
CCION DE AGUA CRUDA

PENDIENTE PRESION (m)


CAUDAL VELOCIDAD HIDRAULICA PERDIDA DE COTA PIEZOMETRICA
(l/s) (ms) (%0) CARGA (m) DEL AL DEL AL

28.36 0.58 1.18 0.28928 2,805.91 2,805.62 30.13 31.37


28.36 0.58 1.18 0.26825 2,805.62 2,805.35 31.37 31.54
28.36 0.58 1.18 0.12344 2,805.35 2,805.23 31.54 32.85
28.36 0.58 1.18 0.09641 2,805.23 2,805.13 32.85 33.20
28.36 0.58 1.18 0.12600 2,805.13 2,805.01 33.20 32.96
28.36 0.58 1.18 0.14101 2,805.01 2,804.87 32.96 31.73
28.36 0.58 1.18 0.74596 2,804.87 2,804.12 31.73 33.33
28.36 0.58 1.18 0.16257 2,804.12 2,803.96 33.33 33.63
28.36 0.58 1.18 0.06734 2,803.96 2,803.89 33.63 35.47
28.36 0.58 1.18 0.11086 2,803.89 2,803.78 35.47 36.30
28.36 0.58 1.18 0.18575 2,803.78 2,803.59 36.30 36.42
28.36 0.58 1.34 0.05567 2,803.59 2,803.54 36.42 36.69
28.36 0.58 1.34 0.29619 2,803.54 2,803.24 36.69 41.17
28.36 0.58 1.18 0.01867 2,803.24 2,803.22 41.17 56.87
28.36 0.58 1.18 0.03565 2,803.22 2,803.19 56.87 79.19
28.36 0.58 1.18 0.03421 2,803.19 2,803.15 79.19 102.45
28.36 0.58 1.18 0.01294 2,803.15 2,803.14 102.45 125.06
28.36 0.58 1.18 0.04609 2,803.14 2,803.09 125.06 124.89
28.36 0.58 1.18 0.02201 2,803.09 2,803.07 124.89 102.37
28.36 0.58 1.18 0.05449 2,803.07 2,803.02 102.37 44.29
28.36 0.58 1.34 0.08125 2,803.02 2,802.94 44.29 46.27
28.36 0.58 1.34 0.31596 2,802.94 2,802.62 46.27 46.45
28.36 0.58 1.34 0.06613 2,802.62 2,802.56 46.45 44.59
28.36 0.58 1.18 0.23574 2,802.56 2,802.32 44.59 46.12
28.36 0.58 1.18 0.27082 2,802.32 2,802.05 46.12 46.06
28.36 0.58 1.18 0.19567 2,802.05 2,801.85 46.06 50.62

373281116.xlsx 7/90
CCION DE AGUA CRUDA

PENDIENTE PRESION (m)


CAUDAL VELOCIDAD HIDRAULICA PERDIDA DE COTA PIEZOMETRICA
(l/s) (ms) (%0) CARGA (m) DEL AL DEL AL

28.36 0.58 1.18 0.04176 2,801.85 2,801.81 50.62 49.37


28.36 0.58 1.18 0.21480 2,801.81 2,801.60 49.37 53.18
28.36 0.58 1.18 0.03330 2,801.60 2,801.56 53.18 51.30
28.36 0.58 1.18 0.27356 2,801.56 2,801.29 51.30 50.62
28.36 0.58 1.18 0.15709 2,801.29 2,801.13 50.62 49.45
28.36 0.58 1.18 0.05115 2,801.13 2,801.08 49.45 50.91
28.36 0.58 1.18 0.18008 2,801.08 2,800.90 50.91 50.36
28.36 0.58 1.18 0.08259 2,800.90 2,800.82 50.36 51.78
28.36 0.58 1.18 0.09152 2,800.82 2,800.73 51.78 51.30
28.36 0.58 1.18 0.84816 2,800.73 2,799.88 51.30 54.59
28.36 0.58 1.18 0.02117 2,799.88 2,799.86 54.59 60.53
28.36 0.58 1.18 0.02955 2,799.86 2,799.83 60.53 60.47
28.36 0.58 1.18 0.03534 2,799.83 2,799.79 60.47 54.81
28.36 0.58 1.18 0.29977 2,799.79 2,799.49 54.81 55.36
28.36 0.58 1.18 0.06689 2,799.49 2,799.43 55.36 54.75
28.36 0.58 1.18 0.37828 2,799.43 2,799.05 54.75 56.46
28.36 0.58 1.18 0.05083 2,799.05 2,799.00 56.46 56.28
28.36 0.58 1.18 0.07445 2,799.00 2,798.92 56.28 58.92
28.36 0.58 1.18 0.28299 2,798.92 2,798.64 58.92 57.95
28.36 0.58 1.18 0.07963 2,798.64 2,798.56 57.95 62.57
28.36 0.58 1.18 0.17259 2,798.56 2,798.39 62.57 62.23
28.36 0.58 1.18 0.07097 2,798.39 2,798.32 62.23 65.48
28.36 0.58 1.34 0.26620 2,798.32 2,798.05 66.68 69.92
28.36 0.58 1.34 0.43502 2,798.05 2,797.62 69.92 68.51
28.36 0.58 1.34 0.20323 2,797.62 2,797.41 68.51 71.54
28.36 0.58 1.34 0.14456 2,797.41 2,797.27 71.54 71.47

373281116.xlsx 8/90
CCION DE AGUA CRUDA

PENDIENTE PRESION (m)


CAUDAL VELOCIDAD HIDRAULICA PERDIDA DE COTA PIEZOMETRICA
(l/s) (ms) (%0) CARGA (m) DEL AL DEL AL

28.36 0.58 1.34 0.20449 2,797.27 2,797.06 71.47 69.95


28.36 0.58 1.34 0.26054 2,797.06 2,796.80 69.95 71.60
28.36 0.58 1.34 0.10819 2,796.80 2,796.69 71.60 74.07
28.36 0.58 1.34 0.06954 2,796.69 2,796.62 74.07 74.53
28.36 0.58 1.34 0.10650 2,796.62 2,796.52 74.53 74.93
28.36 0.58 1.34 0.03702 2,796.52 2,796.48 74.93 75.06
28.36 0.58 1.34 0.10406 2,796.48 2,796.38 75.06 75.78
28.36 0.58 1.18 0.02904 2,796.38 2,796.35 75.78 74.88
28.36 0.58 1.18 0.16433 2,796.35 2,796.18 74.88 74.78
28.36 0.58 1.18 0.13564 2,796.18 2,796.05 74.78 76.94
28.36 0.58 1.18 0.03627 2,796.05 2,796.01 76.94 79.35
28.36 0.58 1.18 0.05202 2,796.01 2,795.96 79.35 79.47
28.36 0.58 1.18 0.02558 2,795.96 2,795.93 79.47 77.36
28.36 0.58 1.18 0.15946 2,795.93 2,795.77 77.36 78.75
28.36 0.58 1.18 0.10717 2,795.77 2,795.67 78.75 78.98
28.36 0.58 1.18 0.01063 2,795.67 2,795.66 78.98 81.72
28.36 0.58 1.18 0.04891 2,795.66 2,795.61 81.72 81.22
28.36 0.58 1.18 0.08308 2,795.61 2,795.52 81.22 79.28
28.36 0.58 1.18 0.20955 2,795.52 2,795.32 79.28 79.30
28.36 0.58 1.18 0.06616 2,795.32 2,795.25 79.30 77.37
28.36 0.58 1.18 0.05495 2,795.25 2,795.19 77.37 82.19
28.36 0.58 1.18 0.01300 2,795.19 2,795.18 82.19 87.74
28.36 0.58 1.18 0.02362 2,795.18 2,795.16 87.74 87.60
28.36 0.58 1.18 0.01283 2,795.16 2,795.14 87.60 82.95
28.36 0.58 1.34 0.15411 2,795.14 2,794.99 82.95 86.08
28.36 0.58 1.34 0.14591 2,794.99 2,794.84 86.08 86.58

373281116.xlsx 9/90
CCION DE AGUA CRUDA

PENDIENTE PRESION (m)


CAUDAL VELOCIDAD HIDRAULICA PERDIDA DE COTA PIEZOMETRICA
(l/s) (ms) (%0) CARGA (m) DEL AL DEL AL

28.36 0.58 1.34 0.42413 2,794.84 2,794.42 86.58 87.86


28.36 0.58 1.34 0.30368 2,794.42 2,794.12 87.86 96.93
28.36 0.58 1.34 0.09851 2,794.12 2,794.02 96.93 119.05
28.36 0.58 1.34 0.06455 2,794.02 2,793.95 119.05 129.83
28.36 0.58 1.34 0.06205 2,793.95 2,793.89 129.83 138.62
28.36 0.58 1.34 0.05105 2,793.89 2,793.84 138.62 138.40
28.36 0.58 1.34 0.00757 2,793.84 2,793.83 138.40 133.96
28.36 0.58 1.34 0.13287 2,793.83 2,793.70 133.96 82.52
28.36 0.58 1.34 0.13514 2,793.70 2,793.57 82.52 31.10
28.36 0.58 1.34 0.07412 2,793.57 2,793.49 31.10 20.63
28.36 0.58 1.34 0.01299 2,793.49 2,793.48 20.63 17.73

373281116.xlsx 10/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO (PRESEDIMENTADOR - PTAP)

COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD PENDIENTE


TRAMO DIAMETRO (mm) LONGITUD (m) CAUDAL VELOCIDAD
(msnm) (msnm) (m) DE TUBERIA Material
(m/m)
DEL AL DEL AL DEL AL DEL AL DN Interno Horizontal Inclinada (l/s) (ms)

0 + 0.00 0 + 11.74 2,804.000 2,804.000 2,803.00 2,802.800 1.00 1.20 0.01704 250 230.8 PVC 11.74 11.74 40.00 0.96
0 + 11.74 0 + 27.63 2,804.000 2,799.579 2,802.800 2,798.079 1.20 1.50 0.29711 250 230.8 PVC 15.89 16.58 40.00 0.96
0 + 27.63 0 + 39.23 2,799.579 2,795.661 2,798.079 2,794.522 1.50 1.14 0.30664 250 230.8 PVC 11.60 12.13 40.00 0.96
0 + 39.23 0 + 56.80 2,795.661 2,794.411 2,794.522 2,794.411 1.14 0.00 0.00632 250 230.8 PVC 17.57 17.57 40.00 0.96
0 + 56.80 0 + 140.75 2,794.411 2,792.984 2,794.411 2,791.984 0.00 1.00 0.02891 250 230.8 PVC 83.95 83.99 40.00 0.96
0 + 140.75 0 + 248.97 2,792.984 2,790.367 2,791.984 2,789.354 1.00 1.01 0.02430 250 230.8 PVC 108.22 108.25 40.00 0.96
0 + 248.97 0 + 342.60 2,790.367 2,787.294 2,789.354 2,786.294 1.01 1.00 0.03268 250 230.8 PVC 93.63 93.68 40.00 0.96
0 + 342.60 0 + 384.92 2,787.294 2,786.651 2,786.294 2,785.651 1.00 1.00 0.01519 250 230.8 PVC 42.32 42.32 40.00 0.96
0 + 384.92 0 + 444.03 2,786.651 2,772.840 2,785.651 2,771.842 1.00 1.00 0.23362 250 230.8 PVC 59.11 60.70 40.00 0.96
0 + 444.03 0 + 475.01 2,772.840 2,771.187 2,771.842 2,770.187 1.00 1.00 0.05342 250 230.8 PVC 30.98 31.02 40.00 0.96
0 + 475.01 0 + 508.58 2,771.187 2,770.261 2,770.187 2,769.261 1.00 1.00 0.02758 250 230.8 PVC 33.57 33.58 40.00 0.96
0 + 508.58 0 + 630.32 2,770.261 2,769.454 2,769.261 2,768.454 1.00 1.00 0.00663 250 230.8 PVC 121.74 121.74 40.00 0.96
0 + 630.32 0 + 693.69 2,769.454 2,767.537 2,768.454 2,766.537 1.00 1.00 0.03025 250 230.8 PVC 63.37 63.40 40.00 0.96
0 + 693.69 0 + 737.01 2,767.537 2,763.374 2,766.537 2,762.374 1.00 1.00 0.09610 250 230.8 PVC 43.32 43.52 40.00 0.96
0 + 737.01 0 + 849.33 2,763.374 2,755.390 2,762.374 2,754.390 1.00 1.00 0.07108 250 230.8 PVC 112.32 112.60 40.00 0.96
0 + 849.33 0 + 893.51 2,755.390 2,754.508 2,754.390 2,753.429 1.00 1.08 0.02175 250 230.8 PVC 44.18 44.19 40.00 0.96
0 + 893.51 0 + 897.00 2,754.508 2,754.424 2,753.429 2,752.881 1.08 1.54 0.15702 250 230.8 PVC 3.49 3.53 40.00 0.96
0 + 897.00 0 + 927.00 2,754.424 2,754.088 2,752.881 2,752.158 1.54 1.93 0.02410 250 230.8 PVC 30.00 30.01 40.00 0.96
0 + 927.00 0 + 933.10 2,754.088 2,753.883 2,752.158 2,752.568 1.93 1.31 -0.06721 250 230.8 PVC 6.10 6.11 40.00 0.96
0 + 933.10 1 + 33.49 2,753.883 2,752.293 2,752.568 2,750.909 1.31 1.38 0.01653 250 230.8 PVC 100.39 100.40 40.00 0.96
1 + 33.49 1 + 36.07 2,752.293 2,752.080 2,750.909 2,750.580 1.38 1.50 0.12752 250 230.8 PVC 2.58 2.60 40.00 0.96
1 + 36.07 1 + 41.07 2,752.080 2,752.065 2,750.580 2,750.506 1.50 1.56 0.01480 250 230.8 PVC 5.00 5.00 40.00 0.96
1 + 41.07 1 + 44.29 2,752.065 2,752.327 2,750.506 2,750.748 1.56 1.58 -0.07516 250 230.8 PVC 3.22 3.23 40.00 0.96
1 + 44.29 1 + 216.65 2,752.327 2,748.353 2,750.748 2,747.853 1.58 0.50 0.01680 250 230.8 PVC 172.36 172.38 40.00 0.96
1 + 216.65 1 + 309.52 2,748.353 2,747.264 2,747.853 2,747.502 0.50 -0.24 0.00378 250 226.2 HDPE 92.87 92.87 40.00 1.00
1 + 309.52 1 + 614.36 2,747.264 2,741.427 2,747.502 2,741.542 -0.24 -0.11 0.01955 250 226.2 HDPE 304.84 304.90 40.00 1.00
1 + 614.36 1 + 769.73 2,741.427 2,763.660 2,741.542 2,763.869 -0.11 -0.21 -0.14370 250 226.2 HDPE 155.37 156.97 40.00 1.00

373281116.xlsx 11/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO (PRESEDIMENTADOR - PTAP)

COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD PENDIENTE


TRAMO DIAMETRO (mm) LONGITUD (m) CAUDAL VELOCIDAD
(msnm) (msnm) (m) DE TUBERIA Material
(m/m)
DEL AL DEL AL DEL AL DEL AL DN Interno Horizontal Inclinada (l/s) (ms)

1 + 769.73 1 + 850.00 2,763.660 2,763.027 2,763.869 2,763.027 -0.21 0.00 0.01049 250 226.2 HDPE 80.27 80.27 40.00 1.00
1 + 850.00 2 + 50.00 2,763.027 2760.929 2,763.027 2760.929 0.00 0.00 0.01049 250 226.2 HDPE 200.00 200.01 40.00 1.00
2 + 50.00 2 + 144.70 2,760.929 2,759.939 2,760.929 2,759.939 0.00 0.00 0.01045 250 226.2 HDPE 94.70 94.71 40.00 1.00
2 + 144.70 2 + 542.73 2,759.939 2,754.387 2,759.939 2,753.922 0.00 0.47 0.01512 250 226.2 HDPE 398.03 398.08 40.00 1.00
2 + 542.73 2 + 554.73 2,754.387 2,753.162 2,753.922 2,751.743 0.47 1.42 0.18158 250 226.2 HDPE 12.00 12.20 40.00 1.00
2 + 554.73 2 + 571.07 2,753.162 2,753.014 2,751.743 2,751.643 1.42 1.37 0.00612 250 226.2 HDPE 16.34 16.34 40.00 1.00
2 + 571.07 2 + 741.00 2,753.014 2,749.006 2,751.643 2,749.032 1.37 -0.03 0.01537 250 226.2 HDPE 169.93 169.95 40.00 1.00
2 + 741.00 2 + 759.00 2,749.006 2,748.076 2,749.032 2,746.676 -0.03 1.40 0.13089 250 226.2 HDPE 18.00 18.15 40.00 1.00
2 + 759.00 2 + 776.27 2,748.076 2,748.076 2,746.676 2,746.576 1.40 1.50 0.00579 250 226.2 HDPE 17.27 17.27 40.00 1.00
2 + 776.27 2 + 794.50 2,748.076 2,748.084 2,746.576 2,747.584 1.50 0.50 -0.05529 250 226.2 HDPE 18.23 18.26 40.00 1.00
2 + 794.50 2 + 961.45 2,748.084 2,746.072 2,747.584 2,746.098 0.50 -0.03 0.00890 250 226.2 HDPE 166.95 166.96 40.00 1.00
2 + 961.45 3 + 354.47 2,746.072 2,740.933 2,746.098 2,741.245 -0.03 -0.31 0.01235 250 226.2 HDPE 393.02 393.05 40.00 1.00
3 + 354.47 3 + 653.20 2,740.933 2,736.662 2,741.245 2,736.662 -0.31 0.00 0.01534 315 277.6 HDPE 298.73 298.77 40.00 0.66
3 + 653.20 3 + 772.60 2,736.662 2,733.987 2,736.662 2,732.534 0.00 1.45 0.03457 315 277.6 HDPE 119.40 119.47 40.00 0.66
3 + 772.60 3 + 854.54 2,733.987 2,733.089 2,732.534 2,733.089 1.45 0.00 -0.00677 315 277.6 HDPE 81.94 81.94 40.00 0.66
3 + 854.54 3 + 883.53 2,733.089 2,732.957 2,733.089 2,732.958 0.00 0.00 0.00452 315 277.6 HDPE 28.99 28.99 40.00 0.66
3 + 883.53 4 + 205.65 2,732.957 2,729.086 2,732.958 2,729.086 0.00 0.00 0.01202 315 277.6 HDPE 322.12 322.14 40.00 0.66
4 + 205.65 4 + 330.41 2,729.086 2,726.807 2,729.086 2,726.807 0.00 0.00 0.01827 315 277.6 HDPE 124.76 124.78 40.00 0.66
4 + 330.41 4 + 623.30 2,726.807 2,723.671 2,726.807 2,723.671 0.00 0.00 0.01071 315 277.6 HDPE 292.89 292.91 40.00 0.66
4 + 623.30 4 + 729.63 2,723.671 2,723.052 2,723.671 2,723.052 0.00 0.00 0.00582 315 277.6 HDPE 106.33 106.33 40.00 0.66
4 + 729.63 4 + 890.63 2,723.052 2,721.256 2,723.052 2,720.552 0.00 0.70 0.01553 315 268.6 HDPE 161.00 161.02 40.00 0.71
4 + 890.63 5 + 233.89 2,721.256 2,718.352 2,720.552 2,718.352 0.70 0.00 0.00641 315 268.6 HDPE 343.26 343.27 40.00 0.71
5 + 233.89 5 + 345.04 2,718.352 2,715.487 2,718.352 2,715.754 0.00 -0.27 0.02337 315 268.6 HDPE 111.15 111.18 40.00 0.71
5 + 345.04 5 + 490.73 2,715.487 2,714.214 2,715.754 2,714.214 -0.27 0.00 0.01057 315 268.6 HDPE 145.69 145.70 40.00 0.71
5 + 490.73 5 + 665.60 2,714.214 2,712.494 2,714.214 2,712.494 0.00 0.00 0.00984 315 268.6 HDPE 174.87 174.88 40.00 0.71
5 + 665.60 5 + 792.95 2,712.494 2,711.513 2,712.494 2,711.513 0.00 0.00 0.00770 315 268.6 HDPE 127.35 127.35 40.00 0.71
5 + 792.95 6 + 44.21 2,711.513 2,710.183 2,711.513 2,710.100 0.00 0.08 0.00562 315 268.6 HDPE 251.26 251.26 40.00 0.71

