OFERENTE : FORMULARIO No.

HOJA 1 DE 1

TABLA DE CANTIDADES Y PRECIOS

PRECIO
UNITARIO PRECIO TOTAL
RUBRO DESCRIPCION UN CANT. USD USD

1 DEMOLICION DE PAREDES e= 10cm M2 90.00 3.62 325.80

2 TRAZADO Y REPLANTEO M2 400.00 1.22 488.00

3 EXCAVACION A MANO M3 40.00 17.83 713.20

4 EXCAVACION A MAQUINA M3 110.00 5.55 610.50

5 RELLENO COMPACTADO M3 80.00 20.79 1,663.20

6 REPLANTILLO F'C=140Kg/cm2 e=0,05 M2 70.00 8.65 605.50

7 HORMIGON F'C= 210Kg/cm2 (cimentacion, pilares y vigas) M3 70.00 318.06 22,264.20

ACERO DE REFUERZO FY=4200 Kg/cm2 (inc. Alambre #


8 KG 4,000.00 1.73 6,920.00
18)
9 CONTRAPISO e= 8cm. F'c= 180 Kg/cm2 M2 130.00 17.33 2,252.90

10 PAREDES DE BLOQUE e=9 cm. M2 300.00 23.40 7,020.00

11 ENLUCIDO DE PAREDES M2 600.00 9.38 5,628.00

12 PINTURA (No incl. empaste) M2 600.00 7.50 4,500.00

13 CERAMICA M2 70.00 21.67 1,516.90


MURO DE HORMIGON CICLOPEO F'C=180 KG/CM2
14 M3 30.00 162.31 4,869.30
(60% HORMIGON Y 40% PIEDRA)

15 PILARETES Y VIGUETAS 10 X 25 CM. F'C=210 KG/CM2 ML 60.00 14.54 872.40

16 MURO DE H. SIMPLE F'C=210 KG/CM2 (25X45cm.) ML 50.00 32.34 1,617.00

17 LOSA DE CUBIERTA H.A. E=12CM. (NOVALOSA) M2 0.00 0.00

18 TRANSPORTE DE MATERIALES PETREOS M3-KM 0.00 0.00

19 EMPASTE INTERIOR M2 600.00 1.90 1,140.00

20 PISO DE PORCELANATO M2 130.00 41.59 5,406.70

21 PUNTO DE LUZ DE 110V PTO 12.00 29.50 354.00

22 PUNTO DE TOMACORRIENTE D 110V PTO 16.00 44.79 716.64

23 PUNTO DE VOZ Y DATOS PTO 4.00 74.82 299.28

24 PUNTO DE AGUA POTABLE 1/2 PTO 12.00 28.49 341.88

25 PUNTO DE AGUA SERVIDAS DE 110MM PTO 0.00

26 VENTANA CORREDIZA DE ALUMINIO Y VIDRIO 0.00

27 0.00

28 0.00

0.00

0.00

0.00

0.00
TOTAL 70,125.40

Guayaquil, 28 de Agosto del 2017 FIRMA


FORMULARIO No.4

NOMBRE DEL PROPONENTE: .


PROYECTO: SEMINARIO TALLER
1 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 1.00 UNIDAD: M2
DETALLE: DEMOLICION DE PAREDES e= 10cm
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.1436

SUBTOTAL M = 0.1436
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 2.000 3.4100 6.8200 0.2700 1.8414
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.2700 1.0314

SUBTOTAL N = 2.8728
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P = 0.0000
TOTAL COSTO DIRECTOS X=(M+N+O+P) 3.0164
INDIRECTOS Y UTILIDAD 20.00% 0.6033
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 3.6197
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 3.62
FORMULARIO No.4

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
2 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 2.00 UNIDAD: M2
DETALLE: TRAZADO Y REPLANTEO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.0384
Equipo topografico 1.000 2.5000 2.5000 0.0530 0.1325

SUBTOTAL M = 0.1709
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 0.0530 0.1807
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.0530 0.2025
Topografo 1.000 3.8200 3.8200 0.0530 0.2025
Cadenero 1.000 3.4500 3.4500 0.0530 0.1829

SUBTOTAL N = 0.7686
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Tablas de Encofrado semidura u 0.0057 4.5000 0.0257
Cuarton semiduras u 0.0190 2.6000 0.0494
Pintura de caucho gln 0.00020 15.6200 0.0031
Clavo 2"x 8 Lb 0.00095 0.8200 0.0008
Cementina (25kg) sc 0.000038 1.6000 0.0001

SUBTOTAL O = 0.0791
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P = 0.0000
TOTAL COSTO DIRECTOS X=(M+N+O+P) 1.0186
INDIRECTOS Y UTILIDAD 20.00% 0.2037
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 1.2223
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 1.22
FORMULARIO No.4

FIRMA
NOMBRE DEL PROPONENTE:
PROYECTO: SEMINARIO TALLER
3 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 3.00 UNIDAD: M3
DETALLE: EXCAVACION A MANO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.7076

SUBTOTAL M = 0.7076
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) B C=A*B R D=C*R
Peon (estr.ocp. E2) 2.000 3.4100 6.8200 1.3300 9.0706
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 1.3300 5.0806

SUBTOTAL N = 14.1512
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P = 0.0000
TOTAL COSTO DIRECTOS X=(M+N+O+P) 14.8588
INDIRECTOS Y UTILIDAD 20.00% 2.9718
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 17.8306
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 17.83
FORMULARIO No.4

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
4 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 4.00 UNIDAD: M3
DETALLE: EXCAVACION A MAQUINA
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.0534
Retroexcavadora 1.000 35.0000 35.0000 0.1000 3.5000

SUBTOTAL M = 3.5534
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
OP. Retroexcavadora 1.000 3.8200 3.8200 0.1000 0.3820
Ayudante Mec. 1.000 3.4500 3.4500 0.1000 0.3450
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 0.1000 0.3410

SUBTOTAL N = 1.0680
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P = 0.0000
TOTAL COSTO DIRECTOS X=(M+N+O+P) 4.6214
INDIRECTOS Y UTILIDAD 20.00% 0.9243
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 5.5457
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 5.55
FORMULARIO No.4

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
5 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 5.00 UNIDAD: M3
DETALLE: RELLENO COMPACTADO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.2660
Compactador manual 1.000 2.0000 2.0000 0.5000 1.0000

SUBTOTAL M = 1.2660
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 2.000 3.4100 6.8200 0.5000 3.4100
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.5000 1.9100

SUBTOTAL N = 5.3200
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cascajo mediano y fino m3 1.300 4.9400 6.4220
Agua m3 0.150 1.5000 0.2250

SUBTOTAL O = 6.6470
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Material Petreo (15km) m3/km 19.500 0.210 4.0950

SUBTOTAL P = 4.0950
TOTAL COSTO DIRECTOS X=(M+N+O+P) 17.3280
INDIRECTOS Y UTILIDAD 20.00% 3.4656
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 20.7936
FORMULARIO No.4

Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 20.79

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
6 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 6.00 UNIDAD: M2
DETALLE: REPLANTILLO F'C=140Kg/cm2 e=0,05
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.0930
Concretera de 1 Saco 1.000 3.1300 3.1300 0.0670 0.2097

SUBTOTAL M = 0.3027
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 5.000 3.4100 17.0500 0.0670 1.1424
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.0670 0.2312
Carpintero (estr.ocp. D2) 1.000 3.4500 3.4500 0.0670 0.2312
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.0670 0.2559

SUBTOTAL N = 1.8607
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 15.750 0.1400 2.2050
Piedra 3/4" m3 0.047 13.0000 0.6110
Arena m3 0.032 12.7000 0.4064
Agua m3 0.008 1.5000 0.0120
Cuarton semiduras u 0.120 2.6000 0.3120
Tira de encofrado semiduras u 0.600 1.1300 0.6780
Clavo 2"x 8 Lb 0.090 0.8200 0.0738

SUBTOTAL O = 4.2982
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Cemento kg/km 15.750 0.011 0.1733
Transporte de Material Petreo (15km) m3/km 1.185 0.210 0.2489
Transporte de Madera u/km 0.720 0.450 0.324
SUBTOTAL P = 0.7462
TOTAL COSTO DIRECTOS X=(M+N+O+P) 7.2078
INDIRECTOS Y UTILIDAD 20.00% 1.4416
OTROS INDIRECTOS ... %
FORMULARIO No.4

COSTO TOTAL DEL RUBRO 8.6494


Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 8.65

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
7 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 7.00 UNIDAD: M3
DETALLE: HORMIGON F'C= 210Kg/cm2 (cimentacion, pilares y vigas)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 2.7770
Concretera de 1 Saco 1.000 3.1300 3.1300 2.0000 6.260
Vibrador de Manguera 1.000 2.0000 2.0000 2.0000 4.000

SUBTOTAL M = 13.0370
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 5.000 3.4100 17.0500 2.0000 34.1000
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 2.0000 6.9000
Carpintero (estr.ocp. D2) 1.000 3.4500 3.4500 2.0000 6.9000
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 2.0000 7.6400

SUBTOTAL N = 55.5400
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 420.000 0.1400 58.8000
Piedra 3/4" m3 0.945 13.0000 12.2850
Arena m3 0.630 12.7000 8.0010
Agua m3 0.158 1.5000 0.2370
Tablas de Encofrado semidura u 9.590 4.5000 43.1550
Cuarton semiduras u 10.960 2.6000 28.4960
Tira de encofrado semiduras u 14.390 1.1300 16.2607
Clavo 2"x 8 Lb 4.800 0.8200 3.9360

SUBTOTAL O = 171.1707
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Cemento kg/km 420.000 0.011 4.620
Transporte de Material Petreo (15km) m3/km 23.625 0.210 4.961
Transporte de Madera u/km 34.940 0.450 15.723
SUBTOTAL P = 25.3040
TOTAL COSTO DIRECTOS X=(M+N+O+P) 265.0517
INDIRECTOS Y UTILIDAD 20.00% 53.0103
FORMULARIO No.4

OTROS INDIRECTOS ... %


COSTO TOTAL DEL RUBRO 318.0620
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 318.06

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
8 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 8.00 UNIDAD: KG
DETALLE: ACERO DE REFUERZO FY=4200 Kg/cm2 (inc. Alambre # 18)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.0234
Cortadora - dobladora 1.000 0.500 0.500 0.0330 0.0170

SUBTOTAL M = 0.0404
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.410 3.410 0.0330 0.1130
Fierrero (estr.ocp. D2) 2.000 3.450 6.900 0.0330 0.2280
Maestro (estr.ocp. C1) 1.000 3.820 3.820 0.0330 0.1260

SUBTOTAL N = 0.4670
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Acero de refuerzo fy=4200 kg/cm2 kg 1.050 0.8300 0.8715
Alambre Recocido # 18 kg 0.032 1.420 0.0454

SUBTOTAL O = 0.9169
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Hierro kg/km 1.082 0.016 0.017

SUBTOTAL P = 0.0170
TOTAL COSTO DIRECTOS X=(M+N+O+P) 1.4413
FORMULARIO No.4

INDIRECTOS Y UTILIDAD 20.00% 0.2883


OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 1.7296
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 1.73

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
9 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 9.00 UNIDAD: M2
DETALLE: CONTRAPISO e= 8cm. F'c= 180 Kg/cm2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.3194
Concretera de 1 Saco 1.000 3.1300 3.1300 0.2300 0.720

SUBTOTAL M = 1.0394
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 5.000 3.4100 17.0500 0.2300 3.9215
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.2300 0.7935
Carpintero (estr.ocp. D2) 1.000 3.4500 3.4500 0.2300 0.7935
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.2300 0.8786

SUBTOTAL N = 6.3871
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 29.400 0.1400 4.1160
Piedra 3/4" m3 0.076 13.0000 0.9880
Arena m3 0.050 12.7000 0.6350
Agua m3 0.013 1.5000 0.0195
Tablas de Encofrado semidura u 0.088 4.5000 0.3960
Cuarton semiduras u 0.030 2.6000 0.0780
Clavo 2"x 8 Lb 0.015 0.8200 0.0123

SUBTOTAL O = 6.2448
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Madera u/km 0.118 0.450 0.053
Transporte de Material Petreo (15km) m3/km 1.890 0.210 0.397
Transporte de Cemento kg/km 29.400 0.011 0.323
SUBTOTAL P = 0.7730
FORMULARIO No.4

TOTAL COSTO DIRECTOS X=(M+N+O+P) 14.4443


INDIRECTOS Y UTILIDAD 20.00% 2.8889
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 17.3332
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 17.33

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
10 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 10.00 UNIDAD: M2
DETALLE: PAREDES DE BLOQUE e=9 cm.
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.2846

SUBTOTAL M = 0.2846
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 0.5330 1.8175
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.5330 1.8389
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.5330 2.0361

SUBTOTAL N = 5.6925
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 12.600 0.1400 1.7640
Arena m3 0.021 12.7000 0.2667
Agua m3 0.006 1.5000 0.0095
Pesado P9-E 9X19X39 (hormign) u 13.125 0.6800 8.9250
Acero de refuerzo fy=4200 kg/cm2 kg 0.632 0.8300 0.5246
Tablas de Encofrado semidura u 0.057 4.5000 0.2565
Caa rolliza u 0.043 1.2000 0.0516
Cuarton semiduras u 0.115 2.6000 0.2990
Soga u 0.170 0.4000 0.0680

SUBTOTAL O = 12.1649
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Material Petreo (15km) m3/km 0.315 0.210 0.066
Transporte de Cemento kg/km 12.600 0.011 0.139
Transporte de Hierro kg/km 0.632 0.016 0.010
FORMULARIO No.4

Transporte de Bloques u/km 13.125 0.080 1.050


Transporte de Madera u/km 0.215 0.450 0.097
SUBTOTAL P = 1.3620
TOTAL COSTO DIRECTOS X=(M+N+O+P) 19.5040
INDIRECTOS Y UTILIDAD 20.00% 3.9008
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 23.4048
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 23.40

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
11 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 11.00 UNIDAD: M2
DETALLE: ENLUCIDO DE PAREDES
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.2136

SUBTOTAL M = 0.2136
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 0.4000 1.3640
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.4000 1.3800
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.4000 1.5280

SUBTOTAL N = 4.2720
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 14.700 0.1400 2.0580
Arena m3 0.021 12.7000 0.2667
Agua m3 0.006 1.5000 0.0095
Tablas de Encofrado semidura u 0.057 4.5000 0.2565
Caa rolliza u 0.043 1.2000 0.0516
Cuarton semiduras u 0.115 2.6000 0.2990
Soga u 0.170 0.4000 0.0680

SUBTOTAL O = 3.0093
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
FORMULARIO No.4

Transporte de Material Petreo (15km) m3/km 0.315 0.210 0.066


Transporte de Cemento kg/km 14.700 0.011 0.162
Transporte de Madera u/km 0.215 0.450 0.097
SUBTOTAL P = 0.3250
TOTAL COSTO DIRECTOS X=(M+N+O+P) 7.8199
INDIRECTOS Y UTILIDAD 20.00% 1.5640
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 9.3839
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 9.38

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
12 DE 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 12.00 UNIDAD: M2
DETALLE: PINTURA (No incl. empaste)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.2136

SUBTOTAL M = 0.214
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.410 3.410 0.40000 1.364
Pintor (estr.ocp. D2) 1.000 3.450 3.450 0.40000 1.380
Maestro (estr.ocp. C1) 1.000 3.820 3.820 0.40000 1.528

SUBTOTAL N = 4.272
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Pintura de caucho gln 0.055 15.620 0.859
Brocha de 4" mango rojo u 0.013 5.100 0.066
Rodillo manual de pintura u 0.007 5.000 0.035
Tablas de Encofrado semidura u 0.057 4.500 0.257
Caa rolliza u 0.043 1.200 0.052
Cuarton semiduras u 0.115 2.600 0.299
Soga u 0.170 0.400 0.068

SUBTOTAL O = 1.635
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
FORMULARIO No.4

A B C=A*B
Transporte de Madera u/km 0.215 0.450 0.097
Transporte de Pintura gln/km 0.055 0.500 0.028

SUBTOTAL P = 0.125
TOTAL COSTO DIRECTOS X=(M+N+O+P) 6.246
INDIRECTOS Y UTILIDAD 20.00% 1.249
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 7.495
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 7.50

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
13 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 13.00 UNIDAD: M2
DETALLE: CERAMICA
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.2136
Cortadora de ceramica 1.000 0.500 0.500 0.40000 0.2000

SUBTOTAL M = 0.4140
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 0.4000 1.3640
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.4000 1.3800
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.4000 1.5280

SUBTOTAL N = 4.2720
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Ceramica m2 1.050 10.2500 10.7625
Cemento tipo I(50 Kg) kg 10.500 0.1400 1.4700
Agua m3 0.0030 1.5000 0.0045
Porcelana kg 0.260 1.3300 0.3458
Separadores de ceramica u 2.000 0.0200 0.0400

SUBTOTAL O = 12.623
TRANSPORTE
FORMULARIO No.4

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO


A B C=A*B
Transporte de Cermica m2/km 1.050 0.600 0.630
Transporte de Cemento kg/km 10.500 0.011 0.116
Transporte de Porcelana kg/km 0.260 0.011 0.003
SUBTOTAL P = 0.749
TOTAL COSTO DIRECTOS X=(M+N+O+P) 18.058
INDIRECTOS Y UTILIDAD 20.00% 3.612
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 21.670
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 21.67

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
14 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 14.00 UNIDAD: M3
DETALLE: MURO DE HORMIGON CICLOPEO F'C=180 KG/CM2 (60% HORMIGON Y 40% PIEDRA)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 1.3885
Concretera de 1 Saco 1.000 3.1300 3.1300 1.0000 3.1300

SUBTOTAL M = 4.5185
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 5.000 3.4100 17.0500 1.0000 17.0500
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 1.0000 3.4500
Carpintero (estr.ocp. D2) 1.000 3.4500 3.4500 1.0000 3.4500
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 1.0000 3.8200

SUBTOTAL N = 27.7700
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 220.500 0.1400 30.8700
Piedra 3/4" m3 0.567 13.0000 7.3710
Arena m3 0.378 12.7000 4.8006
Agua m3 0.095 1.5000 0.1425
Piedra Base m3 0.420 6.8000 2.8560
Tablas de Encofrado semidura u 5.003 4.5000 22.5135
Cuarton semiduras u 7.204 2.6000 18.7304
Tira de encofrado semiduras u 1.201 1.1300 1.3570
Clavo 2"x 8 Lb 1.914 0.8200 1.5695

SUBTOTAL O = 90.2105
FORMULARIO No.4

TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Material Petreo (15km) m3/km 20.475 0.210 4.300
Transporte de Cemento kg/km 220.500 0.011 2.426
Transporte de Madera u/km 13.408 0.450 6.034
SUBTOTAL P = 12.7600
TOTAL COSTO DIRECTOS X=(M+N+O+P) 135.2590
INDIRECTOS Y UTILIDAD 20.00% 27.0518
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 162.3108
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 162.31

FIRMA
NOMBRE DEL PROPONENTE: FORMULARIO # 15
PROYECTO: SEMINARIO TALLER
15 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 15.00 UNIDAD: ML
DETALLE: PILARETES Y VIGUETAS 10 X 25 CM. F'C=210 KG/CM2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.2099

