Sei sulla pagina 1di 43

VOCATIONAL TRAINING

On
500MW THERMAL POWER PLANT

AT

NTPC LIMITED

UNCAHAAR,RAEBARELI
UTTAR PRADESH

BY
RANJEET KUMAR

OF

NATIONAL INSTITUTE OF TECHNOLOGY , PATNA

UNDER THE EXPERT GUIDANCE


OF:

Mr.P.S.PANDEY , Manage(BMD)
Mr. J.N.SINGH , Manage(BMD)
Mrs Sharda Nanda ,Deputy Manger(TMD)
.
ACKNOWLEDGEMENT

With feelings of joy and thanks, I placed in your


hand my Project report. It is my pleasant privileges
to thank all those who have help me in molding and
shaping my project. Without their guidance,
CERTIFICATE
cooperation and best wishes it would have been
impossible for me to complete my dissertation
report. A big thanks to all those who helped me by
sparing time amidst their busy schedule and for
being kind enough to help me whenever I needed
them.
As man is a social animal. He requires the
encouragement and affection of his parents and
friends to accomplish his goal and I have been
NATIONAL THERMAL POWER CORPORATION LTD.
Lucky to get it and make this project report a
(A GOVERNMENT OF INDIA ENTERPRISE)
success.RIHAND SUPER THERMAL POWER PROJECT
Finally, I P.O.-Rihand
am thankful to all
Nagar, theSonebhadra
Distt. respected(U.P.)
Executive
. DATE-23/07/2006
employees of N.T.P.C UNCHAHAAR,RAEBARELI, for
providing me the necessary information, cooperation
in VOCATINAL TRAINING. I thank god almighty for
CERTIFICATE
his abundant blessing because without it this project
TO WHOMSOEVER IT MAY CONCERN
was only a dream.

RANJEET KUMAR
III Year
Mechanical Engg.
N.I.T.PATNA (BIHAR)
CERTIFICATE

This is to certify that this summer training report has been prepared by MR.
RANJEET KUMAR S/O SHRI MADAN RAM, a student of B.TECH. (MECH.
ENGG.) at NATIONAL INSTITUE OF TECHNOLOGY,PATNA in the partial
fulfillment of requirement of vocational training at NTPC Uchahar.

The matter was analyzed by candidate under my guidance and this report
embodies the work done by him.

We wish him a bright future.

Approving Authority: Guide:

Mr. A.K.TIWARI Mr. A.K. SHARMA


DGM (BMD) SUPDT (BMD)

Mr. O P SINGH
SR. ENGG. (BMD)
ABOUT N.T.P.C.

The NTPC was formed in 1975 to meet the power requirement challenge faced by the nation
during the period. N.T.P.C. (National Thermal Power Corporation) is an Indian Govt. undertaking.
It has the installed capacity of 23,745MW including joint venture, contributing 26.7% of the
nations power generation with only 19.1% of Indias total installed capacity.
Based on 1998 data, carried out by Data monitor UK, NTPC is the 6th largest in terms of thermal
power generation and the second most efficient in terms of capacity utilization amongst the
thermal utilities in the world.
NTPC's core business is engineering, construction and operation of power generating plants
and also providing consultancy to power utilities in India and abroad. As on date the
installed capacity of NTPC is 23,749 MW through its 13 coal based (19,480 MW), 7 gas based
(3,955 MW) and 3 Joint Venture Projects (314 MW). NTPC acquired 50% equity of the SAIL
Power Supply Corporation Ltd. (SPSCL). This JV company operates the captive power
plants of Durgapur (120 MW), Rourkela (120 MW) and Bhilai (74 MW). NTPC is also
managing Badarpur thermal power station (705 MW) of Government of India.

Recognising its excellent performance and vast potential, Government of the India has
identified NTPC as one of the jewels of Public Sector Navratnas- a potential global giant.
Inspired by its glorious past and vibrant present, NTPC is well on its way to realise its vision
of being one of the worlds largest and best power utilities, powering Indias growth.

New technology

Super critical technology at NTPC Sipat project (3X600MW) to increase the efficiency of
the cycle and to decrease the green house gas emission.
Closed cycle seawater cooling at Simhadri project for first time in India.
Introduction of IGCC (Integrated gasified combined cycle) for clean and efficient
utilization of coal.

Environment management

Liquid water treatment plants at Farakka and Kahalgaon.


Ash water recycling system at Kahalgaon and Korba to reduce water requirement for ash
disposal at these station

ABSTRACT
Any thermal power plant is converting the chemical energy of fossil fuel (coal) into electrical
energy. The process involved for this conversion is based upon the Modified Rankine Cycle. The
major components that are used to accomplish the Modified Rankine Cycle are

i) Boiler feed pump,


ii) The steam generator water walls (evaporator),
iii) Steam generator super heaters,
iv) Steam turbine,
v) Reheater, vi) Condenser,
vii) Regenerative feed heaters etc.

All components of a power generating cycle are vital and critical in operation. In Modified
Rankine Cycle the two most important aspect that is added are reheating & regenerative heating
By reheating steam, coming from exhaust of the turbines, is used to send back to the reheater of
the boiler so that its enthalpy increases and more work can be done by this steam the other
purpose is to make steam dry so that no harm will be done to the blades of the turbine.

In RHSTPP there are four turbines in Tandem coupling namely one H.P Turbine, one L.P
Turbine & two L.P Turbine coupled with the generator to which is synchronised with the grid to
produce electricity at 50Hz.

. In all my modesty, I wish to record here that a sincere attempt has been made for the
presentation of this project report. I also trust that this study will not only prove to be of academic
interest but also will be able to provide an insight into the area of technical management.
MODIFIED RANKINE CYCLE

A thermal power station operates using a closed steam power cycle, which is a dual
(vapour+liquid) phase cycle. In this cycle, the working fluid i.e. water undergoes various
thermodynamic processes and is used repeatedly. Previously, rankine cycle was used in most of the
thermal power plants. However, in modern power plants the rankine cycle is modified to include
superheating of steam, regenerative feed water heating and reheating of steam.

3 5

2 4

1 6

S
The modified cycle is represented on T-S diagram. Various processes are:
1-2 Ideal pressure increase at constant entropy in boiler feed pump.
2-3 Heat addition in the boiler at constant pressure.
3-4 Isentropic expansion in HP turbine.
4-5 Reheating at constant pressure.
5-6 Isentropic expansion in IP and LP turbines.
6-1 Extraction of latent heat in condenser.
Factors affecting thermal efficiency of Modified Rankine Cycle are listed as under:
Initial Steam Pressure.
Initial Steam Temperature.
Reheat Pressure and Temperature.
Condenser Pressure.
Regenerative Feed Water Heating.

MAIN BOILER

A . BOILER FUNDAMENTALS

Principles of combustion:

1. The primary function of oil and coal burning systems in the process of steam generation is
to provide controlled efficient conversation of chemical energy of fuel into heat energy,
which is then transferred to the heat absorbing surfaces of the steam generator. When
combustion is properly completed the exhaust gases will contain, CO2, water vapour,
sulphur dioxide and a large volume of nitrogen, combining carbon and hydrogen with the
oxygen in air brings about combustion. When carbon burns incompletely it forms carbon
monoxide.

2. Composition of air:
a) 79% nitrogen and 21% oxygen by volume.
b) 77% nitrogen and 23% oxygen by weight.
3. Excess air:
In practice the theoretical quantity is not sufficient to ensure complete combustion and
extra air has to be supplied. This excess air is known as excess air.

4. Ignition:
Fuel must be ignited before it can burn. Raising the temperature of the fuel
to its ignition temperature brings about combustion.

5. The following factors in efficient combustion are usually referred to as The


three TS.

a) TIME: It will take a definite time to heat the fuel to its ignition
temperature and having ignited, it will also take time to burn.

b) TEMPERATURE: A fuel will not burn until it has reached its ignition
temperature. Preheating the combustion air increases the speed at which this
temperature will be reached.

C) TURBULENCE: Turbulence is introduced to achieve a rapid relative motion


between the air and the fuel particles. This produces a quick propagation of the flame
and its rapid spread throughout the fuel/air mixture in the combustion chamber.

6) Combustion efficiency:
Maximum combustion efficiency depends on
c) Design of the boiler
d) Fuel used
e) Skill in obtaining combustion with the minimum amount of excess air.

7) Thermal efficiency of a boiler is measured by the amount of the heat transferred to the
water in the boiler by each Kg of the fuel used.

ARRANGEMENT OF THE MAIN BOILER:

1). Boiler Structurals:

The boiler structurals are divided into two parts.

a) Supporting Structures: boiler-supporting structure consists of a systematic


arrangement of columns stiffened with horizontal beams and vertical diagonal
bracings and comprise of low carbon steel material. The main columns support
the main boiler components viz. drum, economizers air preheaters, burners and
galleries at various levels.

b) Galleries and Stairways: Galleries and stairways around the combustion and the
heat recovery areas are provided for approach to the boiler.

2) Furnace:
A Boiler furnace is that space under or adjacent to a boiler in which a fuel is burned
and from which the combustion products pass into the boiler proper. It provides a
chamber in which the combustion reaction can be isolated and confined so that the
reaction remains under controlled force. In addition, it provides a support or
enclosure for the firing equipment. The wall construction of the furnace is water-
cooled walls i.e. the wall is of tube in which water is flowing continuously

3) Boiler drum:

The boiler drum forms a part of the circulation system of the boiler.The
drum serves two functions,the first and primary onebeing that of separating
steam from the mixture of water and steam discharged into it.Secondary,the
drum houses all equipments used for purification of steam after being
separated from water.The purification equipment is commonly reffered to as
the drum intervals.
The quantity of water contained in the boiler below the water level is
relatively small compared to the total steam output.Primarily,the drum size
is determine by the space required to accommodate the steam separating and
purifying equipments.The steam space provided should be sufficient to
prevent priming and foaming.
Material: The boiler drum is made of carbon steam plates. The
materials used should comply with the Indian Boiler Regulations.
Comparing carbon steel and alloy steel as material for drum,the
carbon steel costs less per ton of material but the overall weight
of drum will be higher because that of thickness.

