U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Duc(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 60 LCY $0.50 $1.05 108.20% $100.63 23.17
General
Fill
Area
Drains/Catch
Basins Assuming
6
Area
Drains/Catch
Basins
on
Site
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Manholes
&
Catch
Basins
(Equipment
Cost
included
in
Concrete,
Precast,
4'
ID
riser,
4'
deep 6 EA $1,425.00 $1,200.00 $0.00 108.20% $17,041.50 Installa(on
Cost)
Electrical Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
71
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 100 LF $2.00 $8.05 108.20% $1,087.41 19
Electrical
Underground
Ducts
and
Manholes
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 40 LCY $20.00 $0.00 $0.00 108.20% $865.60 conversa(on
on
June
29th,
2011
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepara3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 3994 LCY $20.00 $1.75 $3.44 108.20% $108,858.79 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 3994 LCY $7.64 $14.10 108.20% $93,949.58 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 3698 ECY $0.63 $1.81 108.20% $9,763.41 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 4622 SY $1.48 $0.09 $0.03 108.20% $8,001.99 23
Aggregate
Base
Courses
$227,219.73
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inunda3on
Concrete
Wall 208 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1247 SF $0.00 $5.30 $0.00 108.20% $7,151.49 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 208 LF $46.25 $81.00 $0.00 99.30% $26,263.28 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 208 LF $2.04 $3.77 $0.00 99.30% $1,199.13 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 675 LF $33.75 $77.00 $0.00 99.30% $74,287.92 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 675 LF $2.04 $3.77 $0.00 108.20% $4,246.48 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2702 SF $1.46 $3.31 $0.52 99.30% $14,193.52 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 4800 SF $1.85 $0.20 $0.24 108.20% $11,893.34 16.14
Asphal(c
Concrete
Paving
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
151 LCY $33.00 $24.00 $0.00 108.20% $9,319.63 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 907 SY $0.20 $0.10 $0.06 108.20% $353.16 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 50 LCY $33.00 $24.00 $0.00 108.20% $3,085.98
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 208 LF $17.65 $4.82 $0.00 95.40% $4,455.47 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 8160 SF $0.32 $0.46 $0.00 108.20% $6,886.71 23.10,
sprinkler
irriga(on
system
$24,100.96
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Duc(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepara3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 4281 LCY $20.00 $1.75 $3.44 108.20% $116,681.14 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 4281 LCY $7.64 $14.10 108.20% $100,700.59 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 3964 ECY $0.63 $1.81 108.20% $10,464.98 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 5926 SY $1.48 $0.09 $0.03 108.20% $10,258.96 23
Aggregate
Base
Courses
$244,751.64
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inunda3on
Concrete
Wall 268 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1610 SF $0.00 $5.30 $0.00 108.20% $9,232.53 Installa(on)
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
196 LCY $33.00 $24.00 $0.00 108.20% $12,104.09 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 1178 SY $0.20 $0.10 $0.06 108.20% $458.68 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 50 LCY $33.00 $24.00 $0.00 108.20% $3,064.61
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 268 LF $17.65 $4.82 $0.00 95.40% $5,751.98 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 10598 SF $0.32 $0.46 $0.00 108.20% $8,944.29 23.10,
sprinkler
irriga(on
system
$30,323.65
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepara3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inunda3on
Concrete
Wall 170 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1018 SF $0.00 $5.30 $0.00 108.20% $5,839.16 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 170 LF $46.25 $81.00 $0.00 99.30% $21,443.88 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 170 LF $2.04 $3.77 $0.00 99.30% $979.09 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 552 LF $33.75 $77.00 $0.00 99.30% $60,655.84 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 552 LF $2.04 $3.77 $0.00 108.20% $3,467.23 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2206 SF $1.46 $3.31 $0.52 99.30% $11,588.96 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 3200 SF $1.85 $0.20 $0.24 108.20% $7,928.90 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 59 CY $7.64 $14.10 108.20% $1,393.94 16,
31
23
23.20
Hauling
$116,306.99
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
121 LCY $33.00 $24.00 $0.00 108.20% $7,492.25 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 729 SY $0.20 $0.10 $0.06 108.20% $283.92 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 41 LCY $33.00 $24.00 $0.00 108.20% $2,519.69
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 170 LF $17.65 $4.82 $0.00 95.40% $3,637.87 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 6560 SF $0.32 $0.46 $0.00 108.20% $5,536.38 23.10,
sprinkler
irriga(on
system
$19,470.11
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Du(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 60 LCY $0.50 $1.05 108.20% $100.63 23.17
General
Fill
Area
Drains/Catch
Basins Assuming
6
Area
Drains/Catch
Basins
on
Site
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Manholes
&
Catch
Basins
(Equipment
Cost
included
in
Concrete,
Precast,
4'
ID
riser,
4'
deep 6 EA $1,425.00 $1,200.00 $0.00 108.20% $17,041.50 Installa(on
Cost)
Electrical Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
71
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 100 LF $2.00 $8.05 108.20% $1,087.41 19
Electrical
Underground
Ducts
and
Manholes
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 40 LCY $20.00 $0.00 $0.00 108.20% $865.60 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 40 LCY $7.64 $14.10 108.20% $940.91 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 35 ECY $3.05 $0.34 108.20% $128.38 23.16
Fill
By
Borrow
&
U(lity
Bedding
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepara3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 3171 LCY $20.00 $1.75 $3.44 108.20% $86,427.44 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 3171 LCY $7.64 $14.10 108.20% $74,590.42 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 2936 ECY $0.63 $1.81 108.20% $7,751.57 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 4148 SY $1.48 $0.09 $0.03 108.20% $7,181.27 23
Aggregate
Base
Courses
$182,596.67
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inunda3on
Concrete
Wall 224 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1347 SF $0.00 $5.30 $0.00 108.20% $7,724.49 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 224 LF $46.25 $81.00 $0.00 99.30% $28,367.58 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 224 LF $2.04 $3.77 $0.00 99.30% $1,295.21 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 561 LF $33.75 $77.00 $0.00 99.30% $61,723.18 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 561 LF $2.04 $3.77 $0.00 108.20% $3,528.24 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2245 SF $1.46 $3.31 $0.52 99.30% $11,792.89 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 5600 SF $1.85 $0.20 $0.24 108.20% $13,875.57 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 104 CY $7.64 $14.10 108.20% $2,439.39 16,
31
23
23.20
Hauling
$133,756.54
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Du(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepara3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 2432 LCY $20.00 $1.75 $3.44 108.20% $66,285.57 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 2432 LCY $7.64 $14.10 108.20% $57,207.16 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Buidling
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 2252 ECY $0.63 $1.81 108.20% $5,945.07 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 2963 SY $1.48 $0.09 $0.03 108.20% $5,129.48 23
Aggregate
Base
Courses
$141,213.24
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 190 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1138 SF $0.00 $5.30 $0.00 108.20% $6,528.38 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 190 LF $46.25 $81.00 $0.00 99.30% $23,974.98 Cost
included
in
Installa(on)
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
121 LCY $33.00 $24.00 $0.00 108.20% $7,446.56 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 724 SY $0.20 $0.10 $0.06 108.20% $282.19 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 35 LCY $33.00 $24.00 $0.00 108.20% $2,167.00
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 190 LF $17.65 $4.82 $0.00 95.40% $4,067.27 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 6520 SF $0.32 $0.46 $0.00 108.20% $5,502.62 23.10,
sprinkler
irriga(on
system
$19,465.64
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 208 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1247 SF $0.00 $5.30 $0.00 108.20% $7,151.49 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 208 LF $46.25 $81.00 $0.00 99.30% $26,263.28 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 208 LF $2.04 $3.77 $0.00 99.30% $1,199.13 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 520 LF $33.75 $77.00 $0.00 99.30% $57,144.56 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 520 LF $2.04 $3.77 $0.00 108.20% $3,266.52 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2078 SF $1.46 $3.31 $0.52 99.30% $10,918.09 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 4800 SF $1.85 $0.20 $0.24 108.20% $11,893.34 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 89 CY $7.64 $14.10 108.20% $2,090.90 16,
31
23
23.20
Hauling
$122,937.31
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
136 LCY $33.00 $24.00 $0.00 108.20% $8,360.25 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 813 SY $0.20 $0.10 $0.06 108.20% $316.81 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 38 LCY $33.00 $24.00 $0.00 108.20% $2,373.83