SUBTOTAL M = 0.2099
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 2.000 3.4100 6.8200 0.2000 1.3640
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.2000 0.6900
Carpintero (estr.ocp. D2) 1.000 3.4500 3.4500 0.2000 0.6900
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.2000 0.7640
Fierrero (estr.ocp. D2) 1.000 3.4500 3.4500 0.2000 0.6900

SUBTOTAL N = 4.1980
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 10.500 0.1400 1.4700
Piedra 3/4" m3 0.024 13.0000 0.3120
Arena m3 0.016 12.7000 0.2032
Agua m3 0.004 1.5000 0.0060
Acero de refuerzo fy=4200 kg/cm2 kg 2.290 0.8300 1.9007
Alambre Recocido # 18 kg 0.069 1.4200 0.0980
Tablas de Encofrado semidura u 0.375 4.5000 1.6875
Cuarton semiduras u 0.315 2.6000 0.8190
Tira de encofrado semiduras u 0.300 1.130 0.3390
Clavo 2"x 8 Lb 0.181 0.8200 0.1484
FORMULARIO No.4

SUBTOTAL O = 6.9838
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Material Petreo (15km) m3/km 0.600 0.210 0.126
Transporte de Cemento kg/km 10.500 0.011 0.116
Transporte de Madera u/km 0.990 0.450 0.446
Transporte de Hierro kg/km 2.359 0.016 0.038
SUBTOTAL P = 0.7260
TOTAL COSTO DIRECTOS X=(M+N+O+P) 12.1177
INDIRECTOS Y UTILIDAD 20.00% 2.4235
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 14.5412
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 14.54

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
16 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 16.00 UNIDAD: ML
DETALLE: MURO DE H. SIMPLE F'C=210 KG/CM2 (25X45cm.)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.4166
Concretera de 1 Saco 1.000 3.1300 3.1300 0.3000 0.939
Vibrador de Manguera 1.000 2.0000 2.0000 0.3000 0.600

SUBTOTAL M = 1.9556
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 5.000 3.4100 17.0500 0.3000 5.1150
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.3000 1.0350
Carpintero (estr.ocp. D2) 1.000 3.4500 3.4500 0.3000 1.0350
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.3000 1.1460

SUBTOTAL N = 8.3310
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Cemento tipo I(50 Kg) kg 47.460 0.1400 6.6444
Piedra 3/4" m3 0.107 13.0000 1.3910
Arena m3 0.071 12.7000 0.9017
Agua m3 0.018 1.5000 0.0270
Tablas de Encofrado semidura u 0.600 4.5000 2.7000
Cuarton semiduras u 0.900 2.6000 2.3400
Tira de encofrado semiduras u 0.435 1.1300 0.4916
Clavo 2"x 8 Lb 0.257 0.8200 0.2110
FORMULARIO No.4

SUBTOTAL O = 14.7067
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Material Petreo (15km) m3/km 2.670 0.210 0.561
Transporte de Cemento kg/km 47.460 0.011 0.522
Transporte de Madera u/km 1.935 0.450 0.871
SUBTOTAL P = 1.9540
TOTAL COSTO DIRECTOS X=(M+N+O+P) 26.9473
INDIRECTOS Y UTILIDAD 20.00% 5.3895
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 32.3368
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 32.34

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
17 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 17.00 UNIDAD: M2
DETALLE: LOSA DE CUBIERTA H.A. E=12CM. (NOVALOSA)
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O

SUBTOTAL M =
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R

SUBTOTAL N = 0.0000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
FORMULARIO No.4

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P = 0.0000
TOTAL COSTO DIRECTOS X=(M+N+O+P) 0.000
INDIRECTOS Y UTILIDAD 20.00% 0.000
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 0.000
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 0.00

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
18 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 18.00 UNIDAD: M3-KM
DETALLE: TRANSPORTE DE MATERIALES PETREOS
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R

SUBTOTAL M =
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R

SUBTOTAL N = 0.0000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
FORMULARIO No.4

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P = 0.0000
TOTAL COSTO DIRECTOS X=(M+N+O+P) 0.000
INDIRECTOS Y UTILIDAD 20.00% 0.000
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 0.000
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 0.00

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
19 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 19.00 UNIDAD: M2
DETALLE: EMPASTE INTERIOR
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O

SUBTOTAL M = 0.0000
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R

SUBTOTAL N = 0.0000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Sika Empaste Blanco kg 1.050 0.8500 0.8925
Lija plg 0.030 0.6000 0.0180
Tablas de Encofrado semidura u 0.057 4.5000 0.2565
Caa rolliza u 0.043 1.200 0.0516
Cuarton semiduras u 0.115 2.600 0.2990
FORMULARIO No.4

Soga u 0.170 0.400 0.0680

SUBTOTAL O = 1.5856
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Madera u/km 0.450

SUBTOTAL P =
TOTAL COSTO DIRECTOS X=(M+N+O+P) 1.5856
INDIRECTOS Y UTILIDAD 20.00% 0.3171
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 1.9027
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 1.90

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
20 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 20.00 UNIDAD: M2
DETALLE: PISO DE PORCELANATO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.2830
Maquina de corte 1.000 1.000 1.000 0.53000 0.5300

SUBTOTAL M = 0.8130
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 0.5300 1.8073
Albail (estr.ocp. D2) 1.000 3.4500 3.4500 0.5300 1.8285
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 0.5300 2.0246

SUBTOTAL N = 5.6604
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Porcelanato (Alto Trfico) Color - Graiman m2 1.050 22.3000 23.4150
Bondex Premiun 1 saco 0.260 11.9000 3.0940
Porcelana kg 0.260 1.3300 0.3458
Disco de Corte (para cortar cermica y porcel u 0.020 29.000 0.5800
FORMULARIO No.4

Separadores de ceramica u 2.000 0.0200 0.0400


Agua m3 0.003 1.5000 0.0045

SUBTOTAL O = 27.4793
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Porcelanato m2/km 1.050 0.600 0.6300
Transporte de Bondex saco 25kg/km 0.260 0.275 0.0715
Transporte de Porcelana kg/km 0.260 0.011 0.0030
SUBTOTAL P = 0.7045
TOTAL COSTO DIRECTOS X=(M+N+O+P) 34.6572
INDIRECTOS Y UTILIDAD 20.00% 6.9314
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 41.5886
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 41.59

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
21 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 21.00 UNIDAD: PTO
DETALLE: PUNTO DE LUZ DE 110V
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.6088

SUBTOTAL M = 0.6088
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 1.1400 3.8874
Electricista (estr.ocp. D2) 1.000 3.4500 3.4500 1.1400 3.9330
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 1.1400 4.3548

SUBTOTAL N = 12.1752
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Alambre Cu TW #12 AWG mt 8.000 0.5100 4.0800
Tubera galv. EMT 1/2"x3m u 1.170 1.7200 2.0124
Interruptor completo u 1.000 3.0000 3.0000
FORMULARIO No.4

Cajetin rectangula u 1.000 0.500 0.5000


Cajetin octagonal u 1.000 0.6000 0.6000
Cinta aislante rollo 1.000 0.5200 0.5200
Uniones EMT de 1/2" u 2.000 0.1760 0.3520
Codo EMT 1/2 u 1.000 0.1800 0.1800
Alambre galv. #18 Kg 0.100 2.0100 0.2010

SUBTOTAL O = 11.445
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Cable m/km 8.000 0.008 0.064
Transporte de Tuberia EMT u/km 1.170 0.250 0.293

SUBTOTAL P = 0.357
TOTAL COSTO DIRECTOS X=(M+N+O+P) 24.586
INDIRECTOS Y UTILIDAD 20.00% 4.917
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 29.503
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 29.50

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
22 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 22.00 UNIDAD: PTO
DETALLE: PUNTO DE TOMACORRIENTE D 110V
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.6088

SUBTOTAL M = 0.6088
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 1.1400 3.8874
Electricista (estr.ocp. D2) 1.000 3.4500 3.4500 1.1400 3.9330
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 1.1400 4.3548

SUBTOTAL N = 12.1752
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
Alambre Cu TW #12 AWG mt 15.000 0.5100 7.6500
Alambre Cu TW #14 AWG mt 7.500 0.3300 2.4750
FORMULARIO No.4

Tubera galv. EMT 3/4"X3m u 2.330 3.0000 6.9900


Tomacorriente ticino u 1.000 3.580 3.5800
Cajetin rectangula u 1.000 0.5000 0.5000
Cinta aislante rollo 1.000 0.5200 0.5200
Uniones EMT de 3/4" u 4.000 0.2300 0.9200
Conector EMT de 3/4" u 0.2300
Codo EMT de 3/4 " u 2.000 0.4720 0.9440
Alambre galv. #18 Kg 0.100 2.0100 0.2010

SUBTOTAL O = 23.780
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Tuberia EMT u/km 2.330 0.250 0.583
Transporte de Cable m/km 22.500 0.008 0.180

SUBTOTAL P = 0.763
TOTAL COSTO DIRECTOS X=(M+N+O+P) 37.327
INDIRECTOS Y UTILIDAD 20.00% 7.465
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 44.792
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 44.79

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
23 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 23.00 UNIDAD: PTO
DETALLE: PUNTO DE VOZ Y DATOS
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.8544

SUBTOTAL M = 0.8544
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 1.6000 5.4560
Electricista (estr.ocp. D2) 1.000 3.4500 3.4500 1.6000 5.5200
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 1.6000 6.1120

SUBTOTAL N = 17.0880
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
C. UTP. CAT 6E Solido gris m 15.000 0.9600 14.4000
FORMULARIO No.4

Tubera galv. EMT 3/4"X3m u 2.330 3.0000 6.9900


Toma Voz y Datos (Jack RJ45 Cat.6+Face plat u 1.000 19.2300 19.2300
Cajetin rectangula u 1.000 0.5000 0.5000
Cinta aislante rollo 1.000 0.5200 0.5200
Uniones EMT de 3/4" u 4.000 0.2300 0.9200
Codo EMT de 3/4 " u 2.000 0.4720 0.9440
Alambre galv. #18 Kg 0.100 2.0100 0.2010

SUBTOTAL O = 43.705
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Cable m/km 15.000 0.0080 0.120
Transporte de Tuberia EMT u/km 2.330 0.250 0.583

SUBTOTAL P = 0.703
TOTAL COSTO DIRECTOS X=(M+N+O+P) 62.350
INDIRECTOS Y UTILIDAD 20.00% 12.470
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 74.820
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 74.82

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
24 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 24.00 UNIDAD: PTO
DETALLE: PUNTO DE AGUA POTABLE 1/2
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O 0.6088

SUBTOTAL M = 0.6088
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
Peon (estr.ocp. E2) 1.000 3.4100 3.4100 1.1400 3.8874
Plomero (estr.ocp. D2) 1.000 3.4500 3.4500 1.1400 3.9330
Maestro (estr.ocp. C1) 1.000 3.8200 3.8200 1.1400 4.3548

SUBTOTAL N = 12.1752
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B
FORMULARIO No.4

Tubera de PVC 1/2"(roscable) ml. 5.0000 0.9500 4.7500


Codo 90 PVC 1/2" (unin roscable) u. 2.0000 0.6500 1.3000
Tee PVC 1/2" (unin roscable) u. 1.0000 0.8400 0.8400
Unin PVC 1/2" ( roscable) u. 0.0000 0.6500
Neplo H.G. de 1/2 x 3 u 1.0000 0.2000 0.2000
Tapn Macho PVC 1/2" (unin roscable) u. 1.000 0.8900 0.8900
Tefln rll 2.000 0.2400 0.4800

SUBTOTAL O = 8.460
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B
Transporte de Tuberia PVC AAPP u/km 5.000 0.500 2.500

SUBTOTAL P = 2.500
TOTAL COSTO DIRECTOS X=(M+N+O+P) 23.744
INDIRECTOS Y UTILIDAD 20.00% 4.749
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 28.493
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 28.49

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
25 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 25.00 UNIDAD: PTO
DETALLE: PUNTO DE AGUA SERVIDAS DE 110MM
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O

SUBTOTAL M =
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R

SUBTOTAL N = 0.0000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
FORMULARIO No.4

A B C=A*B

SUBTOTAL O = 0.000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P = 0.000
TOTAL COSTO DIRECTOS X=(M+N+O+P) 0.000
INDIRECTOS Y UTILIDAD 20.00% 0.000
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 0.000
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 0.00

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
26 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 26.00 UNIDAD:
DETALLE: VENTANA CORREDIZA DE ALUMINIO Y VIDRIO
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O

SUBTOTAL M =
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R

SUBTOTAL N = 0.0000
MATERIALES
FORMULARIO No.4

DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO


A B C=A*B

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P =
TOTAL COSTO DIRECTOS X=(M+N+O+P)
INDIRECTOS Y UTILIDAD 20.00%
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 0.0000
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 0.00

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
27 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 27.00 UNIDAD:
DETALLE:
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O

SUBTOTAL M =
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R

SUBTOTAL N = 0.0000
FORMULARIO No.4

MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P =
TOTAL COSTO DIRECTOS X=(M+N+O+P)
INDIRECTOS Y UTILIDAD 20.00%
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 0.0000
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 0.00

FIRMA
NOMBRE DEL PROPONENTE: .
PROYECTO: SEMINARIO TALLER
28 0
ANALISIS DE PRECIOS UNITARIOS
RUBRO: 28.00 UNIDAD:
DETALLE:
EQUIPOS
DESCRIPCION CANTIDAD TARIFA COSTO HORARENDIMIENTO COSTO
A B C=A*B R D=C*R
Herramienta menor 5 % M/O

SUBTOTAL M =
MANO DE OBRA
DESCRIPCION CANTIDAD JORNAL /HR
COSTO HORARENDIMIENTO COSTO
(CATEGORIAS) A B C=A*B R D=C*R
FORMULARIO No.4

SUBTOTAL N = 0.0000
MATERIALES
DESCRIPCION UNIDAD CANTIDAD PRECIO UNIT. COSTO
A B C=A*B

SUBTOTAL O = 0.0000
TRANSPORTE
DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO
A B C=A*B

SUBTOTAL P =
TOTAL COSTO DIRECTOS X=(M+N+O+P)
INDIRECTOS Y UTILIDAD 20.00%
OTROS INDIRECTOS ... %
COSTO TOTAL DEL RUBRO 0.0000
Guayaquil, 28 de Agosto del 2017 VALOR OFERTAD $ 0.00

FIRMA
FORMULARIO No.
OFERENTE:

HOJA 1 DE 1

ANALISIS DE PRECIOS UNITARIOS . CUADRO AUXILIAR: COSTOS DE MANO DE OBRA ( en US Dolares)

EST.OCP. C1 ESTR.OCP.C1 ESTR.OCP.C2 ESTR.OCP.C1 ESTR.OCP.D2 ESTR.OCP.C1 ESTR.OCP.C2 ESTR.OCP.D2


CATEGORIA/CARGO TOPOGRAFO OPERADORES OPERADORES CHOFER MECANICOS SIN TITULO CAT (III)
OP.I OP.II "E" SOLDADOR AYUD. MEC.
RETROEXCAVADORA RODILLO LISO VOLQUETE MAESTRO TECNICO OBRAS ALBANIL
MOTONIVELADORA RODILLO NEUMATICO MAYOR CIVILES CARPINTERO
TRACTOR FINISHER MAESTRO PINTOR
EXCAVADORA DISTRIB. ASFALTO ELECTRICISTA PLOMERO
GRUA COMPRESOR ELECTRICISTA
INSTALADOR
SALARIO DIARIO UNIFICADO NOMINAL 14.48 14.48 13.75 19.21 14.48 12.99 14.48 13.75 12.99
MENSUAL NOMINAL (2) 434.52 434.52 412.42 576.37 434.52 389.73 434.52 412.42 389.73
ANUAL NOMINAL 5214.24 5214.24 4949.04 6916.44 5214.24 4676.76 5214.24 4949.04 4676.76
COMPENSACION SALARIAL EN PROCES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TRANSPORTE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13 er SUELDO 434.52 434.52 412.42 576.37 434.52 389.73 434.52 412.42 389.73
14 to SUELDO 375.00 375.00 375.00 375.00 375.00 375.00 375.00 375.00 375.00
APORTE PATRONAL 633.53 633.53 601.31 840.35 633.53 568.23 633.53 601.31 568.23
FONDO DE RESERVA 434.52 434.52 412.42 576.37 434.52 389.73 434.52 412.42 389.73
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OTROS CODIGOS DE TRABAJO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL ANUAL 7091.81 7091.81 6750.19 9284.53 7091.81 6399.45 7091.81 6750.19 6399.45
TOTAL MENSUAL 590.98 590.98 562.52 773.71 590.98 533.29 590.98 562.52 533.29
FACTOR DE SALARIO REAL 2.110 2.110 2.118 2.082 2.110 2.125 2.110 2.118 2.125
MENSUAL REAL 916.84 916.84 873.51 1200.00 916.84 828.18 916.84 873.51 828.18
COSTO HORARIO 3.820 3.820 3.640 5.000 3.820 3.450 3.820 3.640 3.450

Guayaquil, 28 de Agosto del 2017


FIRMA
DE 1

ESTR.OCP.E2 ESTR.OCP. E2
CAT (II) CAT (I)

AYUDANTE PEON
GUARDIAN

12.82 12.82
384.72 384.72
4616.64 4616.64
0.00 0.00
0.00 0.00
384.72 384.72
375.00 375.00
560.92 560.92
384.72 384.72
0.00 0.00
0.00 0.00
6322.00 6322.00
526.83 526.83
2.127 2.127
818.30 818.30
3.410 3.410
OFERENTE:
FORMULARIO No 19

HOJA 1 DE 1

.
CRONOGRAMA VALORADO DE TRABAJO ( en US Dolares )

CANT. PRECIO PRECIO TIEMPO EN: 90 DIAS


RUBROS UNITARIO TOTAL 1 MES 2 MES 3 MES DECIMO SEGUNDO MES
1er QUINCENA 2 do. QUINC. 3er. QUINC. 4to. QUINC. 5to. QUINC. 6to. QUINC.
DEMOLICION DE PAREDES e= 10cm 90.00 3.62 325.80 100.00%
325.80 325.80
TRAZADO Y REPLANTEO 400.00 1.22 488.00 0.00%
0.00
EXCAVACION A MANO 40.00 17.83 713.20 0.00%
0.00
EXCAVACION A MAQUINA 110.00 5.55 610.50 0.00
0.00
RELLENO COMPACTADO 80.00 20.79 1,663.20 0.00
0.00
REPLANTILLO F'C=140Kg/cm2 e=0,05 70.00 8.65 605.50 0.00
0.00
HORMIGON F'C= 210Kg/cm2 (cimentacion, pilar 70.00 318.06 22,264.20 0.00
0.00
ACERO DE REFUERZO FY=4200 Kg/cm2 (inc. A 4,000.00 1.73 6,920.00 0.00
0.00
CONTRAPISO e= 8cm. F'c= 180 Kg/cm2 130.00 17.33 2,252.90 0.00
0.00
PAREDES DE BLOQUE e=9 cm. 300.00 23.40 7,020.00 0.00
0.00
ENLUCIDO DE PAREDES 600.00 9.38 5,628.00 0.00
0.00
PINTURA (No incl. empaste) 600.00 7.50 4,500.00 0.00
0.00
CERAMICA 70.00 21.67 1,516.90 0.00
0.00
MURO DE HORMIGON CICLOPEO F'C=180 KG 30.00 162.31 4,869.30 0.00
0.00
PILARETES Y VIGUETAS 10 X 25 CM. F'C=21 60.00 14.54 872.40 0.00
0.00
MURO DE H. SIMPLE F'C=210 KG/CM2 (25X4 50.00 32.34 1,617.00 0.00
0.00
LOSA DE CUBIERTA H.A. E=12CM. (NOVALO 0.00 0.00 0.00 0.00
0.00
TRANSPORTE DE MATERIALES PETREOS 0.00 0.00 0.00 0.00
0.00
EMPASTE INTERIOR 600.00 1.90 1,140.00 0.00
0.00
PISO DE PORCELANATO 130.00 41.59 5,406.70 0.00
0.00
PUNTO DE LUZ DE 110V 12.00 29.50 354.00 0.00
0.00
PUNTO DE TOMACORRIENTE D 110V 16.00 44.79 716.64 0.00
0.00
PUNTO DE VOZ Y DATOS 4.00 74.82 299.28 0.00
0.00
PUNTO DE AGUA POTABLE 1/2 12.00 28.49 341.88 0.00
0.00
OFERENTE: FORMULARIO No 19

HOJA 2 DE 4
.
CRONOGRAMA VALORADO DE TRABAJO ( en US Dolares )
CANT. PRECIO PRECIO TIEMPO EN: 90 DIAS
RUBROS UNITARIO TOTAL 1 MES 2 MES 3 MES DECIMO SEGUNDO MES
1er QUINCENA 2 do. QUINC. 3er. QUINC. 4to. QUINC. 5to. QUINC. 6to. QUINC.
PUNTO DE AGUA SERVIDAS DE 110MM 0.00 0.00 0.00 0.00
0.00
VENTANA CORREDIZA DE ALUMINIO Y VIDR 0.00 0.00 0.00 0.00
0.00
0 0.00 0.00 0.00 0.00
0.00
0 0.00 0.00 0.00 0.00
0.00
70,125.40 0.00

INVERSION MANSUAL 325.80 0.00 0.00 0.00 0.00 0.00 ###


AVANCE PARCIAL EN % 0.46% 0.00% 0.00% 0.00% 0.00% 0.00% ###
INVERSION ACUMULADA 325.80 325.80 325.80 325.80 325.80 325.80 ###
AVANCE ACUMULADO % 0.46% 0.46% 0.46% 0.46% 0.46% 0.46% ###

Guayaquil, 28 de Agosto del 2017

FIRMA
#REF!