DRUM INTERVALS:

Drum intervals are used to separate water from steam and to direct the flow
of water and steam in a manner so as to obtain the optimum distribution of
drum matal temperature in boiler operation.
The arrangement of drum normally consists of two or more integrated
device,each of which may be quite different in design and operate on totally
different principles.Each stage must have a higher separation efficiency.The
greater the number of stages of separation,the lower the required efficiency
of each stage .Thus,two stages at 99% efficiency,three stages at 90%
efficiency and six stages at 70% efficiency will give similar results.
Water level gauge is mounted on each end of the steam drum. If water level
goes outside of the prescribed operating limit then the boiler is
tripped.Thus,with increase in pressure,the separation of water from steam by
simple devices become more difficult.It become necessary to use more
efficient apparatus if primary separation is to be achieved in a confined area.
4) Economiser:

The purpose of the economizer is to preheat the boiler feed water before it is
introduced into steam drum by recovering heat from the flue gases leaving the
boiler.Entering first,the economizer water is heated to about 30 to 40 deg C below
saturation temperature.From economiser the water enters the drum and thus joins
the circulation system.Water entering the drum flows down through the downcomer
and and entersring header at the bottom.It is located in the boiler second pass below
the superheater. The economizer is continuous loop type and water flows in upward
direction and gas in the downward direction. All tube circuits originates from the
inlet header and terminate at outlet header which are connected with the economizer
outlet headers through three rows of hanger tubes.

5)Downcomers:

Down comers provide a passage for water from the boiler drum to bottom ring
header. From bottom ring header the water goes to water walls for heat absorption
and conversion into steam heating .To achieve the circulation of water into water
wall Boiler circulation pumps are provided in down comers.

6)Waterwalls:

Water walls are the necessary elements of the boiler. They serve as the means of
heating and evaporating the feed water supplied to the boiler from the economizers
via boiler drum and down comers.
In large boilers, water walls completely cover the interior surfaces of the furnace
providing practically complete elimination of exposed refractory surface. They
usually consist of vertical tubes membrane and are connected at the top and at the
bottom to headers. These tubes receive water from the boiler drum by means of
down comers connected between drum and water walls lower header.
Water walls absorb 50 percent of the heat released by the combustion of fuel in the
furnace, which is utilized for evaporation of feed water. The mixture of water and
steam is discharged from the top of the water walls into the upper wall header and
then passes through riser tubes to the steam drum.
The design and construction of the water walls depends upon the combustion and
steam conditions and the size of the boiler.
Orifices installed in the inlet of each water circuit maintain an appropriate flow of
water through the circuit.

7)Riser tubes:

A riser is a tube through which the mixture of water and steam pass from an upper
water wall header to the steam drum.

8) Super Heater:
There are three stages of super heater; the first stage consists of horizontal superheater of
convection mixed flow type with upper and lower banks located above economizer
assembly in the second pass. The upper bank terminates into hanger tubes, which are
connected into the outlet header of the first stage super heater. The second stage
superheater consists of a pendant platen, which is a radiant parallel flow type. The third
stage superheater pendant spaced is of convection parallel flow type.
In radiant super heaters heat is absorbed by direct radiation from the furnace and are
generally located at the top of the furnace. Since the furnace temperature, and therefore the
amount of available heat from radiation, does not rise as rapidly as the rate of the steam
flow, thus the steam temperature drops as the steam flow rises.
Convection superheaters absorb mainly by the impingement of flow of hot gases around
the tubes. A purely convection superheater has a rising steam temperature characteristic i.e.
the amount of available heat from convection, rise as rapidly as the rate of steam flow.

9)Reheater:

The function of the reheater is to reheat the steam coming out from the high pressure
turbine to a temperature of 540C. The reheater is composed of two sections-one is front
pedant section and rear pedant section. The rear pedant section is located above the furnace
arc and the rear water wall and the front pedant section is located between the rear water
hanger tubes and the superheater platen section.
The cold reheat is the line from turbine to the boiler and is at a lower than the reheat
line from boiler to the turbine called hot reheat steam. Due to resistance of flow through the
reheat section, the hot reheat steam is at a lower pressure compared to the cold reheat
steam.

10)Burners:

There are forty total pulverized coal burners arranged on the corners at a height of 18 to
25 meters and twelve oil burners provided each in between corner two pulverized two-fuel
burner.
The pulverized coal burners are arranged in such a way that ten mills supply the coal to
burners at 4 corners, of the furnace. All the nozzles of the burners are interlinked and can
be tilted as a single unit from +30 to 30.
The oil burners are fed with the heavy fuel oil till boiler load reaches to about 25%.

11)Desuperheaters:

A. Superheater Desuperheater:
The superheater desuperheater is fitted between stages 4 and 5(on transfer pipe) to control the
superheated steam at the specified terminal temperature of 540 oC. The maximum design
temperature reduction at the superheater desuperheater is from 446 oC to 388 oC.

The desuperheater comprises a spray nozzle shell and associated spray assembly projecting
into a section of the superheater steam line. This section of the steam line forms the
desuperheater shell. Steam assisted spray nozzle assembly provides a fine spray of water
which attemperates the steam passing through the desuperheater.
Spray water for desuperheater is taken from the boiler feed water pump discharge. In
addition, spray water regulating stations are provided further downstream in each line.

B. Reheater Desuperheater:
The reheater desuperheater is only brought into use when the reheater outlet temperature
rises above the normal temperature.
The reheater desuperheater comprises of a spray nozzle shell and associated spray nozzle
assembly projecting into a section of the steam line between the HP turbine outlet and the
reheater inlet headers. This section of the steam line forms the desuperheater shell. Water is
fed into the shell from the discharge side of the boiler feed pumps via a reheater
desuperheater spray water regulating station.

When the reheater desuperheater is called into service water is fed via the water tube and
passes through the spray nozzle thereby forming a spray which attemprates the steam passing
through the desuperheater and thus decreasing e The quantity of water in the boiler drum is
relatively small compared to the total steam output. So, the drum size is determined by the
space required to accommodate the steam separating and purifying equipments.

12) Boiler Water Circulations Pumps:

Each boiler water circulation pump consists of a single stage centrifugal pump on a wet stator
induction motor mounted with in a common pressure vessel. The vessel consists of three
main parts a pump casing, motor housing and motor covers. The motor is suspended beneath
the pump casing and is filled with boiler water at full system pressure. No seal exists between
the pump and motor, but a provision is made to thermally isolate the pump from the motor.

13) Igniters:

High Energy Arc type electrical igniters are provided which can directly ignite the heavy
fuel oil. An exciter unit stores up the electrical energy and releases the energy at a high
voltage and short duration. A spark rod tip, which is designed such a way that converts the
electrical energy into an intensive spark. A pneumatically operated retracts mechanism,
which is used to position the spark rod in the firing position and retract to the non firing
position. Each discrete spark provides a large burst of ignition energy as the current reaches
a peak value of the order of 2000 amps. These sparks are effective in lighting of a well-
atomized oil spray and also capable of blasting off any coke particle or oil muck on the
surface of the spark rod.

B. WATER CIRCULATION SYSTEM:

Water must flow through the heat absorption surface of the boiler in order that it is
evaporated into the steam. In drum type units the water is circulated from the drum
through the generating circuits and back to the drum where steam is separated and
directed to the superheater. The water leaves the drum through the downcomers at a
temperature slightly below the saturation. The flow through the furnace wall is at
saturation. Heat absorbed is the latent heat of vaporization creating the mixture of
steam and water.
At very a high pressure the density difference between steam and water becomes
progressively less and a point is reached where natural circulation is too slow.Natural
circulation is limited to boiler with drum operating pressure around 175 kg/cm-2.
To overcome this forced circulation is employed which uses pumps to speed up the
circulation of the water.

TECHNICAL DATA

Main boiler 500MW


Type Balanced Draft ,Dry bottom,Single drum,Radiant Furnace,
Controlled Circulation,Tangentially Fired,Tiltable Nozzle.
Manufacturer M/S BHEL(CE DESIGN)
Furnace type Controlled Circulation.
Drum
a. Overall length 22070 mm
b. Designed pressure 204.9 Ksc.
c. Designed temperature 366 oC.
Superheater
a.Number of stages 6 stages
Reheater
a. Number of stages 3 stages
Steam flow at MCR
a. Steam at final superheater outlet 1725 TPH
b. Steam at reheater outlet 1530 TPH
Water flow at MCR
a. Feed water entering economizer 1725TPH
Coal flow at MCR 316.4 TPH
Steam pressure at MCR (ksc)
At final superheater outlet 178
At reheater outlet 43.46
At reheater inlet 45.85
From drum 193.5
Economizer inlet 196.6
BOILER AUXILIARIES

MILLING SYSTEM: -

COAL BUNKER: -

These are in-process storage silos used for storing crushed coal coming from the coal handling
plant through conveyor belts.
There are ten coal bunkers supplying coal to each mills and are located at top of the mills to aid
in gravity feeding of the coal. Each bunker can store coal, which can be used for 12hrs.

COAL FEEDER: -

The purpose of coal feeder is to transfer coal at a pre- determined rate, from
coalbunker to the mill.
The coal feeder comprises two continuous chains with L sections flight bars mounted between
the chains at every fifth link .The chains runs on sprockets mounted at each end of the feeder to
given an upper strand movement towards the driven ends and a lower strand movement in the
opposite direction. The drive shaft is supported on two self aligning bearing mounted in the
Plummer block on support out side the feeder casing, shaft sealing is achieved by the lip seals in
the sealing housing and mounted in board of the bearing to abut the feeder casing.
The tail sprocket shaft is mounted in adjustable bearing blocks adjacent to the feeder casing with
positioned which allow the feeder chain to be tensioned.
Both upper and lower strands run over full width carrying plates with the lower strands located
by angle section guides mounted on the feeder wall. The upper and lower carrying plates and the
inside wall are protected from wear by replace by replaceable stainless steel panels, chains are
kept clean by rubber wiper.
Feeder input is achieved by roller chain drive to the conveyor via a fixed speed electric motor
driving a variable speed gear box, torque limiter and fixed out put gear box The electric motor is
flanged mounted to variable speed gear box, coupled to the fixed output gear box by a flexible
coupling and torque limiter.

