Catenaries and Tensile for Primary Networks Compact

During assembly of a compact line is done release, the traction and anchoring of the
messenger cable, only then , the cables are pulled and placed the phases in the
spacers.
To allow mounting of the network, the tables below present the initial situation only
with the Messenger released the intermediate situation with the launch of the phase
cables and the situation end with the complete network with Messenger and phase
cables stuck with spacers.

During the messenger traction, the traction being applied is that of the initial situation
compulsory and must be verified with a dynamometer. After the complete mounting
of the network, the traction in the messenger cable will be that shown in the table of
final situation.
The traction being applied in phase conductors does not depend on the basic span,
since the average distances between the spacers are considered for the catenary. The
traction and the catenary are to be considered in the launch on cable curtain method,
i.e. where the reels distance are 7 meters of spacing from one another.

For the condition of minimum catenary was considered -5 C.


The project traction is the maximum traction that may suffer the conductor during the
lifetime in the network, under condition of maximum wind to 15 C or no wind the -
5C . Therefore, if the value of the project traction is different from the drive -5 C is
because the traction with a maximum wind of 15 c is greater than the previous ones.

For the basics span of 35 metres was considered a wind speed of 60 km/H and for the
basic span 80 metres will a speed of 80 km/H.
The covered cables for 15 kV networks and 25 kV has parameters with values near,
therefore adopted the same traction for these cables. Covered cables 34.5 kV have
different parameters of the others, therefore adopted individual calculations for these.
The single phase compact line with cable 35 mm2 single will be identified as "Cable 35
mm2 (M) "in the following tables:

Basic span of 35 meters


Traction of project
Cable 35mm2 185mm2 70mm2 185mm2 70mm2 34,5
M(daN) (daN) (daN) 34,5kV (daN) kV (daN)
Tension 187 648 373 659 438
Mounting traction for messenger cable initial situation

Catenary of mounting for the messenger cable - initial situation

Cable 35 mm (Vo = Span in meters and Flechas = Catenary in cm)


Cable 185 mm (Vo = Span in meters and Flechas = Catenary in cm)

Cable 70 mm
Cable 185 mm - 34,5 kV

Cable 70 mm - 34,5 kV
Mounting traction for phase cables

Mounting catenary for phase cable


Catenary of mounting for complete network - final situation -35 mm
cable

Catenary of mounting for complete network - final situation -185 and 70


mm cable
Catenary of mounting for complete network - final situation -185 and 70
mm cable 34,5 kV

Basic span of 80 meters


Traction of project
Cable 35mm2 185mm2 70mm2 185mm2 70mm2 34,5
M(daN) (daN) (daN) 34,5kV (daN) kV (daN)
Tension 448 838 549 837 601
Mounting traction for messenger cable initial situation

Catenary of mounting for the messenger cable - initial situation

Cable 35 mm (Vo = Span in meters and Flechas = Catenary in cm)


Cable 185 mm (Vo = Span in meters and Flechas = Catenary in cm)

Cable 70 mm
Cable 185 mm 34,5 kV

Cable 70mm - 34,5 kV


Mounting traction for phase cables

Mounting catenary for phase cable


Catenary of mounting for complete network - final situation

Catenary of mounting for complete network - final situation cable


35mm
Catenary of mounting for complete network - final situation cable 185
and 70 mm
Catenary of mounting for complete network - final situation cable 185
and 70 mm - 35,4 kV

Potrebbero piacerti anche