PART A PART A PART A 1. Define CIM. 1. What is concurrent Engineering? 1. Define Lean manufacturing? 2. Define automation. 2. What are the goals of automation in manufacturing 2. What are the computerised components of CIM? 3. Give the classification of automation. industry? 3. Explain Availability & Utilization. 4. What is MLT? 3. Give the types of Production. 4. Mention the benefits of a CIM. 5. List the various costs involved in manufacturing? 4. Define JIT. 5. What are the various functions involved in 5. What is manufacturing planning? Manufacturing Control? PART B 6. What is CIM wheel? Explain its different segments PART B PART B in relation to CIMs scope. 6. What are the basic elements of an automated 6. What is the need of automation?Explain the types of 7. Explain Lean manufacturing in detail. system? Elaborate them. automation in detail. 7. A Small machine shop has two machines and works 7. The summary of the costs involved in a 40 hr/wk. During a week of interest, 4 batches of manufacturing firm is shown below. The company parts were processed through these machines. operates 2 different plants plus a corporate Details are given in the following table. Determine headquarters. Determine (a) the factory overhead (a) weekly production output of the shop and (b) rate for each plant and (b) the corporate rate. whether this represents the weekly plant capacity. Machine 1 Machine 1 Part Rp(pc/hr) Duration Rp(pc/hr) Duration Plant 1 Plant 2 Headquarters A 25 12 30 10 Category Total () () () () B 10 20 Direct C 7.5 24 800000 400000 1200000 labour D 20 6 Materials 2500000 1500000 4000000 Factory 2000000 1100000 3100000 expense Corporate 7200000 expense Total 5300000 3000000 7200000 15500000