Sei sulla pagina 1di 12

EQUIPOS PARA PERFORACION

COMPRESORAS NEUMATICAS COMPRESORAS NEUMATICAS COMPRESORAS NEUMATICAS


76 HP COMPRESORAS NEUMATICAS COMPRESORAS NEUMATICAS COMPRESORAS
125-175
NEUMATICAS
PCM MARTILLOS NEUMATICOS MARTILLOS NEUMATICO
87 HP 250-330 PCM
93 HP 335-375 PCM
150 HP 380-590 PCM
196 HP 600-690 PCM
240 HP 700-800 PCM
21-24 KG
1400 RPM 25-29 KG
185 CC
660-690 PCM

EQUIPO PARA MOVIMIENTO DE TIERRA


CARGADORES SOBRE ORUGA CARGADORES SOBRE ORUGA CARGADORES 110-135 HP 2.0-2.25 Yd3
SOBRE ORUGA CARGADORES SOBRE ORUGA CARGADORES SOBRE LLANTAS 150-180 HP 2.5-2.75 Yd3
CARGADORES SOBRE LLANTAS CARGADORES SOBRE LLANTAS CARGADORES 190-225 HP 3.2-3.75 Yd3
SOBRE LLANTAS CARGADORES SOBRE LLANTAS CARGADORES SOBRE LLANTAS 245 HP 4.0-6.0 Yd3
CARGADORES SOBRE LLANTAS CARGADORES SOBRE LLANTAS CARGADORES 80-95 HP 1.5-1.75 Yd3
SOBRE LLANTAS MOTOTRAILLAS AUTOCARGABLES MOTOTRAILLAS 100-115 HP 2.0-2.35 Yd3
AUTOCARGABLES MOTOTRAILLAS AUTOCARGABLES MOTOTRAILLAS 100-125 HP 2.50 Yd3
CARGABLES MOTOTRAILLAS CARGABLES RETROEXCAVADORA SOBRE LLANTAS 125-155 HP 3.0 Yd3
RETROEXCAVADORA SOBRE LLANTAS EXCAVADORA SOBRE ORUGAS 160-195 HP 3.5 Yd3
EXCAVADORA SOBRE ORUGAS EXCAVADORA SOBRE ORUGAS EXCAVADORA 200-250 HP 4.0 - 4.1 Yd3
SOBRE ORUGAS EXCAVADORA SOBRE ORUGAS EXCAVADORA SOBRE ORUGAS 200-260 HP 4.6 Yd3
MINICARGADOR (bobcat) 260-300 HP 5.0-5.50 Yd3
TRACTORES SOBRE ORUGAS TRACTORES SOBRE ORUGAS TRACTORES SOBRE 375 HP 8.0 Yd3
ORUGAS TRACTORES SOBRE ORUGAS TRACTORES SOBRE ORUGAS TRACTORES 140-210 HP 11.0 Yd3
SOBRE ORUGAS TRACTORES SOBRE ORUGAS TRACTORES SOBRE ORUGAS 210-300 HP 16.0 Yd3
TRACTORES SOBRE ORUGAS TRACTORES SOBRE ORUGAS TRACTORES SOBRE 310-350 HP 23.0 Yd3
ORUGAS TRACTORES SOBRE ORUGAS TRACTORES SOBRE ORUGAS TRACTORES 310-400 HP 14-20 Yd3
SOBRE LLANTAS TRACTORES SOBRE LLANTAS TRACTORES SOBRE LLANTAS 405-480 HP 21-31 Yd3
58 HP 1 Yd3
62 HP 1 Yd3
80-110 HP 0.50-1.3 Yd3
115-165 HP 0.75-1.60 Yd3
170-250 HP 1.10-2.75 Yd3
325 HP 2.0-3.8 Yd3
330 HP 2.5 Yd3
385 HP 3.5 Yd3
70 HP 0.5 Yd3
60-70 HP
75-100 HP
105-135 HP
140-160 HP
160-180HP
180-190 HP
190-240 HP
270-295 HP
300-330 HP
335-410 HP
415-470 HP
510 HP
650 HP
200-250 HP
300-350 HP
400-500 HP