#REF!

#REF!

#REF!

#REF!

#REF! 325.80 0.00 0.00 0.00 0.00 0.00


0.00 #REF! #REF! #REF! #REF! #REF!
#REF! 0.00 0.00 0.00 #REF! #REF! #REF!
0.00 #REF! 0.00 #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! 0.00 0.00 0.00
0.00 #REF! #REF! #REF! #REF! 0.00
#REF! #REF! #REF! #REF! #REF! #REF! 0.00
#REF! #REF! #REF! 0.00 0.00 0.00
#REF! #REF! #REF! #REF! 0.00 0.00 0.00
#REF! #REF! #REF! #REF! 0.00 0.00
#REF!

#REF!

#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
0.00
0.00
-488.00
0.00
-713.20
0.00
-610.50
0.00
-1,663.20
0.00
-605.50
0.00
-22,264.20
0.00
-6,920.00
0.00
-2,252.90
0.00
-7,020.00
0.00
-5,628.00
0.00
-4,500.00
0.00
-1,516.90
0.00
-4,869.30
0.00
-872.40
0.00
-1,617.00
0.00
0.00
0.00
0.00
0.00
-1,140.00
0.00
-5,406.70
0.00
-354.00
0.00
-716.64
0.00
-299.28
0.00
-341.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
FORMULA POLINOMICA PARA: SEMINARIO TALLER DE REAJUSTES DE PRECIOS

DESGLOSE DE MATERIALES

RUBROS UN. CANT UNITARIO COSTO TOTAL EQUIPO TRANSPORMADERA PINTURA HIERRO MAT. PETRE CEMENTO NOVALOSA INST ELECT.BLOQUE

DIRECTO DIRECTO M/O

1 DEMOLICION DE PARED M2 90.00 3.016


### 271.48

2 TRAZADO Y REPLANT M2 400.00 1.019 407.44

3 EXCAVACION A MANO M3 40.00 14.859 594.35

4 EXCAVACION A MAQU M3 110.00 4.621 508.35

5 RELLENO COMPACTADOM3 80.00 17.328 1,386.24

6 REPLANTILLO F'C=140K M2 70.00 7.208 504.55

7 HORMIGON F'C= 210Kg/cm2


M3 70.00 265.052 18,553.62

8 ACERO DE REFUERZO FY=4


KG 4,000.00 1.441 5,765.20

9 CONTRAPISO e= 8cm. M2 130.00 14.444 1,877.76

10 PAREDES DE BLOQUE e M2 300.00 19.504 5,851.20

11 ENLUCIDO DE PAREDE M2 600.00 7.820 4,691.94

12 PINTURA (No incl. empa M2 600.00 6.246 3,747.60

13 CERAMICA M2 70.00 18.058 1,264.06

14 MURO DE HORMIGON CIM3 30.00 135.259 4,057.77

15 PILARETES Y VIGUETAS ML 60.00 12.118 727.06

16 MURO DE H. SIMPLE F' ML 50.00 26.947 1,347.37

17 LOSA DE CUBIERTA H.A M2 0.00 0.000 0.00

18 TRANSPORTE DE MATEM3-KM 0.00 0.000 0.00

19 EMPASTE INTERIOR M2 600.00 1.586 951.36

20 PISO DE PORCELANAT M2 130.00 34.657 4,505.44

21 PUNTO DE LUZ DE 110 PTO 12.00 24.586 295.03

22 PUNTO DE TOMACORRI PTO 16.00 37.327 597.23

23 PUNTO DE VOZ Y DATO PTO 4.00 62.350 249.40

24 PUNTO DE AGUA POTABPTO 12.00 23.744 284.93

25 PUNTO DE AGUA SERV PTO 0.00 0.000 0.00

26 VENTANA CORREDIZA D 0 0.00 0.000 0.00

27 0 0 0.00 0.000 0.00

28 0 0 0.00 0.000 0.00

TOTALES: 58,439.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EQUIPO + TRANSPORTE = 0.00

0.00 0.0000 0.0000 0.00000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

(B) (E) (C) (K) (F) (G) (H) (D) (I)

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

DESGLOSE DE LA MANO DE OBRA


FORMULA POLINOMICA PARA: SEMINARIO TALLER DE REAJUSTES DE PRECIOS

RUBROS UN. CANT UNITARIO COSTO TOTAL CAT. I CAT. II CAT. III CAT. IV TOPOGRAFO AY. MEC. OP. I CHOF.E SOLDADOR

DIRECTO DIRECTO M/O


ESTR.OCP. E2 ESTR.OCP. E2 ESTR.OCP.D2 ESTR.OCP.C1 ESTR.OCP.C1 ESTR.OCP.C1

1 DEMOLICION DE PARED M2 90.00 3.016 271.48

2 TRAZADO Y REPLANT M2 400.00 1.019 407.44

3 EXCAVACION A MANO M3 40.00 14.859 594.35

4 EXCAVACION A MAQU M3 110.00 4.621 508.35

5 RELLENO COMPACTADOM3 80.00 17.328 1,386.24

6 REPLANTILLO F'C=140K M2 70.00 7.208 504.55

7 HORMIGON F'C= 210Kg/cm2


M3 70.00 265.052 18,553.62

8 ACERO DE REFUERZO FY=4


KG 4,000.00 1.441 5,765.20

9 CONTRAPISO e= 8cm. M2 130.00 14.444 1,877.76

10 PAREDES DE BLOQUE e M2 300.00 19.504 5,851.20

11 ENLUCIDO DE PAREDE M2 600.00 7.820 4,691.94

12 PINTURA (No incl. empa M2 600.00 6.246 3,747.60

13 CERAMICA M2 70.00 18.058 1,264.06

14 MURO DE HORMIGON CIM3 30.00 135.259 4,057.77

15 PILARETES Y VIGUETAS ML 60.00 12.118 727.06

16 MURO DE H. SIMPLE F' ML 50.00 26.947 1,347.37

17 LOSA DE CUBIERTA H.A M2 0.00 0.000 0.00

18 TRANSPORTE DE MATEM3-KM 0.00 0.000 0.00

19 EMPASTE INTERIOR M2 600.00 1.586 951.36

20 PISO DE PORCELANAT M2 130.00 34.657 4,505.44

21 PUNTO DE LUZ DE 110 PTO 12.00 24.586 295.03

22 PUNTO DE TOMACORRI PTO 16.00 37.327 597.23

23 PUNTO DE VOZ Y DATO PTO 4.00 62.350 249.40

24 PUNTO DE AGUA POTABPTO 12.00 23.744 284.93

25 PUNTO DE AGUA SERV PTO 0.00 0.000 0.00

26 VENTANA CORREDIZA D 0 0.00 0.000 0.00

27 0 0 0.00 0.000 0.00

28 0 0 0.00 0.000 0.00

58,439.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CAT. I CAT. II CAT. III CAT. IV TOPOGRAFO AY. MEC. OP. I CHOF.E SOLDADOR SUMATORIA

SALARIOS REFERENCIALES 25.4400 25.7600 28.5600 28.5600 25.7600 28.5600 37.3600 28.5600

DIA-HOMBRE 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00

RELACION CON DIA-HOMBRE TOTAL #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

CANTIDAD FINAL #DIV/0! 0.000 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
FORMULA POLINOMICA PARA: SEMINARIO TALLER DE REAJUSTES DE PRECIOS

Formula Polinomica:

B1 C1 D1 E1 F1 G1
Pr = Po ( 0.000 --------- + 0.000 --------- + 0.000 ---------- + 0.000 ---------- + 0.000 ---------- + 0.000 ---------- +
Bo Co Do Eo Fo Go

MANO DE OBRA MADERA NOVALOSA EQUIPO HIERRO MAT. PETREO


( Lamin. y planch. Galv.) ( Acero en barras)

H1 I1 J1 K1 X1
0.000 --------- + 0.000 --------- + 0.000 ---------- + 0.000 ---------- + 0.000 ---------- )
Ho Io Jo Ko Xo

CEMENTO BLOQUE CERAMICA PINTURA SALDO DE MATERIAL


(I.P.C. para Guayaquil )

CUADRILLA TIPO :
CAT. I ( E.O. E2) #DIV/0! CONTROL

CAT. III ( E.O. D2) #DIV/0!


CAT. IV ( E.O. C1) #DIV/0!
TOPOGRAFO (E.O. C1) #DIV/0!
OP. I (E.O. C1) #DIV/0!
SOLDADOR ( E.O. C1) #DIV/0!
AY. MEC (SIN TITULO) #DIV/0!
CHOF.E #DIV/0!
#DIV/0!
CERAMICA INST. SANIT. PERF.ALUM SOLDADURA OTROS

VARIOS

0.00 0.00 0.00 3.016

0.00 0.00 0.00 1.019 1.24

0.00 0.00 0.00 14.859

0.00 0.00 0.00 4.621

0.00 0.00 0.00 17.328

0.00 0.00 0.00 7.208

0.00 0.00 0.00 265.052

0.00 0.00 0.00 1.441

0.00 0.00 0.00 14.444

0.00 0.00 0.00 19.504

0.00 0.00 0.00 7.820

0.00 0.00 0.00 6.24600 515.40

0.00 0.00 0.00 18.05800

0.00 0.00 0.00 135.259

0.00 0.00 0.00 12.118

0.00 0.00 0.00 26.947

0.00 0.00 #DIV/0! #DIV/0!

0.00 0.00 #DIV/0! #DIV/0!

0.00 0.00 0.00 1.586 535.50

0.00 0.00 0.00 34.657

0.00 0.00 0.00 24.586 #REF! 181.14 124.84

0.00 0.00 0.00 37.327 #REF! 322.82 329.06

0.00 0.00 0.00 62.350 #REF! 236.41 218.57

0.00 0.00 0.00 23.744 #REF! 82.20 85.08

0.00 0.00 #DIV/0! #DIV/0! #REF! 177.77 226.53

0.00 0.00 #DIV/0! #DIV/0! #REF! 378.00 1,008.00

0.00 0.00 #DIV/0! #DIV/0! #REF! 7.92

0.00 0.00 #DIV/0! #DIV/0! #REF!

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF!

0.0000 0.0000 0.0000 0.0001

(J) (x)

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000

0.000
0.00 0.00 0.00 3.016

0.00 0.00 0.00 1.019

0.00 0.00 0.00 14.859

0.00 0.00 0.00 4.621

0.00 0.00 0.00 17.328

0.00 0.00 0.00 7.208

0.00 0.00 0.00 265.052

0.00 0.00 0.00 1.441 0.001

0.00 0.00 0.00 14.444

0.00 0.00 0.00 19.504

0.00 0.00 0.00 7.820

0.00 0.00 0.00 6.246

0.00 0.00 0.00 18.058

0.00 0.00 0.00 135.259

0.00 0.00 0.00 12.118

0.00 0.00 0.00 26.947

0.00 0.00 #DIV/0! #DIV/0!

0.00 0.00 #DIV/0! #DIV/0!

0.00 0.00 0.00 1.586

0.00 0.00 0.00 34.657

0.00 0.00 0.00 24.586

0.00 0.00 0.00 37.327

0.00 0.00 0.00 62.350

0.00 0.00 0.00 23.744

0.00 0.00 #DIV/0! #DIV/0!

0.00 0.00 #DIV/0! #DIV/0!

0.00 0.00 #DIV/0! #DIV/0!

0.00 0.00 #DIV/0! #DIV/0!


0.000
PLANILLA DE AVANCE DE OBRA

OBRA: REMODELACION URBANA CONTRATO % ACUM. PLAN. ANTERIOR 0.00% PLANILLA #1


CONTRATIS CONTRUCTORA ALFA MONTO $70,125.40 % AVANCE PROGRAMADO PERIODO 12 de Enero al 11 de Febrero del 2015
FISCALIZADOR: ANTICIPO 35,062.70 % PERIODO ACTUAL 0.00% PLAZO DE OBRA 90 DIAS
FECHA FIRMA CONTRATO 29-Feb-12 % ACUMULADO 0.00%

TABLA DE CANTIDADES Y PRECIOS PLANILLA 1


ITEMS PRECIO U.S. $ CANTIDAD IMPORTE % %
N RUBRO UND. CANTIDAD Unitario Total ANTERIOR ESTA PLAN. ACUMULADA ANTERIOR ESTA PLAN. ACUMULADA AVANCE A LA FECHA

1 DEMOLICION DE PAREDES e M2 90.00 3.62 325.80 - - - - 0.00% 0.00%


2 TRAZADO Y REPLANTEO M2 400.00 1.22 488.00 - - - - 0.00% 0.00%
3 EXCAVACION A MANO M3 40.00 17.83 713.20 - - - - 0.00% 0.00%
4 EXCAVACION A MAQUINA M3 110.00 5.55 610.50 - - - - 0.00% 0.00%
5 RELLENO COMPACTADO M3 80.00 20.79 1,663.20 - - - - 0.00% 0.00%
6 REPLANTILLO F'C=140Kg/cm M2 70.00 8.65 605.50 - - - - 0.00% 0.00%
7 M3 70.00
HORMIGON F'C= 210Kg/cm2 (cim 318.06 22,264.20 - - - - 0.00% 0.00%
8 ACERO DE REFUERZO FY=4200 KG 4,000.00 1.73 6,920.00 - - - - 0.00% 0.00%
9 CONTRAPISO e= 8cm. F'c= M2 130.00 17.33 2,252.90 - - - - 0.00% 0.00%
10 PAREDES DE BLOQUE e=9 M2 300.00 23.40 7,020.00 - - - - 0.00% 0.00%
11 ENLUCIDO DE PAREDES M2 600.00 9.38 5,628.00 - - - - 0.00% 0.00%
12 PINTURA (No incl. empaste) M2 600.00 7.50 4,500.00 - - - - 0.00% 0.00%
13 CERAMICA M2 70.00 21.67 1,516.90 - - - - 0.00% 0.00%
14 MURO DE HORMIGON CICLOPM3 30.00 162.31 4,869.30 - - - - 0.00% 0.00%
15 PILARETES Y VIGUETAS 10 X ML 60.00 14.54 872.40 - - - - 0.00% 0.00%
16 MURO DE H. SIMPLE F'C=210 ML 50.00 32.34 1,617.00 - - - - 0.00% 0.00%
17 LOSA DE CUBIERTA H.A. E= M2 - - - - #DIV/0! #DIV/0!
18 TRANSPORTE DE MATERIA M3-KM - - - - #DIV/0! #DIV/0!
19 EMPASTE INTERIOR M2 600.00 1.90 1,140.00 - - - - 0.00% 0.00%
20 PISO DE PORCELANATO M2 130.00 41.59 5,406.70 - - - - 0.00% 0.00%
21 PUNTO DE LUZ DE 110V PTO 12.00 29.50 354.00 - - - - 0.00% 0.00%
22 PUNTO DE TOMACORRIENTEPTO 16.00 44.79 716.64 - - - - 0.00% 0.00%
23 PUNTO DE VOZ Y DATOS PTO 4.00 74.82 299.28 - - - - 0.00% 0.00%
24 PUNTO DE AGUA POTABLE 1 PTO 12.00 28.49 341.88 - - - - 0.00% 0.00%
25 PUNTO DE AGUA SERVIDAS PTO - - - - #DIV/0! #DIV/0!
26 VENTANA CORREDIZA DE AL 0 - - - - #DIV/0! #DIV/0!
27 0 0 - - - - #DIV/0! #DIV/0!
28 0 0 - - - - #DIV/0! #DIV/0!
- - -

Suman .- 70,125.40 Planilla Suma .- 0.00 0.00 0.00 0.00% 0.00%

Total Contratado .- 70,125.40 0.00 0.00

Amortizacin Anticipo (50%) .- 0.00 0.00 0.00 Anticipo por


Impuesto a Renta 0.00 0.00 Devengar
Descuento escalafo 0.00
Retencion del iva 0.00 35,062.70
Valor Lquido a Recibir.- 0.00 0.00
-
FISCALIZADOR CONTRATISTA
PLANILLA DE REAJUSTE DE ANTICIPO
Formula de Reajuste:

Pr=

Indice 1 Indice 0
Literal Rubro Coeficiente Enero del Diciembre del
2015 2014

B Mano de Obra 0.000 #DIV/0! #DIV/0!

