Sei sulla pagina 1di 4

ALLWEILER

Operating and Maintenance Instructions VMNo.: 460.00082 GB


Edition: 02.01
IdentNo.: 550 129

VoluteCasing Centrifugal Pumps Retain


ENT
for future
EM
Series NTT and CTT SUPPL use!

Design: Drive side with regreasable groove ball bearing

JobNo.: Pump Ident No.:

MachineNo.: Pump type:

Operating data of the pump according to order data sheet


For dimensions see orderspecific installation drawing

These instructions are to be used only together with the following operating and main-
tenance instructions:

Series NTT/CTT VM 460.0008/... IdentNr. 550 102

These Operating and Maintenance Instructions relate to a nonstandard design version. The sec-
tions are divided such that they can be allocated to the (standard) Instructions.

1
NTT/CTT ALLWEILER
1 General
For specific applications, volute casing centrifugal For relubrication, the pump must be stopped. The
pumps of series NTT and CTT may be designed with a instructions in the table are valid for new and re-
regreasable bearing instead of the liftetime greaselu- placed bearings.
bricated bearing on the drive side.
Grease quantity in grams
7.1.2 Maintenance of components every ... for pumps with bearing
operating bracket size
7.1.2.1 Bearing hours
The nominal service life of the bearing is designed for a 360 470 530 650
minimum of 2 years continuous operation, in accord-
Relubricate 2000 17 30 75 160
ance with DIN ISO 281. The actual usable life may be
Relubricate 4000 6 12 30 65
lower, due to intermittent operation, high temperature,
low viscosity or the like. Relubricate 6000 6 12 30 65
The running noises and the temperature in the bearing Relubricate 8000 6 12 30 65
area must be checked at regular intervals. We recom- Relubricate 10000 6 12 30 65
mend monitoring bearings by means of shock pulse Relubricate 12000 6 12 30 65
measurements. If damage to a bearing is detected, the Relubricate 14000 6 12 30 65
groove ball bearing must be replaced. Replace bearing 16000
The bearing area can become very hot.
Risk of burning if touched!
Replace bearing
For operational safety reasons the groove ball bearing
At the factory, the groove ball bearing was provided must be replaced every 16000 operating hours.
with a sufficient grease filling.
The grease filling for a new groove ball bearing
Rolling bearing grease: must be effected as described hereinafter.
For the lubrication of the driveside groove ball bear-
ing, the belowlisted rolling bearing grease or an equiv- 1. Carefully clean the groove ball bearing.
alent special grease with molybdenum disulfite portion 2. Fill hollow spaces between the rolling bodies up to
and the following characteristics must be used. approx. 40% with grease. Depending upon the bear-
ing bracket size, this corresponds to the following
Quality: grease quantities.
The rolling bearing grease must be free from resin and
acid and anticorrosive. Bearing bracket size Grease quantitiy
360 6 Gramm
Characteristics:
Worked penetration 265295 mm/10 470 12 Gramm
Dropping point > 200 C 530 30 Gramm
Range of temperature 650 65 Gramm
application: 10 bis 150 C
3. Scrape off excessive grease (most suitably with
Manufacturer Brand your fingers, do not use any metallic object).
Total LUBRIPLATE N 3000

Sole distributor in the Federal Republic of Germany:


Relubrication / grease quality as above mentioned.
Deutsche Total GmbH

Relubrication / Grease quantities


Relubrication is effected with a grease gun, via the
grease nipple screwed in the bearing cover.
regrease at this point

VM 460.00082 GB/02.01 IdentNr. 550 129 2


NTT/CTT ALLWEILER
7.2.1 Dismounting the centrifugal pump 7.2.2 Mounting the centrifugal pump
Before dismounting, the following work must be carried Before remounting check all parts for wear
out: and aging and, as necessary, replace with
original replacement parts.
S Electrical danger must be eliminated! The motor Clean all parts before mounting. Always fit new
must be secured against being switched on. If gaskets.
necessary, the power supply cable must be
disconnected from the motor by an authorized
The pump must be mounted by a qualified techni-
electrician.
cian using the pertaining drawings. The prescribed
S Close all stop devices in the inlet and delivery pipe- tightening torque must be observed.
line, and in the auxiliary pipelines. To prevent damage, it is especially important to ensure
that the components are mounted concentrically and
that they are not tilted.
S Allow the pump housing to cool to ambient
temperature. Mounting instructions:
S Drain the fluid in flowable condition from the pump. S The markings applied when dismounting must be
Note: Use a collecting tank. observed. The components must be put back in their
original fitting position.
S The pump must be depressurized and drained.
S When assembling, screws and nuts must be painted
S Hazardous substances and/or environmentally with a suitable hightemperature screw paste (e.g.
harmful media must be drained off and collected Molykote P37).
such that no danger to life and limb is created.
Environmentally compatible disposal must be S After fitting the insert unit, the pump shaft must lie
ensured. exactly flush with the motor shaft.
S Remove auxiliary pipelines, if fitted. S After tightening the screws, it must be possible to
turn the pump and drive manually without straining
S Dismount manometer lines, manometers and hold- points.
ing devices.

S Dismount protection against accidental contact. 7.2.3 Tightening torque


Note: With poor and lightly greased surfaces, the va-
The pump must be dismounted by a qualified lues must be increased by 1015%, in order to reach
technician using the pertaining drawings. the required performance.
To prevent damage, it is especially important to ensure
that the components are dismounted concentrically Tightening
and that they are not tilted. Part no. Thread Quality torque
[Nm]
Dismounting instructions:
902.1
920.1 M 10 35
S The pumps are produced as standard in process de- 901.01 M 12
8.8
60
GAT2
sign. This means that the insert unit can be dis- 902.01 M 16 146
mounted without the need to remove the volute 920.01
housing and the pipes. 901.02 M 12 8.8 60
902.02 M 16 GAT2 146
S If a coupling with a distance piece is used, the motor
901.03
can remain on the base plate during this process. 901.14
M 10 8.8 35

S The fitting position of all components must be accu- 901.13


M 12
8.8
31
rately marked before dismounting. M 16 146
903.1
903.2
903.02 G 1/4 10
903.06 G 3/8 St 15
903.07 G 1/2 30
903.18
903.19
M6 9
914.4
M8 8.8 22
914.08
M 10 35
M 20 x 1,5 112
922.2 M 24 x 1,5 188
1.7139
922.01 M 30 x 1,5 340
M 36 x 1,5 700

VM 460.00082 GB/02.01 IdentNr. 550 129 3


NTT/CTT ALLWEILER
Following the mounting the centrifugal pump, the
following operations are to be performed.

S Fill groove ball bearing with grease.

S Align coupling (please refer to Section 5.4 above).

S Attach protection against accidental contact and


supporting foot, if any.

S Attach manometer pipelines, manometer and hold-


ing devices to the pump.

S Electrical danger must be eliminated! Power supply


cables must only be connected by qualified
electricians. Pay attention to sense of rotation.

Start up pump as per instructions in Section 6.

Subject to technical changes.

ALLWEILER AG
Werk Radolfzell
Postfach 1140
D78301 Radolfzell
Allweilerstrae 1
D78315 Radolfzell
Germany
& (++ 49) 7732 86 0
Fax (++ 49) 7732 86 436
Email: service@allweiler.de
Internet: http://www.allweiler.de

VM 460.00082 GB/02.01 IdentNr. 550 129 4

Potrebbero piacerti anche