EQUIPO DE COMPACTACION
VIBRADOR DE CONCRETO VIBRADOR DE CONCRETO VIBRADOR DE CONCRETO 4 HP 1.25 Plg.
COMPACTADOR VIB. TIPO PLANCHA COMPACTADOR VIB. TIPO PLANCHA 4 HP 1.50 Plg.
COMPACTADOR VIB. TIPO PLANCHA ROD. LISO VIBRAT. MANUAL 4 HP 2.40 Plg.
RODILLO VIB. LISO AUTOPROPULSADO RODILLO VIB. LISO AUTOPROPULSADO 4 HP
RODILLO VIB. LISO AUTOPROPULSADO RODILLO VIB. LISO AUTOPROPULSADO 5.8 HP
RODILLO VIB. LISO DE TIRO 7 HP 0.8 - 1.1 Tn.
RODILLO NEUMATICO AUTOPROPULSADO 10.8 HP 7-9 Tn.
70-100 HP 10-12 Tn.
101-135 HP 15-17 Tn.
136-170 HP 19-23 Tn.
210 HP 4-5.5 Tn.
50-80 HP 3.0-5.0 Tn.
60-80 HP
RODILLO NEUMATICO AUTOPROPULSADO RODILLO NEUMATICO AUTOPROPULSADO RODILLO NEUMATICO AUTOPROPULSADO 81-100 HP
PATA DE CABRA VIB. AUTO 127 HP
PATA DE CABRA VIB. AUTO PATA DE CABRA VIB. AUTO PATA DE CABRA VIB. AUTO 135 HP
RODILLO TANDEM ESTATICO AUTOPROPULSADO RODILLO TANDEM ESTATICO AUTOPROPULSADO RODILLO TANDEM ESTATICO 84 HP
AUTOPROPULSADO RODILLO TANDEM VIB. AUTOPROPULSADO RODILLO TANDEM VIB. AUTOPROPULSADO TRACTOR DE TIRO MF 100-135 HP
290/4 136-180 HP
TRACTOR DE TIRO MF 296-B TRACTOR DE TIRO MF 2725/4 210 HP
30-57 HP
58-70 HP
70-100 HP
130 HP
133 HP
80 HP
115 HP
158 HP

EQUIPOS PRODUCTORES DE AGREGADO


CHANCADORA PRIMARIA 15x24" CHANCADORA PRIMARIA 30x42" CHANCADORA
M.E. 30SECUNDARIA
HP M.E. 150 HP
24"S
M.E.
CHANCADORA
30 HP M.E. 75
SECUNDARIA
HP M.E. 20036"S
HP M.E.
CHANCADORA
200 HP M.E.
PRIM-SEC
40 HP M.E.
4 1/4'
3 HP
CHANCADORA
M.E. 3 HP M.E.
CONICA
5 HP M.E.
+ ZARANDA
5 HP M.E.
ZARANDA
7.5 HP VIBRATORIA 4"x6"

EQUIPOS PARA OBRA DE CONCRETO


DOSIFICADORA CONCRETO DOSIFICADORA CONCRETO DOSIFICADORA CONCRETO MEZCL.CONCRETO TIPO TROMPO M.E. 40 HP M.E. 45 HP M.E. 60 HP
MEZCLADORA DE CONCRETO TIPO TAMBOR MEZCLADORA DE CONCRETO TIPO TAMBOR MEZCLADORA DE CONCRETO TIPO 8 HP
TAMBOR 18 HP
18 HP
20-35 HP

EQUIPOS PARA REFINE Y AFIRMADO


MOTONIVELADORA MOTONIVELADORA MOTONIVELADORA MOTONIVELADORA 125 HP
130-135 HP
145-150 HP
180-200 HP

EQUIPOS PARA PAVIMENTACION


COCINA DE ASFALTO BARREDORA MECANICA CALENTADOR DE ACEITE 48-S SECADOR DE ARIDOS SECADOR DE ARIDOS 10-20 HP M.E. 50 HP
PLANTA DE ASFALTO EN CALIENTE M.E. 70 HP
PLANTA DE ASFALTO EN CALIENTE (CYBER)
PLANTA DE ASFALTO EN CALIENTE (CIFALI)
PAVIMENTADORA SOBRE ORUGAS 105 HP
PAVIMENTADORA SOBRE ORUGAS 224 HP
RECICLADORA EN FRIO 396 HP
FRESADORA 565 HP

