Sei sulla pagina 1di 19

CBAP Application Worksheet

ver. 2.4b
Developed by Watermark Learning
CBAP Application Worksheet www.WatermarkLearning.com
INSTRUCTIONS 800-646-9362 n +1-952-921-0900
Thanks to Linda Miller, CBAP, PMP for her help on this form.
NOTE: This Excel spreadsheet assumes an average level of Excel expertise to use.

WORKBOOK: How to use this spreadsheet:


Summary Complete the Summary section and list and number each project you worked on.
The number will help in cross-referencing to the other worksheets.
Copy additional rows for each project you report on.
Project Hours Section
You can look back over 10 years, and need 7500 hours of BA work on those projects.
For each project, list the BA hours you worked.
For example, if you worked 1000 hours on a project, and did 50 hours of PM-related work, and
50 hours of QA work, you would list 900 in the "BA Activity Hours" cell.
The worksheet will total the hours for you. Be sure to blank out the example hours.

Activities by KA Section - Hours


For each project, list the hours you spent on each Knowledge Area for the BA activities you performed.
You do not need hours in 4 KAs for every project, but you will need the 900+ hours in at least 4 KAs
among all your projects. You need to have 900+ hours in at least 4 of the KAs to qualify.
Check the total on the bottom to make sure you have 900+ hours in at least 4 of the 6 KAs.

Activities by KA Section - Percentages


For each project, the percentages spent on each Knowledge Area for the BA activities of a project
will be calculated. The percentages should total 100% for each project.
The worksheet will total the KAs, so you will know when you have reached 100%.
You do not need 4 KAs per project, but you will need experience in at least 4 KAs among all your projects.

Projects For each project, list the information asked for. The online CBAP application requests all this information.
If any data is optional, it is listed as "Opt." on the worksheet. If a contact has left the organization,
and you dont have a replacement contact name, we recommend listing a generic phone number and
email address for the organization. IIBA will use this to reach your contacts if the audit your application.
Estimate the number of hours per task within each Knowledge Area. The tasks you have hours for will
be the tasks you check on the CCBA application.
Expand the column widths as needed to add your data.
Use one worksheet per project and add additional worksheets as needed.

Developed by: Watermark Learning 800-646-9362


Page 1
www.WatermarkLearning.com/CBAP Copy and distribute freely, but please keep this footer
CBAP Application Worksheet

NOTE Pass this template on to friends and colleagues who want to apply for the CBAP credential.
As a courtesy, please leave our name and contact information on this worksheet.
Contact us at 800-646-9362 for additional copies or more information on CBAP Certification Preparation.
Or, visit www.WatermarkLearning.com/CBAP for more information, including tips to help you
prepare for the CBAP exam.

Developed by: Watermark Learning 800-646-9362


Page 2
www.WatermarkLearning.com/CBAP Copy and distribute freely, but please keep this footer
CBAP Application Worksheet

OVERVIEW
Activities by KA
Activities by KA (Percentage of Total BA Hours; will be calculated-
(Total BA Hours. Need 900+ in 4 or more KAs) dont enter any values)

Start BA Activity TOTAL


Nbr Project Name Dates End Dates Hours BAPM RE RC EA RA SAV (Calculated) BAPM RE RC EA RA
Exmp: New Order Entry System May-2010 Present 1010 60 150 200 50 500 50 1010 6% 15% 20% 5% 50%
1 AAAAAA
2 BBBBB
3 CCCCC
4 DDDDD
TOTAL N/A 0 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A
(Recommend BA hours be 8500 or more
unless you select only BA tasks)

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 3
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

ties by KA
BA Hours; will be calculated-
ter any values)

SAV TOT Notes


5% 100% Example: delete this from your final version.
0%
0%
0%
0%
N/A N/A

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 4
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Project Listing Note: all fields required unless marked (Opt) Items in green get entered on the CBAP online application
EXAMPLE

Project Information (Use separate sheet for each project or group of projects) Hours on Project Contact
Project
Nbr Project Name Start Date End Date Project Description/Objective Project Role(s) Nbr Total BA Name Email Phone
Reporting Hrs of Each
to You (Opt) KA Below

1 New Order Entry May-2010 Present Phase 1 of new order entry BA, tester 1 1010 John Doe xxx@gmail.com 555-555-
System system - product look-up. 1212

KAs: Business Analysis Planning and Monitoring

% Hours Nbr BA Tasks


Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Tasks: Spent Planned business analysis approach

Conducted stakeholder analysis

Planned business analysis activities

20 Estimated requirements activities (e.g., milestones, work units, level of effort,


duration,)
Planned business analysis communication

40 Planned requirements management process

Determined what requirement attributes need to be captured

Planned, monitored and reported on business analysis performance

Measured and reported on requirements activity

Percent of BA 6% 60.0 TOTAL Hours - Business Analysis Planning and Monitoring


hours on
BAPM:
Elicitation
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent 50 Prepared for requirements elicitation