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 208 LF $17.65 $4.82 $0.00 95.40% $4,455.47 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 7320 SF $0.32 $0.46 $0.00 108.20% $6,177.79 23.10,
sprinkler
irriga(on
system
$21,684.15
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Du(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 60 LCY $0.50 $1.05 108.20% $100.63 23.17
General
Fill
Area
Drains/Catch
Basins Assuming
6
Area
Drains/Catch
Basins
on
Site
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Manholes
&
Catch
Basins
(Equipment
Cost
included
in
Concrete,
Precast,
4'
ID
riser,
4'
deep 6 EA $1,425.00 $1,200.00 $0.00 108.20% $17,041.50 Installa(on
Cost)
Electrical Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
71
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 100 LF $2.00 $8.05 108.20% $1,087.41 19
Electrical
Underground
Ducts
and
Manholes
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 40 LCY $20.00 $0.00 $0.00 108.20% $865.60 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 40 LCY $7.64 $14.10 108.20% $940.91 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 35 ECY $3.05 $0.34 108.20% $128.38 23.16
Fill
By
Borrow
&
U(lity
Bedding
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 2022 LCY $20.00 $1.75 $3.44 108.20% $55,110.78 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 2022 LCY $7.64 $14.10 108.20% $47,562.86 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Buidling
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 1872 ECY $0.63 $1.81 108.20% $4,942.82 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 1541 SY $1.48 $0.09 $0.03 108.20% $2,667.33 23
Aggregate
Base
Courses
$116,929.75
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 120 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 720 SF $0.00 $5.30 $0.00 108.20% $4,128.91 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 120 LF $46.25 $81.00 $0.00 99.30% $15,163.11 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 120 LF $2.04 $3.77 $0.00 99.30% $692.32 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 390 LF $33.75 $77.00 $0.00 99.30% $42,890.15 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 390 LF $2.04 $3.77 $0.00 108.20% $2,451.70 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 1560 SF $1.46 $3.31 $0.52 99.30% $8,194.63 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 1600 SF $1.85 $0.20 $0.24 108.20% $3,964.45 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 30 CY $7.64 $14.10 108.20% $696.97 16,
31
23
23.20
Hauling
$81,192.25
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Du(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 3156 LCY $20.00 $1.75 $3.44 108.20% $86,018.61 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 3156 LCY $7.64 $14.10 108.20% $74,237.58 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Buidling
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 2922 ECY $0.63 $1.81 108.20% $7,714.90 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 2015 SY $1.48 $0.09 $0.03 108.20% $3,488.05 23
Aggregate
Base
Courses
$178,105.10
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 120 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 720 SF $0.00 $5.30 $0.00 108.20% $4,128.91 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 120 LF $46.25 $81.00 $0.00 99.30% $15,163.11 Cost
included
in
Installa(on)
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
113 LCY $33.00 $24.00 $0.00 108.20% $6,944.04 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 676 SY $0.20 $0.10 $0.06 108.20% $263.14 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 38 LCY $33.00 $24.00 $0.00 108.20% $2,329.91
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 120 LF $17.65 $4.82 $0.00 95.40% $2,572.37 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 6080 SF $0.32 $0.46 $0.00 108.20% $5,131.28 23.10,
sprinkler
irriga(on
system
$17,240.73
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 104 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 624 SF $0.00 $5.30 $0.00 108.20% $3,575.74 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 104 LF $46.25 $81.00 $0.00 99.30% $13,131.64 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 104 LF $2.04 $3.77 $0.00 99.30% $599.57 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 675 LF $33.75 $77.00 $0.00 99.30% $74,287.92 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 675 LF $2.04 $3.77 $0.00 108.20% $4,246.48 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2702 SF $1.46 $3.31 $0.52 99.30% $14,193.52 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 1200 SF $1.85 $0.20 $0.24 108.20% $2,973.34 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 22 CY $7.64 $14.10 108.20% $522.73 16,
31
23
23.20
Hauling
$116,540.93
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
152 LCY $33.00 $24.00 $0.00 108.20% $9,365.31 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 911 SY $0.20 $0.10 $0.06 108.20% $354.90 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 50 LCY $33.00 $24.00 $0.00 108.20% $3,085.98
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 104 LF $17.65 $4.82 $0.00 95.40% $2,227.73 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 8200 SF $0.32 $0.46 $0.00 108.20% $6,920.47 23.10,
sprinkler
irriga(on
system
$21,954.40
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Du(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 60 LCY $0.50 $1.05 108.20% $100.63 23.17
General
Fill
Area
Drains/Catch
Basins Assuming
6
Area
Drains/Catch
Basins
on
Site
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Manholes
&
Catch
Basins
(Equipment
Cost
included
in
Concrete,
Precast,
4'
ID
riser,
4'
deep 6 EA $1,425.00 $1,200.00 $0.00 108.20% $17,041.50 Installa(on
Cost)
Electrical Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
71
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 100 LF $2.00 $8.05 108.20% $1,087.41 19
Electrical
Underground
Ducts
and
Manholes
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 40 LCY $20.00 $0.00 $0.00 108.20% $865.60 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 40 LCY $7.64 $14.10 108.20% $940.91 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 35 ECY $3.05 $0.34 108.20% $128.38 23.16
Fill
By
Borrow
&
U(lity
Bedding
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 2062 LCY $20.00 $1.75 $3.44 108.20% $56,201.01 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 2062 LCY $7.64 $14.10 108.20% $48,503.77 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Buidling
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 1909 ECY $0.63 $1.81 108.20% $5,040.60 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 2370 SY $1.48 $0.09 $0.03 108.20% $4,103.59 23
Aggregate
Base
Courses
$120,494.92
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 170 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1018 SF $0.00 $5.30 $0.00 108.20% $5,839.16 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 170 LF $46.25 $81.00 $0.00 99.30% $21,443.88 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 170 LF $2.04 $3.77 $0.00 99.30% $979.09 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 424 LF $33.75 $77.00 $0.00 99.30% $46,658.33 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 424 LF $2.04 $3.77 $0.00 108.20% $2,667.10 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 1697 SF $1.46 $3.31 $0.52 99.30% $8,914.59 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 3200 SF $1.85 $0.20 $0.24 108.20% $7,928.90 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 59 CY $7.64 $14.10 108.20% $1,393.94 16,
31
23
23.20
Hauling
$98,834.98
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Du(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 6164 LCY $20.00 $1.75 $3.44 108.20% $168,003.40 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6164 LCY $7.64 $14.10 108.20% $144,993.80 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Buidling
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 5707 ECY $0.63 $1.81 108.20% $15,068.01 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 4030 SY $1.48 $0.09 $0.03 108.20% $6,976.09 23
Aggregate
Base
Courses
$341,687.27
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 170 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1018 SF $0.00 $5.30 $0.00 108.20% $5,839.16 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 170 LF $46.25 $81.00 $0.00 99.30% $21,443.88 Cost
included
in
Installa(on)
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
163 LCY $33.00 $24.00 $0.00 108.20% $10,050.58 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 978 SY $0.20 $0.10 $0.06 108.20% $380.86 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 53 LCY $33.00 $24.00 $0.00 108.20% $3,294.99
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 170 LF $17.65 $4.82 $0.00 95.40% $3,637.87 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 8800 SF $0.32 $0.46 $0.00 108.20% $7,426.85 23.10,
sprinkler
irriga(on
system
$24,791.15
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 170 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 1018 SF $0.00 $5.30 $0.00 108.20% $5,839.16 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 170 LF $46.25 $81.00 $0.00 99.30% $21,443.88 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 170 LF $2.04 $3.77 $0.00 99.30% $979.09 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 552 LF $33.75 $77.00 $0.00 99.30% $60,655.84 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 552 LF $2.04 $3.77 $0.00 108.20% $3,467.23 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2206 SF $1.46 $3.31 $0.52 99.30% $11,588.96 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 3200 SF $1.85 $0.20 $0.24 108.20% $7,928.90 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 59 CY $7.64 $14.10 108.20% $1,393.94 16,
31
23
23.20
Hauling
$116,306.99
Landscaping Quan3ty Unit Material
Costs Installa3on
Costs Equipment
Costs Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
Top
Soil
121 LCY $33.00 $24.00 $0.00 108.20% $7,492.25 19.13
Top
Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 729 SY $0.20 $0.10 $0.06 108.20% $283.92 Mechanical
Seeding,
44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 41 LCY $33.00 $24.00 $0.00 108.20% $2,519.69
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
rail,
9
&
Guardrails
(Equipment
Costs
are
included
in
ga.
