Sei sulla pagina 1di 1
# Re ROR GOVERNMENT OF INDIA Sata cre Prater Peart CENTRAL PUBLIC WORKS DEPARTMENT oohnrs ver . Executive Engineer samo tre oat weet UT Ropar Project Ousion 1 at, Reon TH, Aish as HE oe (CPW, Bia Fam, 8.0. Phool Krud art tr, y= 140171 ‘Sub Ofc: Bela, Ropar: 140111 ha m9: 01722749515, ee Phone ne: 01722748515 95: ee iitrpd1.cpwd@gov.in E-mail 6 itrpdt cowd@gov.in W541) ES for.an A.-sre -S /BAA 6 YS fei: 21-12-2018 aa a, ae nga, gate ear HRs, AapIe te, aI BEAR, fad oma-tee, aeas 400057 $1 Anshuman.Chatterjee@itdcem.co in Sub:- Construcé. 1 of different buildings under Phase-! for IIT Ropar at Ropar, Punjab. SH: Construction of Admin, Block (G+3), Academic Blocks (3 nos. G+3, 1 no G+2, 1 no. S/S), Residential Blocks (T-2/7 nos. G+3, T-4/7 nos. G+3), Hostel Block (Boys-1¥% nos. G+3, Girls-1no. G+3, Director Residence (G+1), Dining Block- 1 no. S/S and Utility blocks (3 nos. single / double storey) including water supply, sanitary installations, internal electrical installations, Roads, Drainage and Sewerage. Agreement no. O2/EE/IITRPD/2014-15. Re Your office letter no. ITDC/35214EB/IIT Ropar!12/242 dated 19.12.2015. Please refer your proposal dated 19.12.2015 for approval of name of acceptable make for Procurement of structural steel for the steel work to be carried out in Admin block. The approval of the competent authority is hereby conveyed as mentioned below: “S.no. ____ Material T Name of manufacturer 1 Steel plates [SAIL _ 2 Structural steel tubes TATA steel and APL Apollo 3 Structural steel sections | SAIL/ TATA The above approval is subject to following conditions: 1. The APL Apollo Tubes may be used when the particular size of the tube is not readily available with TATA. Material of approved manufacturer shall never be changed without prior written permission of the authority, 2. The sections and quantities likely to be procured from the approved manufacturers may be intimated. 3. The copies of each purchase invoice alongwith the challans may be submitted with each lot of procurement. 4. All the MTC of finished product and base material shall be submitted with each lot procured for record especially in case of APL Apollo Tubes and its base material of JSW steel plates. 5. Allthe mandatory test shall be carried out as per provision of the agreement. You are therefore requsted to take further necessary actions accordingly. }s & ar) ‘ondurere sift warfare : 1. uRdrort ware, angosngodio tas uftaern, 3.51. F.A., Was, aay |

Potrebbero piacerti anche