373281116.xlsx 12/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO (PRESEDIMENTADOR - PTAP)

COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD PENDIENTE


TRAMO DIAMETRO (mm) LONGITUD (m) CAUDAL VELOCIDAD
(msnm) (msnm) (m) DE TUBERIA Material
(m/m)
DEL AL DEL AL DEL AL DEL AL DN Interno Horizontal Inclinada (l/s) (ms)

6 + 44.21 6 + 177.33 2,710.183 2,709.505 2,710.100 2,709.306 0.08 0.20 0.00596 315 268.6 HDPE 133.12 133.12 40.00 0.71
6 + 177.33 6 + 271.71 2,709.505 2,711.116 2,709.306 2,711.116 0.20 0.00 -0.01918 315 268.6 HDPE 94.38 94.40 40.00 0.71
6 + 271.71 6 + 610.85 2,711.116 2,714.529 2,711.116 2,714.529 0.00 0.00 -0.01006 315 268.6 HDPE 339.14 339.16 40.00 0.71
6 + 610.85 6 + 815.23 2,714.529 2,714.945 2,714.529 2,714.945 0.00 0.00 -0.00204 315 268.6 HDPE 204.38 204.38 40.00 0.71
6 + 815.23 7 + 30.10 2,714.945 2,715.763 2,714.945 2,715.643 0.00 0.12 -0.00325 315 268.6 HDPE 214.87 214.87 40.00 0.71
7 + 30.10 7 + 42.10 2,715.763 2,715.641 2,715.643 2,714.508 0.12 1.13 0.09458 315 268.6 HDPE 12.00 12.05 40.00 0.71
7 + 42.10 7 + 58.16 2,715.641 2,715.848 2,714.508 2,714.608 1.13 1.24 -0.00623 315 268.6 HDPE 16.06 16.06 40.00 0.71
7 + 58.16 7 + 70.58 2,715.848 2,716.403 2,714.608 2,716.403 1.24 0.00 -0.14452 315 268.6 HDPE 12.42 12.55 40.00 0.71
7 + 70.58 7 + 255.23 2,716.403 2,717.999 2,716.403 2,717.513 0.00 0.49 -0.00601 315 268.6 HDPE 184.65 184.65 40.00 0.71
7 + 255.23 7 + 458.43 2,717.999 2,720.202 2,717.513 2,720.202 0.49 0.00 -0.01323 315 268.6 HDPE 203.20 203.22 40.00 0.71
7 + 458.43 7 + 605.27 2,720.202 2,722.941 2,720.202 2,722.941 0.00 0.00 -0.01865 315 277.6 HDPE 146.84 146.87 40.00 0.66
7 + 605.27 7 + 861.40 2,722.941 2,723.579 2,722.941 2,723.579 0.00 0.00 -0.00249 315 277.6 HDPE 256.13 256.13 40.00 0.66
7 + 861.40 7 + 913.87 2,723.579 2,723.753 2,723.579 2,723.753 0.00 0.00 -0.00332 315 277.6 HDPE 52.47 52.47 40.00 0.66
7 + 913.87 8 + 26.73 2,723.753 2,725.602 2,723.753 2,725.602 0.00 0.00 -0.01638 315 277.6 HDPE 112.86 112.88 40.00 0.66
8 + 26.73 8 + 127.56 2,725.602 2,725.781 2,725.602 2,725.781 0.00 0.00 -0.00178 315 277.6 HDPE 100.83 100.83 40.00 0.66
8 + 127.56 8 + 231.93 2,725.781 2,726.369 2,725.781 2,726.369 0.00 0.00 -0.00563 315 277.6 HDPE 104.37 104.37 40.00 0.66
8 + 231.93 8 + 316.04 2,726.369 2,727.745 2,726.369 2,727.745 0.00 0.00 -0.01636 315 277.6 HDPE 84.11 84.12 40.00 0.66
8 + 316.04 8 + 451.13 2,727.745 2,728.041 2,727.745 2,728.000 0.00 0.04 -0.00189 315 277.6 HDPE 135.09 135.09 40.00 0.66
8 + 451.13 8 + 674.79 2,728.041 2,731.025 2,728.000 2,731.025 0.04 0.00 -0.01352 315 277.6 HDPE 223.66 223.68 40.00 0.66
8 + 674.79 8 + 886.73 2,731.025 2,733.202 2,731.025 2,733.202 0.00 0.00 -0.01027 315 277.6 HDPE 211.94 211.95 40.00 0.66
8 + 886.73 9 + 17.84 2,733.202 2,733.797 2,733.202 2,733.797 0.00 0.00 -0.00454 315 277.6 HDPE 131.11 131.11 40.00 0.66
9 + 17.84 9 + 169.68 2,733.797 2,735.173 2,733.797 2,735.187 0.00 -0.01 -0.00915 315 277.6 HDPE 151.84 151.85 40.00 0.66
9 + 169.68 9 + 188.37 2,735.173 2,735.469 2,735.187 2,735.485 -0.01 -0.02 -0.01594 315 277.6 HDPE 18.69 18.69 40.00 0.66
9 + 188.37 9 + 296.26 2,735.469 2,736.694 2,735.485 2,736.694 -0.02 0.00 -0.01121 315 277.6 HDPE 107.89 107.90 40.00 0.66
9 + 296.26 9 + 469.20 2,736.694 2,737.761 2,736.694 2,737.761 0.00 0.00 -0.00617 315 277.6 HDPE 172.94 172.94 40.00 0.66
9 + 469.20 9 + 572.76 2,737.761 2,739.490 2,737.761 2,739.490 0.00 0.00 -0.01670 250 226.2 HDPE 103.56 103.57 40.00 1.00
9 + 572.76 9 + 631.45 2,739.490 2,739.695 2,739.490 2,739.695 0.00 0.00 -0.00349 250 226.2 HDPE 58.69 58.69 40.00 1.00

373281116.xlsx 13/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO (PRESEDIMENTADOR - PTAP)

COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD PENDIENTE


TRAMO DIAMETRO (mm) LONGITUD (m) CAUDAL VELOCIDAD
(msnm) (msnm) (m) DE TUBERIA Material
(m/m)
DEL AL DEL AL DEL AL DEL AL DN Interno Horizontal Inclinada (l/s) (ms)

9 + 631.45 9 + 733.67 2,739.695 2,741.038 2,739.695 2,740.982 0.00 0.06 -0.01259 250 226.2 HDPE 102.22 102.23 40.00 1.00
9 + 733.67 9 + 892.57 2,741.038 2,741.931 2,740.982 2,741.931 0.06 0.00 -0.00597 250 226.2 HDPE 158.90 158.90 40.00 1.00
9 + 892.57 10 + 6.30 2,741.931 2,743.669 2,741.931 2,743.669 0.00 0.00 -0.01528 250 226.2 HDPE 113.73 113.74 40.00 1.00
10 + 6.30 10 + 122.91 2,743.669 2,743.770 2,743.669 2,743.861 0.00 -0.09 -0.00165 250 226.2 HDPE 116.61 116.61 40.00 1.00
10 + 122.91 10 + 282.09 2,743.770 2,745.948 2,743.861 2,745.614 -0.09 0.33 -0.01101 250 226.2 HDPE 159.18 159.19 40.00 1.00
10 + 282.09 10 + 302.49 2,745.948 2,745.995 2,745.614 2,744.450 0.33 1.55 0.05706 250 226.2 HDPE 20.40 20.43 40.00 1.00
10 + 302.49 10 + 339.09 2,745.995 2,745.832 2,744.450 2,744.350 1.55 1.48 0.00273 250 226.2 HDPE 36.60 36.60 40.00 1.00
10 + 339.09 10 + 361.79 2,745.832 2,746.164 2,744.350 2,746.164 1.48 0.00 -0.07991 250 226.2 HDPE 22.70 22.77 40.00 1.00
10 + 361.79 10 + 490.16 2,746.164 2,747.469 2,746.164 2,747.906 0.00 -0.44 -0.01357 250 226.2 HDPE 128.37 128.38 40.00 1.00
10 + 490.16 10 + 806.20 2,747.469 2,750.303 2,747.906 2,750.303 -0.44 0.00 -0.00758 250 226.2 HDPE 316.04 316.05 40.00 1.00
10 + 806.20 11 + 170.23 2,750.303 2,756.755 2,750.303 2,756.755 0.00 0.00 -0.01772 250 226.2 HDPE 364.03 364.09 40.00 1.00
11 + 170.23 11 + 286.12 2,756.755 2,759.372 2,756.755 2,759.372 0.00 0.00 -0.02258 250 226.2 HDPE 115.89 115.92 40.00 1.00
11 + 286.12 11 + 417.19 2,759.372 2,760.678 2,759.372 2,760.034 0.00 0.64 -0.00505 250 226.2 HDPE 131.07 131.07 40.00 1.00
11 + 417.19 11 + 428.89 2,760.678 2,760.799 2,760.034 2,759.297 0.64 1.50 0.06299 250 226.2 HDPE 11.70 11.72 40.00 1.00
11 + 428.89 11 + 449.99 2,760.799 2,760.800 2,759.297 2,759.397 1.50 1.40 -0.00474 250 226.2 HDPE 21.10 21.10 40.00 1.00
11 + 449.99 11 + 474.57 2,760.800 2,760.874 2,759.397 2,760.875 1.40 0.00 -0.06013 250 226.2 HDPE 24.58 24.62 40.00 1.00
11 + 474.57 11 + 562.74 2,760.874 2,762.016 2,760.875 2,761.296 0.00 0.72 -0.00477 250 226.2 HDPE 88.17 88.17 40.00 1.00
11 + 562.74 11 + 704.29 2,762.016 2,763.276 2,761.296 2,761.776 0.72 1.50 -0.00339 250 226.2 HDPE 141.55 141.55 40.00 1.00
11 + 704.29 11 + 726.19 2,763.276 2,763.648 2,761.776 2,761.876 1.50 1.77 -0.00457 250 226.2 HDPE 21.90 21.90 40.00 1.00
11 + 726.19 11 + 738.19 2,763.648 2,763.932 2,761.876 2,763.293 1.77 0.64 -0.11808 250 226.2 HDPE 12.00 12.08 40.00 1.00
11 + 738.19 11 + 781.49 2,763.932 2,763.425 2,763.293 2,763.425 0.64 0.00 -0.00305 250 226.2 HDPE 43.30 43.30 40.00 1.00
11 + 781.49 11 + 867.34 2,763.425 2,764.801 2,763.425 2,763.688 0.00 1.11 -0.00306 250 226.2 HDPE 85.85 85.85 40.00 1.00
11 + 867.34 11 + 879.34 2,764.801 2,764.763 2,763.688 2,763.423 1.11 1.34 0.02208 250 226.2 HDPE 12.00 12.00 40.00 1.00
11 + 879.34 11 + 910.44 2,764.763 2,764.896 2,763.423 2,763.523 1.34 1.37 -0.00322 250 226.2 HDPE 31.10 31.10 40.00 1.00
11 + 910.44 11 + 934.44 2,764.896 2,765.263 2,763.523 2,764.695 1.37 0.57 -0.04883 250 226.2 HDPE 24.00 24.03 40.00 1.00
11 + 934.44 12 + 118.16 2,765.263 2,765.412 2,764.695 2,765.345 0.57 0.07 -0.00354 250 226.2 HDPE 183.72 183.72 40.00 1.00
12 + 118.16 12 + 256.92 2,765.412 2,765.467 2,765.345 2,765.467 0.07 0.00 -0.00088 250 226.2 HDPE 138.76 138.76 40.00 1.00

373281116.xlsx 14/90
CALCULO HIDRAULICO DE LA LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO (PRESEDIMENTADOR - PTAP)

COTA DE TERRENO COTA DE TUBERIA PROFUNDIDAD PENDIENTE


TRAMO DIAMETRO (mm) LONGITUD (m) CAUDAL VELOCIDAD
(msnm) (msnm) (m) DE TUBERIA Material
(m/m)
DEL AL DEL AL DEL AL DEL AL DN Interno Horizontal Inclinada (l/s) (ms)

12 + 256.92 12 + 509.99 2,765.467 2,766.030 2,765.467 2,766.030 0.00 0.00 -0.00222 250 226.2 HDPE 253.07 253.07 40.00 1.00
12 + 509.99 12 + 555.95 2,766.030 2,764.970 2,766.030 2,764.970 0.00 0.00 0.02306 250 226.2 HDPE 45.96 45.97 40.00 1.00
12 + 555.95 12 + 746.61 2,764.970 2,765.080 2,764.970 2,765.080 0.00 0.00 -0.00058 250 226.2 HDPE 190.66 190.66 40.00 1.00
12 + 746.61 12 + 792.94 2,765.080 2,765.000 2,765.080 2,763.800 0.00 1.20 0.02763 250 226.2 HDPE 46.33 46.35 40.00 1.00
12 + 792.94 12 + 903.23 2,765.000 2,765.020 2,763.800 2,763.380 1.20 1.64 0.00381 250 226.2 HDPE 110.29 110.29 40.00 1.00
12 + 903.23 13 + 14.40 2,765.020 2,757.650 2,763.380 2,760.860 1.64 -3.21 0.02267 250 226.2 HDPE 111.17 111.20 40.00 1.00

373281116.xlsx 15/90
)

COTA PIEZOMETRICA SOBRE PRESION


PRESION (m)
PENDIENTE (msnm) (m)
HIDRAULICA
(%0) DEL AL DEL AL DEL AL

3.28 2,805.46 2,805.42 2.46 2.62 2.46 3.19


3.28 2,805.42 2,805.37 2.62 7.29 3.19 8.86
3.28 2,805.37 2,805.33 7.29 10.81 8.86 13.13
3.28 2,805.33 2,805.27 10.81 10.86 13.13 13.26
3.28 2,805.27 2,805.00 10.86 13.01 13.26 16.17
3.28 2,805.00 2,804.64 13.01 15.29 16.17 19.33
3.28 2,804.64 2,804.33 15.29 18.04 19.33 23.00
3.28 2,804.33 2,804.19 18.04 18.54 23.00 23.77
3.28 2,804.19 2,804.00 18.54 32.15 23.77 40.34
3.28 2,804.00 2,803.89 32.15 33.71 40.34 42.33
3.28 2,803.89 2,803.78 33.71 34.52 42.33 43.44
3.28 2,803.78 2,803.38 34.52 34.93 43.44 44.41
3.28 2,803.38 2,803.18 34.93 36.64 44.41 46.71
3.28 2,803.18 2,803.03 36.64 40.66 46.71 51.71
3.28 2,803.03 2,802.66 40.66 48.27 51.71 61.29
3.28 2,802.66 2,802.52 48.27 49.09 61.29 62.44
3.28 2,802.52 2,802.51 49.09 49.63 62.44 63.10
3.28 2,802.51 2,802.41 49.63 50.25 63.10 63.96
3.28 2,802.41 2,802.39 50.25 49.82 63.96 63.47
3.28 2,802.39 2,802.06 49.82 51.15 63.47 65.46
3.28 2,802.06 2,802.05 51.15 51.47 65.46 65.86
3.28 2,802.05 2,802.03 51.47 51.53 65.86 65.95
3.28 2,802.03 2,802.02 51.53 51.27 65.95 65.66
3.28 2,802.02 2,801.46 51.27 53.60 65.66 69.13
3.62 2,801.46 2,801.12 53.60 53.62 69.13 69.55
3.62 2,801.12 2,800.02 53.62 58.47 69.55 76.70
3.62 2,800.02 2,799.45 58.47 35.58 76.70 49.91

373281116.xlsx 16/90
)

COTA PIEZOMETRICA SOBRE PRESION


PRESION (m)
PENDIENTE (msnm) (m)
HIDRAULICA
(%0) DEL AL DEL AL DEL AL

3.62 2,799.45 2,799.16 35.58 36.13 49.91 50.92


3.62 2,799.16 2,798.43 36.13 38.49 50.92 53.44
3.62 2,798.43 2,798.09 37.50 44.17 53.44 54.63
3.62 2,798.09 2,796.65 38.15 44.91 54.63 61.85
3.62 2,796.65 2,796.61 42.73 44.86 61.85 64.46
3.62 2,796.61 2,796.55 44.86 44.90 64.46 64.58
3.62 2,796.55 2,795.93 44.90 46.90 64.58 67.72
3.62 2,795.93 2,795.87 46.90 49.19 67.72 70.54
3.62 2,795.87 2,795.80 49.19 49.23 70.54 70.66
3.62 2,795.80 2,795.74 49.23 48.15 70.66 69.45
3.62 2,795.74 2,795.13 48.15 49.03 69.45 71.24
3.62 2,795.13 2,793.71 49.03 52.46 71.24 77.06
1.34 2,793.71 2,793.31 52.46 56.65 77.06 82.56
1.34 2,793.31 2,793.15 56.65 60.62 82.56 87.51
1.34 2,793.15 2,793.04 60.62 59.95 87.51 86.85
1.34 2,793.04 2,793.00 59.95 60.05 86.85 87.00
1.34 2,793.00 2,792.57 60.05 63.49 87.00 91.65
1.34 2,792.57 2,792.41 63.49 65.60 91.65 94.39
1.34 2,792.41 2,792.02 65.60 68.34 94.39 98.15
1.34 2,792.02 2,791.87 68.34 68.82 98.15 98.89
1.57 2,791.87 2,791.62 68.82 71.07 98.89 101.89
1.57 2,791.62 2,791.08 71.07 72.73 101.89 104.53
1.57 2,791.08 2,790.91 72.73 75.15 104.53 107.65
1.57 2,790.91 2,790.68 75.15 76.47 107.65 109.50
1.57 2,790.68 2,790.41 76.47 77.91 109.50 111.56
1.57 2,790.41 2,790.21 77.91 78.69 111.56 112.74
1.57 2,790.21 2,789.81 78.69 79.71 112.74 114.43

373281116.xlsx 17/90
)