The principle of operation of coal feeder is that coal flows from the bunker into the chain feeder
via feed hopper and is conveyed to the mill feed inlet chute, when the feeder is in the operation,
the conveyor chain drag a fixed head of coal towards the driven ends of the feeder. At the end of
the carrying plates the coal falls through the conveyor onto the bottom plate, where it is picked
up by the returning flight bars and dragged back along the feeder to fall into the mill feed chute.
MILL CHUTE: -

Mill chute trans port coal directly from the coal feeder to its associated mill, in addition an
emergency chute is incorporated to allow coal to be removed from the coal bunker via coal
feeder in the event that outage time is more than one month, or if there is a danger from fire in
the mill chute area, coal feeder, or coal bunker.
Each mill is provided which transport raw coal from the bunker to the inlet of mill at the desired
rate. The rate of feeding is controlled by variable speed gear box . Here chain type feeder is
present in which continuous chain is moving round sprockets in which a sprocket is driven by a
variable speed D.C motor and the other sprocket is a return .Sprocket on this chain ,at different
MS plates are connected which are called as scrapers .This type chain feeder are called scraper
feeder. The coal from the bunker falls on a platform which is below the scrapper feeder. When
the scraper moves it will scrap the coal and at the end of platform the coal falls into the
pulverizer.

PULVERISER MILL:-

There are ten mills for every 500 MW unit located adjacent to the furnace at 0 m level.
These mills pulverize coal to desired fineness to be fed to the furnace for combustion .
The main structure of the pulverisering mill is fabricated from mild steel in three cylindrical
sections, the bottom section (the mill housing support )which support the entire unit and
encloses the mill drive gear unit, a center section (the mill housing)that contains the rotary
grinding element and upper section (the classifier housing )comprising an accommodate the gas
loading cylinders of the mill loading gear .A platform around the upper section provide an access
to an inspection door and to the top of the mill routine maintenance and is served by detachable
ladder .
.
PULVERIZERS:

The pulverizser exclusive of its feeder, consists essentially of a grinding chamber with a
classifier mounted above it. The pulverizing take place in a rotating bowl in which centrifugal
force is utilized to move the coal, delivery by the feeder, outwards against the grinding ring (buil
ring). Rolls revolving on journals that are attached to the mill housing pulverize the coal
sufficiently to enable the air stream through the pulverizer to pick it up. Heavy spring action
through the journal saddles, provide the necessary pressure between the grinding surfaces and the
coal. The rolls do not touch the grinding rings , even when pulverizer is empty. Tramp iron and
other foreign material is discharged through a suitable spout. The air and coal mixture passes
upward the classifier with its deflector blades where the direction of the flow is changed
abruptly, causing the coarse particles to be returned to the bowl for further grinding. The fine
particles, remaining in suspension, leave the classifier and pass on through the coal piping to the
windbox nozzles.
LOW SPEED MILL:
These are commonly known as tube ball mills and operate at approximately 17 to 20
rev/sec.Such slow speed is essential with these types of mills as otherwise the balls will held
along the rorating surface due due to centrifugal force and no milling takes place.
Advantages of low speed mills:
(1). Wearable part which needs replacement between annual overhaulsis only the ball and this
can be done when mill is in operation.
(2). No maintenance for long period.
(3). this mill has no relects and does not give tramp iron problem.
(4). There is reverse of fuel within the mill which makes the mill output more stable.
Disadvantages of low speed mills:
(1). power consumed per ton of coal pulverised is nearly to that of economic mills.
(2). This mill consumes more power/ton coal ground especially when not loaded fully as bulk of
power is consumed in rotating mass of heavy ball charge.
BOWL MILL:
The ball mill is one of the most advanced design of coal pulveriser.The advantages of this mills
are :
(1). lower power consupton.
(2). Reliability.
(3). Minimum maintenance.
(4). Wide capacity(1.7 t/hr. to100 t/hr.).
MILL TECHNICAL DATA:-

Manufacture--------------------------M/S BHEL
Type of pulveriser 1003x RP
No. of Mill / boiler 10
Base capacity of Mill 68Tonnes/Hr.
Speed of pulveriser 42rpm
Normal capacitywith design coal 52.5 T/Hr

FANS

A fan is a device by which the air is made to flow at required velocity and pressure in a defined
path imparting K.E of its impellers to air/flue gases . This pressure boost is used to create a draught
in the air and flue gas system. Fans mainly performs two functions:
i. They supply air required for combustion in the furnace with required pressure & flow.
ii. They evacuate the product of combustion i.e. flue gases into the atmosphere via chimney.

P.A Fan :-

The primary air fan supplies heated air to the coal mills to give dry and pulverized coal to
the furnace for efficient combustion.The P.A fan also supply fresh air to prevent coal mills by
overheating.
There are two P.A fans per boiler, each fan having pneumatically operated radial guide vanes at the
fan inlet to control the fan output. The fan impeller is a double inlet, centrifugal wheel with
backward curved plate blades.
Ambient air is drawn into the P.A duct by two 50% duty, motor driven centrifugal fans. The
air from each fan discharges into a hot air crossover duct via a steam air heater. This duct extends
around to each side of the boiler to supply the hot air to mills duct, both of which are branched to
supply hot air to four coal mills.

F.D Fan:

The forced draught fan system is provided to supply air required for pulverized coal combustion in
the furnace, air for fuel oil combustion and over fire air to minimize Nox production.
The F.D fan system comprises of two single stage axial flow, constant speed, and auto variable
pitch fans per boiler. These fans provide pressurized atmospheric air to the boiler for combustion.
Ambient air is drawn into the secondary air system by two 50% duty, motor driven, axial flow
forced draught fans with variable pitch control. The air from each fan discharges into a hot air
crossover duct via a main air heater.
This duct extends around to each side of the boiler furnace to form two secondary air to burners
ducts. At the sides of the furnace, each duct split to supply air to two corners, then split again to
supply air to each of the nineteen burner/air nozzle elevations in the burner box.
I.D Fan system:

The induced draught system comprises of three centrifugal double inlet fans per boiler, two
operating and one standby. Each fan unit consists of a backward curved plate bladed impeller,
which is driven by an electric motor through a variable speed hydraulic coupling. The I.D fan
serves the purpose of evacuating the products of combustion or the flue gases in the atmosphere
via chimney. The flue gases after being cleaned in the precipitators is directed towards the
atmosphere through the chimney.

Scanner air fan :

Scanner fans are installed in the boiler for supplying continuously cooling air to the flame scanner
provided for the flame supervision. Normally one fan remains in service while the other one
remains available as standby.
Scanner air fan is centrifugal type. It takes suction from F.D fan outlet and boosts the pressure
further to provide cooling air to the scanners.

Seal air fan:

Seal air fan supplies sealing air, at a pressure higher than that inside the mill, to a brush sealing
around the stem of the coal mill yoke casting to prevent coal dust escaping to atmosphere. There
are eight seal air fans one per mill to provide sealing air. Each fan is a close coupled, electrically
operated, centrifugal fan unit operated as part of the mill operating sequence, which incorporates
an auto-start facility.
Purge or cooling air fan

The function of the purge/cooling air system is to provide a continuous supply of clean air to cool
all soot blowers in the retracted position, and to purge each retractable soot blower lance whenever
it is in the retracted position. There are two fans (one operational, and one standby) to provide
purging/cooling air to each of the soot blowers, and also to prevent furnace gas blow-back into the
sealing areas. Each fan comprises a close coupled, electrically driven centrifugal fan unit, which
initially, is manually operated but which contains an automatic standby.

5.Electrostatic precipitators

The ash content in the Indian coal is of the order of 30% to 40%. When coal is fired in the boiler,
ashes are liberated and about 80% of ash is carried along with the flue gases. If this ash is
allowed to atmosphere, it is hazardous to health. So, it became necessary to incorporate an
electrostatic precipitator in the path of the flue gases going in the atmosphere. The electrostatic
precipitators are preferred to mechanical precipitators because they are capable of precipitating
particles from sub micron to large sizes of particles. The efficiency of the modern ESPs is of the
order of 99.9%.

In NTPC Rihand, the gas cleaning plant consists of two ESPs that operate on the exhaust gases
from each of the 500 MW steam generators.
The electrostatic precipitator consists of a large chamber, which comprises of parallel rows of
sheet type collecting electrodes suspended from the precipitator casing with wire type discharge
electrodes arranged mid-way between them. At the inlet of the chamber, gas distributor screens
for uniform distribution of the gases in the chamber, are provided.
The collectors are connected to earth at positive polarity while the discharge electrodes are
connected to a high voltage dc supply at negative polarity. When dust-laden gas flows between
the electrodes, the corona discharge causes the dust particles to become charged, the particles
then being attracted towards and, eventually, deposited on the collector electrodes.
This dust falls as the collecting electrodes are continuously rapped through a rapping system and
is collected into the pyramid type hoppers, located beneath each collecting electrodes, from
where it is removed by the ash handling system

6.Air heaters

Air heater is a heat transferring device in which air temperature is raised by transferring heat
from flue gases. Air heaters are capable of reclaiming heat from the flue gases at low temperature
levels and thus reducing the amount of heat rejected to chimney. This results in increasing the
boiler efficiency. For every 20 0C drop in flue gas exit temperature, the boiler efficiency
increases by about 1%. In NTPC Rihand, recuperative type of air heaters is mainly used. In
recuperative air heaters, the heating medium i.e. flue gases flows through a closely packed
matrix structure and then air is passed through the matrix to pickup the heat. There are two
recuperative type of main air heaters for heating up the air from fans, two recuperative type air
heaters for mill air heating.

Steam air heaters

This type of air heaters does not utilize the heat from the boiler flue gases and so does not affect
the boiler efficiency. These are generally used during starting when the flue gases entering the
regular air heater is low and hence further heat extraction is not possible and low temperature
corrosion prevails.
There are two main steam air heaters and two mill air heaters. Steam air heaters comprises of
round tubes carrying steam to be condensed. These heaters are provided with air extraction
system so that air entering with steam will not lock and prevent the operation of air heater. In
addition, the outlet temperature of air can be controlled easily.