C MADERA 0.000

D NOVALOSA 0.000

E EQUIPO 0.000

F HIERRO 0.000

G MAT. PETREO 0.000

H CEMENTO 0.000

I BLOQUE 0.000

J CERAMICA 0.000

K PINTURA 0.000

X Saldo Material (IPC -Guayaquil) 0.000


0.000

Po
Pr #DIV/0!
Sub- total: #DIV/0!
Total #DIV/0!

Cuadrilla Tipo
Detreminacin de la variable Bo Fecha: Diciembre del 2014
Porcentaje de Jornal a la
Concepto Total
participacin fecha

CAT. I ( E.O. E2) #DIV/0! #DIV/0!

0.00 0.000 0.000

CAT. III ( E.O. D2) #DIV/0! #DIV/0!

CAT. IV ( E.O. C1) #DIV/0! #DIV/0!

TOPOGRAFO (E.O. C1) #DIV/0! #DIV/0!

OP. I (E.O. C1) #DIV/0! #DIV/0!

SOLDADOR ( E.O. C1) #DIV/0! #DIV/0!

CHOF.E #DIV/0! #DIV/0!

AY. MEC (SIN TITULO) #DIV/0! #DIV/0!

#DIV/0! #DIV/0!

Detreminacin de la variable B1 Fecha: Enero del 2015


Porcentaje de Jornal a la
Concepto Total
participacin fecha

CAT. I ( E.O. E2) #DIV/0! #DIV/0!

0.00 0.000 0.000

CAT. III ( E.O. D2) #DIV/0! #DIV/0!

CAT. IV ( E.O. C1) #DIV/0! #DIV/0!

TOPOGRAFO (E.O. C1) #DIV/0! #DIV/0!

OP. I (E.O. C1) #DIV/0! #DIV/0!

SOLDADOR ( E.O. C1) #DIV/0! #DIV/0!

CHOF.E #DIV/0! #DIV/0!

AY. MEC (SIN TITULO) #DIV/0! #DIV/0!

#DIV/0! #DIV/0!
Valor

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!
#DIV/0!
D E G 25000

DESCRIPCION U. COSTO $

1 Varillas grado interm. corr.8-32 mm qq 49.88


2 Viga ARMEX V1 St. ml 0.98
3 Viga ARMEX V2 St. ml 1.01
4 Viga ARMEX V3-V4 St. ml 1.04
5 Malla electro ARMEX R-188 (6.15) m2 1.71
6 Malla electro ARMEX R-131 (5.15) m2 1.22
7 Malla electro ARMEX R-283 (6.10) m2 2.67
8 Varilla cuadrada 1/2" x 6ml u 3.50

9 Hierro redondo 1/2"x6ml lisox0.80mm. u 3.05

10
11 Tub. met.encajable D=.91mts,e=2.0 ml. 16.89
12 Tub. met.encajable D=1.07m.,e=2.5 mm ml. 22.65
13 Tapa de Hierro Fundido D=24" pza 50.00

14 Cerco de Hierro Fundido D=24" pza 30.00

15
16 Angulos 20x20x2, 0.58 Kg/m, 6mts u 2.17 1.566
17 Angulos 20x20x3, 0.83 Kg/m, 6mts u 2.87
18 Angulos 25x25x2, 0.73 Kg/m, 6mts u 2.55
19 Angulos 25x25x3, 1.06 Kg/m, 6mts u 3.63
20 Angulos 30x30x2, 0.89 Kg/m, 6 mts u 3.95
21 Angulos 30x30x3, 1.3 Kg/m, 6 mts u 4.45
22 Angulos 30x30x4, 1.68 Kg/m, 6 mts. u 5.85
23 Angulos 40x40x2, 1.20 Kg/m, 6 mts. u 5.99
24 Angulos 40x40x3, 1.77 Kg/m, 6 mts. u 6.98
25 Angulos 40x40x4, 2.31 Kg/m, 6 mts. u 7.88
26 Angulos 40x40x5, 2.82 Kg/m, 6 mts. u 12.25
27 Angulos 50x50x2, 1.52 Kg/m, 6 mts u 10.12

28 Angulos 50x50x3, 2.24 Kg/m, 6 mts u 7.96


29 Angulos 50x50x4, 2.93 Kg/m, 6 mts. u 10.00
30 Angulos 50x50x5, 3.6 Kg/m, 6 mts u 14.85
31 Angulos 60x60x5, 4.39 Kg/m, 6 mts u 14.25
32 Angulos 100x100x6, 11.4 Kg/m, 6 mts u 32.33
33 Canales 50x25x2, 1.47 Kg/m, 6 mts u 4.08
34 Canales 50x25x3, 2.12 Kg/m, 6 mts u 5.85
35 Canales 80x40x2, 2.41 Kg/m, 6 mts u 6.32
36 Canales 80x40x3, 3.54 Kg/m, 6 mts u 9.15
37 Canales 80x40x4, 4.61 Kg/m, 6 mts u 11.70
38 Canales 80x40x5, 5.63 Kg/m, 6 mts u 15.15

39 Canales 80x40x6, 6.74 Kg/m, 6 mts u 17.79


40 Canales 100x50x2, 3.04 Kg/m, 6mts u 8.60
41 Canales 100x50x3, 4.48 Kg/m, 6mts u 11.04
42 Canales 100x50x4, 5.87 Kg/m, 6 mts u 14.87
43 Canales 100x50x5, 7.20 Kg/m, 6 mts u 19.01
44 Canales 125x50x2, 3.43 Kg/m, 6 mts u 11.23
45 Canales 125x50x3, 5.07 Kg/m, 6 mts u 12.86
46 Canales 125x50x4, 6.65 Kg/m, 6 mts u 16.84
47 Canales 125x50x5, 8.19 Kg/m, 6 mts u 21.62
48 Canales 125x75x5, 10.10 Kg/m, 6 mts u 21.87
49 Canales 150x50x2, 3.82 Kg/m, 6 mts u 9.68
50 Canales 150x50x3, 5.66 Kg/m, 6 mts u 14.35
51 Canales 150x50x5, 9.17 Kg/m, 6 mts u 24.21
52 Canales 200x50x2, 4.61 Kg/m, 6 mts u 11.68
53 Canales 200x50x3, 6.83 Kg/m, 6 mts u 17.31
54 Canales 200x50x4, 9.01 Kg/m, 6 mts u 64.93
55 Canales 200x50x5, 11.10 Kg/m, 6 mts u 29.30
56 Correas 80x40x15x2, 2.78 Kg/m, 6 mts u 15.65
57 Correas 80x40x15x3, 4.01 Kg/m, 6mts u 22.57
58 Correas 80x40x15x4, 4.01 Kg/m, 6mts u 22.79
59 Correas 100x50x15x2, 3.4 Kg/m, 6 mts u 19.14
60 Correas 100x50x15x3, 4.95 Kg/m, 6 mts u 27.69
61 Correas 100x50x15x4, 6.40 Kg/m, 6 mts u 36.02
62 Correas 100x75x15x2, 4.19 Kg/m, 6 mts u 23.58
63 Correas 100x75x15x3, 6.13 Kg/m, 6 mts u 34.50
64 Correas 100x75x15x4, 7.97 Kg/m, 6 mts u 44.86
65 Correas 125x50x15x2, 3.80 Kg/m, 6 mts u 21.39

66 Correas 125x50x15x3, 5.54 Kg/m, 6 mts u 31.18


67 Correas 125x50x15x4, 7.18 Kg/m, 6 mts u 40.41
68 Planchas 1.22x2.44x30, 70.10 Kg/m u 25.24
69 Planchas 1.22x2.44x4, 93.47 Kg/m u. 33.65
70 Tubo cuadrado 1"x1.5mm u 4.34
71 Platina 1/2" x 1/8" u 0.99
72 Platina 1/2" x 3/16" u 1.24
73 Platina 1/2" x 1/4" u 1.81
74 Platina 1" x 1/8" u 2.03
75 Platina 1" x 3/16" u 2.71
76 Plancha 1/20"x1.2,negra u 15.14

77 Plancha 1/32"x 0.75,negra u 8.41

78
79 Vidrio Claro de 2mm. (importado) m2 7.86
80 Vidrio Claro de 3mm.(importado) m2 8.54
81 Vidrio Claro de 4mm (importado) m2 12.58
82 Vidrio Claro de 5mm.(importado) m2 11.89

83 Vidrio Claro de 6mm.(importado) m2 7.59


84 Vidrio Bronce de 4mm.(importado) m2 10.28
85 Vidrio Bronce de 5mm.(importado) m2 14.98
86 Puerta corrediza(4m2) 2 hojas PC m2 55.98
87 Puerta corr.(4m2) 2 hojas color m2 69.54
88 Puerta de bao(2.25m2).nat.panor. m2 40.21
89 Ventana corrediza de Al/Vd. nat. malla m2 48.50
90 Vent. corr. Al/Vid color malla m2 59.92 100.8
91 Ventana Celosa Al/Vd natural m2 48.12
92 Ventana fija (1m2) m2 38.45
93 Base (ventana celosa) Alum.natural ml 2.10
94 Cabezal(ventana celosa) ml 1.95
95 Barra operadora(Vent.Alum.y Vid.) ml 0.63
96 Vidrio Cortado 4mm(ventana celosa) m2 9.52
97 Operador manual (vent. celosa) u 1.87
98 Remaches (ventana celosa) u 0.02
99
100 Horizontal de hoja standard nat. 6,40 mts. u 8.83
101 Vertical abierto standar nat. 6,40 mts. u 10.49
102 Malla corrediza standard 6,40 mts. u 7.00
103 Vertical cerrado standard nat. 6,40 mts. u 12.21
104 Jamba marco econmico nat. 6,40 mts. u 11.58
105 Riel superior de tres aletas nat. 6,40 mts. u 11.47
106 Riel inferior econmico nat. 6,40 mts u 11.81
107 Riel Sup. e Inf. standard nat. 6,40 mts. u 11.81
108 Vertical abierto econmico nat. 6,40 mts. u 7.34
109 Horizontal de hoja econmico nat. 6,40 mts. u 10.44
110 Jamba marco standard nat. 6,40 mts. u 12.33
111 Vertical cerrado econmico nat. 6,40 mts. u 11.12

112 Malla corrediza econmica nat. 6,40 mts. (perfil) u 5.28


113
114 Riel nat. 6,40 mts. u 11.81
115 Vertical redondo nat. 6,40 mts. u 10.04
116 Horizontal redondo nat. 6,40 mts. u 11.01
117 Jamba Marco nat. 6,40 mts. u 12.33
118
119 Adaptador nat. 6,40 mts. u 6.25
120 Vertical cerrado nat. 6,40 mts. u 13.88
121 Vertical abierto nat. 6,40 mts. u 11.53
122 Jamba Marco nat. 6,40 mts. u 14.16
123 Horizontal nat. 6,40 mts. u 16.34
124 Riel nat. 6,40 mts. u 15.20
125
126 Barra operadora standard nat. 6,40 mts. u 2.70

127 Malla fija con bisel standard nat. 6,40 mts. u 5.10
128 Cabezal celosia nat. 6,40 mts. u 10.09
129 Barra operadora econmica nat. 6,40 mts. u 1.84
130 Jamba sencilla celosia nat. 6,40 mts. u 13.71
131 Base celosia nat. 6,40 mts. u 10.09
132 Malla fija econmica nat. 6,40 mts.(perfil) u 2.47
133
134 Junquillo v. fijo sin felpero nat. 6,40 mts. u 3.78
135 Mullon standard (unin) nat. 6,40 mts. u 5.96
136 Horizontal vid. fijo standard nat. 6,40 mts. u 8.43
137 Vertical vidrio fijo standard nat. 6,40 mts. u 7.57
138 Horizontal vid.fijo econm. nat. 6,40 mts. u 7.58
139 Vertical vid. fijo econmico nat.6,40 mts. u 6.98
140 Horizont.vid. fijo stand.alivianada 6,40 mts. u 10.44
141 Vertical vid.fijo stand.alivianada 6,40 mts. u 11.01
142 Junquillo v. fijo c/felpero aliv. nat.6,40 mts. u 4.59
143
144 Marco doble vent. proyectable nat. 6,40 mts u 20.36

145 Borde hoja y marco vent. proyect.6,40mts. u 6.19


146 Hoja de ventana proyectable nat. 6,40 mts. u 17.32
147 Marco de ventana proyectable nat. 6,40mts. u 11.07
148
149 Horizontal inf. puerta batiente nat. 6,40 mts. u 27.98
150 Horizontal sup. puerta batiente nat. 6,40mts. u 21.33
151 Vertical de hoja puerta batiente nat. 6,40mts. u 21.68
152 Vertical de felpa puerta batiente nat. 6,40mts. u 22.94
153 Junquillo de puerta batiente nat. 6,40 mts. u 4.70
154 Horizontal sup. de puerta batiente nat. 6,40 mts. u 21.33
155 Barra de empuje nat. 6,40 mts. u 32.23

156 Sardinel de 4 pulgadas nat. 6,40 mts. u 31.94


157 Tiraderas puerta batiente nat. 6,40 mts. u 55.97
158 Felpero de 1 1/2 nat. 6,40 mts. u 7.34
159 Porta de felpa para tubo 1 3/4 nat. 6,40 mts. u 9.12
160 Sardinel econmico nat. 6,40 mts. u 6.08
161 Tiradera G nat. 6,40 mts. u 34.64
162 Perfil Bisagra nat. 6,40 mts. u 24.37
163
164 Horizontal inferior nat. 6,40 mts. u 27.98
165 Vertical felpa nat. 6,40 mts. u 22.94
166 Vertical de hoja nat. 6,40 mts. u 21.68
167 Horizontal superior nat. 6,40 mts. u 21.33
168
169 Adaptador puerta corrediza nat. 6,40 mts. u 4.70
170 Jamba chapa ancha puert. corrediza nat. 6,40 mts. u 20.41
171 Horizontal inf. puerta corrediza nat. 6,40 mts. u 18.98
172 Horizontal Sup. Puerta corrediza nat. 6,40 mts. u 15.02
173 Entrecierre puerta corrediza nat. 6,40 mts. u 17.89
174 Jamba marco puerta corrediza nat. 6,40 mts. u 21.45
175 Riel sup. sin malla puerta corrediza nat. 6,40 mts. u 18.98
176 Riel inf. sin malla puerta corrediza nat. 6,40 mts. u 16.11
177 Vertical hoja fija puerta corrediza nat. 6,40 mts. u 11.87
178 Jamba marco puerta corrediza nat. 6,40 mts. u 22.99
179 Riel superior puerta corrediza nat. 6,40 mts. u 24.37
180 Riel inferior puerta corrediza nat. 6,40 mts. u 23.68
181 Horizontal de malla de P/C nat. 6,40 mts. u 14.39
182 Vertical de malla de P/C nat. 6,40 mts. u 17.43
183
184 Jamba chapa econ. puerta corrediza nat. 6,40 mts. u 17.55
185 Jamba marco puerta corrediza econ. nat. 6,40 mts. u 17.43
186 Riel superior puerta corrediza econ. nat. 6,40 mts. u 17.83
187 Riel inferior puerta corrediza econ. nat. 6,40 mts. u 16.06

188 Horizontal sup. puert. corred. econ. nat. 6,40 mts. u 14.97
189 Horizontal Inf. puert. corred. econ. nat. 6,40 mts. u 17.78
190 Entrecierre puerta corrediza econ. nat. 6,40 mts. u 15.71
191 Vertical de malla puert. corred. econ. nat. 6,40 mts. u 10.21
192 Horizontal de malla puert. corred. econ. nat. 6,40 mts. u 9.46
193
194 Riel superior puerta de bao nat. 6,40 mts. u 18.81
195 Jamba marco de puerta de bao nat. 6,40 mts. u 8.09
196 Horizontal sup. hoja puert. bao nat. 6,40 mts. u 10.61
197 Vertical de hoja puerta bao nat. 6,40 mts. u 6.65
198 Horizontal inf. hoja puert. bao nat. 6,40 mts. u 7.97
199 Porta toallero puerta de bao nat. 6,40 mts. u 10.61
200 Toallero puerta de bao nat. 6,40 mts. u 4.76
201 Riel inferior puerta de bao nat. 6,40 mts. u 11.41
202
203 Mangn vidrio templado nat. 6,40 mts. u 52.76
204 Tubo decorativo nat. 6,40 mts. u 19.78
205 Mangn de pasamano econmico nat. 6,40 mts. u 27.24

206 Pletina econmica 1 1/2 nat. 6,40 mts. u 6.94


207 Tubo elipse nat. 6,40 mts. u 10.04
208
209 Tapa perimetral fijo manpara 4" nat. 6,40 mts. u 18.24
210 Perimetral fijo manpara 4" nat. 6,40 mts. u 42.95
211 Perimetral movil manpara 4" nat. 6,40 mts. u 37.04
212 Junquillo manpara 4" nat. 6,40 mts. u 10.26
213
214 Angulo alivianado de 1"x 1" nat. 6,40 mts. u 4.24
215 L de 1"x1/2" nat. 6,40 mts. u 4.07
216 L de 1/2"x1/2" nat. 6,40 mts. u 2.01

217 T de 1"x3/4" nat. 6,40 mts. u 3.54


218 L de 3/4"x3/4" nat. 6,40 mts. u 3.44
219 T de 3/4"x3/4" nat. 6,40 mts. u 2.58
220
221 Escaln de escalera nat. 6,40 mts. u 15.02
222 Vertical columna escalera nat. 6,40 mts. u 13.82
223 Escaln superior escalera nat. 6,40 mts. u 25.86
224 Escaln liviano escalera nat. 6,40 mts. u 7.91
225 Tensor de escalera nat. 6,40 mts. u 5.62
226
227 Tubo 1 1/2"x1 1/2" (Pesado) nat. 6,40 mts. u 13.59
228 Tubo 4"x1 3/4" (Pesado) nat. 6,40 mts. u 35.38
229 Tubo 1 1/2"x1 1/2" nat. 6,40 mts. u 17.43
230 Tubo 3"x1 1/2" nat. 6,40 mts. u 22.13
231 Tubo 2"x2" nat. 6,40 mts. u 21.05
232 Tubo rectangular de 2"x1 1/2" nat. 6,40 mts. u 16.58
233 Tubo 1 1/4"x1 1/4" nat. 6,40 mts. u 10.44
234 Tubo de 1"x1" con tornillero nat. 6,40 mts. u 10.15
235 Tubo cuadrado de 17 m.m. nat. 6,40 mts. u 4.64
236 Tubo 3"x1" nat. 6,40 mts. u 18.59
237 Tubo 1"x1" nat. 6,40 mts. u 8.26
238 Tubo 1 1/2"x 3/4" nat. 6,40 mts. u 9.63
239 Tubo 1 3/4"x1" nat. 6,40 mts. u 21.50
240
241 Tubo 4"x1 3/4" abierto 1 aleta nat. 6,40 mts. u 28.30
242 Tubo 4"x1 3/4" cerrado 1 aleta nat. 6,40 mts. u 25.38
243 Tubo 3"x1 1/2" una aleta nat. 6,40 mts. u 27.41
244 Tubo 3"x1" doble aleta nat. 6,40 mts. u 20.93
245 Tubo 3"x1" una aleta nat. 6,40 mts. u 21.96
246 Tubo 3"x1 1/2" doble aleta nat. 6,40 mts. u 27.41
247
248 Junquillo triangular esplada 1 1/4 u 3.61