Galv.
Wire
5'
high 170 LF $17.65 $4.82 $0.00 95.40% $3,637.87 Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
Irriga(on
System 6560 SF $0.32 $0.46 $0.00 108.20% $5,536.38 23.10,
sprinkler
irriga(on
system
$19,470.11
Site
U3li3es Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes3c
Water,
Duc3le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Du(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 60 LCY $0.50 $1.05 108.20% $100.63 23.17
General
Fill
Area
Drains/Catch
Basins Assuming
6
Area
Drains/Catch
Basins
on
Site
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Manholes
&
Catch
Basins
(Equipment
Cost
included
in
Concrete,
Precast,
4'
ID
riser,
4'
deep 6 EA $1,425.00 $1,200.00 $0.00 108.20% $17,041.50 Installa(on
Cost)
Electrical Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
71
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 100 LF $2.00 $8.05 108.20% $1,087.41 19
Electrical
Underground
Ducts
and
Manholes
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 40 LCY $20.00 $0.00 $0.00 108.20% $865.60 converstaion
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 40 LCY $7.64 $14.10 108.20% $940.91 16,
31
23
23.20
Hauling
Excava3on-Backll Quan3ty Unit Material
Cost Installa3on
Cost Equipment
Cost Loca3on
Factor Total
Cost Comments
Site
Prepera3on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 3813 LCY $20.00 $1.75 $3.44 108.20% $103,925.53 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 3813 LCY $7.64 $14.10 108.20% $89,691.98 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Buidling
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 3531 ECY $0.63 $1.81 108.20% $9,320.95 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 3022 SY $1.48 $0.09 $0.03 108.20% $5,232.07 23
Aggregate
Base
Courses
$214,816.49
Concrete Quan3ty Unit Material
Cost Installa3on
Cost Equipment Loca3on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Based
on
square
root
of
the
berm
safe
haven
area
Tsunami
Wave
Inuda3on
Concrete
Wall 147 LF (mes
three
walls
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 882 SF $0.00 $5.30 $0.00 108.20% $5,056.86 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 147 LF $46.25 $81.00 $0.00 99.30% $18,570.94 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 147 LF $2.04 $3.77 $0.00 99.30% $847.91 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
required
for
seismic
event
and
tsunami.
(Equipment
5'
high
wall,
pumped,
8"
thick 625 LF $33.75 $77.00 $0.00 99.30% $68,692.42 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 625 LF $2.04 $3.77 $0.00 108.20% $3,926.62 Installa(on)
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2498 SF $1.46 $3.31 $0.52 99.30% $13,124.44 29.60
Concrete
or
Gravel
Plahorm
Asphal(c
Concrete
Paving,
6"
stone
bse,
2"
binder
course,
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
1"
toping 2400 SF $1.85 $0.20 $0.24 108.20% $5,946.67 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 44 CY $7.64 $14.10 108.20% $1,045.45 16,
31
23
23.20
Hauling
$120,221.32
Fire
Water,
Duc/le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
Fire
Water,
Duc/le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RS
Means
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RS
Means
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RS
Means,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Fire
Water,
Duc/le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Fire
Water,
Duc/le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RS
Means
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RS
Means
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RS
Means,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Fire
Water,
Duc/le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RS
Means,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RS
Means,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RS
Means
Building
Construc(on
Cost
Data,
2011,
31
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 05
16,
31
23
23.20
Hauling
RS
Means,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 168 VLF $26.50 $7.85 $0.00 95.40% $5,505.34 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 219 LF $32.50 $9.80 95.40% $8,841.16 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$50,452.62
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 168 VLF $26.50 $7.85 $0.00 95.40% $5,505.34 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 283 LF $32.50 $9.80 95.40% $11,413.89 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$53,025.35
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
Safe Haven Cost Estimates: Page B-9
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 120 VLF $26.50 $7.85 $0.00 95.40% $3,932.39 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 522 LF $32.50 $9.80 95.40% $21,046.18 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$61,084.68
Tsunami Wave Inunda1on Concrete Wall 268 LF Based on square root of the berm safe haven area (mes three walls
Sandblast Concrete Heavy Treatment 2683 SF $1.46 $3.31 $0.52 99.30% $14,095.20 RSMeans Building Construc(on Cost Data, 2011, 03 35 29.60
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
19.13
Top
Top
Soil
444 LCY $33.00 $24.00 $0.00 108.20% $27,410.67 Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 2667 SY $0.20 $0.10 $0.06 108.20% $1,038.72 Mechanical Seeding, 44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 50 LCY $33.00 $24.00 $0.00 108.20% $3,064.61
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
&
rail,
9
ga.
Galv.