7.Firing system

NTPC Rihand has direct firing system. In this system, a controlled quantity of crushed coal is fed
to each bowl mill (pulveriser) by its respective feeders and primary air is supplied from the
primary air fans which dries the coal as it is being pulverized and transports the pulverized coal
through the coal piping system to the coal burners.In this system,burners are set at each corners
of the furnace and are directed to strike the outside of an IMAGINARY CIRCLE at the centre of
the furnace.Because the streams of fuel strike each other,extremily good mixing is
obtained.Since the body of the flame produced is given a rotary motion is leads to a longer flame
traveland gases spread out and fill the combustion.
There are ten pulverisers out of which eight are used and two remains in standby. The raw coal
feeders supply 74 TPH of coal to each mill.
The pulverized coal and air discharged from the coal burners is directed towards the center of the
furnace to form firing circle. There are 32 tilting, tangentially fired coal burners fitted at the four
corners of the boiler at eight elevations.
The secondary air heating system supplies secondary air for combustion in the furnace around
the pulverized coal burners and through auxiliary air compartments directly adjacent to the coal
burner compartments. There are 16 air-atomizing ignitors per boiler, which initially ignite the
coal and air mixture.
Above a predictable minimum loading condition, the ignition becomes self-sustaining.
Combustion is completed as the gases spiral up in the furnace.
SOOT BLOWING SYSTEM

Introduction

In RhSTPP, soot deposited in various regions of boiler is removed with the help of soot
blowers, which utilize steam as the main working medium. This part is mainly concerned
with the existing soot blowing system and the problems arising in the system during
operation.

The removal of soot is very necessary for the efficient working of the plant. This is because
soot acts as an insulator for the heat transfer taking place between the flue gases and
water/steam inside the tubes. On the other side, it increases the metal temperature of
superheater and reheater tubes located inside the boiler. This temperature increase may cause
damage of the tubes resulting leakages across the tubes. Which, in turn affect the working of
the boiler.

So, regular soot blowing is very necessary in the boiler. Similarly, soot is also deposited on
the air preheater baskets, which causes plugging of the baskets. Also in case of oil firing
during initial light-up unburnt oil may deposit in baskets. This deposited oil may cause fire
hazard in air heater. To avoid these problems soot blowing is done in air preheater also.

Soot blowing process:

The complete soot blowing process can be divided into following three major sequential parts:
A. Shut down process- This part of the process step checks the close status of all the
valves.
B. Warm up process- In this step the valves according to the selected blower group open
to provide hot steam to the selected blower group at certain pressure level.
C. Blowing process- In this sequence actual blowing of steam takes place. The blower
pairs under currently selected group when comes in to operation carries the steam
inside the boiler and continues to blow till it returns to its park position.

Steam blowing scheme:

When blowers go inside the boiler they carries steam, which is made available to the blowers
through the section valves dedicated for the blower group. These section valves are all
motorized and their positions are sensed by their end limit switches.
Valves are classified in four categories according to their operational involvement. They are
listed as follows:
a) Main steam supply valves.
b) Steam pressure control valves.
c) Section valves.
d) Drain valves.
The main steam supply for soot blowing is obtained from two alternative sources each isolated
by a separate motorized isolating valve. Only one source can be selected at a time. Now, this
steam supply is distributed to four sections of the boiler and each section is isolated by a
motorized section valve. Down stream of which a pressure switch monitors the steam pressure.
The air heaters can be cleaned using an auxiliary steam supply. This supply is used exclusively
for the air heater soot blowers when the air heater is required to be cleaned during start up of
the boiler. The auxiliary supply is connected downstream of the section valve, which remains
closed when this source is being used. The drainage pipe work is isolated by a number of
motorized drain valves.

Location of Soot Blowers:

The blowers are divided into groups, numbered from 1 to 9. Group 1 to 4 comprises of wall
blowers and group 5 to 9 comprises of long retractable soot blowers. The soot blowers within
each group are listed in pairs, with an odd numbered soot blower paired with an even
numbered soot blower.

Wall Blower:

Presently there are 88 wall blowers, which are numbered from 1 to 88. All wall blowers are
located at four levels, so grouped as group-1, group-2, group-3 & group-4, of first pass of
boiler each having 22 blowers. Group-1 is below furnace zone and other three are above
furnace zone.

Long Retractable Soot Blower:

LRSBs are kept in LHS and RHS of the boiler. Odd numbered LRSBs are kept in RHS and
even numbered LRSBs are kept in LHS. With an exception of group 6, all soot blowers in a
particular group are operated in synchronous pairs in an automatic sequence i.e. an odd
numbered soot blower with an even numbered soot blower
LRSBs are mainly used to penetrate between the tube banks of the economizer, superheater
etc.It consists of a fabricated box casing, steam lance tube, steam feed tube, steam isolating
valve, traverse and rotary chains, etc

Whenever the signal to operate the soot blower is given from the control room, an electric
motor drives the traverse reduction gearbox from its parked position, at a preset distance the
steam isolating valve opens to allow steam to flow through the feed tube and out through the
lance tube nozzles. The pattern of the steam jet from the nozzles is helical with a different pitch
on the inward stroke to that on the outward stroke. At about mid-stroke a feed tube support
rises to abut the feed tube preventing sagging.

Whenever the extent of the stroke has been reached, a reverse limit switch is actuated causing
the main gearbox/lance tube to reverse and return to its parked position engaging the stop limit
ready for the next operation, having re-set the feed tube support mechanism and isolated the
steam isolating valve.
An air scavenge valve is fitted to the steam isolating valve which prevents the ingress of boiler
gases into the valve chest and provides a positive air flow when the soot blower is in the
parked position.
Air is also provided for the wall box to prevent gas leakage from the boiler.

SOOT BLOWER ARRANGEMENT

PP1 PP2 PP3 PP4 PP5 PP6

12 13 14 15 16 17
1 2 3 4 5 6

23 24 25 26 27 28 34 35 36 37 38 39

45 46 47 48 49 50 56 57 58 59 60 61

67 68 69 70 71 72 78 79 80 81 82 83
FRONT WALL REAR WALL
123 124
125 126
WALL DESLAGGER AIR HEATER BLOWER

LONG RETRACTABLE SOOT BLOWER

STEAM TO MECHANICAL POWER

INTRODUCTION

A thermal power plant is based upon the principle of conversion of heat energy into mechanical
energy. For this conversion of energy a power plant requires a turbo machine.
A turbo machine is a power producing thermodynamic machine. In order to function, a turbo
machine requires a suitable working fluid, a source of high-grade energy and a sink for low-
grade energy. In a thermal power plant water is used as a working fluid and it is converted into
steam.
A steam turbine is a device that converts heat energy of the steam coming from the boiler into the
mechanical energy of shaft rotation.
NTPC Rihand has four 500 MW units. Each unit has one steam turbine.
For large turbo machines, multicylinder designs are used. The number of cylinder depends on the
terminal conditions of steam and speed of rotation. The turbine with a number of cylinders on a
single shaft is described as a Tandem compound machine. NTPC Rihand is a fossil-fired power
station using a typical turbine of 500 MW output in each unit. Each of the two turbines consists
of a single flow HP, a double flow IP and two double flow LP turbines (cylinders) coupled to the
generator shaft.
Each section of steam turbine consists of a rotor from which project several rows of closely
spaced blades. Between each row of moving blades there is a row of fixed guide vanes (blades)
that projects inward from circumferential housing. The vanes are carefully shaped to direct the
flow of steam against the moving blades at some angle and at a high velocity that will maximize
the energy conversion.
The cross-sectional diameter of a turbine section increases continuously and so the steam
expands. In this process the temperature and pressure of the steam decreases and volume
increases continuously. The LP section has the largest cross-sectional diameter, whereas the HP
has smallest cross-sectional diameter. Separate stop valves and governing valves are provided to
control the steam inlet and outlet from the turbines.
The main auxiliaries of a steam turbine are the rotor, blades, guide vanes, casing, bearings
and couplings, bolting, steam chests, valves and critical piping.

INTRODUCTION TO 500 MW POWER PLANT


BOILER:
The boiler is a radient,controlled circulation drum,dry bottom type unit.The boiler units are
designed for the following terminal conditions(mcr):
Evaporation a)SH outlet : 1,725 t/hr
b)RH outlet: 1,530 t/hr
Working pressure after stop valve:178 kg/cm-2
Steam Temperature at SH outlet :540 deg C
Steam Temperature at RH Inlet :344.1 deg C
Steam Temperature at RH Inlet :45.85 kg/cm-2
Steam Temperature at RH Inlet :43.36 kg/cm-2
Feed Water Temperature at ECO Inlet:256 deg C
Furnace Design Pressure : +/- 660 mm wc(g)

The boilers are of single furnace design,circulating pumps to provide assisted circulation.
Each Boiler corner is fitted with tilting tangential burner boxes comprising for high energy
ignitors, four light-up heavy oil fired burners and eight pulverized coal burners. The angle of
tilt from the horizontal is about 30 deg to +30 deg.
Feed water to the boiler passes through HP feed heaters into the economizer and then to the
steam drum from where it flows into the suction manifold and furnace wall circuits via the
three boiler circulating pumps, returning to the steam drum as a water/steam mixture.This
mixture is separated into three stages and first two stages are incorporated into the turbo
separators and the final stage takes place at the top of the drum just before the steam enters
the connecting tubes comprising of first stage superheating .
within the steam circuit there are a further four stages of superheating, making five in total.
There are also three stages of reheat.
superheater temperature control is provided by spray attemperation situated in the connecting
link between the superheater low temperature pendant outlet header and the superheater
division panel inlet headers.
Pulverized coal system
The system for direct firing of pulverized coal utilizes bowl mills to pulverize the coal and a
tilting tangential firing system to admit the pulverized coal together with the air required for
combustion(secondary air) to the furnace.
As crushed coal is fed to each pulveriser by the feeder,primary air supplied from the primary
air fans which dries the coal as it is being pulverized the transports the pulverized coal
through the coal piping system to the coal nozzles in the wind box assemblies.
The pulverized coal and air discharged from the coal nozzles is directed towards the center of
the furnace to form firing circle.
Primary air system
The primary air draught plant supplies hot air to the coal mills to dry and convey pulverized
coal to the burners.
The P.A system comprises two P.A. fans,two steam coil air preheaters (SCAPH) and two
regenerative air preheaters.Each fans, which is of sufficient rating to support 60%
MCR load,discharges through a SCAPH into a common bus duct that has four outlets,two
directing air into the primary air preheater for heating, two direct cold air straight to the
pulverized mills.
Secondary air system
The secondary air draught plant supplies the balance of air required for pulverized coal
combustion, air for fuel oil combustion, and overfire air to minimize the production of nitrous
oxide(NOX).
The secondary air system,comprises two forced draft (F.D.) fans, two steam coil air preheaters
(SCAPH) and two regenerative type secondary air preheaters.
Flue gas handing system
The flue gas handling plant draws the hot flue gases from thefurnace and discharges,them to
atmosphere through the chimney.During its passage to the chimney.During its passage to the
chimney,flue gas is passed through a feed water economizer and four regenerative air preheaters
to improve boiler efficieny ,and through four electrostatic precipatators to keep dust emission
from chimney within prescribed limits.
soot blowing system
On load,gas side cleaning of boiler tubes and regenerative air heaters is achieved using 126
electronically controlled soot blowers which are disposed around the plant as follows:
88 - furnace wall blowers : steam
34 - long retractable soot blowers : steam
4 - Air heater soot blowers primary
and secondary air heaters : steam
TURBINE