249 Junquillo triangular tapa 1 1/4 u 2.29


250 Junquillo redondo tapa u 2.98
251 Junquillo redondo tapa u 2.98
252 Junquillo triangular esplada 1 1/2 u 5.56
253 Junquillo triangular tapa 1 1/2 u 3.21
254
255 Tubo 4"x1 3/4" abierto sin aleta nat. 6,40 mts. u 28.59
256 Canal 3"x1" con aleta nat. 6,40 mts. u 16.34
257 Canal 3"x1/2" sin aleta nat. 6,40 mts. u 20.07
258 Canal 3"x1/2" con aleta nat. 6,40 mts. u 19.21
259 Canal 3"x1" sin aleta nat. 6,40 mts. u 15.21
260
261 Tubo estriado 1 1/4" nat. 6,40 mts. u 7.86
262 Tubo estriado 1" nat. 6,40 mts. u 5.68
263 Tubo estriado 1/2" nat. 6,40 mts. u 2.64
264
265 Cubre canto de revestimiento J nat. 6,40 mts. u 3.21
266 Remate "V" para revestimiento nat. 6,40 mts. u 2.12

267 Revestimiento(econmico) nat. 6,40 mts. u 9.75


268 Revestimiento nat. 6,40 mts. u 10.38
269 Revestimiento nat. 6,40 mts. u 10.38

270 Revestimiento de 136 mm nat. 6,40 mts. u 7.96

271
272 Peatonal gris(exagonal) ,35 x m2 m2 6.70
273 Peatonal gris(cruz),AC-P 6x22.5x25 cm. u 0.50
274 Vehicular gris (cruz) AC-V 9x22.5x25 cm u 0.38
275 Vehicular gris (exagonal),35 x m2 m2 7.40
276 Vehicular gris (cruz),9X29X29,AD-1 u 0.63
277 Bloque liviano bl-9 9x19x39 cm u 0.38

278 Vehicular gris(trebol), 9x10.5x20.5, AD-2 u 0.23

279
280 Asfalto RC-2 gln. 0.32
281 Asfalto AP-3 gln. 0.34
282 Cemento tipo I(50 Kg) sc 7.82

283 Cemento Blanco(50kg) sc 11.60


284 Cal P-24 (25kg) sc 2.80
285 Cementina (25kg) sc 1.60

286 Yeso grueso lb 0.12

287
288 Cascajo Grueso m3 0.94
289 Cascajo mediano y fino m3 0.72
290 Piedra chispa #7 m3 4.88
291 Piedra # 3/4 m3 8.01
292 Piedra # 4 m3 8.01
293 Piedra Base m3 6.80
294 Arena corriente ( fina ) m3 8.15 8.79
295 Arena Babahoyo (gruesa lavada hormign) m3 6.58

296 Agua(100 m3) m3 1.08

297
298 Unicolor(11x11)Trad. sup. tonos suaves m2 1.17

299 Unicolor(11x11)Trad.sup. tonos oscuros m2 1.18


300 Decorados (11x11) mejicana. m2 0.22
301 Ceramica(20x20) unicolor (tonos suaves) m2 20.00
302 Ceramica(20x20) unicolor (tonos oscuros) m2 20.00
303 Papel tapiz Romantic simplex linea rll 12.26
304 Papel tapiz Tradicional duplex linea rll 12.26
305 Papel tapiz Imp. Giselle simplex linea rll 18.45
306 Papel tapiz Imp. Cinthia Vinilo linea rll 29.20
307 Papel tapiz Imp. Cinthia Vinilo linea rll 29.00
308 Funda de Alcasit u 3.92
309 Poma Pegavinyl (para papel tapiz) gal 1.32

310 Porcelana en polvo (blanca) lb 1.02


311 Porcelana negra 103 c/arena lb 0.29
312 Kermikos lnea Hilos superior m2 9.15
313 Kermikos lnea Pointee superior m2 10.25

314 Decorados Castao Whisky superior jgo 10.25

315
316 Blanca grano marmol 3-4 (30x30) m2 5.60
317 Blanca grano marmol 3-4 (40x40) m2 6.10
318 Baldosa gres natural 10x20(50xm2) u 7.50
319 Baldosa gres natural 20x20(25xm2) u 8.50
320 Baldosa gres natural 30x30(11xm2) u 9.57
321 Baldosa de pierdra de roG.F., G.G (30x30) u 8.00
322 Baldosa de pierdra de roG.F., G.G (40x40) u 8.40
323 Baldosa blanca gr. cero piedra caliza #0 (30x30) m2 7.88
324 Baldosa blanca gr. cero piedra caliza #0(40x40) m2 8.40
325 Baldosa blanca gr. cero piedra caliza #0(50x50) m2 9.80
326 Baldosa blanca gr. fino piedra caliza #1-2(30x30) m2 7.00

327 Baldosa blanca gr. fino piedra caliza #1-2(40x40) m2 7.48


328 Baldosa blanca gr. fino piedra caliza #1-2(50x50) m2 7.92
329 Baldosa blanca gr. med. piedra caliza #3-4(30x30) m2 7.92
330 Baldosa blanca gr. med. piedra caliza #3-4(40x40) m2 8.48
331 Baldosa blanca gr. med. piedra caliza #3-4(50x50) m2 10.00
332 Baldosa roja gr. fino piedra caliza #1-2(30x30) m2 10.00
333 Baldosa roja gr. fino piedra caliza #1-2(40x40) m2 11.00
334 Baldosa roja gr. fino piedra caliza #1-2(50x50) m2 11.80
335 Baldosa amarilla gr. fino piedra caliza #1-2(30x30) m2 8.00
336 Baldosa amarilla gr. fino piedra caliza #1-2(40x40) m2 8.84
337 Baldosa amarilla gr. fino piedra caliza #1-2(50x50) m2 9.84
338 Baldosa cero blanca gr.marmol blanco #0(30x30) m2 10.00
339 Baldosa cero blanca gr.marmol blanco #0(40x40) m2 11.48
340 Baldosa cero blanca gr.marmol blanco #0(50x50) m2 12.04
341 Plaquetas nat. de arcilla 6x20 (83xm2) u 0.04
342 Marmettone TB(15x15) m2 4.40
343 Marmettone TE(15x25) m2 5.00
344 Marmettone TR(15x30)* m2 8.96
345 Marmettone TC(20x20) m2 9.00
346 Marmettone TG(20x40) m2 9.14
347 Marmettone TD(25x25) m2 10.00
348 Marmettone TM(25x50) m2 10.50
349 Marmettone TF(30x30) m2 11.20
350 Marmettone TP(30x60) m2 11.98
351 Marmettone TQ(40x40) m2 12.54
352 Marmettone TS(40x80) m2 13.25
353 Mrmol (30x30) m2 85.00 IMPORTADO
354 Mrmol m2 8.20 NACIONAL
355 Mrmol Negro (marquina) (15x25) m2 7.92

356 Mrmol Negro (marquina) (15x30) m2 8.28


357 Mrmol Negro (marquina) (20x20) m2 8.60
358 Mrmol Negro (marquina) (20x40) m2 8.72
359 Mrmol Negro (marquina) (25x25) m2 9.16
360 Mrmol Negro (marquina) (30x30) m2 9.44
361 Mrmol Enconchado Gris y Negro (15x15) m2 7.12
362 Mrmol Enconchado Gris y Negro (15x25) m2 7.44
363 Mrmol Enconchado Gris y Negro (15x30) m2 7.80
364 Mrmol Enconchado Gris y Negro (20x20) m2 8.04
365 Mrmol Enconchado Gris y Negro (20x40) m2 8.48
366 Mrmol Enconchado Gris y Negro (25x25) m2 8.84
367 Mrmol Gris Acerado(15x15) m2 6.60
368 Travertino caram. rojo,beige,amarillo(15x15) m2 8.20
369 Travertino caram. rojo,beige,amarillo(15x25) m2 8.20
370 Travertino caram. rojo,beige,amarillo(15x30) m2 8.20

371 Travertino caram. rojo,beige,amarillo(20x20) m2 8.20


372 Travertino caram. rojo,beige,amarillo(20x40) m2 8.20
373 Travertino caram. rojo,beige,amarillo(25x25) m2 8.20
374 Travertino caram. rojo,beige,amarillo(30x30) m2 8.20
375 Marmolina lb 0.12
376 Mrmol sinttico (1x0.56) ml 14.00
377 Alfombra Mini Bucle m2 8.00
378 Alfombra Bucle plano m2 15.00
379 Vinyl par.,parquepak,futura,e=1.6mm m2 9.30
380 Vinyl par.,parquepak,futura,e=2.4mm m2 12.15
381 Vinyl par.,parquepak,futura,e=3.2mm m2 13.45
382 Vinyl fortaleza slida e=1.6mm m2 14.21
383 Cer. (10x20) Graniti sup. tono suave m2 0.79
384 Cer.(10x20) Graniti sup. tono oscuro m2 0.72
385 Cer.(20x20) Linea Forestal,sup. base m2 1.02
386 Cer.(25x25) Linea Performance, sup. m2 1.21
387 Cer.(40x40) Performance superior m2 1.54
388 Kermicos Gamma (25x25) gris m2 1.23

389 Parquet caoba m2 17.60


390 Pegamento asfltico gln 8.58

391 Piedra Gris "Cuencana" m2 0.32

392
393 Pesado P9-E 9X19X39 (hormign) u 0.68
394 Pesado P-14B 14x19x39 caras rugosas(hormign) u 0.49
395 Pesado 14x19x39 extremos planos(hormign) P-9 u 0.36
396 Liviano PL-6 6.5x19x39 (hormign) u 0.16
397 Liviano 9x19x39 (hormign), PL-1 u 0.32
398 Liviano 14x19x39 cajonetas, LL-14 u 0.32
399 Liviano 19x19x39 cajonetas(hormg.)LL-19 u 0.39
400 Bloq.Alfadomus Econ. R6.5x17x40(15xm2) u 0.22
401 Bloq.8hue.Liso arcilla10x20x40(12.5xm2) u 0.41
402 Bloq. 4 hue. Liso arcilla8x20x40(12.5xm2) u 0.35
403 Bloq.8 hue. Ray.arcilla10x20x40(12.5xm2) u 0.31
404 Bloq.4 hue. Ray. arcilla8x20x40(12.5xm2) u 0.25
405 Bloq.Rasill. Liso arcilla7x20x40(12.5xm2) u 0.34
406 Bloq.Ray. 9 hue.arcilla20x20x40(12.5xm2) u 0.43
407 Ladrillo chico mll 10.00
408 Ladrillo corriente(Payo) mll 16.00
409 Bloque ornamental arcilla 10x20x20 (M-15) u 0.43
410 Bloque ornamental 30x30x10 u 0.54
411 Bloque Piedra pmez 10x20x40 u 0.28
412 Bloque Piedra pmez 10x15x40 u 0.32
413 Bloque Piedra Pmez 20x20x40 u 0.38
414 Bloque Piedra pmez 20x15x40 u 0.36

415 Bordillo simple .15x.18x.30 (100u) u. 10.25

416
417 f'c=100 Kg/cm2, Corr.Piedra 25 mm. m3 54.32
418 f'c=140 Kg/cm2, Bom.Piedra 12 mm. m3 68.32
419 f'c=180 Kg/cm2, Bombeable Piedra 12 mm. m3 71.67
420 f'c=210 Kg/cm2, Bombeable Piedra 12 mm. m3 76.50
421 f'c=240 Kg/cm2, Bombeable Piedra 12 mm. m3 78.18
422 f'c=280 Kg/cm2, Bombeable Piedra 12 mm. m3 85.01
423 f'c=300 Kg/cm2, Bombeable Piedra 12 mm. m3 86.69
424 f'c=320 Kg/cm2, Bombeable Piedra 12 mm. m3 88.70

425 Hormigon premezclado f'c=350 Kg/cm2 m3 91.00

426
427 Tablero Aglomerados 4x7x19 u 4.58
428 Tablero Aglomerados 4x8x4 A u 5.21
429 Tablero Aglomerados 4x8x4 B u 6.45
430 Tablero Aglomerados 4x8x4 C u 6.89
431 Tablero Aglomerados 4x8x9 A u 7.25
432 Tablero Aglomerados 4x8x9 B u 8.12
433 Tablero Aglomerados 4x8x9 C u 9.86
434 Tablero Aglomerados 4x8x12 A u 20.74
435 Tablero Aglomerados 4x8x12 B u 19.21
436 Tablero Aglomerados 4x8x12 C u 17.67
437 Tablero Aglomerados 4x8x15 A u 25.94

438 Tablero Aglomerados 4x8x15 B u 24.01


439 Tablero Aglomerados 4x8x15 C u 22.09
440 Tablero Aglomerados 4x8x18 A u 29.19
441 Tablero Aglomerados 4x8x18 B u 27.03
442 Tablero Aglomerados 4x8x18 C u 24.86
443 Tablero Aglomerados 7x8x15 2 caras u 12.18
444 Tablero Aglomerados 7x8x19 2 caras u 10.25
445 Plywood corriente 4x8x3.6 A u 7.70
446 Plywood corriente 4x8x3.6 B u 7.30
447 Plywood corriente 4x8x3.6 C u 6.60
448 Plywood corriente 4x8x5,2 A u 8.70

449 Plywood corriente 4x8x5,2 B u 8.20


450 Plywood corriente 4x8x5,2 C u 7.40
451 Plywood corriente 4x8x9 A u 12.80
452 Plywood corriente 4x8x9 B u 12.10
453 Plywood corriente 4x8x9 C u 11.20
454 Plywood corriente 4x8x12 A u 16.20
455 Plywood corriente 4x8x12 B u 15.30
456 Plywood corriente 4x8x12 C u 14.00
457 Plywood corriente 4x8x15 A u 20.10
458 Plywood corriente 4x8x15 B u 19.00
459 Plywood corriente 4x8x15 C u 17.50
460 Plywood corriente 4x8x18 A u 22.60
461 Plywood corriente 4x8x18 B u 21.40
462 Plywood corriente 4x8x18 C u 19.80
463 Plywood corriente 4x8x15 C u 17.50
464 Puerta alistonada corr. 3x7x37 u 4.04
465 Puert. alist. corr. Preserv. 3x7x37 u 5.79
466 Puerta alist. decorativa 3x7x38 u 6.48
467 Puerta alist. dec. Preserv. 3x7x38 u 7.81
468 Puert. Embut. Colorad. 2,05x0,60 u 6.42
469 Puert. Embut. Colorad. 2,05x0,70 u 6.82
470 Puert. Embut. Colorad. 2,05x0,80 u 7.83
471 Puert. Embut. Colorad. 2,05x0,90 u 8.40
472 Puert. Embut. Seike. 2,05x0,60 u 5.81
473 Puert. Embut. Seike. 2,05x0,70 u 6.16
474 Puert. Embut. Seike. 2,05x0,80 u 7.04
475 Puert. Embut. Seike. 2,05x0,90 u 7.61
476 Puert. Embut. MDF 2,05x0,60 u 6.58
477 Puert. Embut. MDF 2,05x0,70 u 7.21

478 Puert. Embut. MDF 2,05x0,80 u 8.23


479 Puert. Embut. MDF 2,05x0,90 u 9.00
480 Puert. 2 Paneles Seike 2,05x0,60 u 35.60
481 Puert. 2 Paneles Seike 2,05x0,70 u 36.40
482 Puert. 2 Paneles Seike 2,05x0,80 u 37.00
483 Puert. 2 Paneles Seike 2,05x0,90 u 37.60
484 Puert. 2 Paneles Cedro 2,05x0,60 u 39.20
485 Puert. 2 Paneles Cedro 2,05x0,70 u 41.00
486 Puert. 2 Paneles Cedro 2,05x0,80 u 50.00
487 Puert. 2 Paneles Cedro 2,05x0,90 u 52.00
488 Puerta de plywood int. 2x0.60 u 30.00
489 Puerta de plywood int. 2x0.70 u 30.00
490 Puerta de plywood int. 2X0.80 u 30.00
491 Puerta de plywood int. 2x0.90 u 35.00
492 Puerta de plywood int. 2x1.0 u 40.00

493 Puerta laurel de Duelas2.0x0.60ext. u 56.00


494 Puerta laurel de Duelas2.0x0.70ext. u 60.00
495 Puerta de laurel 2.0x0.80 m u 97.00
496 Puerta laurel de Duelas2.0x0.9ext. u 68.00
497 Puerta laurel de Duelas2.0x1.0ext. u 72.00
498 Puerta guayac. Mod. Marquise2.0x0.60bat. u 112.00
499 Puerta guayac.Mod. Marquise2.0x0.70bat. u 114.40
500 Puerta guayac. Mod. Marquise2.0x0.80bat. u 116.00
501 Puerta guayac.Mod. Marquise2.0x0.90bat. u 118.24
502 Puerta guayac.Mod.Marquise2.0x1.0bat. u 120.00
503 Puerta principal-Labrada (guayacan) u 180.00
504 Puerta enroll.(min 3.5m2)instal.metal pleg. m2 148.00
505 Cerradura KWIKSET principal u. 28.00
506 Cerradura KWIKSET secundaria u 22.20
507 Cerradura KWIKSET bao u 16.00
508 Cerradura YALE (engrampe) u 22.28
509 Cerradura principal (cromada) u 13.17
510 Cerradura principal(satinada) FECSA u 13.76

511 Cerradura dormitorio (satinada) FECSA u 10.58


512 Rudn de blsamo ml 0.14
513 Rastreras de blsamo 12x240 u 2.20
514 Pasamano de teca ml 3.22
515 Cerradura (satinada) FECSA u 8.15
516 Cerradura bao Schlage americana u 12.84
517 Cerradura dormitorio Schlage americana u 12.60
518 Cerradura entrada Schlage americana u 12.60
519 Cerradura terraza (satinada) FECSA u 6.50
520 Cerradura pasillo (cromada) u 6.35
521 Cerradura pasillo (satinada) FECSA u 6.94

522 Cerradura vaivn (cromada) u 4.84


523 Cerradura vaivn (satinada) FECSA u 5.68
524 Cerradura closet (satinada) pomos u 4.56
525 Bisagra dor.1/2"x1 5/16",con tornillos par 0.75
526 Bisagra de Bronce Satinado STANLEY 3 1/2" u. 2.80
527 Bisagra cromada de 3.5"x3.5"inc.torn. par 0.21
528 Bisagra satinado americanas 3x3 par 0.30
529 Bisagra satinado americanas 3 1/2 x 3 par 0.23
530 Bisagra antiguo americanas 3 1/2 x 3 par 0.64
531 Bisagra Bommer vaiven americ. doradas par 6.75
532 Batiente guayacn(juego) 0 cm.anchox4cm. u 3.00
533 Batiente de blsamo (juego) u 3.00
534 Batiente de laurel (juego) u 10.00
535 Jambas de guayacn (juego) u 0.89
536 Pasamano de Guayacn ml 1.57
537 Pasamano de Guayacn ml 1.57
538 Paredes Estilox/Prepintado/0.45 mm. m2 11.10
539 Estilpanel AR2000L/Galvalume/0.35mm. m2 2.23
540 Estilpanel AR2000L/Galvalume/0.40mm. m2 2.44
541 Estilpanel AR2000L/Galvalume/0.45mm. m2 2.73
542 Estilpanel AR2000L/Galvalume/0.50mm. m2 3.02
543 Jambas de blsamo (juego) u 1.20
544 Jambas de laurel (juego) u 4.00
545 Jambas Cedro 6cm. juegos u 0.72
546 Jambas Seike 6cm. juegos u 0.60
547 Jambas Cedro 9cm. juegos u 1.19
548 Jambas Seike 9cm. juegos u 0.98
549 Duela chanul 12 cm. piso m2 2.36
550 Duela chanul 9 cm. pared y tumbado m2 2.54
551 Duela cedrol 9 cm. pared y tumbado m2 2.24
552 Duela de teca m2 16.00
553 Rastreras de laurel de 6x240 u 1.40