Conducted elicitation activities

Facilitated requirements workshop

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 5
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

100 Documented the results of elicitation activities

Validated elicitation results

Percent of BA 15% 150.0 TOTAL Hours - Elicitation


hours on RE:

Requirements Planning and Communication


% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent
Managed solution and requirements scope (e.g., baseline, structure, impacts,
change management and approval process
Obtained sign-off

Managed requirements change

Managed and resolved requirements conflicts

Established requirements baseline

Structured requirements for traceability

200 Determined appropriate format to present requirements

Created a requirements package

Conducted a presentation of the requirements to stakeholders

Communicated requirements

Percent of BA 20% 200.0 TOTAL Hours - Requirements Management and Communication


hours on RMC:

Enterprise Analysis
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent 50 Defined the business needs

Identified business problem or opportunity

Determined gap(s) in capabilities to meet the business needs

Determined solution approach

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 6
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Conducted feasibility studies for solution options

Identified potential high level solutions

Defined solution scope

Developed a business case

Percent of BA 5% 50.0 TOTAL Hours - Enterprise Analysis


hours on EA:

Requirements Analysis
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Determined priority and relative importance of requirements

Organized requirements so that they are understood by all stakeholders

Documented dependencies and interrelationships between requirements

500 Specified and modeled requirements

Created and documented as-is models

Determined requirement assumptions and constraints

Verified requirements

Conducted structured walkthroughs

Validated requirements

Traced requirements back to the business case

Delivered use cases

Percent of BA 50% 500.0 TOTAL Hours - Requirements Analysis


hours on RA:

Solution Assessment and Validation


% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Assessed business value delivered by proposed solutions

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 7
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Allocated requirements among releases and/or solution components

Determined organizational readiness to effectively operate the new solution

50 Defined transition requirements to move to the new solution

Validated a solution

Defined acceptance criteria for the solution

Assessed business impact of defects and issues

Evaluated the quality of the solution

Identified opportunities for improvement post-implementation

Percent of BA 5% 50.0 TOTAL Hours - Solution Assessment and Validation


hours on SAV:

TOTALS: 100% 1010 Make sure these add up to 100% and that the total hours listed to the left matches
the number above under "Total of Each KA below"

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 8
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

AP online application

Organization Information

Relationship Organization Industry Organization Address, Organization


to Contact Name City State, Zip, Website (Opt)
Country

PM for the Allied Products Retail xxxxx AlliedProducts.com


project

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 9
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Project Listing Note: all fields required unless marked (Opt) Items in green get entered on the CBAP online application

Project Information (Use separate sheet for each project or group of projects) Hours on Project Contact
Project
Nbr Project Name Start Date End Date Project Description/Objective Project Role(s) Nbr Total BA Name Email Phone
Reporting Hrs of Each
to You (Opt) KA Below

1 AAAAAA 0

KAs: Business Analysis Planning and Monitoring

% Hours Nbr BA Tasks


Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Tasks: Spent Planned business analysis approach

Conducted stakeholder analysis

Planned business analysis activities

Estimated requirements activities (e.g., milestones, work units, level of effort,


duration,)
Planned business analysis communication

Planned requirements management process

Determined what requirement attributes need to be captured

Planned, monitored and reported on business analysis performance

Measured and reported on requirements activity

Percent of BA #DIV/0! 0.0 TOTAL Hours - Business Analysis Planning and Monitoring
hours on
BAPM:
Elicitation
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Prepared for requirements elicitation

Conducted elicitation activities

Facilitated requirements workshop

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 10
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Documented the results of elicitation activities

Validated elicitation results

Percent of BA #DIV/0! 0.0 TOTAL Hours - Elicitation


hours on RE:

Requirements Planning and Communication


% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent
Managed solution and requirements scope (e.g., baseline, structure, impacts,
change management and approval process
Obtained sign-off

Managed requirements change

Managed and resolved requirements conflicts

Established requirements baseline

Structured requirements for traceability

Determined appropriate format to present requirements

Created a requirements package

Conducted a presentation of the requirements to stakeholders

Communicated requirements

Percent of BA #DIV/0! 0.0 TOTAL Hours - Requirements Management and Communication


hours on RMC:

Enterprise Analysis
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Defined the business needs

Identified business problem or opportunity

Determined gap(s) in capabilities to meet the business needs

Determined solution approach

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 11
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Conducted feasibility studies for solution options

Identified potential high level solutions

Defined solution scope

Developed a business case

Percent of BA #DIV/0! 0.0 TOTAL Hours - Enterprise Analysis


hours on EA:

Requirements Analysis
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Determined priority and relative importance of requirements