GENERAL DESCRIPTION

The turbine is a reaction, condensing type, tandem compound with throttle governing and
regenerative system of feed water heating. It is coupled to directly to the generator.The turbine is
suitable for sliding pressure operation to avoid throttling losses at partial loads. The turbine is a
single shaft machine with separate HP, IP and LP turbines. HP turbine is a single flow cylinder
where as IP and LP are double flow cylinders. Steam flow to HP Turbine is controlled by four
combined main stop and control valves by a simple throttle governing system. On the two
exhaust lines of HP turbine, swing check valves are provided which prevent hot steam from the
reheater flowing back into the HP turbine. The hot reheat steam is admitted to the IP turbine
through the four combined stop and control valves. IP exhaust is connected to the LP turbine by
cross over pipes without valve sat diametrically opposite points.

HP TURBINE

The outer casing of the HP turbine is of the barrel type and has neither axial nor a radial flange.
The guide blade carrier is axially split and kinematically supported. The space between the outer
casing and the inner casing is fed from admission steam to HP turbine. This steam is drained
through HP casing drain during start up which promotes quicker heating of inner casing which
results in lesser problems of differential expansion. The inner casing is attached in the horizontal
and vertical planes in the barrel casing so that it can freely expand radially in all directions and
axially from a fixed point. The HP turbine is provided with a balance piston in the admission side
to counter act the axial thrust caused by steam forces. HP turbine is provided with 18 stages of
reaction blades.

IP TURBINE

It is of double flow construction and consists of two casings. Both are axially split and inner
casing kinematically supported and carries the guide blades. The inner casing is attached to the
outer casing in such a manner as to be free to expand axially from a fixed point and radially in all
directions. IP turbine is having 14 reaction stages per flow. Extraction steam to high pressure
heater no.5 and deaerator are taken from IP turbine and the IP-exhaust respectively.

LP TURBINE

The casing of the double flow LP cylinder is of three-shell design. The shells are axially split and
of rigid welded construction. The inner shell taking the first rows of the guides blades, is
attached kinematically in the middle shell. Independent of the outer shell, the middle shell, is
supported at four points on longitudinal beams. Two rings carrying the last guide blade rows are
also attached to the middle shell. LP turbine is provided with 6 reaction stages/flow.

TURBINE SYSTEM

HP STEAM SYSTEM
The high pressure and temperature steam is piped from the boiler stop valves to the steam inlet
ends via two steam legs or steam pipes. These two steam pipes are further branched into four
sub-branches. These branches end-up into four inlet valves of four horizontally arranged steam
chests, two on each side of the HP cylinder.
Each of the steam chest contains a HP emergency stop valve and a HP governing valve arranged
co-axially. The HP stop valve is a crucial valve and is used only during emergency conditions.
Steam leaves the governor valves through branch pipes to the top and bottom inlet tee pieces on
the HP cylinder. The steam chest assemblies are mounted on the foundations close to the HP
cylinder. Each stop and governor valve is opened by a hydraulic operating gear and closed by
two coil springs.

IP STEAM SYSTEM

The steam expands in the HP turbine and is fed into the reheater section of the boiler. From
reheater section of the boiler the steam is piped into the steam inlet ends of the intermediate
pressure turbine through four inlet pipes.
There exists four steam chests two on each side of the IP cylinder. Each steam chests contains an
IP intercept stop valve and an IP governing valve arranged
co-axially. Steam leaves the governor valves through branch pipes to the top and bottom tee
pieces on the IP cylinder.
The opening and closing mechanism of the valves of the IP turbine is similar to that of the HP
stop valves and governing valves.

LP STEAM SYSTEM

IP steam after expansion is exhausted through four stub pipes, two at each end at the top half of
the IP cylinder, and is ducted to the two LP cylinders by IP/LP crossover pipes. The volume of
steam at the IP outlet is enormous and to handle such an enormous volume of steam two LP
turbines are provided.

The steam from each of the LP turbines after expansion is fed into the condensers mounted
below the LP turbines. In the condensers the steam outlet from the LP turbines is condensed to
give condensate, which further undergoes a cyclic process to give feed water for the boiler input.

Here, under slung condensers with 800 inclined tubes are used, using a connecting duct between
the turbine outlet flange and condenser inlet flange. As the condenser tubes are normally much
longer than the width of the turbine casing, so this duct is trapezoidal in shape.

The heat energy carried by the steam is converted into mechanical power, which results into the
shaft rotation. The turbine shaft is coupled with the generator shaft.
This rotary motion of the generator shaft is converted into electrical power by the generator. The
power output from the generator is at low voltage level of 20 kV`. This low voltage is boosted to
high voltage level of 400 kV to reduce the transmission losses
.
TURBINE AUXILIARIES
Turbine casing

Steam turbine casings are the massive steel casings that encase the internal stationary and
rotating components of the turbine. Turbine casings have two critical functions:
a) Containing the steam pressure and
b) Maintaining support and alignment of the internal components.
There are generally two casings:
i) Outer casing
The outer casing is divided on the horizontal centerline into top and bottom half casings. Both
the halves are bolted together with bolts and cap nuts at their horizontal joint flanges.
ii) Inner casing
The inner casing is subjected to the highest temperatures and pressures, is also divided at the
horizontal centerline into top and bottom half casings, which are bolted together in a similar
manner at their horizontal joint flanges.
The inner casing is supported within the outer casing in such a manner as to maintain proper
alignment and allow thermal expansion. Cracking of the casing can lead to steam leaks and,
in extreme situations, to bursting. Cracks in casings are typically located at the inlets of HP
and IP turbine sections, where the local thermal stresses are higher.

Turbine Blades

Blades are the single most costly parts of the turbine. The function of the turbine blades is to
convert the available heat energy carried by the steam into mechanical energy. Blades fitted in
the stationary part are called guide blades or nozzles and those fitted in the rotor are called
moving blades.

Steam chests and valves

Each of the HP, IP, LP cylinders of the turbine has four steam chests two on each side of the
turbine. Steam chests are the pressure vessels or steam carrying spaces, which performs the
function of both carrying as well as transferring the steam at high pressure and high temperature
via valves into the turbine cylinders. These steam chests comprises of a stop valve and a
governing valve.
The steam from the superheaters outlets is admitted to the HP steam chests via four HP steam
mains. The steam from the steam chests is admitted to the HP turbine steam inlet pipe through
the emergency stop valves and the associated governing valves which are housed in steam
chests. After expansion in the HP turbine the steam is fed into the reheater and then to IP steam
chests, through HP turbine steam outlet pipe. The steam from IP steam chests is fed into the IP
turbine via IP stop valve and IP governing valves and then to LP steam chests.

Stop valves

The stop valves are emergency valves placed in the steam chests and are provided in the main
steam line. The purpose of the emergency stop valves is to cut off the steam supply during
periods of shutdown and to provide prompt interruption of steam flow through the turbine
cylinders in an emergency trip.
Normally, these valves are kept open fully but during emergencies these valves are fully closed
(100%). During such conditions, the plant is producing no power because no input is given to the
turbine.
Governing valves

The governing valves are also situated in the steam chests. These are the control valves i.e. they
provide accurate control of the steam flow rate into the turbine, thus controlling the generator
load when the machine is synchronized to the grid.
HP governing valves are the most important valves. They controls the amount of power produced
by the plant or unit. For a unit producing 500 MW power, the HP governing valve opening is
kept as 40-45% of the total valve opening.

Turbine Oil System:

OIL SUPPLY SYSTEM

The oil supply system fulfills the following functions:


a) Lubricating and cooling the bearings.
b) Driving the hydraulic turning gear during interruptions to operation, on start up and shut
down [1].
c) Jacking up the shaft at low speeds (turning gear operation, start up and shut down) [1,2].

OILSYSTEM

Under normal operating conditions, the main oil pump (1) situated in the bearing pedestal and
coupled directly to the turbine shaft draws oil from the main oil tank (26) and conveys it to the
pressure oil system.
The suction of the main oil pump is aided by two injectors (25). The injectors produce pressure at
the suction connection to the main oil pump sufficient for all types of operation. This guarantees
that the main oil pump takes over the safe supply of oil and cavitations that could occur due to
greater suction heads are avoided. The amount of oil required for driving is extracted from the
pressure oil circuit and adjusted by means of the throttle (31).
The oil for the turning gear (7) is also extracted from the pressure oil system. Oil is admitted to the
nozzles by opening the shut off valve (33). The pressure oil is cooled in the oil coolers (19) and
reduced to lubricating oil pressure in the throttle (18). The throttle is adjusted on the initial start-
up. The amount of oil required for each bearing is adjusted on start up by means of the oil throttles
(15).

FULL LOAD AUXILIARY OIL PUMPS


During turning gear operation and start up and shut down operation, one of the two three phase
a.c., full load auxiliary oil pumps (22,24) supplies the pressure oil system and takes over the
function of the main oil pump when this is not in operation because the turbine is running too
slowly.

