Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
For the shown 25-m span composite concrete deck-on-steel I-girder bridge located in Ontario, Canada,
and based on CHBDC 2014, you are required to perform the following:
Given:
28-day concrete strength = 30 MPa
Thickness of Ashplat Layer = 90 mm
Steel girder: W1000x272, Made of 350W steel
Cross bracing spacing = 5.0 m
Assume any missing data.