COTA PIEZOMETRICA SOBRE PRESION


PRESION (m)
PENDIENTE (msnm) (m)
HIDRAULICA
(%0) DEL AL DEL AL DEL AL

1.57 2,789.81 2,789.60 79.71 80.30 114.43 115.39


1.57 2,789.60 2,789.45 80.30 78.34 115.39 113.22
1.57 2,789.45 2,788.92 78.34 74.39 113.22 109.12
1.57 2,788.92 2,788.60 74.39 73.66 109.12 108.62
1.57 2,788.60 2,788.27 73.66 72.62 108.62 107.78
1.57 2,788.27 2,788.25 72.62 73.74 107.78 109.14
1.57 2,788.25 2,788.22 73.74 73.61 109.14 109.02
1.57 2,788.22 2,788.20 73.61 71.80 109.02 106.87
1.57 2,788.20 2,787.91 71.80 70.40 106.87 105.54
1.57 2,787.91 2,787.59 70.40 67.39 105.54 102.31
1.34 2,787.59 2,787.40 67.39 64.46 102.31 99.03
1.34 2,787.40 2,787.06 64.46 63.48 99.03 98.26
1.34 2,787.06 2,786.99 63.48 63.23 98.26 98.05
1.34 2,786.99 2,786.83 63.23 61.23 98.05 95.83
1.34 2,786.83 2,786.70 61.23 60.92 95.83 95.62
1.34 2,786.70 2,786.56 60.92 60.19 95.62 94.91
1.34 2,786.56 2,786.45 60.19 58.70 94.91 93.26
1.34 2,786.45 2,786.27 58.70 58.27 93.26 92.95
1.34 2,786.27 2,785.97 58.27 54.94 92.95 89.32
1.34 2,785.97 2,785.69 54.94 52.48 89.32 86.71
1.34 2,785.69 2,785.51 52.48 51.71 86.71 86.00
1.34 2,785.51 2,785.31 51.71 50.12 86.00 84.33
1.34 2,785.31 2,785.28 50.12 49.80 84.33 83.97
1.34 2,785.28 2,785.14 49.80 48.45 83.97 82.52
1.34 2,785.14 2,784.91 48.45 47.15 82.52 81.24
3.62 2,784.91 2,784.53 47.15 45.04 81.24 79.17
3.62 2,784.53 2,784.32 45.04 44.63 79.17 78.92

373281116.xlsx 18/90
)

COTA PIEZOMETRICA SOBRE PRESION


PRESION (m)
PENDIENTE (msnm) (m)
HIDRAULICA
(%0) DEL AL DEL AL DEL AL

3.62 2,784.32 2,783.95 44.63 42.97 78.92 77.38


3.62 2,783.95 2,783.38 42.97 41.44 77.38 76.24
3.62 2,783.38 2,782.96 41.44 39.29 76.24 74.15
3.62 2,782.96 2,782.54 39.29 38.68 74.15 73.92
3.62 2,782.54 2,781.97 38.68 36.35 73.92 71.82
3.62 2,781.97 2,781.89 36.35 37.44 71.82 73.21
3.62 2,781.89 2,781.76 37.44 37.41 73.21 73.33
3.62 2,781.76 2,781.68 37.41 35.51 73.33 71.16
3.62 2,781.68 2,781.21 35.51 33.31 71.16 69.07
3.62 2,781.21 2,780.07 33.31 29.76 69.07 66.19
3.62 2,780.07 2,778.75 29.76 21.99 66.19 58.45
3.62 2,778.75 2,778.33 21.99 18.96 58.45 55.31
3.62 2,778.33 2,777.86 18.96 17.82 55.31 54.51
3.62 2,777.86 2,777.81 17.82 18.52 54.51 55.40
3.62 2,777.81 2,777.74 18.52 18.34 55.40 55.28
3.62 2,777.74 2,777.65 18.34 16.77 55.28 53.50
3.62 2,777.65 2,777.33 16.77 16.03 53.50 53.00
3.62 2,777.33 2,776.82 16.03 15.04 53.00 52.42
3.62 2,776.82 2,776.74 15.04 14.86 52.42 52.30
3.62 2,776.74 2,776.69 14.86 13.40 52.30 50.60
3.62 2,776.69 2,776.54 13.40 13.11 50.60 50.44
3.62 2,776.54 2,776.22 13.11 12.54 50.44 50.13
3.62 2,776.22 2,776.18 12.54 12.76 50.13 50.45
3.62 2,776.18 2,776.07 12.76 12.55 50.45 50.33
3.62 2,776.07 2,775.98 12.55 11.29 50.33 48.92
3.62 2,775.98 2,775.32 11.29 9.97 48.92 48.14
3.62 2,775.32 2,774.81 9.97 9.35 48.14 47.99

373281116.xlsx 19/90
)

COTA PIEZOMETRICA SOBRE PRESION


PRESION (m)
PENDIENTE (msnm) (m)
HIDRAULICA
(%0) DEL AL DEL AL DEL AL

3.62 2,774.81 2,773.90 9.35 7.87 47.99 47.32


3.62 2,773.90 2,773.73 7.87 8.76 47.32 48.59
3.62 2,773.73 2,773.04 8.76 7.96 48.59 48.46
3.62 2,773.04 2,772.87 7.96 9.07 48.46 49.99
3.62 2,772.87 2,772.47 9.07 9.09 49.99 50.50
3.62 2,772.47 2,772.07 9.09 11.21 50.50 53.52

PresionLlegada 12.02 m
CNAllegada 2,760.05
CNAsalida 2,757.65

373281116.xlsx 20/90
CALCULO DE LA SOBREPRESION
LINEA DE CONDUCCION EN TRAMO : PRESEDIMENTADOR - PTAP

Determinacion del golpe de ariete en todo el tramo comprendido entre el presedimentador - PTAP

Caudal de conduccion 40.00 l/s.


Altura Estatica 93.7 m
Veloc. equiv. del flujo 0.71 m/s
Cota de salida de la linea 2803.00 m.s.n.m
Cota de terreno mas baja en el tramo 2709.31 m.s.n.m
Nivel max. de Agua PTAP 0.00 m.s.n.m

Parmetros de diseo
Constante de gravedad 9.80 m/s2
D int.del tubo (D) en clase PN 12.5 = 268.6 mm
Modulo de Elasticidad del tubo (E) = 8.62E+08 N/m2
Espesor nominal del tubo (e1) = 23.2 mm
Densidad del agua p(kg/m3) = 1000 Kg/m3
Mod.de Elast. del vol. del agua (e) = 2.05E+09

1
Velocidad de la onda: C
1 D
p x ( )
e E x e1

C= 268.01 m/s

Altura de presin del golpe C x v


de ariete en cierre rpido ha
g
Sobre presin calculada en base al cierre rpido en el ingreso a la PTAP

SOBREPRESION 19.31 m.c.a.


CLASE MINIMA DE LA TUBERIA EN EL
TRAMO MAS BAJO 12.99 bar

TUBERIA SELECCIONADA HDPE SDR 13.6 PE 100 en la zona mas baja; sus especificaciones de trabajo se
indican a continuacin:
a) Presin Nominal de operacion : 12.5 Bar.
b) Presion maxima por golpe de ariete : 18 bar
c) Factor de Seguridad : 1.40
Especificaciones del Fabricante
SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO - PRESEDI


PLANILLA DE METRADOS PARA LAS PARTIDAS TRAZO Y REPLA

Cota de Terreno
Cota de Tuberia msnm) Profundidad (m)
TRAMO (msnm)
DEL AL Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup.

0 + 0 0 + 11.74 2804 2804 2,803.00 2,802.800 1.00


0 + 11.74 0 + 27.63 2804 2799.579 2,802.80 2,798.079 1.20
0 + 27.63 0 + 39.23 2799.579 2795.661 2,798.08 2,794.522 1.50
0 + 39.23 0 + 56.80 2795.661 2794.411 2,794.52 2,794.411 1.14
0 + 56.8 0 + 140.75 2794.411 2792.984 2,794.41 2,791.984 0.00
0 + 140.75 0 + 248.97 2792.984 2790.367 2,791.98 2,789.354 1.00
0 + 248.97 0 + 342.60 2790.367 2787.294 2,789.35 2,786.294 1.01
0 + 342.6 0 + 384.92 2787.294 2786.651 2,786.29 2,785.651 1.00
0 + 384.92 0 + 444.03 2786.651 2772.84 2,785.65 2,771.842 1.00
0 + 444.03 0 + 475.01 2772.84 2771.187 2,771.84 2,770.187 1.00
0 + 475.01 0 + 508.58 2771.187 2770.261 2,770.19 2,769.261 1.00
0 + 508.58 0 + 630.32 2770.261 2769.454 2,769.26 2,768.454 1.00
0 + 630.32 0 + 693.69 2769.454 2767.537 2,768.45 2,766.537 1.00
0 + 693.69 0 + 737.01 2767.537 2763.374 2,766.54 2,762.374 1.00
0 + 737.01 0 + 849.33 2763.374 2755.39 2,762.37 2,754.390 1.00
0 + 849.33 0 + 893.51 2755.39 2754.508 2,754.39 2,753.429 1.00
0 + 893.51 0 + 897.00 2754.508 2754.424 2,753.43 2,752.881 1.08
0 + 897 0 + 927.00 2754.424 2754.088 2,752.88 2,752.158 1.54
0 + 927 0 + 933.10 2754.088 2753.883 2,752.16 2,752.568 1.93
0 + 933.1 1 + 33.49 2753.883 2752.293 2,752.57 2,750.909 1.31
1 + 33.49 1 + 36.07 2752.293 2752.08 2,750.91 2,750.580 1.38
1 + 36.07 1 + 41.07 2752.08 2752.065 2,750.58 2,750.506 1.50
1 + 41.07 1 + 44.29 2752.065 2752.327 2,750.51 2,750.748 1.56
1 + 44.29 1 + 216.65 2752.327 2748.353 2,750.75 2,747.853 1.58
1 + 216.65 1 + 309.52 2748.353 2747.264 2,747.85 2,747.502 0.50
1 + 309.52 1 + 614.36 2747.264 2741.427 2,747.50 2,741.542 -0.24
1 + 614.36 1 + 769.73 2741.427 2763.66 2,741.54 2,763.869 -0.11
1 + 769.73 1 + 850.00 2763.66 2763.027 2,763.87 2,763.027 -0.21
1 + 850 2 + 50.00 2763.027 2760.929 2,763.03 2,760.929 0.00
2 + 50 2 + 144.70 2760.929 2759.939 2,760.93 2,759.939 0.00
2 + 144.7 2 + 542.73 2759.939 2754.387 2,759.94 2,753.922 0.00

373281116.xlsx/Trazo y repl. 22/90


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO - PRESEDI


PLANILLA DE METRADOS PARA LAS PARTIDAS TRAZO Y REPLA

Cota de Terreno
Cota de Tuberia msnm) Profundidad (m)
TRAMO (msnm)
DEL AL Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup.

2 + 542.73 2 + 554.73 2754.387 2753.162 2,753.92 2,751.743 0.47


2 + 554.73 2 + 571.07 2753.162 2753.014 2,751.74 2,751.643 1.42
2 + 571.07 2 + 741.00 2753.014 2749.006 2,751.64 2,749.032 1.37
2 + 741 2 + 759.00 2749.006 2748.076 2,749.03 2,746.676 -0.03
2 + 759 2 + 776.27 2748.076 2748.076 2,746.68 2,746.576 1.40
2 + 776.27 2 + 794.50 2748.076 2748.084 2,746.58 2,747.584 1.50
2 + 794.5 2 + 961.45 2748.084 2746.072 2,747.58 2,746.098 0.50
2 + 961.45 3 + 354.47 2746.072 2740.933 2,746.10 2,741.245 -0.03
3 + 354.47 3 + 653.20 2740.933 2736.662 2,741.25 2,736.662 -0.31
3 + 653.2 3 + 772.60 2736.662 2733.987 2,736.66 2,732.534 0.00
3 + 772.6 3 + 854.54 2733.987 2733.089 2,732.53 2,733.089 1.45
3 + 854.54 3 + 883.53 2733.089 2732.957 2,733.09 2,732.958 0.00
3 + 883.53 4 + 205.65 2732.957 2729.086 2,732.96 2,729.086 0.00
4 + 205.65 4 + 330.41 2729.086 2726.807 2,729.09 2,726.807 0.00
4 + 330.41 4 + 623.30 2726.807 2723.671 2,726.81 2,723.671 0.00
4 + 623.3 4 + 729.63 2723.671 2723.052 2,723.67 2,723.052 0.00
4 + 729.63 4 + 890.63 2723.052 2721.256 2,723.05 2,720.552 0.00
4 + 890.63 5 + 233.89 2721.256 2718.352 2,720.55 2,718.352 0.70
5 + 233.89 5 + 345.04 2718.352 2715.487 2,718.35 2,715.754 0.00
5 + 345.04 5 + 490.73 2715.487 2714.214 2,715.75 2,714.214 -0.27
5 + 490.73 5 + 665.60 2714.214 2712.494 2,714.21 2,712.494 0.00
5 + 665.6 5 + 792.95 2712.494 2711.513 2,712.49 2,711.513 0.00
5 + 792.95 6 + 44.21 2711.513 2710.183 2,711.51 2,710.100 0.00
6 + 44.21 6 + 177.33 2710.183 2709.505 2,710.10 2,709.306 0.08
6 + 177.33 6 + 271.71 2709.505 2711.116 2,709.31 2,711.116 0.20
6 + 271.71 6 + 610.85 2711.116 2714.529 2,711.12 2,714.529 0.00
6 + 610.85 6 + 815.23 2714.529 2714.945 2,714.53 2,714.945 0.00
6 + 815.23 7 + 30.10 2714.945 2715.763 2,714.95 2,715.643 0.00
7 + 30.1 7 + 42.10 2715.763 2715.641 2,715.64 2,714.508 0.12
7 + 42.1 7 + 58.16 2715.641 2715.848 2,714.51 2,714.608 1.13
7 + 58.16 7 + 70.58 2715.848 2716.403 2,714.61 2,716.403 1.24

373281116.xlsx/Trazo y repl. 23/90


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO - PRESEDI


PLANILLA DE METRADOS PARA LAS PARTIDAS TRAZO Y REPLA

Cota de Terreno
Cota de Tuberia msnm) Profundidad (m)
TRAMO (msnm)
DEL AL Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup.

7 + 70.58 7 + 255.23 2716.403 2717.999 2,716.40 2,717.513 0.00


7 + 255.23 7 + 458.43 2717.999 2720.202 2,717.51 2,720.202 0.49
7 + 458.43 7 + 605.27 2720.202 2722.941 2,720.20 2,722.941 0.00
7 + 605.27 7 + 861.40 2722.941 2723.579 2,722.94 2,723.579 0.00
7 + 861.4 7 + 913.87 2723.579 2723.753 2,723.58 2,723.753 0.00
7 + 913.87 8 + 26.73 2723.753 2725.602 2,723.75 2,725.602 0.00
8 + 26.73 8 + 127.56 2725.602 2725.781 2,725.60 2,725.781 0.00
8 + 127.56 8 + 231.93 2725.781 2726.369 2,725.78 2,726.369 0.00
8 + 231.93 8 + 316.04 2726.369 2727.745 2,726.37 2,727.745 0.00
8 + 316.04 8 + 451.13 2727.745 2728.041 2,727.75 2,728.000 0.00
8 + 451.13 8 + 674.79 2728.041 2731.025 2,728.00 2,731.025 0.04
8 + 674.79 8 + 886.73 2731.025 2733.202 2,731.03 2,733.202 0.00
8 + 886.73 9 + 17.84 2733.202 2733.797 2,733.20 2,733.797 0.00
9 + 17.84 9 + 169.68 2733.797 2735.173 2,733.80 2,735.187 0.00
9 + 169.68 9 + 188.37 2735.173 2735.469 2,735.19 2,735.485 -0.01
9 + 188.37 9 + 296.26 2735.469 2736.694 2,735.49 2,736.694 -0.02
9 + 296.26 9 + 469.20 2736.694 2737.761 2,736.69 2,737.761 0.00
9 + 469.2 9 + 572.76 2737.761 2739.49 2,737.76 2,739.490 0.00
9 + 572.76 9 + 631.45 2739.49 2739.695 2,739.49 2,739.695 0.00
9 + 631.45 9 + 733.67 2739.695 2741.038 2,739.70 2,740.982 0.00
9 + 733.67 9 + 892.57 2741.038 2741.931 2,740.98 2,741.931 0.06
9 + 892.57 10 + 6.30 2741.931 2743.669 2,741.93 2,743.669 0.00
10 + 6.3 10 + 122.91 2743.669 2743.77 2,743.67 2,743.861 0.00
10 + 122.91 10 + 282.09 2743.77 2745.948 2,743.86 2,745.614 -0.09
10 + 282.09 10 + 302.49 2745.948 2745.995 2,745.61 2,744.450 0.33
10 + 302.49 10 + 339.09 2745.995 2745.832 2,744.45 2,744.350 1.55
10 + 339.09 10 + 361.79 2745.832 2746.164 2,744.35 2,746.164 1.48
10 + 361.79 10 + 490.16 2746.164 2747.469 2,746.16 2,747.906 0.00
10 + 490.16 10 + 806.20 2747.469 2750.303 2,747.91 2,750.303 -0.44
10 + 806.2 11 + 170.23 2750.303 2756.755 2,750.30 2,756.755 0.00
11 + 170.23 11 + 286.12 2756.755 2759.372 2,756.76 2,759.372 0.00

373281116.xlsx/Trazo y repl. 24/90


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO - PRESEDI


PLANILLA DE METRADOS PARA LAS PARTIDAS TRAZO Y REPLA

Cota de Terreno
Cota de Tuberia msnm) Profundidad (m)
TRAMO (msnm)
DEL AL Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup.

