GROUND FLOOR BUILD UP AREA 1444

FIRST FLOOR BUILD UP AREA 980

2424

STEEL QTY 7.272 2.5 TO 3.0 PER SQFT

CONCRTE QTY 48.48

SHUTTERING 7272

H
9 25 225

I
18 25 450

J
6 25 150

6 25 150
Excavation
FOOTING
F1 ( 0.9 x 0.9x 0.3) 10 1.5 1.5 0.6 13.500
F2 ( 0.6 x 0.6 x 0.3 ) 8 1.2 1.2 0.6 6.912

Back Filling
FOOTING
F1 ( 0.9 x 0.9x 0.3) 10 1.5 1.5 0.6 13.500
Deduct footing area -10 0.9 0.9 0.6 -4.860
F2 ( 0.6 x 0.6 x 0.3 ) 8 1.2 1.2 0.6 6.912
Deduct footing area -8 0.6 0.6 0.6 -1.728

Concrete FOOTING
F1 10 0.9 0.9 0.3 2.430
F2 8 0.6 0.6 0.3 0.864
Column Up to Plinth
Heinght taken appx 5' 10 0.225 0.45 1.5 1.519
8 0.15 0.45 1.5 0.810
Plinth Beam 1 0.15 0.45 3.45 0.233
1 0.15 0.45 2.97 0.200
1 0.15 0.45 3.48 0.235
1 0.15 0.45 3.6 0.243
1 0.15 0.45 7.29 0.492
1 0.15 0.45 3.48 0.235
1 0.15 0.45 0.27 0.018
1 0.15 0.45 2.58 0.174
1 0.15 0.45 2.58 0.174
1 0.15 0.45 2.7 0.182
1 0.15 0.45 2.79 0.188
1 0.15 0.45 4.68 0.316
1 0.15 0.45 2.79 0.188
1 0.15 0.45 3.39 0.229
1 0.15 0.45 4.98 0.336
1 0.15 0.45 1.59 0.107
1 0.15 0.45 3.78 0.255
1 0.15 0.45 1.8 0.122
1 0.15 0.45 3.48 0.235
1 0.15 0.45 5.7 0.385
1 0.15 0.45 3.48 0.235
1 0.15 0.45 5.37 0.362
1 0.15 0.45 3 0.203
1 0.15 0.45 1.59 0.107
Murum Filling 1 134.201 1 0.6 80.520
PCC Over Soling 1 134.201 1 0.15 20.130

Super structure

Column up to first slab 10 0.225 0.45 3 3.038


8 0.15 0.15 3 0.540
Slab beam 1 0.15 0.45 3.45 0.233
1 0.15 0.45 2.97 0.200
1 0.15 0.45 3.48 0.235
1 0.15 0.45 3.6 0.243
1 0.15 0.45 7.29 0.492
1 0.15 0.45 3.48 0.235
1 0.15 0.45 0.27 0.018
1 0.15 0.45 2.58 0.174
1 0.15 0.45 2.58 0.174
1 0.15 0.45 2.7 0.182
1 0.15 0.45 2.79 0.188
1 0.15 0.45 4.68 0.316
1 0.15 0.45 2.79 0.188
1 0.15 0.45 3.39 0.229
1 0.15 0.45 4.98 0.336
1 0.15 0.45 1.59 0.107
1 0.15 0.45 3.78 0.255
1 0.15 0.45 1.8 0.122
1 0.15 0.45 3.48 0.235
1 0.15 0.45 5.7 0.385
1 0.15 0.45 3.48 0.235
1 0.15 0.45 5.37 0.362
1 0.15 0.45 3 0.203
1 0.15 0.45 1.59 0.107

First Slab 1 120.066 1 0.25 30.017

Column up to second slab 10 0.225 0.45 3 3.038

8 0.15 0.15 3 0.540

Slab beam 1 0.15 0.45 3.45 0.233

1 0.15 0.45 2.97 0.200

1 0.15 0.45 3.48 0.235

1 0.15 0.45 3.6 0.243

1 0.15 0.45 7.29 0.492

1 0.15 0.45 3.48 0.235


1 0.15 0.45 0.27 0.018
1 0.15 0.45 2.58 0.174
1 0.15 0.45 2.58 0.174
1 0.15 0.45 2.7 0.182
1 0.15 0.45 2.79 0.188
1 0.15 0.45 4.68 0.316
1 0.15 0.45 2.79 0.188
1 0.15 0.45 3.39 0.229
1 0.15 0.45 4.98 0.336
1 0.15 0.45 1.59 0.107
1 0.15 0.45 3.78 0.255
1 0.15 0.45 1.8 0.122
1 0.15 0.45 3.48 0.235
1 0.15 0.45 5.7 0.385
1 0.15 0.45 3.48 0.235
1 0.15 0.45 5.37 0.362
1 0.15 0.45 3 0.203
1 0.15 0.45 1.59 0.107
Second Slab 1 120.066 1 0.15 18.010

Steel qty 240.132 32.28 7.751

Brick work ground floor


Wall 1 1 4.68 0.225 3 3.159
Wall 2 1 2.4 0.225 3 1.620
Wall 3 1 3.57 0.225 3 2.410
Wall 4 1 3.48 0.225 3 2.349
Wall 5 1 2.4 0.225 3 1.620
Wall 6 1 3.39 0.225 3 2.288
Wall 7 1 4.98 0.225 3 3.362
Wall 8 1 2.1 0.225 3 1.418
Wall 9 1 1.5 0.225 3 1.013
Wall 10 1 1.89 0.225 3 1.276
Wall 11 1 5.4 0.225 3 3.645
Wall 12 1 1.2 0.225 3 0.810
Wall 13 1 1.2 0.225 3 0.810
Wall 14 1 1.2 0.225 3 0.810
Wall 15 1 1.98 0.225 3 1.337
Wall 16 1 5.37 0.225 3 3.625
Wall 17 1 3 0.225 3 2.025
Brick work First Floor
Wall 1 1 42 0.225 3 28.350
Wall 2 1 30 0.225 3 20.250