The full load submersible auxiliary oil pumps are situated on the oil tank (26) and draw in oil
directly.

EMERGENCY OIL PUMP


When main and full load auxiliary oil pumps fail, the lubrication supplies oil directly to the
lubricating oil line, by passing the oil cooler and thus preventing damage to the bearing shells.

OIL RETURN SYSTEM


The lubricating oil from the bearings is returned to the main oil tank via a header.

EXTRACTION OF OIL VAPOUR


The main oil tank is designed to the air tight. The extractors (28) produce a slight vacuum in the
main oil tank and the bearing pedestals to draw off any oil vapour.

FILTERS
Oil for the thrust bearing is passed through the duplex oil filter which can be switched over and
cleaned during operation.

MAIN OIL TANK


The main oil tank contains the oil necessary for the lubricating and cooling of the oil bearings and
for the lifting device. It not only serves as a storage tank but also for deaerating the oil. The
capacity of the tank is such that the full quantity of oil circulated not more than 8 times per hour.
This result in a retention time of approx. 7 to 8 minutes from entry into the tank to suction by
pumps. This time allows sedimentation and detainment of the oil.
Oil returning to the tank from the supply system first flow through a submerged inlet into riser
section where the first stage deaeration takes place as the oil rises to the top of the oil tank. Oil
overflows from the riser section through the oil strainer into the adjacent section of the tank where
it is then drawn off on the opposite side by the suction pipe of the oil pumps. Main oil tank has the
following mountings:
1. AC auxiliary oil pump
2. DC emergency oil pump
3. Shaft lift oil pumps
4. Oil injector
5. Oil vapour extractor
6. Oil level indicator
7. Sonar level limit switch
The main oil pump is situated in the front bearing pedestal and supplies the entire turbine with oil
that is used for bearing lubrication, cooling the shaft journals and as primary and test oil. The main
oil pump is driven direct from the turbine shaft via the coupling. These pump also convey oil in the
suction branches

MAIN OIL PUMP WITH HYDRAULIC SPEED TRANSMITTER

The main oil pump is situated in the front bearing pedestal and supplies the entire turbine with oil
that is used for bearing lubrication, cooling the shaft journals and as primary and test oil. The main
oil pump is driven direct from the turbine shaft via the coupling. These pumps also convey oil in
the suction branches of the main oil pump for oil injectors that maintain a steady suction flow to
main oil pump.

Hydraulic speed transmitter operates on the same principle as centrifugal pump impeller. The
variation of the pressure in the primary oil circuit due to a speed variation serves as a control
impulse for the hydraulic speed governor. The hydraulic speed transmitter is supplied with control
oil supplied from the control equipment rack. The suction of the pump is always flooded and hence
maintains an uniform suction pressure.

AUXILIARY OIL PUMP

The auxiliary oil pump is a vertical one stage rotary pump with a radial impeller and spiral casing.
It is fixed to the cover of the oil tank and submerges into the oil with the pump body. It is driven by
an electric motor that is bolted to the cover plate of the main oil tank. The pump shaft has a sleeve
bearing in the pump casing and a grooved ball bearing in the bearing yoke. The bearings are
lubricated from the pressure chamber of the pump; the sleeve bearing via a bore in the casing; the
grooved ball bearing via lube line.

DC BEARING OIL PUMP

This is a vertical, centrifugal submerged type and serves for lubrication and cooling of the bearing
during emergency conditions when one of the other pump fails. This is driven by a D.C. motor.

SHAFT OIL PUMP

The lift oil pump is self-priming screw spindle pump with three spindles and internal bearings. The
pump supplies the oil to lift the turbine rotor at low speeds.

OILVAPOUR EXHAUSTER

The function of oil vapour exhauster is to produce a slight negative pressure in the main oil tank
and in the bearing casing and thus draw off the oil vapour.

OIL COOLER

Function of oil cooler is to cool the lubricating oil supplied to the bearing of the turbine. Oil
cooler consists of the tube nest, the inner, outer shell and water boxes. The tube nest through which
the cooling water flows is surrounded by the oil space formed by the outer shell. The oil is to be
cooled enters the oil cooler and flows to the inner shell. This shell supports the large baffle plates,
which are provided with an opening in the center. Between every two large plates there is a small
intermediate plate is smaller in diameter than the inner shell and leaves an annular gap. This
arrangement serves to achieve a cross flow pattern forcing the oil flowing to the outlet branch to
flow through the middle of the large plates, while passing round the edge of the short ones.

Turbine gland sealing system:

HP-Turbine, IP-Turbine and LP-Turbine gland leak off are connected to seal steam
header and vapour exhauster system. Initially gland steam requirement for all the three cylinders
is met by supplying auxiliary steam to the seal steam header and the header pressure is
maintained by the seal steam control valve. When the unit load is raised above 30 to 35% HP &
IP-glands start supplying gland leak off steam to the header to the requirement of LP-glands.
Beyond 40% load, no auxiliary steam is required. Once the self sealing steam takes place, then
seal steam header pressure is maintained by opening the leak of steam control valve to the
condenser.
Gland steam header is provided with a motor driven drain valve which helps to raise the gland
steam temperature during start up. This drain valves normally remains open till the gland steam
temperature to LP gland increases beyond 150.

CONDENSATE WATER SYSTEM:

THE PURPOSE OF THIS SYSTEM IS TO STORE AN ADEQUATE QUANTITY OF


DEMINERALIZED WATER TO MEET THE MAKE UP REQUIREMENTS FOR NORMAL
CYCLE FLUCTUATIONS AND FOR ABNORMAL OPERATING CONDITIONS WHEN
SUPPLY OF DEMINERALIZED WATER IS INTERRUPTED.

This system will transfer condensate to and from storage tanks as to satisfy main cycle
requirements. The main cycle flow and thermodynamic requirement is maintained by transporting
the condensate collected in the condenser hotwell through various stages of feedwater heating and
other equipment to the deaerating feedwater heater.

The condensate extraction pumps normally deliver the condensate through the three low pressure
feedwater heaters, the deaerating feedwater heater to the deaerating storage tank. The low pressure
feedwater heaters receive extraction steam as it passes through feedwater heater. The deaerating
further preheats the condensate prior to its entry into the deaerating storage tank. The deaeratig
feedwater heater is warmed by extraction steam during the normal operation and auxiliary steam &
cold reheat steam are utilized as the heat source during start up and shut down condition.

The normal make up to the condenser is supplied from demineralizing plant through the makeup
pumps. Normally, on low level in the condenser hotwell, condensate will flow from the condensate
storage tank to hotwell by static head in the tank and differential pressure due to the condenser
vacuum, however, this flow will be inadequate, the condensate, transfer will supplement the flow.
This makeup is sprayed into the steam space above the tube bundles.

The condenser hotwell is condensate collection vessel, integral with the condenser shell, and
located in a pit below the ground floor. Condensate collected in the hotwell is pumped by 3*50 %
condensate extraction pumps to the feed storage tank through feedwater placed in series. Two lines
from hotwell, make a common header where from three lines are connected at the suction of three
condensate extraction pumps.
The suction piping to the pumps is vented back to the condenser, to insure that the non-operating
pumps stays completely flooded. These vent lines include manual valves on the vent for each
pump.
A minimum flow (350 T/hr) recirculation line for each pump is provided, returning to the
condenser via a flow control valve and a locked open shut off valve.
The shaft seals of these pumps are the water-injected type fed from a header to prevent the
suction of air, particularly the pump that is not operating while the condenser is under vacuum.

Condensate Extraction Pump:

The function of Condensate extraction pumps is to pump out the condensate to the deaerator
through gland steam cooler, and LP heaters. The steam from the LP cylinders exhausts into the
condenser shells where it is constrained to flow across the water tubes, through which cooling
water is circulated.
The steam condensed on the tubes drain to the bottom of the shell .The condensate is retained in
the condenser shell bottom by means of the condenser level control valve. The water in a
condenser provides a head of water for the condensate extraction pump to suppress cavitations in
its suction impellers.
There are two 100% duty extraction pumps, one remains in duty and one remains stand by. With
all the necessary instruments such as suction and discharge valve isolating and dump valves to
insure efficient operation.

The thrust bearings in the driving motors have temperatures sensor, which can trip the motors
automatically.
The pump discharge the condensate via the gland steam condenser and the condensate polishing
plant to the LP feed heating system.

Air Extraction Pump:

The function of the air extraction pump is to raise and maintain the vacuum conditions in the
turbine main condensers, and to remove air and other non-condensable gases vented to the
condenser from various parts of the turbine and feedwater heating system.

Gland steam condenser

An automatic turbine gland sealing system is used to prevent the escape of steam into the turbine
hall, where it would condense on the walls and the plant.
It also prevents the ingress of air at the rotor ends of all the turbine cylinders. This is done by
using the gland steam condenser.
The function of the gland steam condenser is to maintain a sub-atmospheric pressure at the
outermost leak-off belt of the glands and thereby prevent the leakage of steam from the glands
into the turbine hall.The gland steam condenser condenses the steam from the steam/ air mixture
drawn from the outer pocket of the gland. This heat given by the steam is absorbed by the
feedwater. Condensate formed in the shell drains to the gland steam condenser drain tank. This is
again recirculated back to the condensers.

Drain Flash Condenser

The drain flash condenser receives heater drip or drain water from LP heaters. When the drain
water enters the flash condenser through the disperses, steam is flashed off. This steam is drawn
into the tube nest where it condenses and cascade to the bottom of the shell. The resulting drain
water is delivered to the main condenser.
The water side of the DFC is of the conventional to pass surface type in which
the feed water flows through the tube and steam passes over them. The vessel comprises a tube
nest, a shell, an inlet and an outlet water box. The water box has a dished end and incorporates
the feed water inlet and outlet connections. A flanged branch on the water box is fitted with a
davit type hinged cover to give access to the tube bores.
A center plate and an end plate fitted with two stiffeners form a diversion plate, which
separates the incoming, and outgoing flows .The end plate carries a cover, which is located and
bolted between the stiffening ribs.
The DFC is mounted on steel work on four attachment points at the water box
bonded to upper and lower mild steel bearing plates.

