FIELD Quality plan

KEC WATERLEAU ITEM : QP NO.


1 PROJECT: Sewage Treatment Plants at Doddabele,Yellamalappachetty
(JV) CIVIL and Intermediate Sewage pumping Station and Pumping
Work Rev.No. 0 Mains at Sadarmangala

Date:- Contract No. S1e

FIELD QUALITY ASSURANCE DEPARTMENT

FLAKINESS INDEX AND ELONGATION INDEX


IS :2386 (Part - I)
DATE :
AGENCY :
SAMPLE No :
Assign No & Date :
MATERIAL :
SOURCE :
QUANTITY :
LOCATION :
TESTED ON :

FLAKINESS INDEX ELONGATION INDEX


Weight of Weight of
Weight of Non -
Retained Weight of Aggregate taken Aggregate taken
Passing Flaky Aggregate
Test on is Aggregate taken in each Fraction in each Fraction
through is taken in each
No. Sieve in each Fraction passing the not passing the
Sieve (mm) fraction (gms)
(mm) (gms) [A] Thickness Guage length Guage
[C]
(gms) [B] (gms) [D]
1 63 50
2 50 40
3 40 25
4 25 20
5 20 16
6 16 12.5
7 12.5 10
8 10 6.3
Total
Flakiness Index (FI) = B/A x 100 = %
Elongation Index (EI) = D/C x 100 = %
FI & EI Combined = %

__________ ________________ _ __________________


For kec waterleau NMT BWSSB
FIELD Quality plan
KEC WATERLEAU ITEM : QP NO.
1 PROJECT: Sewage Treatment Plants at Doddabele,Yellamalappachetty
(JV) CIVIL and Intermediate Sewage pumping Station and Pumping
Work Rev.No. 0 Mains at Sadarmangala

Date:- Contract No. S1e

Tested By:
____________________
SMC
Remarks:

__________ ________________ _ __________________


For kec waterleau NMT BWSSB