Gypsum Plaster
Door Windows Grills Railing etc
External Plaster & Design
Waterproofing
Qty Rate Amount

20.412 200 4,082.40

13.824 100 1,382.40

10.80
5.76

20.25
14.40
2.59
2.23
2.61
2.70
5.47
2.61
0.20
1.94
1.94
2.03
2.09
3.51
2.09
2.54
3.74
1.19
2.84
1.35
2.61
4.28
2.61
4.03
2.25
1.19
11.078 6000 66,468.60 111.825
80.520 200 16,104.09
20.130 2000 40,260.22
128,297.71

40.50
14.40
2.59
2.23
2.61
2.70
5.47
2.61
0.20
1.94
1.94
2.03
2.09
3.51
2.09
2.54
3.74
1.19
2.84
1.35
2.61
4.28
2.61
4.03
2.25
1.19

120.07

39.049 6000 234,296.43 235.581

40.50

14.40

2.59

2.23

2.61

2.70

5.47

2.61
0.20
1.94
1.94
2.03
2.09
3.51
2.09
2.54
3.74
1.19
2.84
1.35
2.61
4.28
2.61
4.03
2.25
1.19
120.07
27.043 6000 162,256.70 235.581

7.751 41000 317,810.48

14.04
7.2
10.71
10.44
7.2
10.17
14.94
6.3
4.5
5.67
16.2
3.6
3.6
3.6
5.94
16.11
9

126
90

82.175 1000 82,174.50

836.382 322.8 539,968.50


100,000.00
269,984.25
464.000 100 46,400.00

1,881,188.56
SHRI BALAJI CONSTRUCTIONS
Shop. No. 2, Sonali Niwas,
Gopalwadi Road, Daund,
Dist. Pune, Maharashtra

Ref. SBC/2010/002 Date: 1/25/2010

To,
Shri. Namdev Divekar
A/p/ Kadethan

Sub: Quotation for constrction of your bungalow as per doscussion

Sr. Item description Unit Quantity Rate Amount


1 EARTHWORK FOR FOUNDATIONS
Excavation Cum 20.41 300 6,124
Backfilling Cum 13.82 150 2,074
Murrum Filling for Plinth Cum 80.52 500 40,260
PCC over rubble soling for Plinth Cum 20.13 3,000 60,390
2 RCC WORK
Concrete Work Cum 77.17 6,000 463,022
Reinforcement Steel Work MT 12.00 42,000 504,062
Shuttering Work Sqm 699.58 150 104,938
3 FINISHING WORK
9" Brickwork Cum 98.61 1,000 98,609
Internal Plastering Work Sqm 764.68 350 267,637
External Platsering Work Sqm 245.82 450 110,619
Internal Painting Work Sqm 764.68 161 123,465
External Painting Work Sqm 302.68 75 22,806
Spartex Flooring Work Sqm 294.97 400 117,987
Marble Carved Flooring Sqm 13.35 3,500 46,741
Main TW Door Nos 1.00 15,000 15,000
Internal Doors Nos 6.00 6,000 36,000
Toilet Doors Nos 4.00 4,000 16,000
Windows Sqm 30.15 2,690 81,095
Grills Sqm 87.24 1,292 112,692
Door & window Sill Rmt 96.80 426 41,275
Kitchen Otta & Racks Nos 1.00 50,000 50,000
4 SERVICES WORK
Plumbing Work LS 1.00 100,000 100,000
Electrical Work LS 1.00 100,000 100,000
External Architectural Elevation & LS 1.00 100,000 100,000
Landscaping Work

TOTAL AMOUNT Rs. 2,620,796

Terms & Conditions:


1. 60% of Total Amount as advance at the time of starting of work shall be paid.
2. This quotation is valid for 30 days from today.
3. Consultancy charges @ 2.5% of Total Cost payable extra at the time fo final payment.

For Shri Balaji Constructions,

Proprietor
External Plaster
area 210256.12 square in. (1460.1119 square ft.)
perimeter 152'-8 15/16"
GROUND FLOOR
walls 153 Rft 10 1368 Sft
FIRST FLOOR
area 142361.69 square in. (988.6229 square ft.)
perimeter 143'-3 13/16"
walls 144 Rft 10 1278 Sft

2646 Sft
Internal Plaster 3258 Sft
GROUND FLOOR
perimeter
175184.15 square in. (1216.5566 square ft.)
perimeter 256'-6 13/16"
walls 323.5 Rft 10 3073 Sft
ceiling 1093 Sft 1093 Sft

FIRST FLOOR
area 145081.39 square in. (1007.5097 square ft.)
perimeter 251'-11 5/8"

walls 319 Rft 10 3057 Sft


ceiling 1008 Sft 1008 Sft
8231 Sft

Flooring
Groud Floor
Flooring 1213
Skirting 106.755
First Floor
Flooring 1008
Skirting 105.27 3175 Sft
Dado 26.5 7 185.5 742

Windows 162
133 325 sft
Window Sill
18 7 126
24 5 120
10 4 40
Door Sill 3.5 9 31.5 318 Rft

Grills 237.5
191.25
24
252
64
170 938.75 Sft