Sei sulla pagina 1di 1

Annexure-I

List of Test Reports


Pre SC test at works : As per IEC (Oil-air bushing)
1. Measurement of voltage ratio at tap positions
2. Vector group verification.
3. Magnetic balance test
4. Measurement of excitation current with low voltage supply.
5. Measurement of IR for windings.
6. Measurement of winding resistance at all taps.
7. Measurement of capacitance and tan delta of bushings.
8. Measurement of no load loss and no load current at 90%, 100% and 110% excitation.
9. Measurement of impedance voltage and load loss at max tap, rated tap and minimum tap
position.
10. Applied voltage test.
11. Induced voltage with partial discharge test (IVPD).
12. Test for on load tap changer.
13. Core assembly and earthing continuity test (2.5kV DC).
14. SFRA.
SC test at CPRI : As per IEC (Oil-air bushing)
1. Short Circuit Test
Before SC Test
1. Measurement of voltage ratio at tap positions.
2. Measurement of IR for windings.
3. Measurement of winding resistance at max tap, rated tap and min tap positions.
4. Measurement of inductance.
After SC test
1. Measurement of voltage ratio at tap positions.
2. Measurement of IR for windings.
3. Measurement of winding resistance at max tap, rated tap and min tap positions.
4. Measurement of inductance.
Post SC test at works: As per IEC (Oil-air bushing)
1. Measurement of voltage ratio at tap positions
2. Vector group verification.
3. Magnetic balance test
4. Measurement of excitation current with low voltage supply.
5. Measurement of IR for windings.
6. Measurement of winding resistance at all taps.
7. Measurement of capacitance and tan delta of bushings.
8. Measurement of no load loss and no load current at 90%, 100% and 110% excitation.
9. Measurement of impedance voltage and load loss at max tap, rated tap and minimum tap
position.
10. Applied voltage test.
11. Lighting impulse voltage withstand test including chopped wave on tail (LI).
12. Switching impulse voltage withstand test (SI).
13. Induced voltage with partial discharge test (IVPD).
14. Test for on load tap changer.
15. Core assembly and earthing continuity test (2.5kV DC).