Boiler Feed Pumps:


Boiler feed pumps are an important part of any boiler operation. They control the amount of
water fed to the boiler and the manner in which it is fed.

Centrifugal - Continuous
Turbine - Intermittent

In order to properly select a boiler feed pump five key points must be considered:

Will the pumps operation be continuous or intermittent?


This is an operational question and is often answered by the type of level control found on the
boiler that the pump will be servicing. As a general rule of thumb, boilers with a capacity of
10,000 lbs./hr. or less utilize a float type switch that starts and stops the boiler feed pump to
satisfy a predetermined water level within the boiler. This is a classic intermittent operation.
Boilers with capacities exceeding 10,000 lb./hr. typically employs a modulating feed water
regulator and will continuously feed water to the boiler at various rates depending upon the water
level in the boiler.

By knowing which operation you are to satisfy, you can determine which pump design is best
suited for your application. As a general rule of thumb a turbine pump is used in an on-off
situation and a centrifugal pump is used for continuous operation. But remember, this is a general
rule and is some cases a centrifugal could be used for an on-off application and a turbine for
continuous.

What is the temperature of the water being pumped?


It is also important to know the temperature of water you intend to pump. Most pumps can
usually handle 215F to 230F, other pumps are available that can handle higher temperatures by
using external water-cooling. Keep in mind that a deaerator pump must be able to handle higher
temperatures because they operate at a 5 psi or 227F.

What is the required capacity?


How much water you intend to pump is dependent upon the evaporation rate of the boiler the
pump will service. A safe figure for an on-off application would be 2 times the evaporation rate
of the boiler. With a modulating level control, a factor of 1.3 times the evaporation rate plus
recirculation is recommended.

What is the desired discharge pressure?


When you pump directly into the boiler you will need to overcome the pressure in the boiler as
well as any piping losses. You can chose the right pump by looking at the pump curves to
determine which will accomplish this task. Should you have a modulating valve in the discharge
line, the minimum you will need to add to the boiler operating pressure will be 20 to 25 lbs.
Make sure that the pump can handle the pressure along with the flow rate needed. With an on-off
level control the pumps should be designed for the relief valve pressure.

What is the NPSH or net positive suction head required?


This is the last piece of information that you will need. This is the minimum absolute pressure at
the suction nozzle at which the pump can operate. To avoid pump cavitation, the NPSHA of the
system must be greater than the NPSHR of the pump. In other words, the available NPSH must
be higher than the required. We have always sized our deaerator stands to be two feet higher than
the NPSH needed for the pump selection. Remember, the water level in the storage tank adds to
the safety margin.
TDBFP

Turbine driven BFP uses turbine of 14 stages connected to condenser. Turbine is coupled with
main pump having engage/disengage unit called Power pack unit using oil pressure. Between
turbine and booster pump gear assembly is there.

Various system of TDBFP are discussed below:

1) Lube Oil System

Lube oil system of both TDBFPS are provided with one Main Oil Tank each in which oil level
is separately maintained. It has two AC AOPs, one JOP AC and one DC AOP connected to tank.
Lube oil pressure is maintained at 3.0-kg/sq. cm is called control oil which is used as governing
oil.
Lube oil after passing through coolers is led to various bearing of TDBFP system. DC AOP
discharge oil, which is, used on failure of AC AOPs bypass the coolers. During barring of
TDBFP same lube oil at pr. 4.0-kg/ sq. cm is used as power fluid in barring gear impellers. In
the lube oil pressure by changing the recirculation flow.

2) Seal/ Injection System

Mechanical seals are provided on BP side for which continuous cooling is done by CEP water.
For BFP side constant seal injection pressure around 18-kg/sq. cm is maintained with the help of
control valve. Filters are also provided in this line. From this line small pipe provides water in
the exhaust steam as exhaust load spray. Seals drain is collected as clean drain into drain tank
and dirty drain flows into common drain header.

3) Steam System

For TDBFP there is three sources for steam namely 1. Auxiliary steam 2. Cold reheat line 3. IP-
LP cross over steam. Extraction steam parameters are maintained at 4.0 kg/sq cm. & 300 degree
centigrade. During cold start when CRH or IP-LP steam is not available, Aux. Steamis used for
rolling of TDBFP for initial boiler filling. Once steam is insufficient for increasing the speed
beyond 3500 rpm, CRH steam is automatically cut off.

4) Feed Water System

Water from deaerator is taken through two suction into booster pump and then fed into BFP
suction. Drains & vents are provided in FW system for initial charging and venting of BFP
during rolling.

5) Gland Sealing of Turbine

Downstream steam from main turbine gland sealing is used for TDBFP sealing. Before opening
of exhaust valve gland sealing should be done as this is line is connected to condenser.

6) Governing System
For having the required flow through BFP, speed of turbine has to be adjusted and for what we
need perfectly efficient governing system. Governing system is using the control oil at 9 kg/sq
cm. which in turn depending on the position of starting device and speeder gear, will develop
secondary oil and auxiliary secondary oil pressure for operating the 4MCVs and one ACV
thereby adjusting the steam flow speed change is effected. Governing is achieved with the help
of two governors namely hydraulic and Electrohydraulic governors having EHG control and HG
follows it up.

BOOSTER PUMP:

Each boiler feed pump is provided with a booster pump in its suction line which is driven by the
main motor of the boiler feed pump. One of the major damages which may occur to a boiler feed
pump is from cavitation or vapour bounding at the pump suction due to suction failure.
Cavitation will occur when the suction pressure at the pump suction is equal or very near to the
vapour pressure of the liquid to be pumped at a particular feed water temperature. Therefore all
the three feed pumps are provided with a main shaft driven booster suction line for obtaining a
definite positive suction pressure. The boiler feed pump is coupled with its driving motor
through hydraulic coupling. The hydraulic coupling serves the purpose of controlling the speed
of feed pump for maintaining a definite delivery head and delivered quantity of the feed water as
per the requirement of the boiler.

Deaerator:

Deaerators are used to remove oxygen from boiler feed-water. It performs the following
functions:
It serves as a feedwater heater.
Feedwater is deaerated by the removal of non-condensable gases present in the
feedwater and reduce the oxygen content to a level of about 0.007 ppm.
It acts as a buffer to the fluctuations of condensate feedwater flow that occur in
service durations.
The tank height provides a hydrostatic head to satisfy the suction pressure
requirements of the boiler feed pumps.
The presence of non-condensable gases in the feedwater causes the waterside corrosion or
thinning of the boiler tube walls and this further leads to the rupture of walls by the internal fluid
pressure.
Here steam injection-type deaerator is used to deaerate the feedwater. Feedwater from LP heaters
is admitted to the deaerator tank and steam is bled from two sources, one from the HP turbine
(which is known as cold reheat steam), and the other from the IP turbine exhaust. When this
steam and feedwater come in direct contact with incoming water is heated and also gets
deaerated.
Steam initially enters the deaerator through a special, stainless steel Jet Spray atomizing valve.
This valve is designed to fully atomize and provide complete deaeration under all load
conditions. This design insures that the purest steam comes in contact with the purest water.
Once this high velocity steam mechanically shakes out the last traces of non-condensable gases
from the water, it flows upward into the pre-heater area where it meets the incoming make-up
water and pumped returns. This water continuously condenses the steam, which preheats and
releases the non-condensable gases into the internal vent condenser where they are metered
harmlessly to the atmosphere. This action causes more steam to be drawn into 6the system to
complete the cycle.
From the bottom of the deaerator, feedwater is piped through three outlet pipes, each with a
strainer, to the three boiler feed pumps and the used up steam is recirculated back to condenser.
The deaerator is mounted at a high-level with its centerline 34.65 m above the datum level.

The deaerating heater utilizes steam by spraying the incoming water into an atmosphere of steam
in the preheater section (first stage). It then mixes this water with fresh incoming steam in the
deaerators section (second stage).
In the first stage the water is heated to within 2 C of steam saturation temperature and virtually
all of the oxygen and free carbon dioxide are removed. This is accomplished by spraying the water
through self adjusting sprat valves which are designed to produce a uniform spray film under all
conditions of load and consequently a constant temperature and uniform gas removal is obtained at
this point.
From the first stage the preheated water containing minute traces of dissolved gases flows into
the second stage. This section consists of either distributor or a several assemblies of trays.

Here the water is in intimate contact with an excess of fresh gas/free steam. The steam passes into
this stage and it is mixed with the preheated water. Deaeration is accomplished at all the rates of
flow if conditions are maintained in accordance with design criteria. Very little steam is condensed
here as the incoming water has high temperature caused by the preheating. The steam then rises to
the first stage and carries small traces of residual gases. In the first stage most of the steam is
condensed and the remaining gases passes to the vent where the non-condensable gases flow to the
atmosphere.
The water, which leaves the second stage, falls to the storage tank where it is stored for use. At this
time the water is completely deaerated and is heated to the saturated steam temperature
corresponding to the pressure within the vessel.
The condensate pressure just before the entry to deaerators shall be 3 psi more than the deaerator
steam pressure.

FEEDWATER HEATERS

A feed water heater is a special form of a shell and tube heat exchanger designed for the
application of recovering the heat from the turbine extraction steam by preheating the boiler feed
water. Its principal parts are a channel and a tube sheet, tubes, and a shell. The tubes may be either
bent tubes or a straight tubes. Feed water heaters may be defined as high-pressure heaters when
they are located in the feed water circuit upstream from the high pressure feed water pump. Low-
pressure feed water heaters are located upstream from the condensate pump, whichs takes its
suction from the condenser hot well. Typically low pressure feed water heaters are designed for
feed water pressures between 27 kg/cm sq. and 57 kg/cm sq., high pressure feed water heaters
range from 112 kg/cm sq. to 335 kg/cm sq. for super critical boilers.

Each feed water heater bundle will contain from one to three separate heat transfer areas and
zones. These are condensing, desuperheating, and sub-cooling zones. Economics og design will
determine what combination of the three is provided in each heater.

