RYERSON UNIVERSITY

CIVIL ENGINEERING DEPARTMENT


CVL905: BRIDGE DESIGN AND CONSTRUCTION
ASSIGNMENT NO. 3
Fall 2017
Assignment due date: During the TUTORIAL of the week of November 13

For the shown 25-m span composite concrete deck-on-steel I-girder bridge located in Ontario, Canada,
and based on CHBDC 2014, you are required to perform the following:

Given:
28-day concrete strength = 30 MPa
Thickness of Ashplat Layer = 90 mm
Steel girder: W1000x272, Made of 350W steel
Cross bracing spacing = 5.0 m
Assume any missing data.