11 + 286.12 11 + 417.19 2759.372 2760.678 2,759.37 2,760.034 0.00


11 + 417.19 11 + 428.89 2760.678 2760.799 2,760.03 2,759.297 0.64
11 + 428.89 11 + 449.99 2760.799 2760.8 2,759.30 2,759.397 1.50
11 + 449.99 11 + 474.57 2760.8 2760.874 2,759.40 2,760.875 1.40
11 + 474.57 11 + 562.74 2760.874 2762.016 2,760.88 2,761.296 0.00
11 + 562.74 11 + 704.29 2762.016 2763.276 2,761.30 2,761.776 0.72
11 + 704.29 11 + 726.19 2763.276 2763.648 2,761.78 2,761.876 1.50
11 + 726.19 11 + 738.19 2763.648 2763.932 2,761.88 2,763.293 1.77
11 + 738.19 11 + 781.49 2763.932 2763.425 2,763.29 2,763.425 0.64
11 + 781.49 11 + 867.34 2763.425 2764.801 2,763.43 2,763.688 0.00
11 + 867.34 11 + 879.34 2764.801 2764.763 2,763.69 2,763.423 1.11
11 + 879.34 11 + 910.44 2764.763 2764.896 2,763.42 2,763.523 1.34
11 + 910.44 11 + 934.44 2764.896 2765.263 2,763.52 2,764.695 1.37
11 + 934.44 12 + 118.16 2765.263 2765.412 2,764.70 2,765.345 0.57
12 + 118.16 12 + 256.92 2765.412 2765.467 2,765.35 2,765.467 0.07
12 + 256.92 12 + 509.99 2765.467 2766.03 2,765.47 2,766.030 0.00
12 + 509.99 12 + 555.95 2766.03 2764.97 2,766.03 2,764.970 0.00
12 + 555.95 12 + 746.61 2764.97 2765.08 2,764.97 2,765.080 0.00
12 + 746.61 12 + 792.94 2765.08 2765 2,765.08 2,763.800 0.00
12 + 792.94 12 + 903.23 2765 2765.02 2,763.80 2,763.380 1.20
12 + 903.23 13 + 14.40 2765.02 2757.65 2,763.38 2,760.860 1.64

TRAZO Y REPLANTEO INICIAL DE LA LINEA DE CONDUCCION DE AGUA TRATADA(ml) =


REPLANTEO FINAL DE LA LINEA DE CONDUCCION DE AGUA TRATADA(ml) =

373281116.xlsx/Trazo y repl. 25/90


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

GUA CRUDA - 2do TRAMO - PRESEDIMENTADOR - PTAP


ARA LAS PARTIDAS TRAZO Y REPLANTEO INICIAL

Longitud
Profundidad (m) Dimetro (mm) Longitud
Corregida
Ext. Inf. Prom DN Dinterno (m) (m)

1.20 1.10 250 230.8 11.74 11.74


1.50 1.35 250 230.8 15.89 16.58
1.14 1.32 250 230.8 11.6 12.13
0.00 0.57 250 230.8 17.57 17.57
1.00 0.50 250 230.8 83.95 83.99
1.01 1.01 250 230.8 108.22 108.25
1.00 1.01 250 230.8 93.63 93.68
1.00 1.00 250 230.8 42.32 42.32
1.00 1.00 250 230.8 59.11 60.70
1.00 1.00 250 230.8 30.98 31.02
1.00 1.00 250 230.8 33.57 33.58
1.00 1.00 250 230.8 121.74 121.74
1.00 1.00 250 230.8 63.37 63.40
1.00 1.00 250 230.8 43.32 43.52
1.00 1.00 250 230.8 112.32 112.60
1.08 1.04 250 230.8 44.18 44.19
1.54 1.31 250 230.8 3.49 3.53
1.93 1.74 250 230.8 30 30.01
1.31 1.62 250 230.8 6.1 6.11
1.38 1.35 250 230.8 100.39 100.40
1.50 1.44 250 230.8 2.58 2.60
1.56 1.53 250 230.8 5 5.00
1.58 1.57 250 230.8 3.22 3.23
0.50 1.04 250 230.8 172.36 172.38
-0.24 0.13 250 226.2 92.87 92.87
-0.11 -0.18 250 226.2 304.84 304.90
-0.21 -0.16 250 226.2 155.37 156.97
0.00 -0.10 250 226.2 80.27 80.27
0.00 0.00 250 226.2 200 200.01
0.00 0.00 250 226.2 94.7 94.71
0.47 0.23 250 226.2 398.03 398.08

373281116.xlsx/Trazo y repl. 26/90


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

GUA CRUDA - 2do TRAMO - PRESEDIMENTADOR - PTAP


ARA LAS PARTIDAS TRAZO Y REPLANTEO INICIAL

Longitud
Profundidad (m) Dimetro (mm) Longitud
Corregida
Ext. Inf. Prom DN Dinterno (m) (m)

1.42 0.94 250 226.2 12 12.20


1.37 1.39 250 226.2 16.34 16.34
-0.03 0.67 250 226.2 169.93 169.95
1.40 0.69 250 226.2 18 18.15
1.50 1.45 250 226.2 17.27 17.27
0.50 1.00 250 226.2 18.23 18.26
-0.03 0.24 250 226.2 166.95 166.96
-0.31 -0.17 250 226.2 393.02 393.05
0.00 -0.16 315 277.6 298.73 298.77
1.45 0.73 315 277.6 119.4 119.47
0.00 0.73 315 277.6 81.94 81.94
0.00 0.00 315 277.6 28.99 28.99
0.00 0.00 315 277.6 322.12 322.14
0.00 0.00 315 277.6 124.76 124.78
0.00 0.00 315 277.6 292.89 292.91
0.00 0.00 315 277.6 106.33 106.33
0.70 0.35 315 268.6 161 161.02
0.00 0.35 315 268.6 343.26 343.27
-0.27 -0.13 315 268.6 111.15 111.18
0.00 -0.13 315 268.6 145.69 145.70
0.00 0.00 315 268.6 174.87 174.88
0.00 0.00 315 268.6 127.35 127.35
0.08 0.04 315 268.6 251.26 251.26
0.20 0.14 315 268.6 133.12 133.12
0.00 0.10 315 268.6 94.38 94.40
0.00 0.00 315 268.6 339.14 339.16
0.00 0.00 315 268.6 204.38 204.38
0.12 0.06 315 268.6 214.87 214.87
1.13 0.63 315 268.6 12 12.05
1.24 1.19 315 268.6 16.06 16.06
0.00 0.62 315 268.6 12.42 12.55

373281116.xlsx/Trazo y repl. 27/90


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

GUA CRUDA - 2do TRAMO - PRESEDIMENTADOR - PTAP


ARA LAS PARTIDAS TRAZO Y REPLANTEO INICIAL

Longitud
Profundidad (m) Dimetro (mm) Longitud
Corregida
Ext. Inf. Prom DN Dinterno (m) (m)

0.49 0.24 315 268.6 184.65 184.65


0.00 0.24 315 268.6 203.2 203.22
0.00 0.00 315 277.6 146.84 146.87
0.00 0.00 315 277.6 256.13 256.13
0.00 0.00 315 277.6 52.47 52.47
0.00 0.00 315 277.6 112.86 112.88
0.00 0.00 315 277.6 100.83 100.83
0.00 0.00 315 277.6 104.37 104.37
0.00 0.00 315 277.6 84.11 84.12
0.04 0.02 315 277.6 135.09 135.09
0.00 0.02 315 277.6 223.66 223.68
0.00 0.00 315 277.6 211.94 211.95
0.00 0.00 315 277.6 131.11 131.11
-0.01 -0.01 315 277.6 151.84 151.85
-0.02 -0.02 315 277.6 18.69 18.69
0.00 -0.01 315 277.6 107.89 107.90
0.00 0.00 315 277.6 172.94 172.94
0.00 0.00 250 226.2 103.56 103.57
0.00 0.00 250 226.2 58.69 58.69
0.06 0.03 250 226.2 102.22 102.23
0.00 0.03 250 226.2 158.9 158.90
0.00 0.00 250 226.2 113.73 113.74
-0.09 -0.05 250 226.2 116.61 116.61
0.33 0.12 250 226.2 159.18 159.19
1.55 0.94 250 226.2 20.4 20.43
1.48 1.51 250 226.2 36.6 36.60
0.00 0.74 250 226.2 22.7 22.77
-0.44 -0.22 250 226.2 128.37 128.38
0.00 -0.22 250 226.2 316.04 316.05
0.00 0.00 250 226.2 364.03 364.09
0.00 0.00 250 226.2 115.89 115.92

373281116.xlsx/Trazo y repl. 28/90


SUSTENTACION DE METRADOS
TRAZO Y REPLANTEO

GUA CRUDA - 2do TRAMO - PRESEDIMENTADOR - PTAP


ARA LAS PARTIDAS TRAZO Y REPLANTEO INICIAL

Longitud
Profundidad (m) Dimetro (mm) Longitud
Corregida
Ext. Inf. Prom DN Dinterno (m) (m)

0.64 0.32 250 226.2 131.07 131.07


1.50 1.07 250 226.2 11.7 11.72
1.40 1.45 250 226.2 21.1 21.10
0.00 0.70 250 226.2 24.58 24.62
0.72 0.36 250 226.2 88.17 88.17
1.50 1.11 250 226.2 141.55 141.55
1.77 1.64 250 226.2 21.9 21.90
0.64 1.21 250 226.2 12 12.08
0.00 0.32 250 226.2 43.3 43.30
1.11 0.56 250 226.2 85.85 85.85
1.34 1.23 250 226.2 12 12.00
1.37 1.36 250 226.2 31.1 31.10
0.57 0.97 250 226.2 24 24.03
0.07 0.32 250 226.2 183.72 183.72
0.00 0.03 250 226.2 138.76 138.76
0.00 0.00 250 226.2 253.07 253.07
0.00 0.00 250 226.2 45.96 45.97
0.00 0.00 250 226.2 190.66 190.66
1.20 0.60 250 226.2 46.33 46.35
1.64 1.42 250 226.2 110.29 110.29
-3.21 -0.79 250 226.2 111.17 111.20
13,014.40 13,021.32
13,021.32
13,021.32

373281116.xlsx/Trazo y repl. 29/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION

LINEA DE CONDUCCION DE AGUA CRUDA - 2do TRAMO - PRESEDIMENTADOR

PLANILLA DE METRADOS PARA LAS PARTIDAS EXCAVACION, REFINE, RELLENO, ELIMINACION Y SUM

Cota de Terreno
Cota de Fondo msnm) Profundidad (m) Dimetro (mm) Longitud Clase
TRAMO (msnm) Tipo de
de Material
Terreno
Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Ext. Sup. Ext. Inf. Prom DN Dinterno (m) Tuberia
DEL AL

0 + 0 0 + 11.74 2804.000 2804.000 2803.000 2802.800 1.00 1.20 1.10 250 230.8 11.74 TR PN 8 PVC
0 + 11.74 0 + 27.63 2804.000 2799.579 2802.800 2798.079 1.20 1.50 1.35 250 230.8 16.58 TR PN 8 PVC
0 + 27.63 0 + 39.23 2799.579 2795.661 2798.079 2794.522 1.50 1.14 1.32 250 230.8 12.13 TR PN 8 PVC
0 + 39.23 0 + 56.8 2795.661 2794.411 2794.522 2794.411 1.14 0.00 0.57 250 230.8 17.57 TS PN 8 PVC
0 + 56.8 0 + 140.75 2794.411 2792.984 2794.411 2791.984 0.00 1.00 0.50 250 230.8 83.99 TS PN 8 PVC
0 + 140.75 0 + 248.97 2792.984 2790.367 2791.984 2789.354 1.00 1.01 1.01 250 230.8 108.25 TS PN 8 PVC
0 + 248.97 0 + 342.6 2790.367 2787.294 2789.354 2786.294 1.01 1.00 1.01 250 230.8 93.68 TR PN 8 PVC
0 + 342.6 0 + 384.92 2787.294 2786.651 2786.294 2785.651 1.00 1.00 1.00 250 230.8 42.32 TR PN 8 PVC
0 + 384.92 0 + 444.03 2786.651 2772.840 2785.651 2771.842 1.00 1.00 1.00 250 230.8 60.70 TR PN 8 PVC
0 + 444.03 0 + 475.01 2772.840 2771.187 2771.842 2770.187 1.00 1.00 1.00 250 230.8 31.02 TR PN 8 PVC
0 + 475.01 0 + 508.58 2771.187 2770.261 2770.187 2769.261 1.00 1.00 1.00 250 230.8 33.58 TR PN 8 PVC
0 + 508.58 0 + 630.32 2770.261 2769.454 2769.261 2768.454 1.00 1.00 1.00 250 230.8 121.74 TR PN 8 PVC
0 + 630.32 0 + 693.69 2769.454 2767.537 2768.454 2766.537 1.00 1.00 1.00 250 230.8 63.40 TR PN 8 PVC
0 + 693.69 0 + 737.01 2767.537 2763.374 2766.537 2762.374 1.00 1.00 1.00 250 230.8 43.52 TR PN 8 PVC
0 + 737.01 0 + 849.33 2763.374 2755.390 2762.374 2754.390 1.00 1.00 1.00 250 230.8 112.60 TR PN 8 PVC
0 + 849.33 0 + 893.51 2755.390 2754.508 2754.390 2753.429 1.00 1.08 1.04 250 230.8 44.19 TR PN 8 PVC
0 + 893.51 0 + 897 2754.508 2754.424 2753.429 2752.881 1.08 1.54 1.31 250 230.8 3.53 TR PN 8 PVC
0 + 897 0 + 927 2754.424 2754.088 2752.881 2752.158 1.54 1.93 1.74 250 230.8 30.01 TR PN 8 PVC
0 + 927 0 + 933.1 2754.088 2753.883 2752.158 2752.568 1.93 1.31 1.62 250 230.8 6.11 TR PN 8 PVC
0 + 933.1 1 + 33.49 2753.883 2752.293 2752.568 2750.909 1.31 1.38 1.35 250 230.8 100.40 TR PN 8 PVC
1 + 33.49 1 + 36.07 2752.293 2752.080 2750.909 2750.580 1.38 1.50 1.44 250 230.8 2.60 TR PN 8 PVC

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 30/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
1 + 36.07 1 + 41.07 2752.080 2752.065 2750.580 2750.506 1.50 1.56 1.53 250 230.8 5.00 TR PN 8 PVC
1 + 41.07 1 + 44.29 2752.065 2752.327 2750.506 2750.748 1.56 1.58 1.57 250 230.8 3.23 TR PN 8 PVC
1 + 44.29 1 + 216.65 2752.327 2748.353 2750.748 2747.853 1.58 0.50 1.04 250 230.8 172.38 TR PN 8 PVC
1 + 216.65 1 + 309.52 2748.353 2747.264 2747.853 2747.502 0.50 -0.24 0.13 250 226.2 92.87 TR PN 8 HDPE
1 + 309.52 1 + 614.36 2747.264 2741.427 2747.502 2741.542 -0.24 -0.11 -0.18 250 226.2 304.90 TR PN 8 HDPE
1 + 614.36 1 + 769.73 2741.427 2763.660 2741.542 2763.869 -0.11 -0.21 -0.16 250 226.2 156.97 TR PN 8 HDPE
1 + 769.73 1 + 850 2763.660 2763.027 2763.869 2763.027 -0.21 0.00 -0.10 250 226.2 80.27 TR PN 8 HDPE
1 + 850 2 + 50 2763.027 2760.929 2763.027 2760.929 0.00 0.00 0.00 250 226.2 200.01 TSR PN 8 HDPE
2 + 50 2 + 144.7 2760.929 2759.939 2760.929 2759.939 0.00 0.00 0.00 250 226.2 94.71 TR PN 8 HDPE
2 + 144.7 2 + 542.73 2759.939 2754.387 2759.939 2753.922 0.00 0.47 0.23 250 226.2 398.08 TR PN 8 HDPE
2 + 542.73 2 + 554.73 2754.387 2753.162 2753.922 2751.743 0.47 1.42 0.94 250 226.2 12.20 TR PN 8 HDPE
2 + 554.73 2 + 571.07 2753.162 2753.014 2751.743 2751.643 1.42 1.37 1.39 250 226.2 16.34 TR PN 8 HDPE
2 + 571.07 2 + 741 2753.014 2749.006 2751.643 2749.032 1.37 -0.03 0.67 250 226.2 169.95 TR PN 8 HDPE
2 + 741 2 + 759 2749.006 2748.076 2749.032 2746.676 -0.03 1.40 0.69 250 226.2 18.15 TR PN 8 HDPE
2 + 759 2 + 776.27 2748.076 2748.076 2746.676 2746.576 1.40 1.50 1.45 250 226.2 17.27 TR PN 8 HDPE
2 + 776.27 2 + 794.5 2748.076 2748.084 2746.576 2747.584 1.50 0.50 1.00 250 226.2 18.26 TR PN 8 HDPE
2 + 794.5 2 + 961.45 2748.084 2746.072 2747.584 2746.098 0.50 -0.03 0.24 250 226.2 166.96 TR PN 8 HDPE
2 + 961.45 3 + 354.47 2746.072 2740.933 2746.098 2741.245 -0.03 -0.31 -0.17 250 226.2 393.05 TR PN 8 HDPE
3 + 354.47 3 + 653.2 2740.933 2736.662 2741.245 2736.662 -0.31 0.00 -0.16 315 277.6 298.77 TR PN 10 HDPE
3 + 653.2 3 + 772.6 2736.662 2733.987 2736.662 2732.534 0.00 1.45 0.73 315 277.6 119.47 TR PN 10 HDPE
3 + 772.6 3 + 854.54 2733.987 2733.089 2732.534 2733.089 1.45 0.00 0.73 315 277.6 81.94 TR PN 10 HDPE
3 + 854.54 3 + 883.53 2733.089 2732.957 2733.089 2732.958 0.00 0.00 0.00 315 277.6 28.99 TR PN 10 HDPE
3 + 883.53 4 + 205.65 2732.957 2729.086 2732.958 2729.086 0.00 0.00 0.00 315 277.6 322.14 TR PN 10 HDPE
4 + 205.65 4 + 330.41 2729.086 2726.807 2729.086 2726.807 0.00 0.00 0.00 315 277.6 124.78 TR PN 10 HDPE
4 + 330.41 4 + 623.3 2726.807 2723.671 2726.807 2723.671 0.00 0.00 0.00 315 277.6 292.91 TR PN 10 HDPE
4 + 623.3 4 + 729.63 2723.671 2723.052 2723.671 2723.052 0.00 0.00 0.00 315 277.6 106.33 TR PN 10 HDPE
4 + 729.63 4 + 890.63 2723.052 2721.256 2723.052 2720.552 0.00 0.70 0.35 315 268.6 161.02 TR PN 12.5 HDPE
4 + 890.63 5 + 233.89 2721.256 2718.352 2720.552 2718.352 0.70 0.00 0.35 315 268.6 343.27 TR PN 12.5 HDPE
5 + 233.89 5 + 345.04 2718.352 2715.487 2718.352 2715.754 0.00 -0.27 -0.13 315 268.6 111.18 TR PN 12.5 HDPE

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 31/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
5 + 345.04 5 + 490.73 2715.487 2714.214 2715.754 2714.214 -0.27 0.00 -0.13 315 268.6 145.70 TR PN 12.5 HDPE
5 + 490.73 5 + 665.6 2714.214 2712.494 2714.214 2712.494 0.00 0.00 0.00 315 268.6 174.88 TR PN 12.5 HDPE
5 + 665.6 5 + 792.95 2712.494 2711.513 2712.494 2711.513 0.00 0.00 0.00 315 268.6 127.35 TR PN 12.5 HDPE
5 + 792.95 6 + 44.21 2711.513 2710.183 2711.513 2710.100 0.00 0.08 0.04 315 268.6 251.26 TR PN 12.5 HDPE
6 + 44.21 6 + 177.33 2710.183 2709.505 2710.100 2709.306 0.08 0.20 0.14 315 268.6 133.12 TR PN 12.5 HDPE
6 + 177.33 6 + 271.71 2709.505 2711.116 2709.306 2711.116 0.20 0.00 0.10 315 268.6 94.40 TR PN 12.5 HDPE
6 + 271.71 6 + 610.85 2711.116 2714.529 2711.116 2714.529 0.00 0.00 0.00 315 268.6 339.16 TR PN 12.5 HDPE
6 + 610.85 6 + 815.23 2714.529 2714.945 2714.529 2714.945 0.00 0.00 0.00 315 268.6 204.38 TR PN 12.5 HDPE
6 + 815.23 7 + 30.1 2714.945 2715.763 2714.945 2715.643 0.00 0.12 0.06 315 268.6 214.87 TR PN 12.5 HDPE
7 + 30.1 7 + 42.1 2715.763 2715.641 2715.643 2714.508 0.12 1.13 0.63 315 268.6 12.05 TR PN 12.5 HDPE
7 + 42.1 7 + 58.16 2715.641 2715.848 2714.508 2714.608 1.13 1.24 1.19 315 268.6 16.06 TR PN 12.5 HDPE
7 + 58.16 7 + 70.58 2715.848 2716.403 2714.608 2716.403 1.24 0.00 0.62 315 268.6 12.55 TR PN 12.5 HDPE
7 + 70.58 7 + 255.23 2716.403 2717.999 2716.403 2717.513 0.00 0.49 0.24 315 268.6 184.65 TR PN 12.5 HDPE
7 + 255.23 7 + 458.43 2717.999 2720.202 2717.513 2720.202 0.49 0.00 0.24 315 268.6 203.22 TR PN 12.5 HDPE
7 + 458.43 7 + 605.27 2720.202 2722.941 2720.202 2722.941 0.00 0.00 0.00 315 277.6 146.87 TR PN 10 HDPE
7 + 605.27 7 + 861.4 2722.941 2723.579 2722.941 2723.579 0.00 0.00 0.00 315 277.6 256.13 TR PN 10 HDPE
7 + 861.4 7 + 913.87 2723.579 2723.753 2723.579 2723.753 0.00 0.00 0.00 315 277.6 52.47 TR PN 10 HDPE
7 + 913.87 8 + 26.73 2723.753 2725.602 2723.753 2725.602 0.00 0.00 0.00 315 277.6 112.88 TR PN 10 HDPE
8 + 26.73 8 + 127.56 2725.602 2725.781 2725.602 2725.781 0.00 0.00 0.00 315 277.6 100.83 TR PN 10 HDPE
8 + 127.56 8 + 231.93 2725.781 2726.369 2725.781 2726.369 0.00 0.00 0.00 315 277.6 104.37 TR PN 10 HDPE
8 + 231.93 8 + 316.04 2726.369 2727.745 2726.369 2727.745 0.00 0.00 0.00 315 277.6 84.12 TR PN 10 HDPE
8 + 316.04 8 + 451.13 2727.745 2728.041 2727.745 2728.000 0.00 0.04 0.02 315 277.6 135.09 TR PN 10 HDPE
8 + 451.13 8 + 674.79 2728.041 2731.025 2728.000 2731.025 0.04 0.00 0.02 315 277.6 223.68 TR PN 10 HDPE
8 + 674.79 8 + 886.73 2731.025 2733.202 2731.025 2733.202 0.00 0.00 0.00 315 277.6 211.95 TR PN 10 HDPE
8 + 886.73 9 + 17.84 2733.202 2733.797 2733.202 2733.797 0.00 0.00 0.00 315 277.6 131.11 TR PN 10 HDPE
9 + 17.84 9 + 169.68 2733.797 2735.173 2733.797 2735.187 0.00 -0.01 -0.01 315 277.6 151.85 TR PN 10 HDPE
9 + 169.68 9 + 188.37 2735.173 2735.469 2735.187 2735.485 -0.01 -0.02 -0.02 315 277.6 18.69 TR PN 10 HDPE
9 + 188.37 9 + 296.26 2735.469 2736.694 2735.485 2736.694 -0.02 0.00 -0.01 315 277.6 107.90 TR PN 10 HDPE
9 + 296.26 9 + 469.2 2736.694 2737.761 2736.694 2737.761 0.00 0.00 0.00 315 277.6 172.94 TR PN 10 HDPE