Wire
5'
high 268 LF $17.65 $4.82 $0.00 95.40% $5,751.98 Guardrails
(Equipment
Costs
are
included
in
Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
23.10,
sprinkler
Irriga(on
System 24000 SF $0.32 $0.46 $0.00 108.20% $20,255.04 irriga(on
system
$57,521.02
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 120 VLF $26.50 $7.85 $0.00 95.40% $3,932.39 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$49,588.05
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 204 VLF $26.50 $7.85 $0.00 95.40% $6,685.06 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$52,340.72
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 120 VLF $26.50 $7.85 $0.00 95.40% $3,932.39 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$49,588.05
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 168 VLF $26.50 $7.85 $0.00 95.40% $5,505.34 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$51,161.01
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 120 VLF $26.50 $7.85 $0.00 95.40% $3,932.39 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 283 LF $32.50 $9.80 95.40% $11,413.89 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$51,452.40
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 168 VLF $26.50 $7.85 $0.00 95.40% $5,505.34 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$51,161.01
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Safe Haven Cost Estimates: Page B-60
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 120 VLF $26.50 $7.85 $0.00 95.40% $3,932.39 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$49,588.05
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 120 VLF $26.50 $7.85 $0.00 95.40% $3,932.39 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$49,588.05
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Safe Haven Cost Estimates: Page B-76
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 120 VLF $26.50 $7.85 $0.00 95.40% $3,932.39 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 237 LF $32.50 $9.80 95.40% $9,549.55 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$49,588.05
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Safe Haven Cost Estimates: Page B-80
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 204 VLF $26.50 $7.85 $0.00 95.40% $6,685.06 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 490 LF $32.50 $9.80 95.40% $19,769.44 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$62,560.62
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Safe Haven Cost Estimates: Page B-84
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 204 VLF $26.50 $7.85 $0.00 95.40% $6,685.06 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 400 LF $32.50 $9.80 95.40% $16,141.68 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$58,932.86
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Safe Haven Cost Estimates: Page B-88
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 168 VLF $26.50 $7.85 $0.00 95.40% $5,505.34 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 379 LF $32.50 $9.80 95.40% $15,313.34 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$56,924.80
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Safe Haven Cost Estimates: Page B-92
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 204 VLF $26.50 $7.85 $0.00 95.40% $6,685.06 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 379 LF $32.50 $9.80 95.40% $15,313.34 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$58,104.52
Placement of Material
Compac(ng
Backll,
6"to
12"
lirs,
vibra(ng
roller 8488 ECY $0.63 $1.81 108.20% $22,408.09 RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
23
Aggregate
lirs,
5082
SF
per
lir 12222 SY $1.48 $0.09 $0.03 108.20% $21,159.11 Base
Courses
$515,680.55
Sandblast Concrete Heavy Treatment 4042 SF $1.46 $3.31 $0.52 99.30% $21,230.71 RSMeans Building Construc(on Cost Data, 2011, 03 35 29.60
$247,125.49
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
19.13
Top
Top
Soil
833 LCY $33.00 $24.00 $0.00 108.20% $51,395.00 Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 5000 SY $0.20 $0.10 $0.06 108.20% $1,947.60 Mechanical Seeding, 44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 75 LCY $33.00 $24.00 $0.00 108.20% $4,616.02
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
&
rail,
9
ga.
Galv.
Wire
5'
high 367 LF $17.65 $4.82 $0.00 95.40% $7,876.23 Guardrails
(Equipment
Costs
are
included
in
Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
23.10,
sprinkler
Irriga(on
System 45000 SF $0.32 $0.46 $0.00 108.20% $37,978.20 irriga(on
system
$103,813.05
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Safe Haven Cost Estimates: Page B-99
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
breakers,
metering,
20'
conduit
&
wire,
3
phase,
4
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
wire,
120/208
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 50 LF $2.00 $8.05 108.20% $543.71 71
19
Electrical
Underground
Ducts
and
Manholes
RSMeans,
Building
Construc(on
Cost
Data,
2011,
26
Wire,
600
volt,
copper
type
THW,
solid,
#12 50 CLF $11.95 $36.50 0 100.50% $2,434.61 05
19.90
Wire
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 19 LCY $20.00 108.20% $411.16 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 19 LCY $7.64 $14.10 108.20% $446.93 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 19 ECY $3.05 $0.34 108.20% $69.69 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 22 LCY $0.50 $1.05 108.20% $36.90 23
23.17
General
Fill
$15,257.23
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 168 VLF $26.50 $7.85 $0.00 95.40% $5,505.34 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 379 LF $32.50 $9.80 95.40% $15,313.34 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$56,924.80
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 168 VLF $26.50 $7.85 $0.00 95.40% $5,505.34 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 297 LF $32.50 $9.80 95.40% $11,970.99 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$53,582.45
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 204 VLF $26.50 $7.85 $0.00 95.40% $6,685.06 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 297 LF $32.50 $9.80 95.40% $11,970.99 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$54,762.17
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
6"
diameter 100 LF Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
6"
Duc(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 12 LCY $20.00 108.80% $261.12 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23
23.17
General
Fill
Sewage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
data,
2011,
31
Excavate,
3/4
CY
Excavator,
6'-10'
deep 120 BCY $2.88 $2.85 108.20% $743.98 23
16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
SDR
35,
B&S 100 LF $7.60 $2.75 108.20% $1,119.87 31
Sanitary
U(lity
Sewerage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 12 LCY $20.00 108.80% $261.12 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 138 LCY $0.50 $1.05 108.20% $231.44 23
23.17
General
Fill
Storm
Service Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 120 BCY $2.88 $2.85 108.20% $743.98 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 100 LF $10.70 $5.25 $0.97 108.20% $1,830.74 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 12 LCY $20.00 108.80% $261.12 conversa(on
on
June
29th,
2011
Placement of Material
Compac(ng
Backll,
6"to
12"
lirs,
vibra(ng
roller 3292 ECY $0.63 $1.81 108.20% $8,691.62 RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
23
Aggregate
lirs,
5082
SF
per
lir 4741 SY $1.48 $0.09 $0.03 108.20% $8,207.17 Base
Courses
$204,089.68
Sandblast Concrete Heavy Treatment 3036 SF $1.46 $3.31 $0.52 99.30% $15,946.90 RSMeans Building Construc(on Cost Data, 2011, 03 35 29.60
Berm
Landscaping
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
91
19.13
Top
Top
Soil
222 LCY $33.00 $24.00 $0.00 108.20% $13,705.33 Dress
by
hand,
1
CY
for
600
SF
Hydro-Seed 1333 SY $0.20 $0.10 $0.06 108.20% $519.36 Mechanical Seeding, 44lb/sy
Top
Soil
at
Stepped
Concrete
Walls 56 LCY $33.00 $24.00 $0.00 108.20% $3,467.21
Fencing
at
Top
of
Berm,
chain
link,
2"
post,
1
5/8"
RSMeans
Assemblies
Cost
Data,
2011,
G2040
105
Fence
&
rail,
9
ga.
Galv.