Organized requirements so that they are understood by all stakeholders

Documented dependencies and interrelationships between requirements

Specified and modeled requirements

Created and documented as-is models

Determined requirement assumptions and constraints

Verified requirements

Conducted structured walkthroughs

Validated requirements

Traced requirements back to the business case

Delivered use cases

Percent of BA #DIV/0! 0.0 TOTAL Hours - Requirements Analysis


hours on RA:

Solution Assessment and Validation


% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Assessed business value delivered by proposed solutions

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 12
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Allocated requirements among releases and/or solution components

Determined organizational readiness to effectively operate the new solution

Defined transition requirements to move to the new solution

Validated a solution

Defined acceptance criteria for the solution

Assessed business impact of defects and issues

Evaluated the quality of the solution

Identified opportunities for improvement post-implementation

Percent of BA #DIV/0! 0.0 TOTAL Hours - Solution Assessment and Validation


hours on SAV:

TOTALS: #DIV/0! 0 Make sure these add up to 100% and that the total hours listed to the left matches
the number above under "Total of Each KA below"

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 13
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

AP online application

Organization Information

Relationship Organization Industry Organization Address, Organization


to Contact Name City State, Zip, Website (Opt)
Country

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 14
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Project Listing Note: all fields required unless marked (Opt) Items in green get entered on the CBAP online application

Project Information (Use separate sheet for each project or group of projects) Hours on Project Contact
Project
Nbr Project Name Start Date End Date Project Description/Objective Project Role(s) Nbr Total BA Name Email Phone
Reporting Hrs of Each
to You (Opt) KA Below

1 AAAAAA 0

KAs: Business Analysis Planning and Monitoring

% Hours Nbr BA Tasks


Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Tasks: Spent Planned business analysis approach

Conducted stakeholder analysis

Planned business analysis activities

Estimated requirements activities (e.g., milestones, work units, level of effort,


duration,)
Planned business analysis communication

Planned requirements management process

Determined what requirement attributes need to be captured

Planned, monitored and reported on business analysis performance

Measured and reported on requirements activity

Percent of BA #DIV/0! 0.0 TOTAL Hours - Business Analysis Planning and Monitoring
hours on
BAPM:
Elicitation
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Prepared for requirements elicitation

Conducted elicitation activities

Facilitated requirements workshop

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 15
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Documented the results of elicitation activities

Validated elicitation results

Percent of BA #DIV/0! 0.0 TOTAL Hours - Elicitation


hours on RE:

Requirements Planning and Communication


% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent
Managed solution and requirements scope (e.g., baseline, structure, impacts,
change management and approval process
Obtained sign-off

Managed requirements change

Managed and resolved requirements conflicts

Established requirements baseline

Structured requirements for traceability

Determined appropriate format to present requirements

Created a requirements package

Conducted a presentation of the requirements to stakeholders

Communicated requirements

Percent of BA #DIV/0! 0.0 TOTAL Hours - Requirements Management and Communication


hours on RMC:

Enterprise Analysis
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Defined the business needs

Identified business problem or opportunity

Determined gap(s) in capabilities to meet the business needs

Determined solution approach

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 16
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Conducted feasibility studies for solution options

Identified potential high level solutions

Defined solution scope

Developed a business case

Percent of BA #DIV/0! 0.0 TOTAL Hours - Enterprise Analysis


hours on EA:

Requirements Analysis
% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Determined priority and relative importance of requirements

Organized requirements so that they are understood by all stakeholders

Documented dependencies and interrelationships between requirements

Specified and modeled requirements

Created and documented as-is models

Determined requirement assumptions and constraints

Verified requirements

Conducted structured walkthroughs

Validated requirements

Traced requirements back to the business case

Delivered use cases

Percent of BA #DIV/0! 0.0 TOTAL Hours - Requirements Analysis


hours on RA:

Solution Assessment and Validation


% Hours Nbr BA Tasks
Spent Hours (Note: the non-BA tasks on the IIBA application are not listed)
Spent Assessed business value delivered by proposed solutions

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 17
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

Allocated requirements among releases and/or solution components

Determined organizational readiness to effectively operate the new solution

Defined transition requirements to move to the new solution

Validated a solution

Defined acceptance criteria for the solution

Assessed business impact of defects and issues

Evaluated the quality of the solution

Identified opportunities for improvement post-implementation

Percent of BA #DIV/0! 0.0 TOTAL Hours - Solution Assessment and Validation


hours on SAV:

TOTALS: #DIV/0! 0 Make sure these add up to 100% and that the total hours listed to the left matches
the number above under "Total of Each KA below"

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 18
www.WatermarkLearning.com/CBAP
CBAP Application Worksheet

AP online application

Organization Information

Relationship Organization Industry Organization Address, Organization


to Contact Name City State, Zip, Website (Opt)
Country

Developed by: Watermark Learning


Copy and distribute freely, but please keep this footer Page 19
www.WatermarkLearning.com/CBAP

Potrebbero piacerti anche