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 32/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
9 + 469.2 9 + 572.76 2737.761 2739.490 2737.761 2739.490 0.00 0.00 0.00 250 226.2 103.57 TR PN 8 HDPE
9 + 572.76 9 + 631.45 2739.490 2739.695 2739.490 2739.695 0.00 0.00 0.00 250 226.2 58.69 TR PN 8 HDPE
9 + 631.45 9 + 733.67 2739.695 2741.038 2739.695 2740.982 0.00 0.06 0.03 250 226.2 102.23 TR PN 8 HDPE
9 + 733.67 9 + 892.57 2741.038 2741.931 2740.982 2741.931 0.06 0.00 0.03 250 226.2 158.90 TR PN 8 HDPE
9 + 892.57 10 + 6.3 2741.931 2743.669 2741.931 2743.669 0.00 0.00 0.00 250 226.2 113.74 TR PN 8 HDPE
10 + 6.3 10 + 122.91 2743.669 2743.770 2743.669 2743.861 0.00 -0.09 -0.05 250 226.2 116.61 TR PN 8 HDPE
10 + 122.91 10 + 282.09 2743.770 2745.948 2743.861 2745.614 -0.09 0.33 0.12 250 226.2 159.19 TR PN 8 HDPE
10 + 282.09 10 + 302.49 2745.948 2745.995 2745.614 2744.450 0.33 1.55 0.94 250 226.2 20.43 TR PN 8 HDPE
10 + 302.49 10 + 339.09 2745.995 2745.832 2744.450 2744.350 1.55 1.48 1.51 250 226.2 36.60 TR PN 8 HDPE
10 + 339.09 10 + 361.79 2745.832 2746.164 2744.350 2746.164 1.48 0.00 0.74 250 226.2 22.77 TR PN 8 HDPE
10 + 361.79 10 + 490.16 2746.164 2747.469 2746.164 2747.906 0.00 -0.44 -0.22 250 226.2 128.38 TR PN 8 HDPE
10 + 490.16 10 + 806.2 2747.469 2750.303 2747.906 2750.303 -0.44 0.00 -0.22 250 226.2 316.05 TR PN 8 HDPE
10 + 806.2 11 + 170.23 2750.303 2756.755 2750.303 2756.755 0.00 0.00 0.00 250 226.2 364.09 TR PN 8 HDPE
11 + 170.23 11 + 286.12 2756.755 2759.372 2756.755 2759.372 0.00 0.00 0.00 250 226.2 115.92 TR PN 8 HDPE
11 + 286.12 11 + 417.19 2759.372 2760.678 2759.372 2760.034 0.00 0.64 0.32 250 226.2 131.07 TR PN 8 HDPE
11 + 417.19 11 + 428.89 2760.678 2760.799 2760.034 2759.297 0.64 1.50 1.07 250 226.2 11.72 TR PN 8 HDPE
11 + 428.89 11 + 449.99 2760.799 2760.800 2759.297 2759.397 1.50 1.40 1.45 250 226.2 21.10 TR PN 8 HDPE
11 + 449.99 11 + 474.57 2760.800 2760.874 2759.397 2760.875 1.40 0.00 0.70 250 226.2 24.62 TR PN 8 HDPE
11 + 474.57 11 + 562.74 2760.874 2762.016 2760.875 2761.296 0.00 0.72 0.36 250 226.2 88.17 TR PN 8 HDPE
11 + 562.74 11 + 704.29 2762.016 2763.276 2761.296 2761.776 0.72 1.50 1.11 250 226.2 141.55 TR PN 8 HDPE
11 + 704.29 11 + 726.19 2763.276 2763.648 2761.776 2761.876 1.50 1.77 1.64 250 226.2 21.90 TR PN 8 HDPE
11 + 726.19 11 + 738.19 2763.648 2763.932 2761.876 2763.293 1.77 0.64 1.21 250 226.2 12.08 TR PN 8 HDPE
11 + 738.19 11 + 781.49 2763.932 2763.425 2763.293 2763.425 0.64 0.00 0.32 250 226.2 43.30 TR PN 8 HDPE
11 + 781.49 11 + 867.34 2763.425 2764.801 2763.425 2763.688 0.00 1.11 0.56 250 226.2 85.85 TR PN 8 HDPE
11 + 867.34 11 + 879.34 2764.801 2764.763 2763.688 2763.423 1.11 1.34 1.23 250 226.2 12.00 TR PN 8 HDPE
11 + 879.34 11 + 910.44 2764.763 2764.896 2763.423 2763.523 1.34 1.37 1.36 250 226.2 31.10 TR PN 8 HDPE

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 33/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
11 + 910.44 11 + 934.44 2764.896 2765.263 2763.523 2764.695 1.37 0.57 0.97 250 226.2 24.03 TR PN 8 HDPE
11 + 934.44 12 + 118.16 2765.263 2765.412 2764.695 2765.345 0.57 0.07 0.32 250 226.2 183.72 TR PN 8 HDPE
12 + 118.16 12 + 256.92 2765.412 2765.467 2765.345 2765.467 0.07 0.00 0.03 250 226.2 138.76 TR PN 8 HDPE
12 + 256.92 12 + 509.99 2765.467 2766.030 2765.467 2766.030 0.00 0.00 0.00 250 226.2 253.07 TR PN 8 HDPE
12 + 509.99 12 + 555.95 2766.030 2764.970 2766.030 2764.970 0.00 0.00 0.00 250 226.2 45.97 TR PN 8 HDPE
12 + 555.95 12 + 746.61 2764.970 2765.080 2764.970 2765.080 0.00 0.00 0.00 250 226.2 190.66 TR PN 8 HDPE
12 + 746.61 12 + 792.94 2765.080 2765.000 2765.080 2763.800 0.00 1.20 0.60 250 226.2 46.35 TSR PN 8 HDPE
12 + 792.94 12 + 903.23 2765.000 2765.020 2763.800 2763.380 1.20 1.64 1.42 250 226.2 110.29 TSR PN 8 HDPE
12 + 903.23 13 + 14.4 2765.020 2757.650 2763.380 2760.860 1.64 -3.21 -0.79 250 226.2 111.20 TSR PN 8 HDPE
13021.32

Rango
DN250 TS
DN250 TR
DN250 TSR
DN315 TR

METRADOS DE EXCAVACION DE ZANJA PARA INST. DE TUB. POR PROFUNDIDAD Y TIPO DE TERRENO (ML)

TERRENO SATURADO DN 250 MM

Exc. zanja (mq) p/tub t-saturado DN 250 hasta 1,00 m de profundidad = 101.56
Exc.zanja (mq) p/tub t-saturado DN 250 de 1,01 a 1,25 m de profundidad = 108.25
Exc. zanja (mq) p/tub t-saturado DN 250 de 1,26 a 1,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 1,51 a 1,75 m de profundidad = 0.00
373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 34/90
SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
Exc. zanja (mq) p/tub t-saturado DN 250 de 1,76 a 2,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 2,01 a 2,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 2,51 a 3,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 3,01 a 3,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 3,51a 4,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 4,01 a 5,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 5,01 a 6,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 6,01 a 7,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-saturado DN 250 de 7,01 a 8,00 m de profundidad = 0.00
Total (ml) = 209.81

TERRENO ROCOSO DN 250 MM

Exc. zanja (mq) p/tub t-rocoso DN 250 de 0,40 a 1,00 m de profundidad = 905.16
Exc.zanja (mq) p/tub t-rocoso DN 250 de 1,01 a 1,25 m de profundidad = 499.36
Exc. zanja (mq) p/tub t-rocoso DN 250 de 1,26 a 1,50 m de profundidad = 221.06
Exc. zanja (mq) p/tub t-rocoso DN 250 de 1,51 a 1,75 m de profundidad = 102.85
Exc. zanja (mq) p/tub t-rocoso DN 250 de 1,76 a 2,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 2,01 a 2,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 2,51 a 3,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 3,01 a 3,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 3,51a 4,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 4,01 a 5,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 5,01 a 6,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 6,01 a 7,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 250 de 7,01 a 8,00 m de profundidad = 0.00
Total (ml) = 1,728.43

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 35/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
TERRENO SEMIROCOSO DN 250 MM

Exc. zanja (mq) p/tub t-semirocoso DN 250 de 0,40 a 1,00 m de profundidad = 46.35
Exc.zanja (mq) p/tub t-semirocoso DN 250 de 1,01 a 1,25 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 1,26 a 1,50 m de profundidad = 110.29
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 1,51 a 1,75 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 1,76 a 2,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 2,01 a 2,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 2,51 a 3,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 3,01 a 3,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 3,51a 4,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 4,01 a 5,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 5,01 a 6,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 6,01 a 7,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-semirocoso DN 250 de 7,01 a 8,00 m de profundidad = 0.00
Total (ml) = 156.64

TERRENO ROCOSO DN 315 MM

Exc. zanja (mq) p/tub t-rocoso DN 315 de 0,40 a 1,00 m de profundidad = 226.02
Exc.zanja (mq) p/tub t-rocoso DN 315 de 1,01 a 1,25 m de profundidad = 16.06
Exc. zanja (mq) p/tub t-rocoso DN 315 de 1,26 a 1,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 1,51 a 1,75 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 1,76 a 2,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 2,01 a 2,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 2,51 a 3,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 3,01 a 3,50 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 3,51a 4,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 4,01 a 5,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 5,01 a 6,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 6,01 a 7,00 m de profundidad = 0.00
Exc. zanja (mq) p/tub t-rocoso DN 315 de 7,01 a 8,00 m de profundidad = 0.00
373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 36/90
SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
Total (ml) = 242.08

REFINE Y NIVELACION ZANJA PARA TUB. POR TIPO DE TERRENO Y PARA TODA PROFUNDIDAD (ML)

Refine y nivelacin zanja terr-saturado para tub DN 250 p/toda prof. = 209.81 m
Refine y nivelacin zanja terr-rocoso para tub DN 250 p/toda prof. = 1,010.49 m
Refine y nivelacin zanja terr-semirocoso para tub DN 250 p/toda prof. = 156.64

Total (ml) = 1,376.94 m

SUMINISTRO DE TUBERIA

Suministro de tuberia DN 250 PVC PN 8 ISO 1452:2011 = 1220.30 m


Suministro de tubera DN 250 HDPE PE 100 PN 8 ISO 4427: 2008 = 5685.69 m
Suministro de tubera DN 315 HDPE PE 100 PN 10 ISO 4427:2008 = 3,386.21 m
Suministro de tubera DN 315 HDPE PE 100 PN 12.5 ISO 4427:2008 = 2,729.12 m
Total (ml) = ### m

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 37/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION

UA CRUDA - 2do TRAMO - PRESEDIMENTADOR - PTAP

CION, REFINE, RELLENO, ELIMINACION Y SUMINISTRO DE TUBERIAS

INSTALACION DE TUBERIAS POR PROFUNDIDAD

0.40 1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 8.00

0.00 0.00 11.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 16.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 12.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 17.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 83.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 108.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 93.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 42.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 60.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 31.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 33.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 121.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 63.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 43.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 112.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 44.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 3.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 30.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 6.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 100.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 2.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 38/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
0.00 0.00 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 3.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 172.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
92.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 12.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 16.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 169.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 18.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 17.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 18.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
166.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 119.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 81.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
161.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
343.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 39/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
251.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
133.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
94.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
214.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 12.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 16.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 12.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
184.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
203.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
135.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
223.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 40/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
102.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
158.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
159.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 20.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 36.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 22.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
131.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 11.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 21.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 24.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
88.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 141.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 21.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 12.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
43.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 85.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 31.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 41/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
0.00 24.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
183.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
138.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 46.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 110.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

LINEA DE CONDUCCION DE AGUA CRUDA


0.40 1.00 1.25 1.50 1.75 2.00 2.50 3.00 3.50 4.00 5.00 6.00 7.00 8.00 SUB-TOTAL
101.56 108.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 209.81
905.16 499.36 221.06 102.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1728.43
46.35 0.00 110.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 156.64
226.02 16.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 242.08
2336.95

RELLENO Y COMPACTACION DE ZANJA A PULSO PARA TUB. POR PROFUNDIDAD Y TIPO DE TERRENO (ML)

TERRENO SATURADO 250

Relleno comp. zanja (mq) p/tub t-saturado DN250 hasta 1,00 m prof. 101.56
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 1,01 a 1,25 m prof. 108.25
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 1,26 a 1,50 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 1,51 a 1,75 m prof. 0.00
373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 42/90
SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 1,76 a 2,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 2,01 a 2,50 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 2,51 a 3,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 3,01 a 3,50 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 3,51a 4,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 4,01 a 5,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 5,01 a 6,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 6,01 a 7,00 m prof. 0.00
Relleno comp. zanja (mq) p/tub t-saturado DN 250 de 7,01 a 8,00 m prof. 0.00
Total (ml) = 209.81

TERRENO ROCOSO DN 250 MM

Relleno comp. zanja (mq) p/tub t-rocoso DN250 hasta 0,40 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN250 de 0,40 a 1,00 m prof. = 508.90
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,01 a 1,25 m prof. = 322.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,26 a 1,50 m prof. = 135.25
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,51 a 1,75 m prof. = 44.35
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 1,76 a 2,00 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 2,01 a 2,50 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 2,51 a 3,00 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 3,01 a 3,50 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 3,51a 4,00 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 4,01 a 5,00 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 5,01 a 6,00 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 6,01 a 7,00 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-rocoso DN 250 de 7,01 a 8,00 m prof. = 0.00
Total (ml) = 1,010.49

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 43/90


SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
TERRENO SEMIROCOSO DN 250 MM

Relleno comp. zanja (mq) p/tub t-semirocoso DN250 hasta 0,40 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-semirocoso DN250 de 0,40 a 1,00 m prof. = 46.35
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 1,01 a 1,25 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 1,26 a 1,50 m prof. = 110.29
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 1,51 a 1,75 m prof. = 0.00
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 1,76 a 2,00 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 2,01 a 2,50 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 2,51 a 3,00 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 3,01 a 3,50 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 3,51a 4,00 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 4,01 a 5,00 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 5,01 a 6,00 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 6,01 a 7,00 m prof. =
Relleno comp. zanja (mq) p/tub t-semirocoso DN 250 de 7,01 a 8,00 m prof. =
Total (ml) = 156.64

TERRENO SEMIROCOSO DN 315

Relleno comp. zanja (mq) p/tub t-rocoso DN 315 hasta 0,40 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 0,40 a 1,00 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 1,01 a 1,25 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 1,26 a 1,50 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 1,51 a 1,75 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 1,76 a 2,00 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 2,01 a 2,50 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 2,51 a 3,00 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 3,01 a 3,50 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 3,51a 4,00 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 4,01 a 5,00 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 5,01 a 6,00 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 6,01 a 7,00 m prof. =
Relleno comp. zanja (mq) p/tub t-rocoso DN 315 de 7,01 a 8,00 m prof. =
373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 44/90
SUSTENTACION DE METRADOS
EXCAVACION, RELLENO, INSTALACION
Total (ml) = 0.00

ELIMINACION DE DESMONTE R= 5 Km PARA TODA PROFUNDIDAD

Eliminacin de desmonte R = 10 Km (Carg+V) t-saturado p/tub DN 250 p/toda prof. = 209.81 m


Eliminacin de desmonte R = 10 Km (Carg+V) t-rocoso p/tub DN 250 p/toda prof. = 1,728.43 m
Eliminacin de desmonte R = 10 Km (Carg+V) t-semirocoso p/tub DN 250 p/toda prof. = 156.64 m
Eliminacin de desmonte R = 10 Km (Carg+V) t-rocoso p/tub DN 315 p/toda prof. = 242.08 m
Total (ml) = 2,336.95 m

INSTALACION DE TUBERIA DE PVC P/AGUA

Instalacin de tubera de PVC para agua potable DN 250 incl. Prueba hidrulica = 1,220.30 m
Instalacin de tubera de HDPE para agua potable DN 250 incl. Prueba hidrulica = 5,685.69 m
Instalacin de tubera de HDPE para agua potable DN 315 incl. Prueba hidrulica = 6,115.33 m
Total (ml) = 13,021.32 m

373281116.xlsx/Exc-Ref-Rell-Elim-Sum-Inst (3) 45/90


METRADO DE ACCESORIOS DE LA LINEA DE CONDUCCION 2DO TRAMO

PROFUNDIDAD (m)
TRAMO COTA DE TERRENO COTA DE TUBERIA PENDIENTE
DE TUBERIA
DEL AL DEL AL DEL AL DEL AL (m/m)