Wire
5'
high 190 LF $17.65 $4.82 $0.00 95.40% $4,067.27 Guardrails
(Equipment
Costs
are
included
in
Installa(on)
RSMeans
Building
Construc(on
Costs,
2011,
32
84
23.10,
sprinkler
Irriga(on
System 12000 SF $0.32 $0.46 $0.00 108.20% $10,127.52 irriga(on
system
$31,886.69
Fire
Water,
Duc1le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 23
16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 11
Water
U(lity
Distribu(on
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23
23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 41
Storm
U(lity
Drainage
Piping
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23
23.16
Fill
By
Borrow
&
U(lity
Bedding
Stairs/Ramps/Guardrails Quan1ty Unit Cost
per
Unit Material
CostInstalla1on
Cost Loca1on
FactorTotal
Cost
Equipment
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 54
36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
RSMeans
Assemblies
Cost
Data,
2011,
B1010,
208
Steel
Columns,
20'
high,
Wide
Flanged,
6",
12
Steel
Columns
(Equipment
Cost
is
included
in
loca(ons 192 VLF $26.50 $7.85 $0.00 95.40% $6,291.82 Installa(on
Cost)
W
Shape
Beams
and
Girders,
bay
size
15X20,,
Total
RSMeans
Building
Construc(on
Cost
Data,
2011,
Load
263
PSF. 800 SF $11.70 $3.82 $1.50 95.40% $12,989.66 Structural
Steel
Framing,
05
12
23.17
RSMeans
Assemblies
Cost
Data,
2011,
B1010
258,
Floor
Construc(on,
Metal
Deck/Concrete
Fill,
Deck
Metal
Deck/Concrete
Fill
(Equipment
Cost
is
included
Span
6
r,
150
PSF
Superimposed
Load 800 SF $2.38 $2.38 95.40% $3,632.83 in
Installa(on
Cost)
RSMeans
Building
Construc(on
Cost
Data,
2011,
05
05
Weather
Proong/Coa(ngs
(Galvanized) 7.5 Tons $400.00 $0.00 0 0 95.40% $2,862.00 13.50,
Paints
and
Protec(ve
Coa(ngs
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
Ladders/Stairs
Steel
ladder
to
akc
space
20"
wide
bolted
to
RSMeans
Building
Construc(on
Cost
Data
2011,
05
51
concrete
without
cage 10 VLF $65.00 $31.50 $2.18 95.40% $920.61 33
-
Ver(cal
Metal
Ladders
Accordion
Ladder
for
Escape
arer
Tsunami,
RSMeans
Building
Construc(on
Cost
Data
2011,
11
33
Disappearing
Stairs,
Heavy
duty,
16'-0"
ceiling 2 ea $1,400.00 $172.00 95.40% $2,999.38 10.10,
Disappearing
Stairway
Pladorm
Perimeters
Railing
(120
LF
for
each
pladorm,
2
loca1ons)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail 179 LF $32.50 $9.80 95.40% $7,218.78 Construc(on
Cost
Date
2011,
05
52
Metal
Railings
$49,616.72
Site
U'li'es Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Domes'c
Water,
Duc'le
Iron
Class
250,
MJ,
6"
diameter 100 LF 108.20% Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Duc(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Storm
Drainage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng,
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
12"
Bituminous
Coated 100 LF $11.50 $8.30 $1.53 108.20% $2,307.91 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.20% $259.68 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 60 LCY $0.50 $1.05 108.20% $100.63 23.17
General
Fill
Area
Drains/Catch
Basins Assuming
6
Area
Drains/Catch
Basins
on
Site
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Manholes
&
Catch
Basins
(Equipment
Cost
included
in
Concrete,
Precast,
4'
ID
riser,
4'
deep 6 EA $1,425.00 $1,200.00 $0.00 108.20% $17,041.50 Installa(on
Cost)
Electrical Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
71
Install
&
Test
PVC,
type
EB
4
@
3"
diameter 100 LF $2.00 $8.05 108.20% $1,087.41 19
Electrical
Underground
Ducts
and
Manholes
Excava'on-Backll Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
Site
Prepara'on
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
13
Clear
&
Grub 3 acres $320.00 $525.00 108.20% $2,742.87 13,
Selec(ve
Clearing
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 3 acres $32.50 $565.00 $35.00 108.20% $2,053.10 13
Site
Surveys
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $69.00 $116.00 100.00% $1,850.00 36.50
Mobiliza(on
Material
Costs
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 5076 LCY $20.00 $1.75 $3.44 108.20% $138,349.32 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 5076 LCY $7.64 $14.10 108.20% $119,401.12 16,
31
23
23.20
Hauling
Placement
of
Material
RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 4700 ECY $0.63 $1.81 108.20% $12,408.38 Backll
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 7340 SY $1.48 $0.09 $0.03 108.20% $12,707.01 23
Aggregate
Base
Courses
$289,511.80
Concrete Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
88'
long
wall,
6
feet
deep,
at
base
of
berm
stepped
Concrete
Wall,
6'
Deep,
88'
in
length structure
RSMeans
Assemblies
Cost
Data,
2011,
A2010
110
building
Excava(on
&
Backll,
6'
deep,
sand,
gravel,
or
common
earth.
(Equipment
Cost
included
in
Excava(on,
6'
deep 528 SF $0.00 $5.30 $0.00 108.20% $3,027.87 Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
10'
pumped,
12"
thick
(Equipment
Walls,
Cast
in
place,
6'
deep,
pumped,
12"
thick,
88
'
long 88 LF $46.25 $81.00 $0.00 99.30% $11,119.61 Cost
included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 88 LF $2.04 $3.77 $0.00 99.30% $507.70 Installa(on)
Stepped
Concrete
Wall
4'
high 88',
86',
82',
72',
60'
length
walls,
12"
thick,
5'
high.
RSMeans
Assemblies
Cost
Data,
2011,
A2020
110,
Walls,
Cast
In
Place,
6'
pumped,
8"
thick.
Material
costs
have
been
increased
25%
for
addi(onal
reinforcing
5'
high
wall,
pumped,
8"
thick,
88',
86,
82,
72,
60
length
required
for
seismic
event
and
tsunami.
(Equipment
walls. 388 LF $33.75 $77.00 $0.00 99.30% $42,670.20 Cost
Included
in
Installa(on)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 388 LF $2.04 $3.77 $0.00 108.20% $2,439.13 Installa(on)
Landscaping Quan'ty Unit Cost
per
Unit Material
Costs Installa'on
Costs Equipment
Costs Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Sand
Play
Area
Plug
number,
based
on
previous
es(mate
for
material
Filter
Fabric 140 sy $2.00 $0.00 $0.00 108.20% $302.96 costs
for
lter
fabric
Material
&
Equipment
cost
per
es(mator's
best
guess,
Installa(on
per
RSMeans
Building
Construc(on
Cost
Sand
10 CY $60.00 $19.65 $25.00 108.20% $1,132.31 Data31
23
23.13
Backll.
Based
on
price
of
playground
equipment
from
Home
Depot
and
$1000
assumed
cost
for
labor
and
Playground
Equipment 1 EA $1,000.00 $1,000.00 $0.00 108.20% $2,164.00 transporta(on.
Treated
Wood
Trellis
Walkway
60'
x
12'
RSMeans
Assemblies
Cost
Data,
2011,
B1010
266
Wood
Deck
(doubled
material
price
to
account
for
treated
deck
material
not
listed
in
RSMeans)
&
(Equipment
Wood,
laminated
type,
complete
in
place,
60'
span 720 SF $2.72 $3.02 $0.00 97.30% $4,021.21 Costs
are
included
in
Installa(on)
Site
U'li'es Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 10 EA $116.00 $185.00 100.00% $3,010.00 36.50
Mobiliza(on
Fire
Water,
Duc'le
Iron
Class
250,
MJ,
4"
diameter 50 LF $16.05 Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
4"
Duc(le
Iron
Piping,
MJ 50 LF $12.50 $8.55 $2.17 108.20% $1,256.20 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23.17
General
Fill
Storm
Service Assuming
50'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 60 BCY $2.88 $2.85 108.20% $371.99 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
8"
Bituminous
Coated 50 LF $10.70 $5.25 $0.97 108.20% $915.37 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 6 LCY $20.00 108.20% $129.84 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6 LCY $7.64 $14.10 108.20% $141.14 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 5 ECY $3.05 $0.34 108.20% $18.34 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 38 LCY $0.50 $1.05 108.20% $63.73 23.17
General
Fill
Site
Drainage/Area
Drains/Catch
Basins Assume
1
area
drain
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Concrete,
Precast,
4'
ID
riser,
4'
deep 1 EA $1,425.00 $1,200.00 0.00% 108.20% $2,840.25 Manholes
&
Catch
Basins
Electrical 50 LF Assuming
50'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
breakers,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
metering,
20'
conduit
&
wire,
3
phase,
4
wire,
120/208
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 35 BCY $2.16 $2.13 108.20% $162.46 16.13
Excava(ng
Trench
Excava'on-Backll Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on 8 EA $0.00 $0.00 $69.00 $116.00 100.00% $1,480.00 36
-
Equipment
Mobiliza(on
Is
clear
and
grub
needed
for
structure
in
urban
senng?