VEHICULOS
CAMIONETA 4X4 PICK-UP CABINA SIMPLE CAMIONETA 4X4 PICK-UP TURBO DOBLE CABINA CAMIONETA 4X2 PICK-UP CABINA 148 HP
SIMPLE CAMIONETA 4X2 PICK-UP DOBLE CABINA CAMIONETA STATION WAGON 4X2 170 HP
CAMION IMPRIMADOR 90 HP
CAMION CISTERNA 4X2 (AGUA) 118 HP
CAMION CISTERNA 4X2 (AGUA) 84 HP
CAMION CISTERNA 4X2 (AGUA) 210 HP
CAMION CISTERNA 4X2 (COMBUSTIBLE) 122 HP
CAMION CISTERNA 4X2 (ASFALTO) 145-165 HP
CAMION CONCRETERO 4X2 178-210 HP
CAMION CONCRETERO 6X4 122 HP
CAMION CONCRETERO 6X4 178-210 HP
CAMION CONCRETERO 6X4 178-210 HP
CAMION DUMPER 6X4 300 HP
CAMION DUMPER 6X6 330 HP
330 HP
145-240 HP
145-240 HP
CAMION IMPRIMADOR 6X2 178-210 HP
CAMION PLATAFORMA 4X2 122 HP
CAMION PLATAFORMA 4X2 178-210 HP
CAMION PLATAFORMA 4X6 300 HP
SEMI-TRAYLER 6X4 330 HP
SEMI-TRAYLER 6X4 330 HP
CAMION VOLQUETE 4X2 120-140 HP
CAMION VOLQUETE 4X2 140-210 HP
CAMION VOLQUETE 4X2 210-280 HP
CAMION VOLQUETE 6X4 330 HP
CAMION VOLQUETE 6X4 330 HP
CAMION VOLQUETE 6X4 330 HP

EQUIPO DIVERSO
GRUPO ELECTROGENO GRUPO ELECTROGENO GRUPO ELECTROGENO GRUPO ELECTROGENO GRUPO 38 HP
ELECTROGENO GRUPO ELECTROGENO GRUPO ELECTROGENO GRUPO ELECTROGENO MONTACARGAS 58 HP
MONTACARGAS MONTACARGAS MOTOBOMBAS (Gasolina) MOTOBOMBAS (Gasolina) MOTOBOMBAS 89 HP
(Gasolina) MOTOBOMBAS (Petrleo) MOTOBOMBAS (Petrleo) MOTOBOMBAS (Petrleo) 116 HP
AUTOHORMIGUERAS 2.5 FX AUTOHORMIGUERAS 3.5 T4 140 HP
AUTOHORMIGUERAS 3.5 TT AUTOHORMIGUERAS 5.5 XL TORRES DE ILUMINACION TORRES DE 230 HP
ILUMINACION TORRES DE ILUMINACION TORRES DE ILUMINACION 380 HP
480 HP
68 HP
80 HP
94 HP
3.5 HP
5 HP
7-10 HP
12 HP
17 HP
34 HP
85 HP
85 HP
111 HP
150 HP

EQUIPOS Y HERRAMIENTAS LIVIANAS


SOLDADORA ELECTRICA 295 A
EQUIPO OXICORTE, INC. ACC.(MANG., OXI, ETC)
TALADRO 0.5 HP
TARRAJA ELECTRICA 1 1/4"@ 4"
TARRAJA MANUAL 1 1/2"@ 2 1/2", INC. ACC.
DOBLADOR DE TUBOS, HASTA 12"
BOMBA DE PRESION MANUAL, INC. ACC.
ESMERIL DE BANCO

EQUIPO DE PRECISION
GPS TEODOLITO
ESTACION TOTAL LEICA TCA 1200
NIVEL TOPOGRAFICO
MIRA TOPOGRAFICA
JALONES
DESCRIPCION POTENCIA

175 PCM 2,000 8.30


330 PCM 2,300 12.94
375 PCM 2,500 19.34
590 PCM 3,500 21.65
690 PCM 5,000 28.81
800 PCM 6,500 29.96
4 KG 24 5.02
9 KG 29 5.59
CC 26 8.67
690 PCM 6,000 54.15