554 Rastreras cedro 6 cm. u 0.11


555 Rastreras Seike 6 cm. u 0.09
556 Rastreras cedro 9 cm. u 0.19

557 Rastreras Seike 9 cm. u 0.15

558
559 Alambre galv. #18 Kg 2.01

560 Alambre recocido #18 Kg 1.42


561 Soga u 0.40
562 Caa rolliza u 1.20
563 Caa Picada u. 1.50
564 Clavos de acero 1" (finos negros) kg 1.27
565 Clavos de acero 1 1/2" (finos negros) Kg 1.27
566 Clavos de 1 1/2"x14 Kg 0.70
567 Cuartones de encofrado u 1.40
568 Tablas de encofrado de 1"x 4m. u 1.80
569 Tiras de encofrado de 1"x 4m. u 0.60
570 Clavos de 2 " a 31/2" Kg 0.60

571 Cuartones 2x3x4 chanul u 4.20


572 Cuartones 2x3x5 chanul u 6.00
573 Cuartones 2x4x4 chanul u 5.40
574 Cuartones 2x4x5 chanul u 8.00

575 Cuartones 2x5x4 chanul u 7.80

576
577 Plancha de zinc de 6'(liviano) u 3.00
578 Plancha de zinc de 7' u 4.16
579 Plancha de zinc de 8' u 4.00
580 Plancha de zinc de 10' u 5.00
581 Plancha ondulada 10(6p) u 10.00
582 Plancha de Novalosa m2 10.95
583 Paneles Plycem 605x605x5mm u 3.00
584 Paneles Plycem 1210x605x5mm u 5.24
585 Paneles Plycem 1220x1220x6mm u 9.25
586 Paneles Plycem 1220x2440x6mm u 15.48
587 Paneles Plycem 1220x2440x8mm u 22.48

588 Paneles Plycem 1220x2440x11mm u 26.47


589 Paneles Plycem 1220x2440x14mm u 32.00
590 Paneles Plycem 1220x2440x17mm u 12.30
591 Paneles Plycem 1220x2440x20mm u 40.00
592 Paneles Plycem 1220x2440x22mm u 55.00
593 Paneles Plycem 1220x3000x22mm u *
594 Decorit Romano 605x605x6mm u 0.28
595 Fibrocel Mediterraneo blanco 1210x605mm. u 0.77
596 Fibrocel Mediterraneo blanco 605x605mm. u 0.39
597 Romano blanco 605x605 mm. u 0.39
598 Duelas Plycem 1220x2440x11 mm. u 9.51
599 Duelas Plycem 1220x2440x14 mm. u 12.10
600 Duelas Plycem 1220x2440x17 mm. u 15.09
601 Duelas Plycem 1220x2440x22 mm. u 18.81
602 Gancho J 125 mm (5.0 PG) conj. u 0.02
603 Gancho J 140 mm (5.5 PG) conj. u 0.02
604 Gancho J 180 mm (7.0 PG) conj. u 0.02
605 Tanque para agua cnico de 250 Lts. u 49.80
606 Tanque para agua cnico de 500 Lts. u 80.19
607 Tanque para agua cnico de 1000 Lts. u 198.69
608 Tanque para agua cnico de 2000 Lts. u 293.30
609 Tanque para agua cilndrico de 500 Lts. u 99.30
610 Clavos Eterteja 140 mm.(5,5") conj. u 0.01
611 Clavos P7 100 mm.(4") conj. u 0.02
612 Tirafondo de 100mm (4") conjunto u 0.02
613 Tirafondo de 100mm (5") conjunto u 0.02
614 Tornillo aleta 3.5x31mm hierro u 0.01

615 Tornillo aleta 3.9x35mm hierro u 0.02


616 Tumbado acstico fibra mineral planchas2'x4'(5/8") m2 2.73
617 Perfil de aluminio 1x1/2" (6,40m) 60x12 u 3.82
618 Perfil de aluminio 1x3/4" (6,40m) u 3.23
619 Plancha de yeso 1,2x0.6 m u 2.00
620 Tumbado yeso y susp.metalica 2'x4' m2 3.80
621 Perfiles cielo raso T-2 m2 0.16
622 Perfiles cielo raso T-4 m2 0.31
623 Perfiles cielo raso T-8 m2 0.50
624 Perfiles cielo raso T-12 m2 0.88
625 Perfiles cielo raso L-10 m2 0.42
626 Perfiles cielo raso L-12 m2 0.51
627 Despuntador de vidia m2 0.47
628 Hoja para despuntador m2 0.38
629 Cielo falso,E/Prepintado AR-5,0.45 mm. m2 9.15
630 Tumbado de Yeso m2 3.00
631 Alfateja plana esmalt.tapa 10xm2 u. 0.24
632 Alfateja plana esmalt.canal 10xm2 u. 0.24

633 Teja curva 30cm.(15xm2)natural u 0.24


634 Teja curva esmaltada canal 30cm.(15xm2) u 0.24
635 Estilpanel AR2000T/Galvalume/0.40 mm. m2 5.80
636 Estilpanel AR2000L/Prepintado/0.45 mm. m2 9.60
637 Estilpanel AR2000T/Galvalume/0.35 mm. m2 6.32
638 Estilpanel AR2000L/Galvalume/0.60 mm. m2 8.55
639 Estilpanel AR2000T/Prepintado/0.40 mm. m2 6.04
640 Estilpanel Estilox/Galvalume/0.45 mm. m2 7.65
641 Estilpanel Estilox/Galvalume/0.50 mm. m2 8.45
642 Estilpanel Estilox/Galvalume/0.60 mm. m2 10.10
643 Estilpanel Panelux/Galvalume/0.50 mm. m2 9.90

644 Estilpanel Panelux/Galvalume/0.60 mm. m2 11.80


645 Flashing e=0,45 mm. d=305mm. m 0.20
646 Flashing e=0,45 mm. d=610mm. m 0.40
647 Traslucentes Master 1000 L= 2000 mm. u 2.79
648 Traslucentes Master SPT 850/18 L= 2700 mm. u 3.75
649 Pernos Autoperforantes A Zamak 5 u 0.02
650 Pernos Autoperforantes B Zamak 5 u 0.02
651 Autoperforantes SPT u 0.02
652 Colepato WF 1000-1,5 u 0.01
653 Autoperforantes WT 2000-2 u 0.01
654 Colepato u 0.00
655 Gancho J u 0.25

656 Pernos Americanos especiales m2 0.09

657
658
659 Pulsador para botador de cerradura u. 13.53
660 Apliques de pared u. 54.38

661 P.Peiz. Para tomas 110 polarizada u. 17.64


662 P.Peiz. Para tomas de telef. u. 21.63
663 P.Peiz. Para tomas de TV. u. 16.80
664 P.Peiz. Interruptor senc.2 vias u. 16.49
665 P.Peiz. Interruptor senc.3 vias u. 18.13
666 P.Peiz. Interruptor senc.4 vias u. 21.75
667 P.Peiz. Interruptor doble 2 vias u. 18.13
668
669 P.Peiz. Interr.tripla(2-2 vias 1-3 vias) u. 22.48
670 P.Peiz. Interr.doble(1-2 vias1-3 vias) u. 19.76
671 P.Peiz. Interr.doble de 3vias u. 21.27
672 P.Peiz. Interr.tripla(1-2 vias 2-3 vias) u. 23.93
673 P.Peiz. Tapa ciega rectangulares u. 14.50
674 Ojo de buey dicroicos baadores u. 21.75
675 Ojo de buey central (con trans) u. 21.75

676 Ojo de buey para 2 focos u. 45.91


677 Lamparas de 60x60 fluorescentes u. 80.96
678 Cerr. Gl. 42.0mm, 4, 225mm u. +
679 Tub. galv. ref. nac. de 1/2"x6ml (sin unin) u +
680 Tub. galv. ref. nac. de 3/4"x6ml (sin unin) u +
681 Tub. galv. ref. nac. de 1"x6ml (sin unin) u +
682 Tub. galv. ref. nac. de 1 1/4"x6ml (sin unin) u 28.30
683 Tub. galv. senc. nac. de 1 1/4"x6ml (sin unin) u. 21.45
684 Tub. galv. senc. nac. de 1"x6ml (sin unin) u 16.75
685 Tub. galv. senc. nac. de 3/4"x6ml (sin unin) u 11.95
686 Tub. galv. senc. nac. de 1/2"x6ml (sin unin) u 8.15
687 Nudo galvanizado de 1/2" u 0.91
688 Nudo galvanizado de 3/4" u 1.39
689 Neplo galvanizado de 1/2 x2" u 0.30
690 Neplo galvanizado de 1/2"x4" u 0.45
691 Neplo galvanizado de 3/4"x3" u 0.40
692 Neplo galvanizado de 1/2 x3" u 0.35
693 Neplo galvanizado de 3/4"x2" u 0.35

694 Neplo galvanizado de 1/2 x6" u 0.55


695 Tapn galvanizado de 3/4" (hembra) u 0.23
696 Tee galvanizada de 3/4" u 0.41
697 Tee galvanizada de 1/2" u 0.26
698 Codo galvanizado de 1/2"x90 u 0.18
699 Codo galvanizado de 1/2"x45 u 0.30
700 Codo galvanizado de 3/4"x90 u 0.35
701 Codo galvanizado de 1"x90 u. 0.53
702 Codo galvanizado de 1 1/2"x90 u. 0.90
703 Tapn galvanizado 1/2" (hembra) u. 0.14
704 Unin galvanizada de 1/2" u. 0.17

705 Unin galvanizada de 3/4" u. 0.23


706 Unin galvanizada de 1" u. 0.37
707 Unin galvanizada de 1 1/2" u. 0.61
708
709 Cerr.Ng.25.0mm, 1, 200mm u. +
710 Cerr.Ng.31.8mm, 1 1/4, 200mm u. +
711 Cerr.Ng.38.1mm, 1 1/2, 200mm u. +
712 Cerr.Ng.42.0mm, 200mm u. +
713 Cerr.Ng.50.8mm, 2, 200mm u. +
714 Cerr.Ng.63.5mm, 2 1/2, 200mm u. +
715 Cerr.Ng.73.0mm, 2 7/8, 200mm u. +
716 Cerr.Ng.89.0mm, 3, 200mm u. +
717 Cerr.Ng.114.0mm, 4, 200mm u. +
718
719 Adaptador PVC ASTM-ISO 1/2" a 20mm (E/C) u. 0.08
720 Adaptador PVC ASTM-ISO 3/4" a 25mm (E/C) u. 0.08
721 Adaptador PVC ASTM-ISO 1" a 32mm (E/C) u. 0.10
722 Adaptador PVC ASTM-ISO 11/4" a 40mm (E/C) u. 0.19
723 Adaptador PVC ASTM-ISO 11/2" a 50mm (E/C) u. 0.21
724 Adaptador PVC ASTM-ISO 6" a 160mm (E/C) u. 5.47
725 Adaptador PVC ASTM-ISO 8" a 200mm (E/C) u. 11.43
726 Abrazadera de 1/2" u 0.70
727 Abrazadera de 3/4" u 0.72
728 Abrazadera de 1" u 0.78
729 Abrazadera de 1 1/2" u 0.78
730 Abrazadera de 2" u 1.42
731 Abrazadera de 3" u 1.42
732 Abrazadera de 3" u 1.42
733 Abrazadera de 4" u 1.16
734 Polipega lt 4.68
735 Tubera de PVC 1/2"(roscable) ml. 0.95
736 Tubera de PVC 3/4"(roscable) ml. 0.94

737 Tubera de PVC 1"(roscable) ml. 2.25


738 Tubera de PVC 1 1/4"(roscable) ml. 3.14
739 Tubera de PVC 1 1/2"(roscable) ml. 3.80
740 Tubera de PVC 2"(roscable) ml. 4.78
741 Tee PVC 1/2" (unin roscable) u. 0.84
742 Tee PVC 3/4" (unin roscable) u. 1.94
743 Tee PVC 1" (unin roscable) u. 3.02
744 Tee PVC 1 1/4" (unin roscable) u. 4.24
745 Tee PVC 1 1/2" (unin roscable) u. 5.09
746 Tee PVC 2" (unin roscable) u. 6.29
747 Unin PVC 1/2" ( roscable) u. 0.65
748 Unin PVC 3/4" ( roscable) u. 0.70
749 Unin PVC 1" ( roscable) u. 0.92
750 Unin PVC 1 1/4" ( roscable) u. 5.30
751 Unin PVC 1 1/2" ( roscable) u. 11.72
752 Unin PVC 2" ( roscable) u. 11.76
753 Tub. PVC rig. 1/2"x6ml (unin roscable) u. 4.08
754 Tub. PVC rig. 3/4"x6ml (unin roscable) u. 5.64

755 Tub. PVC rig. 1"x6ml (unin roscable) u. 13.52


756 Tub. PVC rig. 1 1/4"x6ml (unin roscable) u. 18.85
757 Tub. PVC rig. 1 1/2"x6ml (unin roscable) u. 22.81
758 Tub. PVC rig. 2"x6ml (unin roscable) u. 28.68
759 Tub. PVC rig. 1"x6ml (unin roscable) u. 13.52
760 Tub. PVC rig. 1/2"x6ml (unin roscable) u 4.08
761 Tub. PVC rig. 3/4"x6ml (unin roscable) u 5.64
762 Tub. pol. flexible 1/2" ml 0.64
763 Tub. pol. flexible 3/4" ml 1.30
764 Tub. pol. flexible 1" ml 1.92
765 Tub. pol. flexible 1 1/2" ml 2.65

766 Tub. pol. flexible 2" ml 3.00


767 Tub. pol. flexible 3" ml 4.28
768 Tub. pol. flexible 4" ml 7.54
769 Medidor de 1/2" sin caja u +++++
770 Unin PVC 1/2" (tub. flexible) u +
771 Codo 45 PVC 1/2" (unin roscable) u. 4.60
772 Codo 45 PVC 3/4" (unin roscable) u. 4.71
773 Codo 45 PVC 1" (unin roscable) u. 5.94
774 Codo 45 PVC 1 1/4" (unin roscable) u. 9.10
775 Codo 45 PVC 1 1/2" (unin roscable) u. 10.72
776 Codo 45 PVC 2" (unin roscable) u. 16.53
777 Codo 90 PVC 1/2" (unin roscable) u. 0.65
778 Codo 90 PVC 3/4" (unin roscable) u. 0.87
779 Codo 90 PVC 1" (unin roscable) u. 2.19
780 Codo 90 PVC 1 1/4" (unin roscable) u. 2.35
781 Codo 90 PVC 1 1/2" (unin roscable) u. 3.51
782 Codo 90 PVC 2" (unin roscable) u. 4.25
783 Tapn Macho PVC 1/2" (unin roscable) u. 0.89
784 Tapn Macho PVC 3/4" (unin roscable) u. 0.94
785 Tapn Macho PVC 1" (unin roscable) u. 1.27
786 Tapn Macho PVC 1 1/4" (unin roscable) u. 1.44
787 Tapn Macho PVC 1 1/2" (unin roscable) u. 1.44
788 Tapn Macho PVC 2" (unin roscable) u. 1.77
789 Codo PVC de 90"x63mm (unin Z) u. 3.38
790 Codo PVC de 90"x90mm (unin Z) u. 14.10
791 Codo PVC de 90"x110mm (unin Z) u. 20.16
792 Codo PVC de 90"x160mm (unin Z) u. 52.00
793 Codo PVC de 90"x200mm (unin Z) u. 161.88
794 Codo PVC de 45"x63mm (unin Z) u. 3.58
795 Codo PVC de 45"x90mm (unin Z) u. 11.35
796 Codo PVC de 45"x110mm (unin Z) u. 18.52
797 Codo PVC de 45"x160mm (unin Z) u. 50.49

798 Codo PVC de 45"x200mm (unin Z) u. 119.47


799 Brida 63 mm. (E/C) u. 4.48
800 Brida 90 mm. (E/C) u. 5.24
801 Cruz PVC L/L de 90mmx63mm. (E/C) u. 2.44
802 Tub.presin E/C 90 mm.x 6m.x73 PSI u. 18.52
803 Tub.presin E/C 110 mm.x 6m.x73 PSI u. 24.77
804 Tub.presin E/C 160 mm.x 6m.x73 PSI u. 52.80
805 Tub.presin E/C 200 mm.x 6m.x73 PSI u. 74.71
806 Tub.presin E/C 75 mm.x 6m.x91 PSI u. 17.02
807 Tub.presin E/C 90 mm.x 6m.x91 PSI u. 20.81
808 Abrazadera de 2" u *
809 Tub.presin E/C 110 mm.x 6m.x91 PSI u. 31.57
810 Tub.presin E/C 160 mm.x 6m.x91 PSI u. 66.96
811 Tub.presin E/C 200 mm.x 6m.x91 PSI u. 102.09
812 Tub.presin E/C 50 mm.x 6m.x116 PSI u. 11.16
813 Tub.presin E/C 63 mm.x 6m.x116 PSI u. 14.22
814 Tub.presin E/C 90 mm.x 6m.x116 PSI u. 27.28
815 Tub.presin E/C 110 mm.x 6m.x116 PSI u. 39.79

816 Tub.presin E/C 160 mm.x 6m.x116 PSI u. 79.00


817 Tub.presin E/C 200 mm.x 6m.x116 PSI u. 121.11
818 Tub.presin E/C 40 mm.x 6m.x145 PSI u. 8.18
819 Tub.presin E/C 50 mm.x 6m.x145 PSI u. 11.45
820 Tub.presin E/C 63 mm.x 6m.x145 PSI u. 17.11
821 Tub.presin E/C 90 mm.x 6m.x145 PSI u. 34.64
822 Tub.presin E/C 110 mm.x 6m.x145 PSI u. 51.01
823 Tub.presin E/C 160 mm.x 6m.x145 PSI u. 105.03
824 Tub.presin E/C 200 mm.x 6m.x145 PSI u. 151.43
825 Tub.presin E/C 32 mm.x 6m.x181 PSI u. 6.81
826 Tub.presin E/C 40 mm.x 6m.x181 PSI u. 10.64

