BALANCES METALURGICOS

Precios Proyectados Medios Ao 2011 Factor US$/t


PRECIOS Ag (US$/oz) 7.00 Pb (cUS$/lb) 108.86 0.04536 2400
Au (US$/oz) 1,700.00 Zn (cUS$/lb) 95.26 0.04536 2100
Cu (cUS$/lb) 204.12 0.04536 4500

VALORIZACION - PLANTA CONCENTRADORA MINA 1


VENTA ZINC AL EXTERIOR - PLOMO Y COBRE A LA OROYA
TON. VALOR VALOR VALOR ENSAYE %
PROCESADO UNITARIO INGRESOS MINERAL CONTENIDO METALICO %RECUPERACION
Producto tms $/t US $ $/t %Cu % Pb % Zn g/t,Ag COBRE PLOMO ZINC PLATA % Cu % Pb % Zn %Ag
Cabeza 20,000.000 1,861,331 93.07 0.56 1.50 5.71 137 112.000 300.000 1,142.000 2,740.000 100.0 100.0 100.0 100.0
Conc. Cu 268.800 1423.12 382,535 19.13 25.00 10.10 9.39 3,772 67.200 27.150 25.238 1,013.800 60.00 9.05 2.21 37.00
Conc. Pb 415.385 1073.18 445,783 22.29 2.56 52.00 4.12 2,177 10.640 216.000 17.130 904.200 9.50 72.00 1.50 33.00
Conc. Zn 1,964.240 525.91 1,033,013 51.65 1.00 1.22 50.00 160 19.600 24.000 982.120 315.100 17.50 8.00 86.00 11.50
Relave 17,351.575 0.47 0.35 0.82 88 81.760 60.000 142.750 1,520.700 13.0 11.0 10.3 18.5
RADIO DE CONCENTRACIN Cu 74.40
RADIO DE CONCENTRACIN Pb 48.15
RADIO DE CONCENTRACIN Zn 10.18

VALORIZACION - PLANTA CONCENTRADORA MINA 2


VENTA ZINC AL EXTERIOR - PLOMO A LA OROYA
TON. VALOR VALOR VALOR ENSAYE %
PROCESADO UNITARIO INGRESOS MINERAL CONTENIDO METALICO %RECUPERACION
Producto tms $/t US $ $/t %Cu % Pb % Zn g/t,Ag tCu tPb tZn Kg Ag Cu Pb Zn Ag
Cabeza 1,000 144,443 144.44 0.10 5.00 6.00 250 1.0 50.0 60.0 250 100.0 100.0 100.0 100.0
Conc. Pb 77.3 1075.75 83,126 83.13 0.49 55.0 3.88 1,715 0.4 42.5 3.0 133 38 85 5 53
Conc. Zn 80.0 766.47 61,317 61.32 0.40 4.38 60.0 531 0.3 3.5 48.0 43 32 7 80 17
Relave 843 0.04 0.47 1.07 89 0.3 4.0 9.0 75 30.0 8.0 15.0 30.0
RC Plomo 12.94
RC Zinc 12.50
Plan de Ventas 2001
Presupuesto de Trminos y condiciones comerciales
Concentrado de Cobre
En tms
Mina 1
Ene 31 136
Feb 28 136
Mar 31 136
Abr 30 136
May 31 136
Jun 30 136
Jul 31 136
Ago 31 136
Sep 30 136
Oct 31 136
Nov 30 136
Dic 31 136
1,632

Precios
Cu (cUS$/lb) 204.1 Cu (US$/tm) 4,500.00
Ag (US$/oz) 7.00
Au (US$/oz) 1,700.0

Mina 1

Volumen disponible para venta


tms 269
% Cu 25.00
g/t Ag 3,771.58
oz/t Ag 121.26
g/t Au 0.70
% H2O 11.00
% As 7.60
% Sb 2.20
% Bi 0.35
% Pb 10.10
% Zn 9.39
% Al2O3 0.20
ppm Hg 10.00

Ingresos
Contenidos pagables
% Cu (-1.1 unid.) 23.90
oz Ag (Si Ag<=90o/t;95%, dm 30 g/t) 0.00
oz Ag (Si Ag>90o/t;96%, dm 50 g/t) 116.41
oz Au (95%, dm 1 g/t) 0.00
Pagos de metales
Por Cu 1,075.50
Por Ag 814.86
Por Au 0.00
Total pagos (US$/tms) 1,890.36

Deducciones
Tratamiento
Maquila OROYA (US$/tms) 125.00
Escalador (10% sobre cUS$90/lb) 60.13
Refinacin
Por Cu (cUS$8.0; lb pagable) 42.14
Por Ag (cUS$35; oz pagable) 40.74
Por Au (US$8.50; oz pagable) 0.00
Penalidades
Por H2O (10%;1%;$3.00) 3.00
Por As (Si As<=2%;0.5%;0.1%;$1.50) 0.00
Por As (Si As>2%;0.8%;0.1%;$1.50) 102.00
Por Sb (Si Sb<=1,5%;0.3%;0.1%;$1.50) 0.00
Por Sb (Si Sb>1,5%;0.5%;0.1%;$1.50) 25.50
Por Bi (0.15%;0.01%;$2.00) 40.00
Por Pb (3%;1%;$2.50) 0.00
Por Zn (3%;1%;$2.50) 0.00
Por Pb+Zn (8%;1%;$2.50) 28.72
Por Al2O3 (2%;1%;$3.00) 0.00
Por Hg (50ppm;50ppm;$10.0) 0.00
Total deducciones (US$/tms) 467.24
Valor neto FOT La Oroya (US$/tms) 1,423.12 1,423.12

FACTOR DE LIQUIDACIN 0.75

FOB=Freeonboard,olibreabordo.Elvendedorponelasmercancasabordo
deuntransportesincostoparaelcompradorhastaesepunto.Apartirdeah
todosloscostosdeltransporte(segurosyfletes)hastasudestinofinal
correnporcuentadelcomprador.

CIF=Cost,insuranceandfreight,ocosto,seguroyflete.Elpreciocotizado
porelvendedorincluyeesoscargoshastaeldestinofinalquelesealeel
comprador.

FOT=Freeontruck,olibredetransportecamiones.Elvendedorponelas
mercancaseneldestinosincostoparaelcompradorhastaesepunto.
Libre de gastos de desestiba/descarga = FO (Free out)