0 + 0.00 0 + 11.74 2,804.00 2,804.00 2,803.00 2,802.80 1.00 1.20 1.10 0.01704 250
0 + 11.74 0 + 27.63 2,804.00 2,799.58 2,802.80 2,798.08 1.20 1.50 1.35 0.29711 250
0 + 27.63 0 + 39.23 2,799.58 2,795.66 2,798.08 2,794.52 1.50 1.14 1.32 0.30664 250
0 + 39.23 0 + 56.80 2,795.66 2,794.41 2,794.52 2,794.41 1.14 0.00 0.57 0.00632 250
0 + 56.80 0 + 140.75 2,794.41 2,792.98 2,794.41 2,791.98 0.00 1.00 0.50 0.02891 250
0 + 140.75 0 + 248.97 2,792.98 2,790.37 2,791.98 2,789.35 1.00 1.01 1.01 0.02430 250
0 + 248.97 0 + 342.60 2,790.37 2,787.29 2,789.35 2,786.29 1.01 1.00 1.01 0.03268 250
0 + 342.60 0 + 384.92 2,787.29 2,786.65 2,786.29 2,785.65 1.00 1.00 1.00 0.01519 250
0 + 384.92 0 + 444.03 2,786.65 2,772.84 2,785.65 2,771.84 1.00 1.00 1.00 0.23362 250
0 + 444.03 0 + 475.01 2,772.84 2,771.19 2,771.84 2,770.19 1.00 1.00 1.00 0.05342 250
0 + 475.01 0 + 508.58 2,771.19 2,770.26 2,770.19 2,769.26 1.00 1.00 1.00 0.02758 250
0 + 508.58 0 + 630.32 2,770.26 2,769.45 2,769.26 2,768.45 1.00 1.00 1.00 0.00663 250
0 + 630.32 0 + 693.69 2,769.45 2,767.54 2,768.45 2,766.54 1.00 1.00 1.00 0.03025 250
0 + 693.69 0 + 737.01 2,767.54 2,763.37 2,766.54 2,762.37 1.00 1.00 1.00 0.09610 250
0 + 737.01 0 + 849.33 2,763.37 2,755.39 2,762.37 2,754.39 1.00 1.00 1.00 0.07108 250
0 + 849.33 0 + 893.51 2,755.39 2,754.51 2,754.39 2,753.43 1.00 1.08 1.04 0.02175 250
0 + 893.51 0 + 897.00 2,754.51 2,754.42 2,753.43 2,752.88 1.08 1.54 1.31 0.15702 250
0 + 897.00 0 + 927.00 2,754.42 2,754.09 2,752.88 2,752.16 1.54 1.93 1.74 0.02410 250
0 + 927.00 0 + 933.10 2,754.09 2,753.88 2,752.16 2,752.57 1.93 1.31 1.62 -0.06721 250
0 + 933.10 1 + 33.49 2,753.88 2,752.29 2,752.57 2,750.91 1.31 1.38 1.35 0.01653 250
1 + 33.49 1 + 36.07 2,752.29 2,752.08 2,750.91 2,750.58 1.38 1.50 1.44 0.12752 250
1 + 36.07 1 + 41.07 2,752.08 2,752.07 2,750.58 2,750.51 1.50 1.56 1.53 0.01480 250
1 + 41.07 1 + 44.29 2,752.07 2,752.33 2,750.51 2,750.75 1.56 1.58 1.57 -0.07516 250
1 + 44.29 1 + 216.65 2,752.33 2,748.35 2,750.75 2,747.85 1.58 0.50 1.04 0.01680 250
1 + 216.65 1 + 309.52 2,748.35 2,747.26 2,747.85 2,747.50 0.50 -0.24 0.13 0.00378 250
1 + 309.52 1 + 614.36 2,747.26 2,741.43 2,747.50 2,741.54 -0.24 -0.11 -0.18 0.01955 250
1 + 614.36 1 + 769.73 2,741.43 2,763.66 2,741.54 2,763.87 -0.11 -0.21 -0.16 -0.14370 250
1 + 769.73 1 + 850.00 2,763.66 2,763.03 2,763.87 2,763.03 -0.21 0.00 -0.10 0.01049 250
1 + 850.00 2 + 50.00 2,763.03 2,760.93 2,763.03 2,760.93 0.00 0.00 0.00 0.01049 250
2 + 50.00 2 + 144.70 2,760.93 2,759.94 2,760.93 2,759.94 0.00 0.00 0.00 0.01045 250
2 + 144.70 2 + 542.73 2,759.94 2,754.39 2,759.94 2,753.92 0.00 0.47 0.23 0.01512 250
2 + 542.73 2 + 554.73 2,754.39 2,753.16 2,753.92 2,751.74 0.47 1.42 0.94 0.18158 250
2 + 554.73 2 + 571.07 2,753.16 2,753.01 2,751.74 2,751.64 1.42 1.37 1.39 0.00612 250
2 + 571.07 2 + 741.00 2,753.01 2,749.01 2,751.64 2,749.03 1.37 -0.03 0.67 0.01537 250
373281116.xlsx 46/90
PROFUNDIDAD (m)
TRAMO COTA DE TERRENO COTA DE TUBERIA PENDIENTE
DE TUBERIA
DEL AL DEL AL DEL AL DEL AL (m/m)
2 + 741.00 2 + 759.00 2,749.01 2,748.08 2,749.03 2,746.68 -0.03 1.40 0.69 0.13089 250
2 + 759.00 2 + 776.27 2,748.08 2,748.08 2,746.68 2,746.58 1.40 1.50 1.45 0.00579 250
2 + 776.27 2 + 794.50 2,748.08 2,748.08 2,746.58 2,747.58 1.50 0.50 1.00 -0.05529 250
2 + 794.50 2 + 961.45 2,748.08 2,746.07 2,747.58 2,746.10 0.50 -0.03 0.24 0.00890 250
2 + 961.45 3 + 354.47 2,746.07 2,740.93 2,746.10 2,741.25 -0.03 -0.31 -0.17 0.01235 250
3 + 354.47 3 + 653.20 2,740.93 2,736.66 2,741.25 2,736.66 -0.31 0.00 -0.16 0.01534 315
3 + 653.20 3 + 772.60 2,736.66 2,733.99 2,736.66 2,732.53 0.00 1.45 0.73 0.03457 315
3 + 772.60 3 + 854.54 2,733.99 2,733.09 2,732.53 2,733.09 1.45 0.00 0.73 -0.00677 315
3 + 854.54 3 + 883.53 2,733.09 2,732.96 2,733.09 2,732.96 0.00 0.00 0.00 0.00452 315
3 + 883.53 4 + 205.65 2,732.96 2,729.09 2,732.96 2,729.09 0.00 0.00 0.00 0.01202 315
4 + 205.65 4 + 330.41 2,729.09 2,726.81 2,729.09 2,726.81 0.00 0.00 0.00 0.01827 315
4 + 330.41 4 + 623.30 2,726.81 2,723.67 2,726.81 2,723.67 0.00 0.00 0.00 0.01071 315
4 + 623.30 4 + 729.63 2,723.67 2,723.05 2,723.67 2,723.05 0.00 0.00 0.00 0.00582 315
4 + 729.63 4 + 890.63 2,723.05 2,721.26 2,723.05 2,720.55 0.00 0.70 0.35 0.01553 315
4 + 890.63 5 + 233.89 2,721.26 2,718.35 2,720.55 2,718.35 0.70 0.00 0.35 0.00641 315
5 + 233.89 5 + 345.04 2,718.35 2,715.49 2,718.35 2,715.75 0.00 -0.27 -0.13 0.02337 315
5 + 345.04 5 + 490.73 2,715.49 2,714.21 2,715.75 2,714.21 -0.27 0.00 -0.13 0.01057 315
5 + 490.73 5 + 665.60 2,714.21 2,712.49 2,714.21 2,712.49 0.00 0.00 0.00 0.00984 315
5 + 665.60 5 + 792.95 2,712.49 2,711.51 2,712.49 2,711.51 0.00 0.00 0.00 0.00770 315
5 + 792.95 6 + 44.21 2,711.51 2,710.18 2,711.51 2,710.10 0.00 0.08 0.04 0.00562 315
6 + 44.21 6 + 177.33 2,710.18 2,709.51 2,710.10 2,709.31 0.08 0.20 0.14 0.00596 315
6 + 177.33 6 + 271.71 2,709.51 2,711.12 2,709.31 2,711.12 0.20 0.00 0.10 -0.01918 315
6 + 271.71 6 + 610.85 2,711.12 2,714.53 2,711.12 2,714.53 0.00 0.00 0.00 -0.01006 315
6 + 610.85 6 + 815.23 2,714.53 2,714.95 2,714.53 2,714.95 0.00 0.00 0.00 -0.00204 315
6 + 815.23 7 + 30.10 2,714.95 2,715.76 2,714.95 2,715.64 0.00 0.12 0.06 -0.00325 315
7 + 30.10 7 + 42.10 2,715.76 2,715.64 2,715.64 2,714.51 0.12 1.13 0.63 0.09458 315
7 + 42.10 7 + 58.16 2,715.64 2,715.85 2,714.51 2,714.61 1.13 1.24 1.19 -0.00623 315
7 + 58.16 7 + 70.58 2,715.85 2,716.40 2,714.61 2,716.40 1.24 0.00 0.62 -0.14452 315
7 + 70.58 7 + 255.23 2,716.40 2,718.00 2,716.40 2,717.51 0.00 0.49 0.24 -0.00601 315
7 + 255.23 7 + 458.43 2,718.00 2,720.20 2,717.51 2,720.20 0.49 0.00 0.24 -0.01323 315
7 + 458.43 7 + 605.27 2,720.20 2,722.94 2,720.20 2,722.94 0.00 0.00 0.00 -0.01865 315
7 + 605.27 7 + 861.40 2,722.94 2,723.58 2,722.94 2,723.58 0.00 0.00 0.00 -0.00249 315
7 + 861.40 7 + 913.87 2,723.58 2,723.75 2,723.58 2,723.75 0.00 0.00 0.00 -0.00332 315
7 + 913.87 8 + 26.73 2,723.75 2,725.60 2,723.75 2,725.60 0.00 0.00 0.00 -0.01638 315
8 + 26.73 8 + 127.56 2,725.60 2,725.78 2,725.60 2,725.78 0.00 0.00 0.00 -0.00178 315
8 + 127.56 8 + 231.93 2,725.78 2,726.37 2,725.78 2,726.37 0.00 0.00 0.00 -0.00563 315
8 + 231.93 8 + 316.04 2,726.37 2,727.75 2,726.37 2,727.75 0.00 0.00 0.00 -0.01636 315
8 + 316.04 8 + 451.13 2,727.75 2,728.04 2,727.75 2,728.00 0.00 0.04 0.02 -0.00189 315

373281116.xlsx 47/90
PROFUNDIDAD (m)
TRAMO COTA DE TERRENO COTA DE TUBERIA PENDIENTE
DE TUBERIA
DEL AL DEL AL DEL AL DEL AL (m/m)
8 + 451.13 8 + 674.79 2,728.04 2,731.03 2,728.00 2,731.03 0.04 0.00 0.02 -0.01352 315
8 + 674.79 8 + 886.73 2,731.03 2,733.20 2,731.03 2,733.20 0.00 0.00 0.00 -0.01027 315
8 + 886.73 9 + 17.84 2,733.20 2,733.80 2,733.20 2,733.80 0.00 0.00 0.00 -0.00454 315
9 + 17.84 9 + 169.68 2,733.80 2,735.17 2,733.80 2,735.19 0.00 -0.01 -0.01 -0.00915 315
9 + 169.68 9 + 188.37 2,735.17 2,735.47 2,735.19 2,735.49 -0.01 -0.02 -0.02 -0.01594 315
9 + 188.37 9 + 296.26 2,735.47 2,736.69 2,735.49 2,736.69 -0.02 0.00 -0.01 -0.01121 315
9 + 296.26 9 + 469.20 2,736.69 2,737.76 2,736.69 2,737.76 0.00 0.00 0.00 -0.00617 315
9 + 469.20 9 + 572.76 2,737.76 2,739.49 2,737.76 2,739.49 0.00 0.00 0.00 -0.01670 250
9 + 572.76 9 + 631.45 2,739.49 2,739.70 2,739.49 2,739.70 0.00 0.00 0.00 -0.00349 250
9 + 631.45 9 + 733.67 2,739.70 2,741.04 2,739.70 2,740.98 0.00 0.06 0.03 -0.01259 250
9 + 733.67 9 + 892.57 2,741.04 2,741.93 2,740.98 2,741.93 0.06 0.00 0.03 -0.00597 250
9 + 892.57 10 + 6.30 2,741.93 2,743.67 2,741.93 2,743.67 0.00 0.00 0.00 -0.01528 250
10 + 6.30 10 + 122.91 2,743.67 2,743.77 2,743.67 2,743.86 0.00 -0.09 -0.05 -0.00165 250
10 + 122.91 10 + 282.09 2,743.77 2,745.95 2,743.86 2,745.61 -0.09 0.33 0.12 -0.01101 250
10 + 282.09 10 + 302.49 2,745.95 2,746.00 2,745.61 2,744.45 0.33 1.55 0.94 0.05706 250
10 + 302.49 10 + 339.09 2,746.00 2,745.83 2,744.45 2,744.35 1.55 1.48 1.51 0.00273 250
10 + 339.09 10 + 361.79 2,745.83 2,746.16 2,744.35 2,746.16 1.48 0.00 0.74 -0.07991 250
10 + 361.79 10 + 490.16 2,746.16 2,747.47 2,746.16 2,747.91 0.00 -0.44 -0.22 -0.01357 250
10 + 490.16 10 + 806.20 2,747.47 2,750.30 2,747.91 2,750.30 -0.44 0.00 -0.22 -0.00758 250
10 + 806.20 11 + 170.23 2,750.30 2,756.76 2,750.30 2,756.76 0.00 0.00 0.00 -0.01772 250
11 + 170.23 11 + 286.12 2,756.76 2,759.37 2,756.76 2,759.37 0.00 0.00 0.00 -0.02258 250
11 + 286.12 11 + 417.19 2,759.37 2,760.68 2,759.37 2,760.03 0.00 0.64 0.32 -0.00505 250
11 + 417.19 11 + 428.89 2,760.68 2,760.80 2,760.03 2,759.30 0.64 1.50 1.07 0.06299 250
11 + 428.89 11 + 449.99 2,760.80 2,760.80 2,759.30 2,759.40 1.50 1.40 1.45 -0.00474 250
11 + 449.99 11 + 474.57 2,760.80 2,760.87 2,759.40 2,760.88 1.40 0.00 0.70 -0.06013 250
11 + 474.57 11 + 562.74 2,760.87 2,762.02 2,760.88 2,761.30 0.00 0.72 0.36 -0.00477 250
11 + 562.74 11 + 704.29 2,762.02 2,763.28 2,761.30 2,761.78 0.72 1.50 1.11 -0.00339 250
11 + 704.29 11 + 726.19 2,763.28 2,763.65 2,761.78 2,761.88 1.50 1.77 1.64 -0.00457 250
11 + 726.19 11 + 738.19 2,763.65 2,763.93 2,761.88 2,763.29 1.77 0.64 1.21 -0.11808 250
11 + 738.19 11 + 781.49 2,763.93 2,763.43 2,763.29 2,763.43 0.64 0.00 0.32 -0.00305 250
11 + 781.49 11 + 867.34 2,763.43 2,764.80 2,763.43 2,763.69 0.00 1.11 0.56 -0.00306 250
11 + 867.34 11 + 879.34 2,764.80 2,764.76 2,763.69 2,763.42 1.11 1.34 1.23 0.02208 250
11 + 879.34 11 + 910.44 2,764.76 2,764.90 2,763.42 2,763.52 1.34 1.37 1.36 -0.00322 250
11 + 910.44 11 + 934.44 2,764.90 2,765.26 2,763.52 2,764.70 1.37 0.57 0.97 -0.04883 250
11 + 934.44 12 + 118.16 2,765.26 2,765.41 2,764.70 2,765.35 0.57 0.07 0.32 -0.00354 250
12 + 118.16 12 + 256.92 2,765.41 2,765.47 2,765.35 2,765.47 0.07 0.00 0.03 -0.00088 250
12 + 256.92 12 + 509.99 2,765.47 2,766.03 2,765.47 2,766.03 0.00 0.00 0.00 -0.00222 250
12 + 509.99 12 + 555.95 2,766.03 2,764.97 2,766.03 2,764.97 0.00 0.00 0.00 0.02306 250
12 + 555.95 12 + 746.61 2,764.97 2,765.08 2,764.97 2,765.08 0.00 0.00 0.00 -0.00058 250
12 + 746.61 12 + 792.94 2,765.08 2,765.00 2,765.08 2,763.80 0.00 1.20 0.60 0.02763 250
12 + 792.94 12 + 903.23 2,765.00 2,765.02 2,763.80 2,763.38 1.20 1.64 1.42 0.00381 250
373281116.xlsx 48/90
PROFUNDIDAD (m)
TRAMO COTA DE TERRENO COTA DE TUBERIA PENDIENTE
DE TUBERIA
DEL AL DEL AL DEL AL DEL AL (m/m)
12 + 903.23 13 + 14.40 2,765.02 2,757.65 2,763.38 2,760.86 1.64 -3.21 -0.79 0.02267 250

Suministro einstalacion de codos de 1115'x250 PVC UF PN 10 en terreno rocoso 10


Suministro einstalacion de codos de 1115'x250 PVC UF PN 10 en terreno saturado 3
Suministro einstalacion de codos de 2230'x250 PVC UF PN 10 en terreno rocoso 7
Suministro einstalacion de codos de 2230'x250 PVC UF PN 10 en terreno saturado 5
Suministro einstalacion de codos de 45x250 PVC UF PN 10 en terreno rocoso 6
Suministro einstalacion de codos de 45x250 PVC UF PN 10 en terreno saturado 1
Suministro einstalacion de codos de 90x250 PVC UF PN 10 en terreno rocoso 1
Suministro einstalacion de codos de 45x250 HDPE PN 10 en terreno semirocoso 5
Suministro einstalacion de codos de 1115'x250 HDPE PN 10 en terreno semirocoso 4
Suministro einstalacion de codos de 2230'x250 HDPE PN 10 en terreno semirocoso 2
Suministro einstalacion de codos de 1115'x250 HDPE PN 10 en terreno rocoso 40
Suministro einstalacion de codos de 2230'x250 HDPE PN 10 en terreno rocoso 26
Suministro einstalacion de codos de 45x250 HDPE PN 10 en terreno rocoso 40
Suministro einstalacion de codos de 90x250 HDPE PN 10 en terreno rocoso 4
Suministro einstalacion de codos de 1115'x315 HDPE PN 10 en terreno rocoso 37
Suministro einstalacion de codos de 2230'x315 HDPE PN 10 en terreno rocoso 34
Suministro einstalacion de codos de 45x315 HDPE PN 10 en terreno rocoso 15
Suministro einstalacion de codos de 90x315 HDPE PN 10 en terreno rocoso 3
Concreto p/anclaje de accesorio f'c 210 k/cm2 (cemento P-I) en tuberia enterrada 22.10
Concreto p/anclaje de accesorio f'c 210 k/cm2 (cemento P-I) en tuberia expuesta 223.16

373281116.xlsx 49/90
DE CONDUCCION 2DO TRAMO

Codos Verticales Codos Horizontales Clase


DIAMETRO LONGITUD Angulo Angulo
de Material
Total de codo
1115' 2230' 1115' 2230' 45 Tubera
(mm) (m) 90

