E 4/1
Location : Khalifa City ZONE 4/1
Dated: 24-02-2015 Document # RA/F/02/15
RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENT
S/N RISK Risk Rating CONTROL MEASURES Residual Risk Responsible
HAZARD Proba Sever Rating Proba Sever Rating person
bility ity (P) x bility ity (P) x
(P) (S) (S) (P) (S) (S)
01 Storage of materials , chemicals, Increased risk 4 4 16 Ensure that correct storage of 2 1 2 Storekeeper
quantity, location, characteristic of fire starting materials , hazardous
of materials substance assessment done
(flammable/explosive/oxidizer) and available for all
substances.
Ensure that only minimum
amount shall be stored on
site.
Ensure that MSDS is
available.
Ensure that chemical
containers are labeled.
Ensure that chemical
containers are closed
properly.
Ensure that impervious
flooring and bunded area
provided .
02 4 4 16 Ensure that electrical 2 1 2 Administration
Potential ignition source, Hot Increased risk inspection and testing regime officer.
work, smoking, electrical hazard, of fire starting are followed.
Ensure that PTW is raised for
Loss/Damage maintenance work involving
hot work
Designated smoking areas
are available with appropriate
facilities for extinguishing
cigarettes.
Page | 1 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC ZONE 4/1
Location : Khalifa City ZONE 4/1
Dated: 24-02-2015 Document # RA/F/02/15
RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENT
S/N RISK Risk Rating CONTROL MEASURES Residual Risk Responsible
HAZARD Proba Sever Rating Proba Sever Rating person
bility ity (P) x bility ity (P) x
(P) (S) (S) (P) (S) (S)
03 Means of escape and evacuation Delayed 4 4 16 Ensure that regular checks of 2 1 2 Electrical
evacuation escape routes are conducted. Engineer/Admi
Regular Fire drill is conduced. nistration
Encourage reporting of fire officer/EHSE.
hazards
05 Signage and information Confusion and 4 5 20 Ensure that correct signage is 2 1 2 Office Engineer
delayed in displayed conspicuous /EHSE
evacuation locations.
Signage to be displayed in
Arabic and English language.
Ensure that Fire Emergency
Evacuation Plan , Procedures
and emergency contact
numbers are displayed at
noticeable locations.
06 Arson Injury/Loss to 4 4 16 Ensure that security is 2 1 2 Administration
property available during out of Officer
working hours.
Ensure that security is
trained.
Ensure that area is secured
and fenced properly
07 Fire Fighting Equipments Failure to 4 5 20 Fire extinguishers sited 2 1 2 PM/HSE
mitigate small properly , serviced and
Page | 2 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC ZONE 4/1
Location : Khalifa City ZONE 4/1
Dated: 24-02-2015 Document # RA/F/02/15
RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENT
S/N RISK Risk Rating CONTROL MEASURES Residual Risk Responsible
HAZARD Proba Sever Rating Proba Sever Rating person
bility ity (P) x bility ity (P) x
(P) (S) (S) (P) (S) (S)
5 0 5 10 15 20 25 Probability Severity
4 0 4 8 12 16 20 Rating 0 = Zero to very low Rating 0 = No injury or illness
3 0 3 6 9 12 15 Rating 1 = Very unlikely Rating 0 = First aid injury or illness Risk
2 0 2 4 6 8 10 Rating 2 = Unlikely Rating 1 = Minor injury or illness =Probability
Severity
Page | 3 of 4
Name of Project: PRIORITY WORKS (STREET LIGHTING, STORM WATER DRAINAGE AND KERBST SOUTH EAST SECTORS IN KC ZONE 4/1
Location : Khalifa City ZONE 4/1
Dated: 24-02-2015 Document # RA/F/02/15
RISK ASSESMENT FOR: FIRE SH&E RISK ASSESSMENT
S/N RISK Risk Rating CONTROL MEASURES Residual Risk Responsible
HAZARD Proba Sever Rating Proba Sever Rating person
bility ity (P) x bility ity (P) x
(P) (S) (S) (P) (S) (S)
YES NO
Page | 4 of 4