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
11
Clear
and
Grub
Site 0.25 ACRE $0.00 $0.00 $1,750.00 $1,300.00 108.20% $825.03 10.10
Clear
and
Grub
Site
Grade
Beams,
3'
wide,
3'
deep,
568
lf.
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
23
16.16
3/4
CY
bucket,
(Price
Included
in
grade
beam
founda(on
Excava(on
for
Grade
Beams
20 BCY $0.00 $0.00 $0.00 $0.00 108.20% $0.00 price)
1225
SF
mat,
2'
deep.
RSMeans
Building
Construc(on
Excava(on
for
slab,
subgrade
and
capillary
break 100 BCY $0.00 $0.00 $7.20 $7.17 108.20% $1,554.83 Cost
Data,
2011,
31
23
16.16
3/4
CY
bucket
Removal
of
Founda(on
Spoils,
Haul
of
Material,
40
MPH,
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
cycle
40
MPH 150 LCY $7.64 $14.10 108.20% $3,528.40 16,
31
23
23.20
Hauling
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Backll
Slab,
subgrade,
capillary
break 125 LCY $20.00 108.20% $2,705.00 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 125 LCY $7.64 $14.10 108.20% $2,940.34 16,
31
23
23.20
Hauling
$13,033.60
Founda'on Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
Piling
needs
to
2x
the
height
of
the
structure
which
is
Piling 23-35'?
Per
phone
conversa(on
with
Quigg
Bros,
Aberdeen,
WA
Mobiliza(on
for
piling 1 EA $12,000.00 $0.00 $0.00 $0.00 100.00% $12,000.00 on
June
29th,
2011
Driven
pipe
piles
40'
long,
18"x.5",
per
phone
conversa(on
with
Quigg
Bros,
Aberdeen,
WA
on
June
Bakered
Piles,
18"
Diameter,
30'-40'
Deep 12 EA $0.00 $3,500.00 $1,200.00 $0.00 100.00% $56,400.00 29th,2011.
Equipment
Included
in
Material/Labor
Cost
Roong Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Costs Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 4 EA $116.00 $185.00 100.00% $1,204.00 36.50
Mobiliza(on
Hip
and
ridge
style
roof,
peak
of
roof
15'.
(Equipment
Roong/Hip
and
Ridge
Roof
Steel
Panels Cost
is
included
in
Installa(on
Cost)
RSMeans
Assemblies
Cost
Data,
2011,
B3010
135,
Flat
Roof
Steel
Panels,
Flat
Seam,
Copper,
1/4"
min.
slope,
Formed
Metal
(Equipment
Cost
is
included
in
20
oz,
1.2
PSF 1260 SF $9.50 $5.80 100.30% $19,335.83 Installa(on
Cost)
$20,539.83
Stairs/Ramps/Guardrails Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 6 EA $116.00 $185.00 100.00% $1,806.00 36.50
Mobiliza(on
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
5'
wide project.
Fire
Protec'on Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Costs Equipment
Cost Loca'on
Factor Total
Cost Comments
Fire
Protec'on,
Wet
Pipe
System
RSMeans
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on 4 EA $69.00 $116.00 100.00% $740.00 36
-
Equipment
Mobiliza(on
RSMeans
Square
Foot
Costs,
2011,
D4010
410,
Wet
Pipe
Sprinkler
Systems
(Equipment
Cost
included
in
First
Floor,
2000
SF,
Light
Hazard 900 SF $4.50 $3.04 97.00% $6,582.42 Installa(on
Cost)
RSMeans
Square
Foot
Costs,
2011,
D4010
410,
Wet
Pipe
Sprinkler
Systems
(Equipment
Cost
included
in
Second
Floor,
2000
SF,
Light
Hazard 900 SF $1.21 $2.08 97.00% $2,872.17 Installa(on
Cost)
$10,194.59
Site
U'li'es Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 8 EA $116.00 $185.00 100.00% $2,408.00 36.50
Mobiliza(on
Domes'c
Water,
Duc'le
Iron
Class
250,
MJ,
6"
diameter 100 LF Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Duc(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.80% $261.12 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Fire
Water,
Duc'le
Iron
Class
250,
MJ,
6"
diameter 100 LF Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 70 BCY $2.16 $2.13 108.20% $324.92 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Duc(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.20% $3,031.76 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 12 LCY $20.00 108.80% $261.12 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 12 LCY $7.64 $14.10 108.20% $282.27 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.20% $36.68 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 75 LCY $0.50 $1.05 108.20% $125.78 23.17
General
Fill
Sewage Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 120 BCY $2.88 $2.85 108.20% $743.98 16.13
Excava(ng
Trench
Excava'on-Backll Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on 4 EA $0.00 $0.00 $69.00 $116.00 100.00% $740.00 36
-
Equipment
Mobiliza(on
Assumed
site
area
to
be
4X
building
pad,
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
11
10.10
Clear
and
Grub
Site 0.53 ACRE $0.00 $0.00 $1,750.00 $1,300.00 108.20% $1,749.05 Clear
and
Grub
Site
Included
in
Grade
Beams,
3'
wide,
3'
deep,
568
lf.
RSMeans
grade
beam
Building
Construc(on
Cost
Data,
2011,
31
23
16.16
3/4
founda(on
CY
bucket,
(Price
Included
in
grade
beam
founda(on
Excava(on
for
Grade
Beams
0 BCY $0.00 $0.00 $7.20 $7.17 108.20% price price)
3360
SF
mat,
2'
deep.
RSMeans
Building
Construc(on
Excava(on
for
slab,
subgrade
and
capillary
break 250 BCY $0.00 $0.00 $7.20 $7.17 108.20% $3,887.09 Cost
Data,
2011,
31
23
16.16
3/4
CY
bucket
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Spoils,
40
MPH,
cycle
40
MPH 311 LCY $7.64 $14.10 108.20% $7,315.55 16,
31
23
23.20
Hauling
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
Fill
Material
for
Capillary
Break 270 BCY $20.00 108.80% $5,875.20 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 250 ECY $0.63 $1.81 108.20% $660.02 Backll
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 270 CY $7.64 $14.10 108.20% $6,351.12 16,
31
23
23.20
Hauling
$26,578.04
Founda'on Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
Piling
Driven
pipe
piles
40'
long,
16"x.5",
Condon
Johnson
Quote,
Equipment
Included
in
Material/Labor
Cost
Piles,
18"
Diameter,
30'-40'
Deep 1680 LF $0.00 $55.00 $15.00 $0.00 100.00% $117,600.00 (Equipment
Cost
included
in
Installa(on
Cost)
RSMeans
Assemblies
Cost
Data
2011,
A1010
250
Pile
Pile
Caps,
3
Piles
Per
Cap,
6'-6"
x
3'-6"
x
37" 6 EA $0.00 $370.00 $540.00 99.90% $5,454.54 Caps
(Equipment
Cost
included
in
Installa(on
Cost)
RSMeans
Assemblies
Cost
Data
2011,
A1010
250
Pile
Pile
Caps,
2
Piles
Per
Cap,
6'-6"
x
3'-6"
x
37" 12 EA $0.00 $375.00 $540.00 99.90% $10,969.02 Caps
(Equipment
Cost
included
in
Installa(on
Cost)
Mobiliza(on
for
Piling 1 EA $35,000.00 $35,000.00 Condon
Johnson
Quote
Founda'on/
Foo'ngs
for
Ramp
RSMeans
Assemblies
Cost
Data,
2011,
A1010
210,
Spread
Foo(ngs,
load
75K,
soil
capacity
6
KSF,
4'-0"
sq
x
Spread
Foo(ngs
(Equipment
Cost
included
in
12"
deep 12 EA $0.00 $94.50 $167.00 $0.00 99.90% $3,134.86 Installa(on
Cost)
Exterior
Walls Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans
Assemblies
Cost
Data,
2011,
B2010
117,
Split
Face
Block
Wall,
Regular
Weight,
En(re
enclosure
surrounding
bays
that
store
the
re
trucks
(20'
high)
and
half
the
height
of
the
common
area
(8'
high).