230.8 11.74 -0.98 1 PN 8 PVC TR


230.8 15.89 -16.55 15.57 1 PN 8 PVC TR
230.8 11.6 -17.05 0.50 PN 8 PVC TR
230.8 17.57 -0.36 16.69 1 1 1 PN 8 PVC TS
230.8 83.95 -1.66 1.29 2 PN 8 PVC TS
230.8 108.22 -1.39 0.26 2 2 PN 8 PVC TS
230.8 93.63 -1.87 0.48 2 1 2 PN 8 PVC TR
230.8 42.32 -0.87 1.00 1 PN 8 PVC TR
230.8 59.11 -13.15 12.28 1 PN 8 PVC TR
230.8 30.98 -3.06 10.09 1 PN 8 PVC TR
230.8 33.57 -1.58 1.48 PN 8 PVC TR
230.8 121.74 -0.38 1.20 2 1 PN 8 PVC TR
230.8 63.37 -1.73 1.35 1 PN 8 PVC TR
230.8 43.32 -5.49 3.76 PN 8 PVC TR
230.8 112.32 -4.07 1.42 PN 8 PVC TR
230.8 44.18 -1.25 2.82 1 PN 8 PVC TR
230.8 3.49 -8.92 7.68 PN 8 PVC TR
230.8 30 -1.38 7.54 1 1 PN 8 PVC TR
230.8 6.1 3.85 5.23 PN 8 PVC TR
230.8 100.39 -0.95 4.79 1 1 1 PN 8 PVC TR
230.8 2.58 -7.27 6.32 PN 8 PVC TR
230.8 5 -0.85 6.42 PN 8 PVC TR
230.8 3.22 4.30 5.15 PN 8 PVC TR
230.8 172.36 -0.96 5.26 1 3 PN 8 PVC TR
226.2 92.87 -0.22 0.75 2 2 PN 8 HDPE TR
226.2 304.84 -1.12 0.90 3 4 2 PN 8 HDPE TR
226.2 155.37 8.18 9.30 2 3 PN 8 HDPE TR
226.2 80.27 -0.60 8.78 1 PN 8 HDPE TR
226.2 200 -0.60 0.00 3 PN 8 HDPE TSR
226.2 94.7 -0.60 0.00 1 1 PN 8 HDPE TR
226.2 398.03 -0.87 0.27 5 2 1 PN 8 HDPE TR
226.2 12 -10.29 9.43 1 PN 8 HDPE TR
226.2 16.34 -0.35 9.94 2 PN 8 HDPE TR
226.2 169.93 -0.88 0.53 1 1 PN 8 HDPE TR
373281116.xlsx 50/90
Codos Verticales Codos Horizontales Clase
DIAMETRO LONGITUD Angulo Angulo
de Material
Total de codo
1115' 2230' 1115' 2230' 45 Tubera
(mm) (m) 90
226.2 18 -7.46 6.58 PN 8 HDPE TR
226.2 17.27 -0.33 7.13 PN 8 HDPE TR
226.2 18.23 3.16 3.50 1 PN 8 HDPE TR
226.2 166.95 -0.51 3.67 1 1 1 PN 8 HDPE TR
226.2 393.02 -0.71 0.20 3 PN 8 HDPE TR
277.6 298.73 -0.88 0.17 3 2 PN 10 HDPE TR
277.6 119.4 -1.98 1.10 1 PN 10 HDPE TR
277.6 81.94 0.39 2.37 1 PN 10 HDPE TR
277.6 28.99 -0.26 0.65 2 PN 10 HDPE TR
277.6 322.12 -0.69 0.43 3 PN 10 HDPE TR
277.6 124.76 -1.05 0.36 1 PN 10 HDPE TR
277.6 292.89 -0.61 0.43 1 1 PN 10 HDPE TR
277.6 106.33 -0.33 0.28 1 PN 10 HDPE TR
268.6 161 -0.89 0.56 2 1 PN 12.5 HDPE TR
268.6 343.26 -0.37 0.52 2 1 PN 12.5 HDPE TR
268.6 111.15 -1.34 0.97 1 1 PN 12.5 HDPE TR
268.6 145.69 -0.61 0.73 1 1 PN 12.5 HDPE TR
268.6 174.87 -0.56 0.04 2 PN 12.5 HDPE TR
268.6 127.35 -0.44 0.12 1 PN 12.5 HDPE TR
268.6 251.26 -0.32 0.12 PN 12.5 HDPE TR
268.6 133.12 -0.34 0.02 1 1 PN 12.5 HDPE TR
268.6 94.38 1.10 1.44 PN 12.5 HDPE TR
268.6 339.14 0.58 0.52 3 4 PN 12.5 HDPE TR
268.6 204.38 0.12 0.46 1 PN 12.5 HDPE TR
268.6 214.87 0.19 0.07 1 2 1 PN 12.5 HDPE TR
268.6 12 -5.40 5.59 2 PN 12.5 HDPE TR
268.6 16.06 0.36 5.76 2 PN 12.5 HDPE TR
268.6 12.42 8.22 7.87 PN 12.5 HDPE TR
268.6 184.65 0.34 7.88 5 PN 12.5 HDPE TR
268.6 203.2 0.76 0.41 1 PN 12.5 HDPE TR
277.6 146.84 1.07 0.31 1 1 PN 10 HDPE TR
277.6 256.13 0.14 0.93 3 1 PN 10 HDPE TR
277.6 52.47 0.19 0.05 1 1 PN 10 HDPE TR
277.6 112.86 0.94 0.75 1 1 PN 10 HDPE TR
277.6 100.83 0.10 0.84 PN 10 HDPE TR
277.6 104.37 0.32 0.22 2 2 PN 10 HDPE TR
277.6 84.11 0.94 0.61 1 PN 10 HDPE TR
277.6 135.09 0.11 0.83 1 PN 10 HDPE TR

373281116.xlsx 51/90
Codos Verticales Codos Horizontales Clase
DIAMETRO LONGITUD Angulo Angulo
de Material
Total de codo
1115' 2230' 1115' 2230' 45 Tubera
(mm) (m) 90
277.6 223.66 0.77 0.67 1 1 PN 10 HDPE TR
277.6 211.94 0.59 0.19 5 1 PN 10 HDPE TR
277.6 131.11 0.26 0.33 1 2 PN 10 HDPE TR
277.6 151.84 0.52 0.26 2 1 PN 10 HDPE TR
277.6 18.69 0.91 0.39 1 PN 10 HDPE TR
277.6 107.89 0.64 0.27 2 PN 10 HDPE TR
277.6 172.94 0.35 0.29 1 1 1 PN 10 HDPE TR
226.2 103.56 0.96 0.60 1 2 PN 8 HDPE TR
226.2 58.69 0.20 0.76 1 1 1 PN 8 HDPE TR
226.2 102.22 0.72 0.52 1 1 1 PN 8 HDPE TR
226.2 158.9 0.34 0.38 1 PN 8 HDPE TR
226.2 113.73 0.88 0.53 1 3 PN 8 HDPE TR
226.2 116.61 0.09 0.78 1 PN 8 HDPE TR
226.2 159.18 0.63 0.54 3 1 PN 8 HDPE TR
226.2 20.4 -3.27 3.90 1 PN 8 HDPE TR
226.2 36.6 -0.16 3.11 PN 8 HDPE TR
226.2 22.7 4.57 4.73 2 PN 8 HDPE TR
226.2 128.37 0.78 3.79 1 PN 8 HDPE TR
226.2 316.04 0.43 0.34 1 1 PN 8 HDPE TR
226.2 364.03 1.02 0.58 3 1 1 PN 8 HDPE TR
226.2 115.89 1.29 0.28 2 PN 8 HDPE TR
226.2 131.07 0.29 1.00 3 1 PN 8 HDPE TR
226.2 11.7 -3.60 3.89 1 PN 8 HDPE TR
226.2 21.1 0.27 3.88 1 PN 8 HDPE TR
226.2 24.58 3.44 3.17 PN 8 HDPE TR
226.2 88.17 0.27 3.17 PN 8 HDPE TR
226.2 141.55 0.19 0.08 3 2 PN 8 HDPE TR
226.2 21.9 0.26 0.07 2 PN 8 HDPE TR
226.2 12 6.73 6.47 PN 8 HDPE TR
226.2 43.3 0.17 6.56 2 PN 8 HDPE TR
226.2 85.85 0.18 0.00 2 PN 8 HDPE TR
226.2 12 -1.27 1.44 PN 8 HDPE TR
226.2 31.1 0.18 1.45 1 PN 8 HDPE TR
226.2 24 2.80 2.61 1 PN 8 HDPE TR
226.2 183.72 0.20 2.59 2 1 2 1 PN 8 HDPE TR
226.2 138.76 0.05 0.15 1 4 PN 8 HDPE TR
226.2 253.07 0.13 0.08 2 2 1 PN 8 HDPE TR
226.2 45.96 -1.32 1.45 PN 8 HDPE TR
226.2 190.66 0.03 1.35 2 PN 8 HDPE TR
226.2 46.33 -1.58 1.62 PN 8 HDPE TSR
226.2 110.29 -0.22 1.36 3 PN 8 HDPE TSR
373281116.xlsx 52/90
Codos Verticales Codos Horizontales Clase
DIAMETRO LONGITUD Angulo Angulo
de Material
Total de codo
1115' 2230' 1115' 2230' 45 Tubera
(mm) (m) 90
226.2 111.17 -1.30 1.08 2 1 2 PN 8 HDPE TSR
4 2 90 72 67 8

m3
m3

373281116.xlsx 53/90
DIMENSIONAMIENTO DE LOS BLOQUES DE ANCLAJE

Predimensionamiento del Bloque Para 10 Codos de 11 o15' en Terreno Rocoso - Tub. Enterrada

L 0.500 m h 1.00 m PROG : 0+ 11.74 0


B 0.750 m 0+ 249 0
b 0.150 m 0+ 384.9 0
Hm 0.550 m 0+ 444 0
V 0.124 m3 0+ 508.6 0
0+ 849.3 0
Fuerzas actuantes 0+ 933.1 1
F = empuje hidralico 1+ 44.29 1
F=KPS
Terreno Rocoso
D 250 mm 1/4 90

t 11.25 1/8 45
K 0.20 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 0.96 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 0.285 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.450 Ton
B = Apoyo de la pared de la Zanja
B 0.631 Ton
f = friccin en el suelo
Empuje 0.73
Angulo 35
f= 0.51 Ton
Verificacin de equilibrio fuerzas
R= 0.631 + 0.51 - 0.96 = 0.18 Ton

F.S. = (B + f) / F = 1.19

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.55 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.59 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 7 Codos de 22 o30' en Terreno Rocoso - Tub. Enterrada

L 0.700 m h 1.000 m PROG : 0+ 249 0


B 0.800 m 0+ 342.6 0
b 0.250 0+ 508.6 0
Hm 0.850 m 0+ 897 0
V 0.312 m3 1+ 44.29 1

Fuerzas actuantes
F = empuje hidralico Terreno Rocoso friccion

Bloques de Anclaje/373281116.xlsx 54/90


F=KPS

D 250 mm 1/4 90

t 22.5 1/8 45
K 0.39 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 1.92 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 0.718 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.735 Ton
B = Apoyo de la pared de la Zanja
B 1.272 Ton
f = friccin en el suelo
Empuje 1.45
Angulo 35
f= 1.02 Ton
Verificacin de equilibrio fuerzas
R= 1.272 + 1.02 - 1.92 = 0.37 Ton

F.S. = (B + f) / F = 1.20

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.58 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo


F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.41 SI FSV > 1.30 OK
caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 6 Codos de 45 o en Terreno Rocoso - Tub. Enterrada

PROG : 0+ 0 0
L 0.900 m h 1.000 m 0+ 249 0
B 1.300 m 0+ 630.3 0
b 0.300 m 0+ 897 0
Hm 1.000 m 0+ 933.1 1
V 1.170 m3

Fuerzas actuantes Terreno Rocoso


F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 45 1/8 45
K 0.77 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 3.76 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 1.656 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 1.440 Ton
Bloques de Anclaje/373281116.xlsx 55/90
B = Apoyo de la pared de la Zanja
B 2.400 Ton
f = friccin en el suelo
Empuje 3.10
Angulo 35
f= 2.17 Ton
Verificacin de equilibrio fuerzas
R= 2.400 + 2.17 - 3.76 = 0.81 Ton

F.S. = (B + f) / F = 1.22

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.60 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.74 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 1 Codos de 90 o en Terreno Rocoso - Tub. Enterrada

L 1.000 m h 1.35 m PROG : 0+ 933.1 1


B 1.500 m
b 0.400 m Terreno Rocoso friccion
Hm 1.250 m
V 1.875 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 90 1/8 45
K 1.41 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 6.94 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 2.731 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 2.564 Ton
B = Apoyo de la pared de la Zanja
B 4.689 Ton
f = friccin en el suelo
Empuje 5.30
Angulo 35
f= 3.71 Ton
Verificacin de equilibrio fuerzas
R= 4.689 + 3.71 - 6.94 = 1.46 Ton

F.S. = (B + f) / F = 1.21

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.65 SI FSD > 1.50 OK


Bloques de Anclaje/373281116.xlsx 56/90
caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.36 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Bloques de Anclaje/373281116.xlsx 57/90


Predimensionamiento del Bloque Para 3 Codos de 11 o15' en Terreno Saturado - Tub. Enterrada

L 0.700 m h 0.57 m PROG : 0+ 39.23 0


B 0.800 m 0+ 140.8 0
b 0.150 m
Hm 0.900 m Terreno Saturado
V 0.299 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 11.25 1/8 45
K 0.20 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 0.96 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 0.688 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.379 Ton
B = Apoyo de la pared de la Zanja
B 0.872 Ton
f = friccin en el suelo
Empuje 1.07
Angulo 11
f= 0.21 Ton
Verificacin de equilibrio fuerzas
R= 0.872 + 0.21 - 0.96 = 0.12 Ton

F.S. = (B + f) / F = 1.12

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 2.29 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.43 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 5 Codos de 22 o30' en Terreno Saturado - Tub. Enterrada

L 0.800 m h 0.500 m PROG : 0+ 39.23 0


B 1.200 m 0+ 56.8 0
b 0.250 0+ 140.8 0
Hm 1.100 m
V 0.638 m3 Terreno Saturado

Fuerzas actuantes
F = empuje hidralico
F=KPS

Bloques de Anclaje/373281116.xlsx 58/90


D 250 mm 1/4 90

t 22.5 1/8 45
K 0.39 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 1.92 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 1.467 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.580 Ton
B = Apoyo de la pared de la Zanja
B 1.675 Ton
f = friccin en el suelo
Empuje 2.05
Angulo 11
f= 0.40 Ton
Verificacin de equilibrio fuerzas
R= 1.675 + 0.40 - 1.92 = 0.16 Ton

F.S. = (B + f) / F = 1.08

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.65 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.33 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 1 Codo de 45 o en Terreno Saturado - Tub. Enterrada

PROG : 0+ 39.23 0
L 1.500 m h 0.570 m
B 1.500 m Terreno Saturado
b 0.300 m
Hm 1.350 m
V 3.038 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 45 1/8 45
K 0.77 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 3.76 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 4.192 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 1.538 Ton
B = Apoyo de la pared de la Zanja
Bloques de Anclaje/373281116.xlsx 59/90
B 3.024 Ton
f = friccin en el suelo
Empuje 5.73
Angulo 11
f= 1.11 Ton
Verificacin de equilibrio fuerzas
R= 3.024 + 1.11 - 3.76 = 0.38 Ton

F.S. = (B + f) / F = 1.10

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.52 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 3.16 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 1 Codo de 11 o15' en Terreno Semirocoso - Tub. Enterrada

L 0.600 m h 0.00 m PROG : 12 + 556 12


B 0.650 m
b 0.150 m Terreno Semirocoso
Hm 0.700 m
V 0.168 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 11.25 1/8 45
K 0.20 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 0.96 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 0.386 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.000 Ton
B = Apoyo de la pared de la Zanja
B 0.196 Ton
f = friccin en el suelo
Empuje 0.39
Angulo 30
f= 0.22 Ton
Verificacin de equilibrio fuerzas
R= 0.196 + 0.22 - 0.96 = -0.54 Ton

F.S. = (B + f) / F = 0.44

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 0.29 SI FSD > 1.50 OK


caso contrario aumentar dimensiones
Bloques de Anclaje/373281116.xlsx 60/90
Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 2.53 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Bloques de Anclaje/373281116.xlsx 61/90


Predimensionamiento del Bloque Para 2 Codos de 22 o30' en Terreno Semirocoso - Tub. Enterrada

L 0.750 m h 1.420 m PROG : 12 + 746.6 12


B 0.500 m 12 + 792.9 12
b 0.250 12 + 903.2 13
Hm 0.850 m
V 0.239 m3

Fuerzas actuantes
F = empuje hidralico Terreno Rocoso friccion
F=KPS

D 250 mm 1/4 90

t 22.5 1/8 45
K 0.39 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 1.92 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 0.550 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 0.799 Ton
B = Apoyo de la pared de la Zanja
B 1.176 Ton
f = friccin en el suelo
Empuje 1.35
Angulo 30
f= 0.78 Ton
Verificacin de equilibrio fuerzas
R= 1.176 + 0.78 - 1.92 = 0.04 Ton

F.S. = (B + f) / F = 1.02

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.05 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.52 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 2 Codos de 45 o en Terreno SemiRocoso - Tub. Enterrada

PROG : 12 + 746.6 12
L 0.850 m h 1.420 m 12 + 792.9 12
B 0.900 m
b 0.300 m
Hm 1.000 m
V 0.765 m3

Fuerzas actuantes Terreno Rocoso


F = empuje hidralico
F=KPS

Bloques de Anclaje/373281116.xlsx 62/90


D 250 mm 1/4 90

t 45 1/8 45
K 0.77 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 3.76 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 1.173 Ton
W = Peso de las tierras
pe 2.00 Ton/m3
W 1.448 Ton
B = Apoyo de la pared de la Zanja
B 2.304 Ton
f = friccin en el suelo
Empuje 2.62
Angulo 30
f= 1.51 Ton
Verificacin de equilibrio fuerzas
R= 2.304 + 1.51 - 3.76 = 0.06 Ton

F.S. = (B + f) / F = 1.02

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.04 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.45 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Bloques de Anclaje/373281116.xlsx 63/90


QUES DE ANCLAJE

ocoso - Tub. Enterrada

+ 27.63 1 1.35
+ 342.6 2 1.01
+ 444.03 1 1.00
+ 475.01 1 1.00
+ 630.32 2 1.00
+ 893.51 1 1.04
+ 33.49 1 1.35
+ 216.65 1 1.04
10
friccion 35

coso - Tub. Enterrada

+ 342.6 1 1.01
+ 384.92 1 1.00
+ 630.32 1 1.00
+ 927 1 1.74
+ 216.65 3 1.04
7

35

Bloques de Anclaje/373281116.xlsx 64/90


so - Tub. Enterrada

+ 11.74 1.00 1.10


+ 342.6 2 1.01
+ 693.69 1 1.00
+ 927 1 1.74
+ 33.49 1 1.35
6.00

friccion 35

Bloques de Anclaje/373281116.xlsx 65/90


so - Tub. Enterrada

+ 33.49 1 1.35

35

Bloques de Anclaje/373281116.xlsx 66/90


turado - Tub. Enterrada

+ 56.8 1 0.57
+ 248.97 2 1.01
3
friccion 11

turado - Tub. Enterrada

+ 56.8 1 0.57
+ 140.75 2 0.50
+ 248.97 2 1.01
5
friccion 11

Bloques de Anclaje/373281116.xlsx 67/90


do - Tub. Enterrada

+ 56.8 1.00 0.57

friccion 11

Bloques de Anclaje/373281116.xlsx 68/90


mirocoso - Tub. Enterrada

+ 746.61 1 0.00

friccion 30

Bloques de Anclaje/373281116.xlsx 69/90


mirocoso - Tub. Enterrada

+ 792.94 1 0.60
+ 903.23 1 1.42
+ 14.4 2
4

30

Rocoso - Tub. Enterrada

+ 792.94 1.00 0.60


+ 903.23 1 1.42

friccion 30

Bloques de Anclaje/373281116.xlsx 70/90


Bloques de Anclaje/373281116.xlsx 71/90
DIMENSIONAMIENTO DE LOS BLOQUES DE ANCLAJE EN TERRENO EXPUESTO
TERRENO ROCOSO
Predimensionamiento del Bloque Para 54 Codos de 11 o15' en Terreno Rocoso - Tub. Expuesta