2.0-2.25 Yd3 16,275 88.54


2.5-2.75 Yd3 18,387 98.78
3.2-3.75 Yd3 25,173 126.22
4.0-6.0 Yd3 28,000 155.49
1.5-1.75 Yd3 9,031 55.93
2.0-2.35 Yd3 10,308 60.09
2.50 Yd3 11,500 61.33
3.0 Yd3 16,584 67.98
3.5 Yd3 18,585 76.59
4.0 - 4.1 Yd3 20,826 87.59
4.6 Yd3 22,000 124.17
5.0-5.50 Yd3 31,105 164.31
8.0 Yd3 49,738 188.45
11.0 Yd3 14,200 145.95
16.0 Yd3 20,600 134.40
23.0 Yd3 32,800 123.80
14-20 Yd3 20,000 128.87
21-31 Yd3 15,500 177.19
1 Yd3 9,000 36.41
1 Yd3 8,000 38.90
0.50-1.3 Yd3 17,300 62.32
0.75-1.60 Yd3 24,300 98.86
1.10-2.75 Yd3 33,800 141.65
2.0-3.8 Yd3 61,600 198.56
2.5 Yd3 65,000 175.62
3.5 Yd3 70,000 242.17
0.5 Yd3 2,600 21.58
6,711 51.50
9,090 58.16
12,300 111.33
14,900 111.74
14,900 134.17
14,900 141.65
20,520 154.75
21,863 186.63
31,980 200.86
37,170 234.07
52,007 257.17
54,760 269.82
70,320 400.15
20,500 157.54
30,380 246.39
46,355 379.63

1.25 Plg. 95 2.85


1.50 Plg. 145 2.95
2.40 Plg. 160 3.06
800 3.20
7,300 3.56
0.8 - 1.1 Tn. 11,100 5.18
7-9 Tn. 13,700 6.48
10-12 Tn. 19,600 21.89
15-17 Tn. 5,500 47.57
19-23 Tn. 3,700 62.74
4-5.5 Tn. 63.15
3.0-5.0 Tn. 8.30
40.90

DESCRIPCION POTENCIA
5.5-20 Tn. 5,500 55.50
8.24 Tn. 8,000 57.71
9.00 Tn. 8,000 58.80
8.1 Tn. 8,200 13.58
11-13 Tn. 11,300 49.07
15-17 Tn. 15,300 68.46
20-22 Tn. 21,500 73.94
3.5 Tn. 3,700 6.52
5-8 Tn. 5,800 9.22
8.14 Tn. 8,800 15.06
11,900 12.38
11,500 12.57
5,000 13.47
6,500 15.52
7,000 24.67

3 HP M.E. 3 HP M.E. 5 HP M.E. 5 HP M.E. 7.5 HP 46-70 Tn/Hr. 19,000 33.22


21,000 150.61
46-70 Tn/Hr. 22,000 54.57
46-70 Tn/Hr. 23,000 61.24
78.59
39,000 169.31
150.00 Tn/Hr. 7,000 24.48
150.00 Tn/Hr. 4,000 4.72
550.00 Tn/Hr. 4,000 4.93
550.00 Tn/Hr. 7,800 6.60
800.00 Tn/Hr. 12,000 6.60
15,500 7.01

HP 50 M3/Hr. 17,000 31.30


50-90 M3/Hr. 20,000 48.02
120 M3/Hr. 23,000 59.23
9 Pie 3 500 2.93
7 Pie 3 1,500 5.77
11-13 Pie 3 1,500 6.57
16 Pie 3 2,700 10.53

11,515 64.41
12,365 68.84
13,540 83.39
18,370 89.72

320 Gln 2,100 2.78


7 Pulg. Lon 1,000 8.18
468 Pie 3 5,700 14.24
30-64 Tn/Hr. 8,000 22.51
60-115 Tn/Hr. 8,500 33.20
150 Tn/Hr. 46,800 210.52
60 Tn/Hr. 35,350 179.89
90-120 Tn/Hr. 62,000 352.33
10 Pulg. 12,000 62.36
10 Pulg. 12,000 126.99
295 Kw 22,900 370.02
421Kw 30,000 432.81

