1 PROJECT: Sewage Treatment Plants at Doddabele,Yellamalappachetty (JV) CIVIL and Intermediate Sewage pumping Station and Pumping Work Rev.No. 0 Mains at Sadarmangala
Date:- Contract No. S1e
FIELD QUALITY ASSURANCE DEPARTMENT
FLAKINESS INDEX AND ELONGATION INDEX
IS :2386 (Part - I) DATE : AGENCY : SAMPLE No : Assign No & Date : MATERIAL : SOURCE : QUANTITY : LOCATION : TESTED ON :
FLAKINESS INDEX ELONGATION INDEX
Weight of Weight of Weight of Non - Retained Weight of Aggregate taken Aggregate taken Passing Flaky Aggregate Test on is Aggregate taken in each Fraction in each Fraction through is taken in each No. Sieve in each Fraction passing the not passing the Sieve (mm) fraction (gms) (mm) (gms) [A] Thickness Guage length Guage [C] (gms) [B] (gms) [D] 1 63 50 2 50 40 3 40 25 4 25 20 5 20 16 6 16 12.5 7 12.5 10 8 10 6.3 Total Flakiness Index (FI) = B/A x 100 = % Elongation Index (EI) = D/C x 100 = % FI & EI Combined = %
__________ ________________ _ __________________
For kec waterleau NMT BWSSB FIELD Quality plan KEC WATERLEAU ITEM : QP NO. 1 PROJECT: Sewage Treatment Plants at Doddabele,Yellamalappachetty (JV) CIVIL and Intermediate Sewage pumping Station and Pumping Work Rev.No. 0 Mains at Sadarmangala