L 0.450 m s 0.28 m PROG : 1+ 216.65 1+


p 0.400 m b 0.65 m 1+ 309.52 1+
B 1.050 m 2+ 50.00 2+
hm 0.400 2+ 144.70 2+
Hb 0.800 m 2+ 571.07 2+
V 0.378 m3 2+ 794.50 2+
2+ 961.45 3+
Fuerzas actuantes 3+ 354.47 3+
F = empuje hidralico 3+ 883.53 4+
F=KPS 8+ 451.13 8+
8+ 674.79 8+
D 250 mm 1/4 90 9+ 296.26 9+
9+ 469.20 9+
t 11.25 1/8 45 9+ 733.67 9+
K 0.20 1/16 22.5 9+ 892.57 10 +
S 0.05 m2 1/32 11.25 10 + 122.91 10 +
P 1 Mpa 10 + 490.16 10 +
F 0.96 Ton 10 + 806.20 11 +
P = Peso del bloque 11 + 286.12 11 +
pe 2.300 Ton/m3 11 + 417.19 11 +
P= 0.904 Ton (Calculado para la zona de mayor S%) 11 + 562.74 11 +
W = Peso de la tuberia 11 + 934.44 12 +
pe 11.15 Kg/m (HDPE SDR 17) 12 + 118.16 12 +
W 0.065 Ton 12 + 256.92 12 +
B = Apoyo de la pared de la Zanja 12 + 509.99 12 +
B 0.524 Ton 12 + 555.95 12 +
f = friccin en el suelo
Empuje 0.97
Angulo 35 (Terreno rocoso)
fh = 0.68 Ton
Verificacin de equilibrio fuerzas
R= 0.524 + 0.68 - 0.96 = 0.24 Ton

F.S. = (B + f) / F = 1.25

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.55 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.56 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 36 Codos de 22 o30' en Terreno Rocoso - Tub. Expuesta

L 0.700 m s 0.28 m PROG : 1+ 309.52 1+


p 0.400 m b 0.65 m 1+ 614.36 1+
B 1.050 m 2+ 144.7 2+

bloques-terreno expuesto 72/90


hm 0.650 2+ 554.73 2+
Hb 1.050 m 2+ 794.5 2+
V 0.772 m3 3+ 354.47 3+
4+ 205.65 4+
Fuerzas actuantes 8+ 451.13 8+
F = empuje hidralico 8+ 674.79 8+
F=KPS 8+ 886.73 9+
9+ 188.37 9+
D 250 mm 1/4 90 9+ 469.2 9+
9+ 572.76 9+
t 22.5 1/8 45 9+ 631.45 9+
K 0.39 1/16 22.5 10 + 122.91 10 +
S 0.05 m2 1/32 11.25 10 + 282.09 10 +
P 1 Mpa 10 + 361.79 10 +
F 1.92 Ton 10 + 806.2 11 +
P = Peso del bloque 11 + 286.12 11 +
pe 2.300 Ton/m3 11 + 428.89 11 +
P= 1.818 Ton 11 + 562.74 11 +
W = Peso de la tuberia 11 + 934.44 12 +
pe 11.15 Kg/m (HDPE SDR 17) 12 + 256.92 12 +
W 0.065 Ton 12 + 746.61 12 +
B = Apoyo de la pared de la Zanja 12 + 792.94 12 +
B 1.385 Ton
f = friccin en el suelo
Empuje 1.88
Angulo 35 (Terreno rocoso)
fh = 1.32 Ton
Verificacin de equilibrio fuerzas
R= 1.385 + 1.32 - 1.92 = 0.79 Ton

F.S. = (B + f) / F = 1.41

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 2.48 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.36 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 52 Codos de 45 o en Terreno Rocoso - Tub. Expuesta

L 1.000 m s 0.28 m PROG : 1+ 216.65 1+


p 0.400 m b 0.65 m 1+ 309.52 1+
B 1.050 m 1+ 614.36 1+
hm 0.850 1+ 769.73 1+
Hb 1.250 m 2+ 50 2+
V 1.313 m3 2+ 144.7 2+
2+ 542.73 2+
Fuerzas actuantes 2+ 571.07 2+
F = empuje hidralico 2+ 776.27 2+
F=KPS 2+ 794.5 2+
3+ 653.2 3+
D 250 mm 1/4 90 3+ 772.6 3+

bloques-terreno expuesto 73/90


3+ 854.54 3+
t 45 1/8 45 8+ 886.73 9+
K 0.77 1/16 22.5 9+ 17.84 9+
S 0.05 m2 1/32 11.25 9+ 169.68 9+
P 1 Mpa 9+ 296.26 9+
F 3.76 Ton 9+ 572.76 9+
P = Peso del bloque 9+ 631.45 9+
pe 2.300 Ton/m3 9+ 892.57 10 +
P= 3.068 Ton 10 + 339.09 10 +
W = Peso de la tuberia 10 + 490.16 10 +
pe 11.15 Kg/m (HDPE SDR 17) 10 + 806.2 11 +
W 0.065 Ton 11 + 170.23 11 +
B = Apoyo de la pared de la Zanja 11 + 704.29 11 +
B 2.368 Ton 11 + 738.19 11 +
f = friccin en el suelo 11 + 781.49 11 +
Empuje 3.13 11 + 879.34 11 +
Angulo 35 (Terreno rocoso) 11 + 910.44 11 +
fh = 2.19 Ton 11 + 934.44 12 +
Verificacin de equilibrio fuerzas 12 + 118.16 12 +
R= 2.368 + 2.19 - 3.76 = 0.80 Ton 12 + 256.92 12 +
12 + 746.61 12 +
F.S. = (B + f) / F = 1.21 12 + 792.94 12 +

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.58 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.59 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 6 Codos de 90 o en Terreno Rocoso - Tub. Expuesta

L 1.000 m s 0.28 m PROG : 9+ 17.84 9+


p 0.700 m b 0.95 m 9+ 296.26 9+
B 1.650 m 9+ 572.76 9+
hm 1.500 9+ 631.45 9+
Hb 1.900 m 10 + 6.3 10 +
V 3.135 m3 11 + 934.44 12 +

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 90 1/8 45
K 1.41 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 6.94 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 7.232 Ton

bloques-terreno expuesto 74/90


W = Peso de la tuberia
pe 11.15 Kg/m (HDPE SDR 17)
W 0.065 Ton
B = Apoyo de la pared de la Zanja
B 3.713 Ton
f = friccin en el suelo
Empuje 7.30
Angulo 35 (Terreno rocoso)
fh = 5.11 Ton
Verificacin de equilibrio fuerzas
R= 3.713 + 5.11 - 6.94 = 1.88 Ton

F.S. = (B + f) / F = 1.27

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.58 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.55 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

TERRENO SEMIROCOSO
Predimensionamiento del Bloque Para 5 Codos de 45 o en Terreno Semirocoso - Tub. Expuesta

L 0.800 m s 0.28 m PROG : 1+ 850 2+


p 0.650 m b 0.9 m 12 + 903.23 13 +
B 1.550 m
hm 0.850
Hb 1.250 m
V 1.550 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 250 mm 1/4 90

t 45 1/8 45
K 0.77 1/16 22.5
S 0.05 m2 1/32 11.25
P 1 Mpa
F 3.76 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 3.628 Ton
W = Peso de la tuberia
pe 11.15 Kg/m (HDPE SDR 17)
W 0.065 Ton
B = Apoyo de la pared de la Zanja
B 2.368 Ton
f = friccin en el suelo
Empuje 3.69
Angulo 30 (Terreno semirocoso)

bloques-terreno expuesto 75/90


fh = 2.13 Ton
Verificacin de equilibrio fuerzas
R= 2.368 + 2.13 - 3.76 = 0.74 Ton

F.S. = (B + f) / F = 1.20

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.53 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.50 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

TERRENO ROCOSO
Predimensionamiento del Bloque Para 24 Codos de 11 o15' en Terreno Rocoso - Tub. Expuesta

L 0.650 m s 0.31 m PROG : 4+ 330.41 4+


p 0.350 m b 0.67 m 4+ 623.3 4+
B 1.015 m 4+ 729.63 4+
hm 0.600 4+ 890.63 5+
Hb 1.065 m 5+ 233.89 5+
V 0.703 m3 5+ 345.04 5+
5+ 490.73 5+
Fuerzas actuantes 6+ 44.21 6+
F = empuje hidralico 6+ 271.71 6+
F=KPS 6+ 610.85 6+
6+ 815.23 7+
D 315 mm 1/4 90 7+ 605.27 7+
7+ 913.87 8+
t 11.25 1/8 45 8+ 127.56 8+
K 0.20 1/16 22.5 8+ 231.93 8+
S 0.08 m2 1/32 11.25 8+ 316.04 8+
P 1.25 Mpa
F 1.91 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 1.655 Ton (Calculado para la zona de mayor S%)
W = Peso de la tuberia
pe 11.15 Kg/m (HDPE SDR 17)
W 0.065 Ton
B = Apoyo de la pared de la Zanja
B 1.180 Ton
f = friccin en el suelo
Empuje 1.72
Angulo 35 (Terreno rocoso)
fh = 1.20 Ton
Verificacin de equilibrio fuerzas
R= 1.180 + 1.20 - 1.91 = 0.47 Ton

F.S. = (B + f) / F = 1.25

Verificacin estabilidad al deslizamiento

bloques-terreno expuesto 76/90


F.S.D. = f / (B - F) = 1.65 SI FSD > 1.50 OK
caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.33 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 26 Codos de 22 o30' en Terreno Rocoso - Tub. Expuesta

L 0.900 m s 0.31 m PROG : 4+ 729.63 4+


p 0.550 m b 0.87 m 5+ 233.89 5+
B 1.415 m 5+ 345.04 5+
hm 0.800 5+ 665.6 5+
Hb 1.265 m 6+ 44.21 6+
V 1.611 m3 6+ 271.71 6+
6+ 815.23 7+
Fuerzas actuantes 7+ 30.1 7+
F = empuje hidralico 7+ 42.1 7+
F=KPS 7+ 70.58 7+
7+ 255.23 7+
D 315 mm 1/4 90 7+ 458.43 7+
7+ 605.27 7+
t 22.5 1/8 45 7+ 913.87 8+
K 0.39 1/16 22.5 8+ 127.56 8+
S 0.08 m2 1/32 11.25
P 1.25 Mpa
F 3.80 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 3.775 Ton
W = Peso de la tuberia
pe 11.15 Kg/m (HDPE SDR 17)
W 0.065 Ton
B = Apoyo de la pared de la Zanja
B 2.097 Ton
f = friccin en el suelo
Empuje 3.84
Angulo 35 (Terreno rocoso)
fh = 2.69 Ton
Verificacin de equilibrio fuerzas
R= 2.097 + 2.69 - 3.80 = 0.99 Ton

F.S. = (B + f) / F = 1.26

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.58 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.95 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 5 Codos de 45 o en Terreno Rocoso - Tub. Expuesta

bloques-terreno expuesto 77/90


L 1.000 m s 0.31 m PROG : 4+ 330.41 4+
p 0.750 m b 1.07 m 4+ 890.63 5+
B 1.815 m 6+ 815.23 7+
hm 1.200 7+ 458.43 7+
Hb 1.665 m 7+ 861.4 7+
V 3.022 m3

Fuerzas actuantes
F = empuje hidralico
F=KPS

D 315 mm 1/4 90

t 45 1/8 45
K 0.77 1/16 22.5
S 0.08 m2 1/32 11.25
P 1.25 Mpa
F 7.46 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 7.016 Ton
W = Peso de la tuberia
pe 11.15 Kg/m (HDPE SDR 17)
W 0.065 Ton
B = Apoyo de la pared de la Zanja
B 4.719 Ton
f = friccin en el suelo
Empuje 7.08
Angulo 35 (Terreno rocoso)
fh = 4.96 Ton
Verificacin de equilibrio fuerzas
R= 4.719 + 4.96 - 7.46 = 2.22 Ton

F.S. = (B + f) / F = 1.30

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.81 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.35 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

Predimensionamiento del Bloque Para 6 Codos de 90 o en Terreno Rocoso - Tub. Expuesta

L 1.200 m s 0.31 m PROG : 7+ 861.4 7+


p 1.000 m b 1.32 m
B 2.315 m
hm 1.800
Hb 2.265 m
V 6.292 m3

bloques-terreno expuesto 78/90


Fuerzas actuantes
F = empuje hidralico
F=KPS

D 315 mm 1/4 90

t 90 1/8 45
K 1.41 1/16 22.5
S 0.08 m2 1/32 11.25
P 1.25 Mpa
F 13.78 Ton
P = Peso del bloque
pe 2.300 Ton/m3
P= 14.483 Ton
W = Peso de la tuberia
pe 11.15 Kg/m (HDPE SDR 17)
W 0.065 Ton
B = Apoyo de la pared de la Zanja
B 7.501 Ton
f = friccin en el suelo
Empuje 14.55
Angulo 35 (Terreno rocoso)
fh = 10.19 Ton
Verificacin de equilibrio fuerzas
R= 7.501 + 10.19 - 13.78 = 3.91 Ton

F.S. = (B + f) / F = 1.28

Verificacin estabilidad al deslizamiento

F.S.D. = f / (B - F) = 1.62 SI FSD > 1.50 OK


caso contrario aumentar dimensiones

Verificacin estabilidad al volteo

F.S.V. = ((W + P) * L / 2 ) / (B * Hm / 3 ) = 1.54 SI FSV > 1.30 OK


caso contrario aumentar dimensiones

bloques-terreno expuesto 79/90


O EXPUESTO

309.52 2
614.36 3
144.70 1
542.73 5
741.00 1
961.45 1
354.47 3
653.20 3
205.65 3
674.79 1
886.73 5
469.20 1
572.76 1
892.57 1
6.30 1
282.09 3
806.20 1
170.23 3
417.19 3
428.89 1
704.29 3
118.16 2
256.92 1
509.99 2
555.95 2
746.61 1
54

614.36 4
769.73 2
542.73 2

bloques-terreno expuesto 80/90


571.07 2
961.45 1
653.2 2
330.41 1
674.79 1
886.73 1
17.84 1
296.26 2
572.76 2
631.45 1
733.67 1
282.09 1
302.49 1
490.16 1
170.23 1
417.19 1
449.99 1
704.29 2
118.16 1
509.99 2
792.94 1
903.23 1

36

309.52 2
614.36 2
769.73 3
850 1
144.7 1
542.73 1
554.73 1
741 1
794.5 1
961.45 1
772.6 1
854.54 1

bloques-terreno expuesto 81/90


883.53 2
17.84 2
169.68 2
188.37 1
469.2 1
631.45 1
733.67 1
6.3 3
361.79 2
806.2 1
170.23 1
286.12 2
726.19 2
781.49 2
867.34 2
910.44 1
934.44 1
118.16 2
256.92 4
509.99 1
792.94 1
903.23 1
52

169.68 1
469.2 1
631.45 1
733.67 1
122.91 1
118.16 1
6

bloques-terreno expuesto 82/90


b. Expuesta

50 3
14.4 2
5

bloques-terreno expuesto 83/90


623.3 1
729.63 1
890.63 2
233.89 2
345.04 1
490.73 1
665.6 2
177.33 1
610.85 3
815.23 1
30.1 1
861.4 3
26.73 1
231.93 2
316.04 1
451.13 1
24

bloques-terreno expuesto 84/90


890.63 1
345.04 1
490.73 1
792.95 1
177.33 1
610.85 4
30.1 2
42.1 2
58.16 2
255.23 5
458.43 1
605.27 1
861.4 1
26.73 1
231.93 2
26

bloques-terreno expuesto 85/90


623.3 1
233.89 1
30.1 1
605.27 1
913.87 1
5

913.87 1

bloques-terreno expuesto 86/90


CALCULO DEL NUMERO DE SOPORTES DE TUBERIAS EXPUESTAS EN HDPE

y =Lx(0.5xxT)0.5

y 0.1 m
0.2 mm/m
T 17 C (27-10)

L= 0.05 = 2.4254 ========> Cada 2.50 m


(0.1x0.0002x17)0.5

Como cada tuberia de HDPE tendra una longitud total de 6 m entonces sera necesario colocar 2 anclajes cada 2 m.

TRAMO Longitud Diametro Anclajes


DEL AL (m) Nominal Tipo

1 + 216.66 1 + 600.00 383.34 250 Adosado


1 + 600.00 1 + 660.00 60 250 Superficial
1 + 660.00 1 + 950.00 290 250 Adosado
1 + 950.00 2 + 542.73 592.73 250 Superficial
2 + 571.97 2 + 741.00 169.03 250 Superficial
2 + 794.50 3 + 900.00 1105.5 315 Superficial
3 + 900.00 4 + 330.41 430.41 315 Adosado
4 + 330.41 6 + 500.00 2169.59 315 Adosado
6 + 500.00 7 + 30.10 530.1 315 Superficial
7 + 70.58 7 + 805.77 735.19 315 Superficial
7 + 805.77 8 + 451.13 645.36 315 Adosado
8 + 451.13 8 + 674.79 223.66 315 Adosado
8 + 674.79 9 + 17.85 343.06 315 Superficial
9 + 17.85 9 + 462.50 444.65 315 Adosado
9 + 462.50 9 + 750.00 287.5 250 Adosado
9 + 750.00 10 + 282.10 532.1 250 Superficial
10 + 361.80 11 + 417.20 1055.4 250 Superficial
11 + 474.58 11 + 704.30 229.72 250 Superficial
11 + 738.20 11 + 867.35 129.15 250 Superficial
11 + 934.45 13 + 440.00 1505.55 250 Superficial

Instalacion de anclajes laterales, adosados a roca fija p/tub DN 250 (incl. abrazadera y pernos)
Instalacion de anclajes laterales, adosados a roca fija p/tub DN 315 (incl. abrazadera y pernos)
Conformacion de camino para asentamiento de tuberia DN 250 mm - HDPE con proteccion lateral
Conformacion de camino para asentamiento de tuberia DN 315 mm - HDPE con proteccion lateral
Instalacion de anclajes sobre camino conformado (incl. abrazadera y pernos) p/tub DN 250
Instalacion de anclajes sobre camino conformado (incl. abrazadera y pernos) p/tub DN 315
Macizo de concreto para anclajes de tuberia DN 250
Macizo de concreto para anclajes de tiberia DN 315
DE TUBERIAS EXPUESTAS EN HDPE

cesario colocar 2 anclajes cada 2 m.

Anclajes
Total En accesorios En tuberia

191 13 178
5 5 0
144 1 143
49 13 36
14 2 12
92 15 77
214 4 210
1084 25 1059
44 5 39
61 12 49
322 10 312
111 2 109
29 9 20
221 9 212
143 9 134
44 10 34
88 14 74
19 5 14
11 4 7
125 21 104
3011 188 2823

182 Und
761 Und
n proteccion lateral 7051.57 m2 (B = 1.65)
n proteccion lateral 6241.855 m2 (B = 2.3)
281 Und
185 Und
175.014 m3
664.69 m3