3 Pasajeros 2,730 12.12


5 Pasajeros 2,730 16.04
3 Pasajeros 1,500 11.90
5 Pasajeros 1,450 12.63
5 Pasajeros 1,250 8.73
2000 gln 13,500 50.72
1500 gln 9,900 43.69
2000 gln 13,000 49.42
3000 gln 19,000 55.78
2000 gln 13,000 61.48
2000 gln 13,000 56.39
4 m3 13,000 66.40
8 m3 26,000 87.41
10 m3 26,000 90.60
12 m3 26,000 95.04
12 m3 25,000 84.23
13 m3 25,000 87.41

DESCRIPCION
2000 gln 13,500 72.15
8 Tn. 13,000 47.54
12 Tn. 19,000 58.30
19 Tn. 26,000 85.66
35 Tn. 42,600 62.12
40 Tn. 54,420 62.12
4 M3 11,500 39.12
6 M3 15,000 39.44
10 M3 19,000 49.30
10 M3 26,000 53.75
12 M3 26,000 58.84
15 M3 26,000 70.93

20 Kw 500 3.66
37.5 Kw 720 4.02
50 Kw 1,150 4.75
75 Kw 1,500 5.31
90 Kw 1,700 5.86
150 Kw 2,000 7.69
250 Kw 2,700 16.09
300 Kw 3,500 16.83
3 tn. 5,200 13.26
5 tn. 8,150 21.56
7.5 tn. 9,150 29.88
2 Plg. 90 0.71
3 Plg. 135 0.74
3-4 Plg. 135 0.78
4 Plg. 295 15.78
6 Plg. 340 18.85
8 Plg. 500 35.48
2.5 m3 5,300 13.27
3.5 m3 7,300 15.56
3.5 m3 7,350 16.39
5.5 m3 8,800 19.71
4 Kw 1,590 2.05
5 Kw 1,590 2.26
6 Kw 1,590 2.47
8 Kw 1,950 3.53

MONOFASICA 6 6.06
6.41
1 7/8" 4.49
220 Vol 6.76
2.35
330 PSI ELECTRICO 4.19
0.98
1.72

5.17
12.26
16.03
9.73
1.84
1.58
COSTO COSTO COSTO
POTENCIA CAPACIDAD PESO POSESION OPERACION HORARIO OBSEV. (KG) (S/.) (A) (S/.) (B) (A + B)

55.46 63.76 (**) (**)


62.68 75.62
83.67 103.01 (**)
103.12 124.77
123.23 152.04
154.79 184.75
1.32 6.34
1.47 7.06
6.30 14.97
36.67 90.82

124.04 212.58
165.05 263.83
192.02 318.24
205.44 360.93
90.42 146.35
99.17 159.26
101.69 163.02
112.99 180.97
131.50 208.09
148.18 235.77
150.44 274.61
181.24 345.55
227.74 416.19
144.57 290.52
204.19 338.59
221.79 345.59
238.07 366.94
286.88 464.07
69.34 105.75
87.35 126.25
100.51 162.83
133.17 232.03
189.18 330.83
236.89 435.45
238.45 414.07
224.38 466.55
64.40 85.98
88.24 139.74
105.95 164.11
126.38 237.71
147.84 259.58
169.07 303.24
180.63 322.28
197.93 352.68
230.69 417.32
239.55 440.41
336.16 570.23
371.66 628.83
401.08 670.90
501.40 901.55
150.16 307.70
202.90 449.29
269.25 648.88

3.63 6.48 (*) (*) (*)


3.83 6.78
3.74 6.80
24.93 28.13
26.86 30.42
28.80 33.98
30.37 36.85
74.78 96.67
103.26 150.83
125.75 188.49
143.35 206.50
42.24 50.54
55.77 96.67

COSTO COSTO COSTO


POTENCIA CAPACIDAD PESO POSESION OPERACION HORARIO OBSEV. (KG) (S/.) (A) (S/.) (B) (A + B)
5.50 64.48 119.98
7.71 75.24 132.95
8.80 78.55 137.35
3.58 64.73 78.31
9.07 106.09 155.16
8.46 121.73 190.19
3.94 143.49 217.43
.52 42.76 49.28
.22 52.29 61.51
5.06 64.34 79.40
2.38 186.96 199.34
2.57 201.89 214.46
3.47 61.30 74.77
5.52 75.66 91.18
4.67 97.54 122.21