827 Tub.presin E/C 50 mm.x 6m.x181 PSI u. 14.40


828 Tub.presin E/C 63 mm.x 6m.x181 PSI u. 20.90
829 Tub.presin E/C 90 mm.x 6m.x181 PSI u. 38.42
830 Tub.presin E/C 110 mm.x 6m.x181 PSI u. 57.43
831 Tub.presin E/C 160 mm.x 6m.x181 PSI u. 119.19
832 Tub.presin E/C 200 mm.x 6m.x181 PSI u. 206.35
833 Reductor PVC de 25mm a 20mm (E/C) u. 0.18
834 Reductor PVC de 32mm a 20mm (E/C) u. 0.23
835 Reductor PVC de 32mm a 25mm (E/C) u. 0.29
836 Reductor PVC de 40mm a 25mm (E/C) u. 0.45
837 Reductor PVC de 40mm a 32mm (E/C) u. 2.62
838 Reductor PVC de 50mm a 25mm (E/C) u. 0.63
839 Reductor PVC de 50mm a 32mm (E/C) u. 0.63
840 Reductor PVC de 50mm a 40mm (E/C) u. 0.63
841 Reductor PVC de 63mm a 25mm (E/C) u. 0.90
842 Reductor PVC de 63mm a 32mm (E/C) u. 1.04
843 Reductor PVC de 63mm a 40mm (E/C) u. 0.83
844 Reductor PVC de 63mm a 50mm (E/C) u. 1.04
845 Reductor PVC de 90mm a 63mm (E/C) u. 2.46
846 Reductor PVC de 110mm a 90mm (E/C) u. 5.76
847 Reductor PVC de 160mm a 110mm (E/C) u. 8.90
848 Reductor PVC de 200mm a 160mm (E/C) u. 18.18
849 Tapn Hembra PVC de 20mm (E/C) u. 0.18
850 Tapn Hembra PVC de 32mm (E/C) u. 0.26
851 Tee PVC reductora de 90mm a 63mm (E/C) u. 5.78
852 Tee PVC reductora de 160mm a 110mm (E/C) u. 31.85
853 Tee PVC reductora de 200mm a 160mm (E/C) u. 97.57
854 Tub. PVC unin Z d=160mm,0.8 MPA ml 78.52
855 Tub. PVC unin Z d=250mm,0.8 MPA ml 195.21
856 Tub. PVC unin Z d=400mm, 0.8 MPA ml 670.58
857 Tub. PVC unin Z d=63mm, 0.8 MPA ml 15.16
858 Tub. PVC unin Z d=90mm, 0.80 MPA ml 28.06

859 Unin Gibault tapn A/L 400mm u. 3.15


860 Vlvula de aire d=1" (1 cmara) u. 2.24
861 Vlv. de comp. APOLO E/L d=400mm u. 48.72
862 Vlv. de comp. TORINO E/L d=90mm u. 5.12
863 Vlv. de comp. WAVIN U/Z d=160mm u. 18.96
864 Check horizontal 1/2" simple (R-W) u 10.60
865 Check horizontal 3/4" u 15.80
866 Curvo galv. 3/4" u 0.54
867 Hidro 3,1/2"x6ml.agua fria o caliente u. 9.07
868 Hidro 3,3/4"x 6 ml. agua fria o caliente u. 13.45

869 Hidro 3,1"x6ml. agua caliente o fria u. 20.96

870
871 Codo PVC de 90" a 50mm (2") u 0.34
872 Codo PVC de 90" a 75mm (3") u 1.25
873 Codo PVC de 90" a 110mm (4") u 0.77
874 Codo PVC de 90" a 160mm (5") u 0.44
875 Desage 1 1/2" x 3 1/2" cocina(246-06) u 4.60

876 Desage 1 1/4" lavatorio (246-04) u 5.80


877 Tub. de HA d=20" (500 mm.) ml 38.95
878 Tub. de HA d=24" (600 mm.) ml 50.10
879 Tub. de HA d=30" (750 mm.) ml 71.50
880 Tub. de HA d=40" (1000 mm.) ml 120.70
881 Tub. de HA d=42" (1050 mm.) ml 136.45
882 Tub. de HA d=48" (1200 mm.) ml 179.50
883 Tub. de HA d=54" (1400 mm.) ml 208.40
884 Tub. de HA d=60" (1400 mm.) ml 221.59
885 Tub. de HA d=80" (2000 mm.) ml 421.50
886 Tub. de HS d=4" (100 mm.) ml 3.15
887 Tub. de HS d=6" (150 mm.) ml 4.15
888 Tub. de HS d=12" (300 mm.) ml 12.45
889 Tub. de HS d=10" (250 mm.) ml 8.85
890 Tub. de HS d=20" (500 mm.) ml 23.05
891 Tub. de HS d=8" (200 mm.) ml 5.90
892 Tub. de HS d=30" (750 mm.) ml 44.70
893 Tub. de HS d=16" (400 mm.) ml 18.35
894 Tub. de HS d=36" (900 mm.) ml 63.45
895 Tub. PVC rig. desage 2"x3ml, 50 mm. u 10.38
896 Tub. PVC rig. desage 3"x3ml, 75 mm u 14.03
897 Tub. PVC rig. desage 4"x3ml, 110 mm. u 20.38
898 Tub. PVC rig. desage 6"x3ml, 160 mm. u 37.48
899 Tub. galv. senc. nac. de 1 1/2"x6ml (sin unin) u 56.02
900 Tub. galv. refor. nac. de 1 1/2x6ml (sin unin) u 116.28
901 Tub. galv. senc. nac. de 2"x6ml (sin unin) u 201.30
902 Tefln rll 0.24
903 Sifn PVC 4" u. 4.88
904 Permatex (tubo peq.) u 1.78

905 Sifn PVC 50 mm u. 2.05


906 Unin PVC 2", 50 mm. u. 0.03
907 Unin PVC 4", 110 mm. u. 0.06
908 Junta de neopreno d=6" (150 mm.) ml 0.40
909 Junta de neopreno d=8" (200 mm.) ml 0.57
910 Junta de neopreno d=10" (250 mm.) ml 0.69
911 Junta de neopreno d=12" (300 mm.) ml 0.86
912 Junta de neopreno d=16" (400 mm.) ml 1.14
913 Junta de neopreno d=20" (500 mm.) ml 1.61
914 Junta de neopreno d=30" (750 mm.) ml 2.06
915 Junta de neopreno d=40" (1000 mm.) ml 2.97
916 Junta de neopreno d=42" (1050 mm.) ml 3.09
917 Junta de neopreno d=54" (1300 mm.) ml 3.95
918 Tub.acero corrugado galv.48" Cal.12 ml 29.52
919 Tub.acero corrugado galv.60" Cal.12 ml 36.48

920 Tub.acero corrugado galv.72" Cal.10 ml 61.44

921
922 Bidet E. Libra (GALAXIE) colores fuertes u 80.49
923 Bidet E.Libra (GALAXIE) colores suaves u 73.18
924 Bidet E.Libra (GALAXIE) color blanco u 50.12
925 Bidet Virgo s/tapa (GALAXIE) color fuertes u 74.00

926 Bidet E.Virgo s/tapa(GALAXIE) color suaves u 68.25


927 Bidet Syria (SPAZZIO) color fuertes u 70.00
928 Bidet Syria (SPAZZIO) colores suaves u 65.00
929 Inodoro Firenze Comercial Color Suave u 34.45 GRIFERSA
930 Inodoro Firenze Comercial Color Blanco u 31.32 GRIFERSA
931 Inodoro Savex (TAURUS) color fuerte u 87.00
932 Inodoro Kingston (S.GALAXIE)color fuerte u 194.31
933 Inodoro Acuario (S.GALAXIE) color fuerte u 213.75
934 Inodoro E.Cacique (COMERCIAL) blanco u 45.00
935 Inodoro Concord (COMERCIAL)col.suave u 50.00
936 Inodoro Leo (Galaxie) blanco u 55.25

937 Inodoro Leo (Galaxie) color fuerte u 45.98


938 Lavamanos Venecia colores fuertes u 49.94 GRIFERSA
939 Lavamanos Venecia colores suves u 45.40 GRIFERSA
940 Lavamanos Venecia con pedestal blanco u 41.27 GRIFERSA
941 Lavamanos Orquidea (GALAXIE) col.fuerte u 42.12
942 Lavamanos Orquidea (GALAXIE) col.suave u 36.48
943 Lavamanos Belair (GALAXIE) col.fuerte u 39.45
944 Lavamanos Belair (GALAXIE) col.suave u 29.12
945 Lavamanos Empress (GALAXIE) col.fuerte u 42.65
946 Lavamanos Empress (GALAXIE) col.suave u 36.58
947 Lavamanos Scorpio (S.GALAXIE) col.fuerte u 65.00
948 Lavamanos Scorpio (S.GALAXIE) col.suave u 49.00
949 Lavamanos Aspio (SPAZZIO) col.fuerte u 54.00
950 Lavamanos Aspio (SPAZZIO) col.suave u 40.00
951 Lavamanos Lirio (TAURUS) col.fuerte u 38.00
952 Lavamanos Lirio (TAURUS) col.suave u 31.00
953 Lavamanos Pompano color fuerte u 30.45 EDESA
954 Lavamanos Amapola (TAURUS)col.fuerte u 54.23
955 Lavamanos Amapola (TAURUS)col.suave u 45.12
956 Lavadero cocina 1p.Teka(100x50)ac.inox. u 56.00
957 Lavadero cocina 2p.Teka(120x50)ac.inox. u 102.00
958 Lavadero hierro enlosado(pipsa) 30x18" u 16.59
959 Lavarropa de fibra de vidrio u 10.29
960 Tina Hidromasajes Venus S/F color fuerte u 1,025.00
961 Tina Hidromasajes Andrea C/F color fuerte u 1,154.00
962 Tina Andino(Imp.Venezuela) color fuerte u 1,241.00
963 Tina Avalon(Imp.Venezuela) color fuerte u 1,100.00
964 Tina Verona(Imp.Venezuela) color fuerte u 987.00
965 Tina Milano(Imp.Venezuela) color fuerte u 879.00

966 Tina Roma II(Imp.Venezuela) color fuerte u 914.00


967 Tina Aspen(Imp.Venezuela) color fuerte u 954.00
968 Tina Florence II(Imp.U.S.A.) color fuerte u 750.00
969 Tina Roma II(Imp.U.S.A.) color fuerte u 714.00
970 Tina Gemini(Imp.U.S.A.) color fuerte c/luz u 687.00
971 Tina Gemini(Imp.U.S.A.) color fuerte s/luz u 610.00
972 Accesorios Adhesivos Edesa col.fuertes jgo 8.48
973 Accesorios Adhesivos Edesa color blanco jgo 12.07
974 Accesorios Adhesivos Edesa col.suave jgo 10.00
975 Accesorios Spazzio col.fuerte jgo 10.52
976 Accesorios Spazzio col.suave jgo 10.52
977 Accesorios Spazzio col.blanco jgo 10.52
978 Llave cromada (221-71) u 3.92
979 LLave de campanola 1/2"(479/67) u. 9.61
980 Llave de cocina futura(420.01E) u 15.99

981 Llave de cocina pico mvil(420/67) u 12.80


982 Llave de paso bronce(471.04) u 3.54
983 LLave de pico Bronce (4430/05) u 3.54
984 Llave de pico cromada(430.04) u 3.90
985 Llave para manguera cromada(436.04) u 3.90
986 Llave lavabo cruz(221-11P) u 6.96
987 LLave para manguera bronce (436-04) u 3.54
988 LLave paso H-H 1/2" (44790/65) u 6.16
989 Llave paso cromada(471.04) u 3.90
990 Mezcladora 4" c/sifn (192/67) u 56.25
991 Mezcladora 8" c/sifn (201/67) u 85.24
992 Juego ducha "futura" (109) u 38.65
993 Mezcladora para ducha (103.74) u 46.16
994 Mezcladora para tina (103-67) u 58.29
995 Urinario Edesa Ariel (TAURUS) color blanco u 12.91
996 Urinario Edesa Celtic(TAURUS) col.blanco u 16.44
997 Ducha duchamatic (119),Linea Intermedia u 57.21
998 Ducha regulable de 1/2"(120-01/63) u 14.14

999 Ducha telfono Futura (118.07E/67) u 42.89


1000 Ducha standar de 1/2"x2 (120/67) u 11.08
1001 Cabeza de ducha (126) u 5.10
1002 Rejilla cromada para piso(586) u 2.07
1003 Tubo de abasto para inodoro(275-02) u 1.32
1004 Tubo para lavatorio (275-01) u 0.87
1005 Sifn de 1 1/2" lavadero cromado (240/38) u 8.13
1006 Sifn de 1 1/4" para lavadero (240/32) u 7.22
1007 Bomba agua (FW) 1/2 H.P. u 260.00
1008 Bomba agua (FW) 3/4 H.P. u 333.76
1009 Calentador de 20 gal. u 80.00

1010 Tanque presin 40 gal. u 35.96


1011 Tanque presin 60 gal. u 44.00
1012 Tanque presin 100 gal. u 76.00

1013 Mezcladora cocina compacto (410/63) u 34.34

1014
1015 Aislador tipo rollo ANSI 53-2 imp. u. 0.80
1016 Aislador tipo rollo nacional u 0.70
1017
1018
1019 Alambre Cu TW #8 AWG mt 1.34
1020 Alambre Cu TW #10 AWG mt 0.80
1021 Alambre Cu TW #12 AWG mt 0.51
1022 Alambre Cu TW #14 AWG mt 0.33
1023 Cable TV 2x20 mt 0.15
1024 Alambre telefnico entorchado #2x23 mt 0.04
1025 Alambre gemelo #12 mt 0.40
1026 Alambre gemelo #14 mt 0.25

1027 Alambre gemelo #18 mt 0.15


1028 Alambre gemelo #16 mt 0.17
1029 Plastiplomo 2x14 mt 0.27
1030 Ancla de empuje d=4" 9m u. 76.50
1031 Bastidor de 1 espacio u. 1.14
1032 Boquilla colgante de baquelita u 0.65
1033 Breakers para caja de 15A a 50A (1p) G.E. u 5.00
1034 Breakers para caja de 20A a 50A (2p) G.E. u 8.80
1035 Breakers para caja de 100A (2p) u 17.00
1036 Breakers para caja de 30A a 60A (3p) u 12.80
1037 Cable aluminio ACSR #1/0 AWG 7h mt 0.80
1038 Cable aluminio ACSR # 2 AWG 7h mt 0.50
1039 Cable Al. desnudo 5005 # 1/0 AWG 7h mt 0.67
1040 Cable Al. desnudo 5005 # 3/0 mt 1.07
1041 Cable Al. triplex ASC 3x6 AWG mt 0.51

1042 Cable Cu TW #2 AWG (100m) rll 169.15


1043 Cable Cu TW #4 AWG (100m) rll 95.40
1044 Cable CU TW #6 AWG (100m) rll 60.60
1045 Cable Cu TW #8 AWG (100m) rll 39.00
1046 Cable Cu TFF #14 AWG (100m) rll 15.00
1047 Caja Medidor clase 200 u. 45.86
1048 Conector comp. similar al Burndy YHD 150 u 0.68
1049 Conector de comp. 1/0-1/0 u 1.14
1050 Conector de comp. 3/0-3/0 u 1.30
1051 Caja octogonal grande nacional u. 0.30
1052 Caja octogonal pequena nacional u 0.25
1053 Caja rectangular profunda nacional u. 0.30
1054 Caja rectagular baja nacional u 0.39
1055 Caja cuadrada de 4" profunda u 0.50
1056 Caja portafusible 15KV - 100AMP u. 81.27
1057 Collar simple de 5 1/2" u. 2.74
1058 Collar doble de 5 1/2" u 3.44
1059 Conector de compresin 3/0 - 4/0 u. 1.28

1060 Conector EMT de 1/2" u 0.14


1061 Conector EMT de 3/4" u 0.23
1062 Conector EMT de 1" u 0.40
1063 Conector EMT de 1 1/4" u 0.74
1064 Conector EMT de 1 1/2" u 0.78
1065 Conector EMT de 2" u 1.34
1066 Codo EMT de 3/4 " u 0.47
1067 Codo EMT de 1" u 0.88
1068 Codo EMT de 2" u. 4.16
1069 Caja rectagular baja nacional u 0.02
1070 Caja cuadrada de 4" profunda u 0.10

1071 Caja portafusible 15KV - 100AMP u. 81.27


1072 Collar simple de 5 1/2" u. 0.37
1073 Collar doble de 5 1/2" u 0.43
1074 Conector de compresin 3/0 - 4/0 u. 0.11
1075 Codo EMT de 1 1/4" u 2.10
1076 Codo PVC L/R 90" de 1/2" u 0.06
1077 Codo PVC L/R 90" de 3/4" u 0.08
1078 Codo PVC L/R 90" de 1" u 0.10
1079 Foco 100W u 0.28
1080 Interruptor ticino sencillo u 2.48
1081 Interruptor ticino doble #711 125V/15A u 3.74
1082 Interruptor veto sencillo,15 amp/125v.B.M. u 0.73
1083 Interruptor veto doble,#1401 u 1.02
1084 Placa para Telfono u. 0.66
1085 Placa interruptor Eagle baquelita u 0.56
1086 Placa interruptor ticino aluminio u 1.06
1087 Socket med.monofsico 2p 4ptos 100A u 3.04
1088 Transformador monof.-autoprot. 5 KVA 1B u 859.24
1089 Transformador monof.-autoprot. 10 KVA u 895.42
1090 Transformador monof.-autoprot. 15 KVA 1B u 914.35
1091 Transformador monof.-autoprot. 25 KVA u 1,028.69
1092 Transformador monof.-autoprot. 50 KVA 1B u 1,492.36
1093 Transformador convencional 15 KVA u 904.46
1094 Transformador convencional 10 KVA 2B u 750.70
1095 Transformador convencional 25 KVA u 949.68
1096 Transformador convencional 37.5 KVA u 1,353.65
1097 Transformador convencional 50 KVA u 1,568.66
1098 Transformador convencional 100 KVA u 2,414.94
1099 Tapas redondas 3 1/4 u 0.11
1100 Reversible EMT de 2" u 3.71
1101 Reversible EMT 1 1/4" u 2.11
1102 Tubera galv. EMT 1/2"x3m u 1.72

1103 Tubera galv. EMT 3/4"X3m u 3.00


1104 Tubera galv. EMT 1"x3m u 3.92
1105 Tubera galv. EMT 1 1/2"x3m u. 6.24
1106 Tubera galv. EMT 2"x3m u 8.04
1107 Tubo rgido EMT 1 1/4" x3m u 9.92
1108 Tomacorriente eagle doble S/P u 0.84
1109 Tomacorriente eagle doble polarizado u 0.86
1110 Tomacorriente ticino u 3.58
1111 Tomacorriente 220 V -15A u 1.30
1112 Uniones EMT de 1/2" u 0.18
1113 Uniones EMT de 3/4" u 0.23
1114 Uniones EMT de 1" u 0.31
1115 Uniones EMT de 1 1/2" u 0.71
1116 Uniones EMT de 2 u 0.98
1117 Varilla COPPERWELD 5/8"x1.80m u. 9.99
1118 Varilla COPPERWELD 5/8"x1.50m u 9.46
1119 Varilla anclaje 5/8"x2.40m u 4.44
1120 Medidor de luz E.E.E. u. 20.00