Split
Block
Exterior
Facing,
Regular
Weight,
No
Core
Fill,
Remove
the
SF
of
the
garage
doors.
(Equipment
Cost
8x8x16,
Un-Reinforced 2912 SF $4.16 8.35 109.20% $39,780.60 included
in
Installa(on
Cost)
RSMeans
Assemblies
Cost
Data,
2011,
B2010
148,
Panel
Shingle
&
Lap
Siding,
Upper
8'
of
Common
Area
por(on
Wood
Siding,
3-5/8"
metal
studs,
16
GA.
24"
OC
insula(on
of
building
(Equipment
Cost
included
in
Installa(on
wall,
1"x6"
cedar
drop
siding 864 SF $7.20 5.5 97.30% $10,676.53 Cost)
RSMeans
Square
Foot
Costs,
2011,
Exterior
Enclosure,
2030
Exterior
Doors,
includes
common
area
only
(Material,
Installa(on
and
Equipment
Cost
included
in
Exterior
Doors 960 SF $4.25 101.80% $4,153.44 Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011,
Exterior
Enclosure,
2020
Exterior
Windows,
includes
common
area
only
(Material,
Installa(on
and
Equipment
Cost
included
in
Exterior
Windows 960 SF $1.92 101.80% $1,876.38 Cost
per
Unit)
Roong Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Costs Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans
Assemblies
Cost
Data,
2011,
B3010
105,
Built
Built-Up
Roof
Covering,
Asphalt
base
sheets
&
3
plies
#15
Up
Roong
(Equipment
Cost
included
in
Installa(on
asphalt
felt,
mopped 3520 SF $0.91 $1.66 100.30% $9,073.54 Cost)
Stairs/Ramps Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
Interior
Stairs,
2
ights,
16
risers,
with
landing,
steel,
RSMeans
Assemblies
Cost
Data,
2011,
C2010
110,
grate
type
w/nosing
&
rails 1 Each $7,875.00 $1,975.00 $0.00 95.40% $9,396.90 Stairs
Beam
and
Column
sizes
are
not
determined
and
es(mate
takes
in
"best
guess"
to
assume
sizes
for
this
Exterior
Ramp,
Rises
20',
6'
wide project.
Interior
Finishes Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans
Square
Foot
Costs,
2011M.230
Fire
Sta(on,
Interiors,
Common
Space
and
Upstairs
Only
(Materials,
Installa(on
and
Equipment
Cost
included
in
Cost
per
Interior
Walls 1920 SF $8.84 103.40% $17,549.88 Unit)
RSMeans
Square
Foot
Costs,
2011M.230
Fire
Sta(on,
Interiors
(Materials,
Installa(on
and
Equipment
Cost
Pain(ng 1920 SF $3.26 93.30% $5,839.83 included
in
Cost
per
unit)
RSMeans
Square
Foot
Costs,
2011M.230
Fire
Sta(on,
Interiors
(Materials,
Installa(on
and
Equipment
Cost
Flooring 1920 SF $2.25 106.40% $4,596.48 included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011M.230
Fire
Sta(on,
Interiors
(Materials,
Installa(on
and
Equipment
Cost
Ceiling
Finishes 1920 SF $2.20 103.30% $4,363.39 included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011M.230
Fire
Sta(on,
Interiors
(Materials,
Installa(on
and
Equipment
Cost
Interior
Doors 1920 SF $2.27 101.80% $4,436.85 included
in
Cost
per
Unit)
$36,786.43
Electrical Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
Electrical SF
RSMeans
Square
Foot
Costs,
2011,
M.220,
Fire
Sta(on,
Electrical
Service/Distribu(on,
400
amp
service,
panel
D50,
Electrical
(Material,
Installa(on
and
Equipment
board
and
feeders 3520 SF $1.44 100.50% $5,094.14 Cost
included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011,
M.220,
Fire
Sta(on,
D50,
Electrical
(Material,
Installa(on
and
Equipment
Ligh(ng
&
Branch
Wiring 3520 SF $6.46 100.50% $22,852.90 Cost
included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011,
M.220,
Fire
Sta(on,
D50,
Electrical
(Material,
Installa(on
and
Equipment
Communica(ons
&
Security 3520 SF $1.88 100.50% $6,650.69 Cost
included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011,
M.230,
Fire
Sta(on,
D50,
Electrical
(Material,
Installa(on
and
Equipment
Emergency
generator,
15
kW 3520 SF $0.25 100.50% $884.40 Cost
included
in
Cost
per
Unit)
$35,482.13
Plumbing Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
Plumbing
RSMeans
Square
Foot
Costs,
2011,
M.220
Fire
Sta(on,
D20
Plumbing
(Material,
Installa(on
and
Equipment
Plumbing
Fixtures 3520 SF $9.33 97.00% $31,856.35 Cost
included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011,
M.220
Fire
Sta(on,
D20
Plumbing
(Material,
Installa(on
and
Equipment
Gas
red
water
heater 3520 SF $2.65 97.00% $9,048.16 Cost
included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011,
M.220
Fire
Sta(on,
D20
Plumbing
(Material,
Installa(on
and
Equipment
Roof
Drain
System 3520 SF $1.18 97.00% $4,028.99 Cost
included
in
Cost
per
Unit)
$44,933.50
Fire
Protec'on Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment
Cost Loca'on
Factor Total
Cost Comments
Fire
Protec'on
RSMeans
Square
Foot
Costs,
2011,
M.230
Fire
Sta(on,
Fire
Protec(on
(Material,
Installa(on
and
Equipment
Sprinklers 3520 SF $4.38 97.00% $14,955.07 Cost
included
in
Cost
per
Unit)
RSMeans
Square
Foot
Costs,
2011,
M.230
Fire
Sta(on,
Fire
Protec(on
(Material,
Installa(on
and
Equipment
Standpipes,
wet,
class
III 3520 SF $1.23 97.00% $4,199.71 Cost
included
in
Cost
per
Unit)
$19,154.78
Landscaping Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Costs Equipment
Costs Loca'on
Factor Total
Cost Comments
RSMeans
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on 4 EA $0.00 $0.00 $69.00 $116.00 108.20% $800.68 36
-
Equipment
Mobiliza(on
Site
U'li'es Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 8 EA $116.00 $185.00 100.00% $2,408.00 36.50
Mobiliza(on
Domes'c
Water,
Duc'le
Iron
Class
250,
MJ,
6"
diameter 100 LF Assuming
100'
distance
from
service
at
street
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator
4'-6'
deep 85 BCY $2.16 $2.13 108.80% $396.74 16.13,
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
11
Install
&
Test,
6"
Duc(le
Iron
Piping,
MJ 100 LF $14.60 $10.70 $2.72 108.80% $3,048.58 Water
U(lity
Distribu(on
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 11 LCY $20.00 108.80% $239.36 conversa(on
on
June
29th,
2011
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 11 LCY $7.64 $14.10 108.20% $258.75 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 10 ECY $3.05 $0.34 108.80% $36.88 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 94 LCY $0.50 $1.05 108.80% $158.52 23.17
General
Fill
Storm
Service Assuming
200'
of
storm
piping
needed
RSMeans,
Building
Construc(on
Cost
Data,
201,
31
23
Excavate,
3/4
CY
Excavator,
6'-10'
deep 250 BCY $2.88 $2.85 108.80% $1,558.56 16.13
Excava(ng
Trench
RSMeans,
Building
Construc(on
Cost
Data,
2011,
33
41
Install
&
Test,
8"
Bituminous
Coated 200 LF $10.70 $5.25 $0.97 108.80% $3,681.79 Storm
U(lity
Drainage
Piping
Quote
per
Quigg
Bros,
Aberdeen,
WA,
phone
U(lity
Bedding,
For
Pipe
&
Conduit,
Not
Incl.