A condensing zone is present in all feed water heaters. Large volumes of steam are condensed in
this zone and most of the heat is transferred here.
The desuperheating zone is a separate heat exchanger contained within the heater shell. This zones
purpose is to remove superheat present in the steam. Because of the high steam velocities
employed, condensation within the desuperheating zone is undesirable.
The sub-cooling zone is another separate counter heat flow heat exchanger whose purpose is to
sub-cooling incoming drains and steam condensate.

HEATER OPERATION:
Prior to opening the feed water valve, the channel start up vents are to be opened and
remain open until all passages have been purged and feed water begins to discharge.
To remove air from the shell sides of a heater, which does not operate under vacuum, the shell
start up vent valves should be opened prior to the admission of the steam to the feed water heater.
The extraction lines must be free of all the condensate to prevent the damage to the heater
internals by slug flow.when the drains outlet valve is opened, the shell start up vent valves are to
be closed and the operating air vent valves are to opened. Continuous venting of air and other
non-condensable is assured by keeping the shell operating vent valves open.
On initial plant start up of the horizontal feed water heaters, having integral drain coolers, the
liquid level is to be kept just below the high-level alarm point.
On initial plant start-up of horizontal feed water heaters, having integral drain coolers, the
liquid level is to be kept just below the high-level alarm point. This will avoid the possibility of
flashing at the sub-cooler inlet and the possible tube damage that can result. Approach temperature
in excess of 8 degree centigrade indicate the probability of flashing at the sub-cooler unit.

VENTING

Proper venting is necessary on feedwater heaters. All operating air vent connections must
be piped to permit continuous venting. The venting system in a feedwater heater is designed to
assure that all points where non-condensable gases could collected are vented. Failure to utilize all
of the operating air vents can lead to corrosion damage and loss of performance due to air
blanketing.

Vent lines of heaters operating at a different shell pressure must not be piped to a common
manifold. Failure to run individual vent lines from each heater has resulted in inadequate or no
venting of heater operating at a lower shell side than other heaters, piped into a common manifold.

FEEDWATER BY-PASSING

A feedwater heater may be severely damaged by erosion and vibration, if it is operated for any
significant period or time with the next lower heaters feedwater flow by passed. When a heater is
by passed, its normal feedwater is passed on to the next higher heater. This next higher heater will
come close to making up the duty of both the heaters. This single heater will tend to draw a total
amount of extraction of steam approx. equal to the flow of both the heaters.
In case of heaters with desuperheating zones, the increased steam load due to by passing the
previous heater can cause an excessive pressure drop in the desuperheating zones, which can cause
an excessive pressure drop in the desuperheating zone, which in turn can cause condensation. The
condensate flowing at high velocity can lead to severe tube erosion.

Excessive steam flow to a heater, resulting from by passing the feedwater side of the previous
heater, can result in:
a) Localized high velocity leading to vibration of the tubing.
b) Flows, which cannot be adequately handled by the drain, control valve.
c) Condensation in the desuperheat zone and high velocity impingement.

LP Feed Heating System

The low-pressure (LP) feedwater heating system is provided to improve the thermal efficiency of
the heat cycle by heating condensate from the condenser with low-pressure steam bled from the
LP cylinder.
Low-pressure (LP) feedwater heaters are basically simple straightforward tube and shell heat
exchangers, with the condensate passing through the tubes and the bled steam being admitted to
the shell.
There are total three LP heaters used in the feed heating cycle. Since, there is a significant
volume of unused space between the exhaust of a double-flow LP cylinder and on the top of
under slung condenser, this space is utilized by inserting two LP heaters in a horizontal altitude.
This results in the low-pressure drop and high temperature for the bled steam, which is used for
heating the condensate, with consequential improvement in cycle efficiency. The LP heater No. 3
is located outside the periphery of the condensers.
The heaters are stacked so that the ultimate LP heater can drain its bled-steam condensate into
the condenser above the working level of condensate in its base.

HP Feed Heating System

The high-pressure (HP) feedwater heating system is provided to improve the thermal efficiency
of the heat cycle by raising the temperature of the feedwater before it enters the boiler. Like LP
heaters HP feedwater heaters are also of traditional form, but are arranged in a horizontal altitude
to ensure free gravity drainage of their bled-steam lines and heater-to-heater drainage. Bled
steam to No. 6 HP heaters is fed from the HP turbine exhaust system and to No. 5 HP heaters
from IP turbine.
The system contains four HP heaters arranged horizontally in pairs with a drain flash vessel
situated above and between each pair. The pairs are identified as bank A and bank B and each
contains a No. 5 HP heater, a No. 6 HP heater and the associated drain flash vessel. In the HP
feed heating system, water is supplied from the boiler feed pumps via the boiler feed regulating
station and is piped through three ways; one to each bank of heaters and one to the bypass pipe.
When this feedwater is passed through the HP heaters, its temperature is increased.

Each heater bank has its own feedwater inlet and outlet isolating valves, which, with the
bypass pipe and its spring-loaded valve, permits either bank to be taken out of service for minor
maintenance or repairs while plant is on load.
Drains from the HP heaters are taken either to the deaerator or to condenser A, depending on the
levels of water and pressures existing in the heaters, which in turn depends on the generator load.
The drains are controlled by level controllers and at normal loads pass to the deaerator. At low
loads, drains are diverted to the condenser.

Feed Regulating Station

To maintain the rate of feed-water input to the boiler corresponding to the steam output from the
boiler under all conditions of loading, feed regulating station is used. For this purpose, feed
regulating station has four regulating lines out of which one line remains stand-by. Also to ensure
security of steam supply it has been considered necessary to provide a multiple feed-water
regulating valve arrangement
The three-element feed-flow regulating system has been developed to meet the requirements of
the boiler. The essential factors that are mainly considered are the steam flow from the boiler, the
feed water flow to the boiler and the water level in the boiler drum.

By-pass systems:

The by-pass system performs an important function. It permits the boiler to be operated
independently of the turbine-generator system. The by-pass system comprises two main units-
HP By-pass system.
LP By-pass system.

HP By-pass system

This system comprises of the operation of bypassing the HP steam without being passed through
the HP turbine. The HP steam is taken from each of the main steam lines after the HP steam stop
valves. The main steam passes into the cold reheat inlet pipes via four pressure control valves and
their associated isolating valves. The valve include the spray water supply and control
equipment .The H.P. valve will operate automatically to maintain upstream pressure on start .In
addition upon rapid load rejection .These valves will operate to relieve 60% of MCR rated steam
flow to the reheat system .The H>P>relive valve mounted on the main steam pipe work will
operate to relive excess steam to atmosphere

LP By-pass system
The LP by-pass system consists of four lines taken from the four hot reheat pipes (upstream of
the IP turbine control valves). These four lines are then converged into two. The steams in each
line flows through an isolating valve, a pressure control valve and then into the condenser dump
tube, bypassing the IP, LP turbines.

Generator

The two 514 MW turbine-generator sets are set axially in line in the turbine hall. The generator is
a 2-pole, 3-phase, hydrogen and water-cooled machine, driven from the turbine. The main exciter
is solidly coupled to the rear end of the generator shaft. A brush less main exciter provides the
excitation power for the generator. The output from this exciter is fed to the generator rotor.
The exciter line is directly coupled to the turbine generator shaft and is driven at generator speed.
Each generator has its own independent stator windings.
Hydrogen is used to cool the generator rotor winding and stator core, the stator winding is
directly water-cooled.

Generator operational limits:

Rated output 514 MW


Rated output 605 MVA
Nominal stator voltage 20 kV
Speed 3000 r/min
Power factor 0.85 Lag
Frequency 50 Hz

Main exciter system

The main exciter system is a six-pole, three-phase, rotating armature generator. The stator has
D.C. Field system and A.C. winding is mounted on the exciter rotor.
The rotating rectifier is mounted on the exciter unit shaft out board of the exciter armature .The
rectifier modules, one +ve and other ve are contained within the +ve and -ve rectifier hubs
shrunk onto the exciter unit shaft.
The main exciter is solidly coupled to the rear end of the generator shaft. Here a brush less main
exciter is used to provide the excitation power for the generator. The output from this exciter is
fed to the generator rotor.
The exciter line is directly coupled to the turbine generator shaft and is driven at generator speed
The main exciter is supplied with power by a pilot exciter whose output is rectified and
controlled by the excitation control system (ECS). This pilot exciter is located to the front of the
main exciter and is a salient pole, permanent magnet, a.c. generator of the hetropolar type. The
pilot exciter is air-cooled with an open, self-ventilated air system.

Electrical barring gear

The HP, IP and LP rotors must be turned continuously during start-up and shut down periods. This
provides even heating or warm up in the initial start up stage of the turbine and cooling during a
shut down of the turbine.
To perform this operation an automatic engaging and disengaging electrical barring gear is used.
This electrical barring gear rotates the coupled turbine and generator rotors continuously at
approximately 35 r/min.
Electrical barring gear is a motor driven machine i.e. it receives power to operate from the motor,
which is vertically mounted on a support plate outside the pedestal above the wormshaft. This
motor supplies 37 kW power for the barring gear operation. This power transmission between
motor and barring gear takes place through worm and worm wheel arrangement.

The motor driven electrical barring gear is mounted on a pedestal at the extreme rear of the
generator and exciter and the drive to the turbine generator rotor is transmitted through a
Synchronous Self Shifting (SSS) clutch, which automatically engages to drive the turbine
generator rotor at a constant speed of approximately 35 r/min and automatically disengages when
the rotor speed, under steam, rises above this value.
If the electrical barring gear motor develops a fault or if the complete rotor requires turning for
maintenance checks, it can be turned manually. The individual rotors of each cylinder can be
turned independently.
MAIN, COLD REHEAT AND HOT REHEAT STEAM LINE

MAIN STEAM LINE MAIN STEAM STOP VALVE

S
U
P
E HIGH PRESSURE
R TURBINE
H
E
A
T
E
R

MAIN STEAM LINE MAIN STEAM STOP VALVE

HP BYPASS SYSTEM
DESUPER HEATER
COLD REHEAT LINE

HOT REHEAT LINE IV

R R
E E
H H INTERMIDIATE PRESSURE
E E TURBINE
A A
T T

I O
N U
T

IV

TO LOW PRESSURE
DESUPER HEATER TURBINE

Potrebbero piacerti anche