Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Shoulder
ab
Approach pavment is flexible.
dge approach sl
Footing A
See Bridge Plans
for details.
for bri
15
(380) Improved subgrade,
see roadway plans.
Pay Wi
36 12 11'-0" (3.35 m)
Longitudinal
Approach Footing
(900) (300) min.
sawed joint
4 (100) Stabilized
SECTION A-A subbase
See plans for
Shoulder new pavement.
ab
Approach
SECTION B-B
dge approach sl
Footing B
GENERAL NOTES
THICKNESS-"t"=Thickness of Pavement.
15
(380) See Standard 420001 for pavement joint details not
shown.
Pay Wi
APPROVED 2016
PLAN term. joint. Renamed std.
ENGINEER OF POLICY AND PROCEDURES 1-1-15 Added pay width for new
EXISTING CONSTRUCTION
1-1-97