Compac(on 25 LCY $20.00 108.80% $544.00 conversa(on
on
June
29th,
2011.
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 25 LCY $7.64 $14.10 108.20% $588.07 16,
31
23
23.20
Hauling
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Compac(ng
Bedding
In
Trench 23 ECY $3.05 $0.34 108.80% $84.83 23.16
Fill
By
Borrow
&
U(lity
Bedding
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Backll,
General
Fill
By
Dozer,
No
Compac(on 284 LCY $0.50 $1.05 108.80% $478.94 23.17
General
Fill
Site
Drainage/Area
Drains/Catch
Basins Assume
4
area
drains
for
structure
RSMeans
Assemblies
Cost
Data,
2011,
G3030
210,
Manholes
&
Catch
Basins
(Equipment
Cost
included
in
Concrete,
Precast,
4'
ID
riser,
4'
deep 4 EA $1,425.00 $1,200.00 0.00% 108.80% $11,424.00 Installa(on
Cost)
Electrical 100 LF Assuming
100'
distance
from
service
at
street
Electrical
Service,
includes
service
installa(on,
breakers,
RSMeans
Assemblies
Cost
Data,
2011,
D
5010
120,
metering,
20'
conduit
&
wire,
3
phase,
4
wire,
120/208
Electric
Service,
3
Phase
-
4
Wire,
equipment
included
volts,
60
A 1 EA $960.00 $920.00 100.50% $1,889.40 in
installa(on
cost
RSMeans,
Building
Construc(on
Cost
Data,
2011,
31
23
Excavate,
3/4
CY
Excavator,
4'-6'
deep 85 BCY $2.16 $2.13 108.80% $396.74 16.13
Excava(ng
Trench
Excava'on-Backll Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment Loca'on
Factor Total
Cost Comments
RSMeans
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on 8 EA $0.00 $0.00 $69.00 $116.00 100.00% $1,480.00 36
-
Equipment
Mobiliza(on
Is
clear
and
grub
needed
for
structure
in
urban
senng?
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
11
Clear
and
Grub
Site 1 ACRE $0.00 $0.00 $1,750.00 $1,300.00 108.20% $3,300.10 10.10
Clear
and
Grub
Site
RSMeans
Building
Construc(on
Cost
Data,
2011,
02
21
Survey
Site 1 ACRE $32.50 $565.00 $35.00 108.20% $684.37 13
Site
Surveys
Fill
Material
for
Berm
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Select
Structural
Fill,
1
1/2"
minus
aggregate 6100 LCY $20.00 $1.75 $3.44 108.20% $166,259.04 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
6"to
12"
lijs,
vibra(ng
roller 5647 ECY $0.63 $1.81 108.20% $14,908.53 Backll
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 6100 LCY $7.64 $14.10 108.20% $143,488.35 16,
31
23
23.20
Hauling
Stabiliza(on
Fabric,
Polypropylene,
6oz/SY,
18"'
lijs,
5082
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
11
SF
per
lij 12000 SY $1.48 $0.09 $0.03 108.20% $20,774.40 23
Aggregate
Base
Courses
Fill
Material
at
Landscape
Walls
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
16,
Aggregates
for
Earthwork,
Select
Structural
Fill
&
Fill
Material,
Top
Soil 484 LCY $20.00 $1.75 $3.44 108.20% $13,191.70 Material
Cost
from
Quigg
Bros.,
Aberdeen,
WA
RSMeans
Building
Construc(on
Data,
2011,
31
23
23.13
Compac(ng
Backll,
by
hand,
no
compac(on,
light
soil 484 LCY $19.65 $0.00 108.20% $10,290.47 Backll
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 484 LCY $7.64 $14.10 108.20% $11,384.98 16,
31
23
23.20
Hauling
$385,761.93
Landscaping
Concrete Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Cost Equipment Loca'on
Factor Total
Cost Comments
Stepped
Concrete
Wall
4'
high
Length
of
walls
330'
and
320'
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
110,
Walls,
Cast-in-Place
(Equipment
included
in
installa(on
4'
high
walls,
cast-in-place,
8"
thick,
pumped
concrete 650 LF $18.10 $51.50 $0.00 99.30% $44,923.32 cost)
RSMeans
Assemblies
Cost
Data,
2011,
A
2020
220,
Subdrainage
Piping
(Equipment
Cost
included
in
Subdrainage
Piping,
4"
diameter,
PVC,
perforated 650 LF $2.04 $3.77 $0.00 108.20% $4,086.17 Installa(on
Cost)
Aesthe'c
Treatments
for
Exposed
Concrete
RSMeans
Building
Construc(on
Cost
Data,
2011,
03
35
Sandblast
Concrete
Heavy
Treatment 2000 SF $1.46 $3.31 $0.52 99.30% $10,505.94 29.60
Concrete
or
Gravel
Pla`orm
Asphal(c
Concrete
Paving,
6"
stone
base,
2"
binder
RSMeans
Building
Construc(on
Cost
Data,
2011,
32
12
course,
1"
toping 5750 SF $1.85 $0.20 $0.24 108.20% $14,247.24 16.14
Asphal(c
Concrete
Paving
RSMeans
Building
Construc(on
Cost
Data,
2011,
31
05
Haul
of
Material,
40
MPH,
cycle
40
MPH 160 CY $7.64 $14.10 108.20% $3,763.63 16,
31
23
23.20
Hauling
Landscaping
Stairs
Up
Berm
RSMeans
Building
Construc(on
Cost
Data
2011,
03
30
Stairs
10'
wide,
cast
on
ground,
24
steps 240 LF
Nose $4.28 $16.30 $0.18 95.40% $4,712.00 53.40,
Concrete
in
Place
RSMeans
Building
Construc(on
Cost
Data
2011,
03
30
Stair
Landing,
cast
on
ground 200 SF $3.29 $4.29 $0.05 95.40% $1,446.26 53.40,
Concrete
in
Place
Stairs/Ramps/Guardrails Quan'ty Unit Cost
per
Unit Material
Cost Installa'on
Costs Equipment
Cost Loca'on
Factor Total
Cost Comments
RSMeans,
Building
Construc(on
Cost
Data,
2011,
01
54
Mobiliza(on
of
Equipment 2 EA $116.00 $185.00 100.00% $602.00 36.50
Mobiliza(on
Pla`orm
Perimeters
Railing
(Top
wall
at
Berm)
Galvanized,
2
Rail,
1
1/2"
diameter,
RSMeans
Building
Hand
Rail/Guard
Rail,
Galvanized,
2
rail,
1
1/2"
diameter 270 LF $32.50 $9.80 95.40% $10,895.63 Construc(on
Cost
Date
2011,
05
52
Metal
Railings