Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Research Topic
NO. PG Guide/Co- External
guide Guide
Predicting Project Completion using Quantitative tools for Elevated Devanshu
1 CEM
Metro Viaduct Pandit
Application of Learning Curve Theory in Metro Devanshu
2 CEM
Pandit
Construction and Demolition Waste Management for Metro Project Devanshu
3 CEM
Pandit
Evaluation of MSW for Waste to Energy CEM/ Devanshu
4
IED Pandit
Selection Criteria for PPP Projects in SWM CEM/ Devanshu
5
IED Pandit
6 Management system for controlling the cost in Construction works. CEM Reshma Shah
Use of Drones and photogrammetry in Project Monitoring[ feasibility CEM Reshma Shah
7
needs to be checked]
8 Trends in Precast Construction CEM Reshma Shah
9 Design Management for EPC contracts CEM Reshma Shah
10 Role of Project Coordination for Construction Projects [ 2 students] CEM Reshma Shah
Construction Supply chain management [ Vendor management and CEM Reshma Shah
11
related process]
Use of information and communicating in construction engineering CEM Reshma Shah
12
and management.
13 Potential role of value management in construction industry. CEM Reshma Shah
14 Impact of GST in working out of Construction cost. CEM Reshma Shah
15 Risk management for Infrastructure projects. CEM Reshma Shah
16 Management and control of on site construction materials CEM Reshma Shah
17 Intelligent Farming GEO Anjana Vyas
Built Forms, Rooftops and Material Used: Creation of a Spectral Anjana Vyas
18 GEO
Library
19 Climate Change: Snow and Glacier Study GEO Anjana Vyas
20 Air Quality Modelling(SAFAR): Ahmedabad City GEO Anjana Vyas
21 Developing Water Supply Complaint Redress System GEO Anjana Vyas
22 Application of remote sensing in air quality monitoring (aerosol) GEO Dipak Samal
Use of hyper-spectral data for water quality assessment. (Urban lake GEO Dipak Samal
23
water/River quality assessment)
24 Geo-informatics for water resources management studies GEO Dipak Samal
56 Design, construction and feasibility of precast and prestressed CEM Anal Sheth
concrete pavements SED
57 Design and quantity estimation of pavements: A case study of IED Anal Sheth
MBSIR
58 BIM-Enabled Contractual Framework for Integrated Project CEM Jyoti Trivedi
Delivery(IPD)
59 Contract Administration in Government Projects CEM Jyoti Trivedi
60 Bidding Strategies for DBFOT type of Construction Projects CEM Jyoti Trivedi
61 Bidding Strategies for EPC type of Construction Projects CEM Jyoti Trivedi
62 4D-5D Simulation of Construction Process CEM Jyoti Trivedi
63 Role of Lean Principles in Facilitating BIM Adoption CEM Jyoti Trivedi
64 Resource Optimization Using Critical Chain Method for Construction CEM Jyoti Trivedi
Projects
65 Impact of Productivity on Project Performance Using Schedule CEM Jyoti Trivedi
Based Simulation
66 Automated Dimensional Compliance Control for Construction CEM Jyoti Trivedi
Projects: Scope is Use of laser scanning for developing automated
model
67 Study and Appraisal of Hybrid Annuity Model for Highway CEM Jyoti Trivedi
Development