3.22 26.49 59.71


50.61 67.31 217.92
4.57 24.64 79.21
1.24 27.60 88.84
8.59 35.31 113.90
69.31 75.54 244.85
4.48 37.72 62.20
.72 2.78 7.50
.93 2.90 7.83
.60 3.96 10.56
.60 3.96 10.56
.01 3.90 10.91

1.30 63.82 95.12


8.02 74.41 122.43
9.23 78.02 137.25
.93 2.52 5.45
.77 4.35 10.12
.57 6.14 12.71
0.53 24.78 35.31

4.41 102.32 166.73


8.84 104.67 173.51
3.39 123.38 206.77
9.72 126.10 215.82

2.78 51.06 53.84


8.18 40.81 48.99
14.24 8.48 22.72
22.51 14.59 37.10
33.20 21.52 54.72
210.52 139.16 349.68
179.89 86.80 266.69
352.33 170.02 522.35
62.36 73.71 136.07
126.99 135.77 262.76
370.02 290.90 660.92
432.81 383.86 816.67

2.12 70.63 82.75


6.04 78.41 94.45
1.90 47.96 59.86
2.63 53.05 65.68
.73 47.01 55.74
0.72 113.01 163.73
3.69 93.86 137.55
9.42 104.43 153.85
5.78 131.02 186.80
1.48 95.20 156.68
6.39 128.34 184.73
6.40 133.61 200.01
7.41 173.80 261.21
0.60 183.86 274.46
5.04 186.46 281.50
4.23 121.01 205.24
7.41 120.98 208.39

COSTO COSTO C
IPCION POTENCIA CAPACIDAD PESO POSESION OPERACION HORARIO OBSEV. (KG) (S/.) (A) (S/.) (B) (
154.91 227.06
91.06 138.60
131.86 190.16
174.19 259.85
168.01 230.13
168.15 230.27
106.41 145.53
129.18 168.62
148.87 198.17
163.14 216.89
165.89 224.73
169.78 240.71

3.66 18.64 22.30 (*) (*) (*) (*) (*) (*) (*) (*)
4.02 46.16 50.18
4.75 79.55 84.30
5.31 95.32 100.63 (*) (*) (*) (*) (*) (*)
5.86 105.26 111.12
7.69 120.26 127.95
16.09 138.59 154.68
16.83 176.62 193.45 (*) (*) (*) (*)
13.26 59.41 72.67
21.56 68.78 90.34
29.88 79.93 109.81
0.71 5.30 6.01
0.74 6.39 7.13
0.78 7.42 8.20
15.78 11.95 27.73
18.85 18.29 37.14
35.48 34.31 69.79
13.27 65.52 78.79
15.56 67.66 83.22
16.39 79.61 96.00
19.71 92.70 112.41
2.05 18.19 20.24
2.26 18.34 20.60
2.47 18.49 20.96
3.53 24.95 28.48

6.06 0.00 6.06 (*) (*) (*) (*) (*) (*) (*) (*)
6.41 0.00 6.41
4.49 0.00 4.49
6.76 0.00 6.76
2.35 0.00 2.35
4.19 0.00 4.19
0.98 0.00 0.98
1.72 0.00 1.72

5.17 0.00 5.17 (*) (*) (*) (*) (*) (*)


12.26 0.00 12.26
16.03 0.00 16.03
9.73 0.00 9.73
1.84 0.00 1.84
1.58 0.00 1.58
COSTO COSTO
(S/.) (B) (A + B)

COSTO COSTO
(S/.) (B) (A + B)
(**) (**) (**)
(**) (**)
(***)

(*) (*) (*) (*)


(*)

(***) (***) (***) (**) (**) (**) (**)

(**) (**) (**)


(****) (****)
(****)

(*) (*)

COSTO COSTO COSTO


G) (S/.) (A) (S/.) (B) (A + B)
*) (*) (*) (*) (*) (*) (*)

*) (*) (*) (*) (*)

*) (*) (*)

*) (*) (*) (*) (*) (*) (*)

*) (*) (*) (*) (*)

Potrebbero piacerti anche