1121 Caja de breaker de 2-4 G.E. u 14.33


1122 Caja de Breaker de 4-8 G.E. u. 24.92
1123 Caja de Breaker de 6-12 G.E. u. 19.60
1124 Caja de Breaker de 12-24 G.E. u. 50.72
1125 Cinta aislante (20 m) rll 0.58
1126 Tornillo de 1 1/2 x10 para madera (100 u.) cj 1.94
1127 Tornillo de 1 1/2"x12 (100 unidades) cj 2.13
1128 Tornillo de 1"x7 cj 1.21
1129 Tornillo Tripa de Pato u 0.02
1130 Tacos fischer F-8 u 0.02
1131 Lmpara vapor de Mercurio 175W u 142.97

1132 Lmpara vapor de Mercurio 400W u 181.93


1133 Pararrayo 10 KV u 28.72
1134 Perno galv. de 5/8" x 1 1/2" u 0.80
1135 Poste tub. H.A. 9m x 350Kg u 52.03
1136 Poste tub. H.A. 11m x 350Kg u 78.88
1137 Poste tub. H.A. 11m x 500Kg u 85.10
1138 Rack galv. de 1 va u. 1.08
1139 Rack galv. de 3 vas u. 3.09
1140 Aislador de retenida ANSI 52-1 u 2.13
1141 Aislador de suspensin ANSI 52-1 u 8.56
1142 Aislador PIN 55-4 normal u 4.39
1143 Bloque anclaje 40x40x10 (lozetas) u 1.67
1144 Cable TTU AWG 1/0 ml 2.85
1145 Cable TTU AWG 3/0 ml 4.40
1146 Cable tensor de 3/8" ml 0.33
1147 Cruceta met. cent. doble 1/4"x2.5"x2m u 26.90
1148 Cruceta met. cent. sencilla 1/4"x2.5"x2m u 14.93
1149 Estructura de farol 2"x1m u 5.49
1150 Grapa de 3 pernos u 1.49
1151 Grapa de lnea viva#1/0 u 12.89
1152 Grapa terminal #1/0 u 8.73
1153 Perno cadmiado 1 1/2"x5/8" u 1.54
1154 Perno carriage 3/8"x1 1/2" u 0.55
1155 Perno rosca corr. 5/8"x12" u 5.13
1156 Perno pin 5/8"x6" u 0.88
1157 Perno pin de extensin u 4.39
1158 Perno tipo U u 1.84
1159 Pie de amigo de platina 1.5"x1/4"x90cm u 1.76

1160 Tuerca de ojo 5/8" u 0.73

1161
1162 Tablas de Encofrado semidura u 4.50
1163 Cuarton semiduras u 2.60
1164 Pintura de caucho gln 15.62
1165 Clavo 2"x 8 Lb 0.82
1166 Encofrado metalico u 3.70
1167 Porcelanato (Alto Trfico) Color - Graiman m2 22.30
1168 Pega Sika BInda Porcelanato kg 0.66
1169 Bondex Premiun 1 saco 11.90

1170 Disco de Corte (para cortar cermica y porcelanato) u 29.00


1171 Tapa Ciega 4x4 u 0.34
1172 Toma Voz y Datos (Jack RJ45 Cat.6+Face plate2pto) u 19.23
1173 C. UTP. CAT 6E Solido gris m 0.96
1174 Neplo H.G. de 1/2 x 3 u 0.20
1175 Union universal u 0.65
1176 Codo de PVC Desage de 90 x 110 mm u 1.90
1177 Pegante Litro 10.07
1178 Limpiador Litro 6.10
1179 Yee de PVC 110 mm desague u 2.78
1180 Codo de PVC Desage de 45 x 110 mm u 2.55

1181 Tubera de PVC Desage de 110mm. ml 3.18


1182 Vidrio claro flotado 6mm m2 12.58
1183 Horizontal tipo pesado (6 ml.) u 21.38 peso 0.62 kg/ml.
1184 Jamba marco tipo pesado u 18.56
1185 Riel aluminio natural u 20.00
1186 Vertical cerrado u 18.20
1187 Perfil de malla u 12.00
1188 Malla antimosquitos m2 1.20
1189 Accesorios pesados (rodamientos, esquineros, etc) juego 18.00
1190 Silicn tubo 6.00
1191 Pintura anticorrosiva gln 14.00
1192 Codo EMT 1/2 u 0.18
1193 Tuberis de 1/2 u 5.70
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256 Sika 1 Kg 0.64
1257 Plastocrete DM Kg 0.68
1258 Hidroseal gris 2 Kg.,Impermeabilizante Kg. 1.26
1259 Hidroseal blanco,Impermeabilizante Kg 0.81
1260 Hidroplug,Cemento Hidrulico Kg 1.22

1261 Aditec 1,Impermeabilizante de Morteros lt 0.62

1262
1263 PDA 25 R gl. 2.93
1264 PDA 25 N gln 2.94
1265 Prokrete R gln 3.58
1266 Prokrete N gln 3.37
1267 PDA High Early 100 gln 3.84
1268 A.E.A gln 6.53
1269 P.S.P. N2 gln 7.17
1270 Plastocrete 161 HE Kg 0.68
1271 Sika 2 Kg. 1.31
1272 Sika 3 Kg. 1.31
1273 Sika 4a Kg. 1.45
1274 Sika Aer Kg. 0.22
1275 Sika Cola Kg. 0.15
1276 Sika Blanco Kg. 0.45
1277 Sika Rojo Kg. 0.34
1278 Plastiment BV-40 Kg. 1.08
1279 Aditec FA-111,Acelerante de fraguado gln 2.60
1280 Conbeton FN-100,Plastificante alta resist. gln 1.79
1281 Aditec FR-100,Retardador de fraguado gln 1.98
1282 Aditec SF-155,Plastificante alta resist. gln 2.13
1283 Conbeton ALE-505,Plastificante alta resist. Kg. 0.07
1284 Conbeton ALE-100,Plastificante alta resist. Kg. 0.07
1285 Conbeton ALE-786,Plastificante alta resist. Kg. 0.07

1286 Impersan D-M,Impermeab.y Plastificante gln 2.52

1287 Aquaseal 3.78 lts lt. 3.03

1288
1289 PW-3b curador gln 3.11
1290 T-370 curador/Desm. gln 6.19
1291 Triple Seal transparente gln 7.84

1292 Lithoplate gln 2.46


1293 Prostop metlico lb. 0.80
1294 Protalico lb. 0.10
1295 Procrom natural lb. 0.35
1296 Procrom en colores lb. 0.37
1297 Aquaplug lb. 0.65
1298 Sika piso 40 Neutro Kg. 0.98
1299 Sika piso 40 rojo Kg. 0.62
1300 Sika piso 40 Listo neutro Kg. 0.58
1301 Sikaguard Seal Kg 6.08
1302 Corinbeton (30 kg), Endurecedor de pisos kg 0.11

1303 Corinbeton rojo(40 kg) kg 0.04


1304 Corinbeton verde(40 kg) kg 0.09
1305 Pisotop Kg 0.03

1306 Pisotop rojo Kg 0.04

1307
1308 Silicone Seal gln 2.34
1309 Sika Emulsion Kg 0.10
1310 Sika top 77 Kg 0.71
1311 Sika top 107 Seal Kg 2.04
1312 Sika top 108 Armatec Kg 2.54
1313 Sika top 122 C. Calido Kg 3.10
1314 Sika top 122 C. Frio Kg 3.45
1315 Sika Empaste blanco Kg 0.32 sika
1316 Cable, caja, . glob 16.00
1317 Alambre telf., tub. emt. glob 30.00
1318 Sikacryl Gris(sellante acrilico) Kg 0.42
1319 Sikaflex 1a. Gris(sellador elastico) Kg 2.25

1320 Sikaflex 11 FC negro (sellador y pegante) Kg 2.41

1321 Aditec,Repelente al agua trasparente Kg 1.08

1322
1323 Probond epoxico gln 12.24
1324 Proweld D gln 12.00
1325 Betoncryl-14,Adherente en di.sustratos gln 10.13
1326 Sikadur 31 Adhesivo gln 0.91
1327 Sikadur 32 Primer N (costa) gln 1.35

1328 Sikadur 32 Primer L (Sierra) gln 1.45

1329
1330 Duratex gln 2.90
1331 Procote gln 3.45
1332 Accel a Set lb. 0.36
1333 Sika Empaste Blanco kg 0.85
1334 Empaste tipo I (funda), Fondo para pinturas kg 3.34
1335 Empaste blanco hueso kg 0.06

1336 Empaste blanco kg 0.07


1337 Curinsol l-886 kg 0.11

1338
1339 Cold Seal lb. 0.86
1340 Pintura para exteriores gln 8.00

1341 Tuberia roscable PVC 3/4" m 0.94

1342
1343 Tub. PVC rig. Desague 2" 50mm. ml 0.99
1344 Soldadura punta azul 6/11x1/8" lb 1.16
1345 Tuberia roscable PVC 1/2" m 0.68
1346 Neplo galv. 1/2" u 0.19
1347 Union galvanizada 1/2" u 0.35
1348 Tee PVC 1/2" u 0.67
1349 Cruz galvanizada 1/2" u 1.60
1350 Codo PVC 1/2" u 1.92
1351 Llave de agua u 4.00

1352 Mangle 4m. u 2.00


1353 Tablas de Encofrado semidura u 3.80
1354 Cuarton semiduras u 2.50
1355 Tira de encofrado semiduras u 1.13
1356 Clavo 2"x 8 Lb 0.82
1357 Alambre Recocido # 18 kg 1.42

1358 Caa u 1.30

1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1369 Codos 4" pvc, uniones tee, y accesorios glob 1.50
1370 Tub. PVC rig. Desague 4" 110mm. ml 2.50
1371 Tub. PVC rig. Desague 2" 50mm. ml 0.99 2.00
1372 Urinario y accesorios u 34.00
1373 Lavadero de cocina ( 1 pozo) y accesorios u 55.00
1374 Inodoro ( blanco) y accesorios u 25.00
1375 Lavamanos ( blanco) y accesorios u 35.00
1376 Codos 2" pvc, uniones tee, y accesorios glob 3.00
1377 Tierra preparada ( abono ) m3 3.00
1378 Tuberia PVC 1/2" roscable u 0.68
1379 Llave de pico u 3.50
1380 Tanque de 1000 litros y accesorios u 100.00
1381 Bomba 1 HP y accesorios glob 250.00
1382 Tuberia y accesorios glob 98.00
1383 Llave de paso 3/4" u 12.00
1384 Tuberia PVC 20mm P/E/C ML 0.92
1385 Llave de paso 1/2" u 8.00
1386 Tuberia 3/4 pvc ml 0.94
1387 Encofrado (para losa, cajonetas) m3 40.00
1388 Poste de H.A. 11m 500kg u 78.74
1389 Panel /break. (contac. y accesorios) u 80.00
1390 Tablero/panel /break.contac.fotoc.var.cable etc) u 226.00
1391 Tablero/panel /break.contac.fotoc.var.cable etc) u 240.00
1392 Tablero/panel /break.contac.fotoc.var.cable etc) u 320.00
1393 Alambrres y accesorios ml 0.90
1394 Alambrres y accesorios ml 0.60
1395 Alambrres, tubos y accesorios ml 2.20
1396 Alambrres, tubos y accesorios ml 1.00
1397 Alambrres, tubos y accesorios ml 3.20
1398 Tablero para medidor y accesorios u 89.00
1399 Tomacoriente 220v u 3.70
1400 Caja rectangular profunda nacional u 0.28
1401 Tuberia Emt 1/2" elect u 1.60
1402 Uniones Emt 1/2 u 0.14
1403 Conector EMT 1/2 u 0.20
1404 Alambre solido #12 ml 0.20
1405 Alambre Recocido # 18 Ib 0.36
1406 Tomacoriente ticino u 3.00
1407 Cables Cu, tubos, y accesorios ml 12.00

1408 Cables, tubos, codo y accesorios ml 10.00


1409 Transformador monofasico de 25 KVA u 850.00
1410 Extintor u 68.00
1411 Tuberia EMT y accesorios ml 0.90
1412 Interruptor completo u 3.00
1413 Cajetin rectangula u 0.50
1414 Alambre awg 12 ml 0.30
1415 Cinta aislante rollo 0.52
1416 Cajetin octagonal u 0.60
1417 Boquilla u 0.50
1418 Foco u 0.40
1419 Apliques de pared u 7.00
1420 Alambre y cables para inatalacion glob 0.60
1421 Cables y accesorios glob 1.00
1422 Reflector de 150W 220V y accesorios glob 117.00
1423 Reflector de 400W 220V y accesorios glob 165.00
1424 Poste de H.A. 11m 350kg u 72.99
1425 Puerta de 0,6x 1,6 m., y accesorios glob 62.00

1426 Diluyente gln 7.33


1427 Impermeabilizante y otros materiales glob 0.60
1428 Perfiles de alum.,vidrio, y otros materiles m2 42.00
1429 Ceramica m2 10.25
1430 Baldosa antideslizante gris 30x30 m2 9.00
1431 Baldosa de 30x30 cm. m2 9.00
1432 Ventana de Alumini, vidrio y malla antimosquito m2 42.00
1433 Rodillo Liso c/h 35.00
1434 Cargadora 115 HP c/h 45.00
1435 Taladro Electrico c/h 0.90
1436 Bomba =4" c/h 2.25

1437 Ecavadora de Oruga 125 HP c/h 38.00


1438 Montacarga c/h 18.00
1439 Grua pequea de 20 ton. c/h 19.00
1440 Soldadora c/h 2.50

1441 Cortadora - dobladora c/h 0.50


1442 Retroexcavadora c/h 35.00
1443 Carro Grua c/h 18.00
1444 Tanquero c/h 25.00
1445 Motoniveladora c/h 48.00
1446 Rodillo neumatico c/h 35.00
1447 Camion distribuidor de asfalto c/h 40.00
1448 Elevador c/h 2.50
1449 Concretera de 1 Saco c/h 3.13
1450 Volqueta de 8m3 c/h 22.00
1451 Excavadora c/h 45.00
1452 Compresor c/h 15.00
1453 Moladora c/h 1.25
1454 Pulverizadora hidrulica c/h 0.20 0.50
1455 Equipo de corte c/h 0.20
1456 Vibrador de Manguera c/h 2.00
1457 Compresor + pistola c/h 2.30
1458 Compactador manual c/h 2.00
1459 Equipo topografico c/h 2.50
1460 Cortadora Circular de Sierra c/h 3.00
1461 Hormigon premezclado f'c=210 kg/cm2 m3 75.00 81.50
1462 Encofrado Bordillo ml 1.00 1.50
1463 Material de Sub-Base clase I m3 5.00
1464 Mezcla asfaltica ( inc. Transporte) m3 45.00 51.00
1465 Asfalto RC-2 ( inc. Transporte) kg 0.60
1466 Diesel tipo 2( inc. Transporte) gln 0.89
1467 Varillas grado interm. corr.8-32 mm kg 0.44
1468 Alambre recocido #18 Kg 0.53

1469 Tuberia de PVC roscable 1/2" u 5.50


1470 Accesorios glob 1.00
1471 Teflon y accesorios glob 3.00
1472 Montura de 1/2" u 9.00
1473 Llave de perforacion de 1/2" u 6.00
1474 Tuberia de PVC 90mm union Z 6ml. u 28.77
1475 Tuberia de PVC 63mm union Z 6ml. u 15.54
1476 Encofrado sumidero sencillo glob 6.00
1477 Rejilla u 10.00
1478
1479
1480
1481 17.60
1482
1483
1484
1485
1486
1487 1.16
1488
1489
1490 Arena m3 12.70
1491 Marco metalico, perfiles,hierro u 16.00
1492 Cemento Blanco(50kg) sc 10.36 10.3571
1493 Blancola ltt 1.64
1494 Lija plg 0.60
1495 Brocha de 4" mango rojo u 5.10 76.60
1496 Porcelana kg 1.33
1497 m3 18.00

1498 Cortadora de ceramica hora 0.50


1499 Maquina de corte hora 1.00
1500 Andamio metalico hora 0.80
1501 Cascajo mediano y fino m3 4.94
1502 Hormigon premezclado f'c=280 kg/cm2 m3 82.00
1503 Encofrado m3 4.00
1504 Cemento tipo I(50 Kg) kg 0.1400 6.9800
1505 Piedra # 4 m3 8.01 7.0000
1506 Agua m3 1.50
1507 Encofrado m3 4.00
1508 Canbeton FN-100 plastificante para inc.resistencia gln 2.40
1509 Acero de refuerzo fy=4200 kg/cm2 kg 0.830 37.7900
1510 Tub. PVC Rig. 1/2" (Union Roscable) ml 0.68
1511 Union Galvanizada de 1/2" u 0.28
1512 Montura de 3" (incl. Empaque) u 4.00
1513 Llave de perforacion de 1/2" u 5.60
1514 Accesorios y varios glob 0.40
1515 Adaptador PVC ASTM-ISO 1/2" a 20mm (e/c) u 0.10
1516 Hormigon premezclado f'c=140 kg/cm2 m3 61.90
1517 Platina 1 1/2"x 3/16" ml 0.80
1518 Mortero m3 58.00
1519 Andamio m2 0.30
1520 Cable de acero 1" ml 8.85
1521 Elementos de fijacion ml 0.60
1522 Sika 1 kg 0.80
1523 Malla electros. D=8mm. (15x15) m2 4.70
1524 Soldadura AGA 6011 (1/8) kg 4.10
1525
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1541
1542
1543
1544
1545
1546
1547
1548
1549
1550
1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
1562
1563
1564
1565
1566
1567
1568
1569
1570
1571
1572
1573
1574
1575
1576
1577
1578
1579
1580
1581
1582
1583
1584
1585
1586
1587
1588
1589
1590
1591
1592
1593
1594
1595
1596
1597 Piedra 3/4" m3 13.00
1598 Rodillo manual de pintura u 5.00
1599 Separadores de ceramica u 0.02
1600
1601
1602
1603
1604
1605
1606
1607
3.84 kg/6ml.
OFERENTE : FORMULARIO No.
HOJA 1 DE 1
.

ANALISIS DE PRECIOS UNITARIOS. CUADRO AUXILIAR: COSTOS INDIRECTOS Y UTILIDAD

OBSERVACION
No. COMPONENTES DEL COSTO INDIRECTO VALOR

Direccin de obra #REF! 3.00


Administrativos #REF! 4.00
Locales provisionales #REF! 0.00
Vehculos #REF! 0.00
Servicios pblicos #REF! 0.00
Promocin #REF! 0.00
Garantas #REF! 0.00
Seguros #REF! 1.00
Costos financieros #REF! 1.50
Prevencin de accidentes #REF! 0.50

Utilidad #REF! 5.00

TOTAL COSTO INDIRECTO Y UTILIDAD #REF! 15.00


#REF!
TOTAL COSTO DIRECTOS #REF!
FACTOR (PORCENTAJE) % #REF!

Guayaquil, 28 de Agosto del 2017