Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
500
Overall Percentage
400 increment 9.7%
300 (3.23% per year)
200
133 134 133 136
Programme ACB (77
TOTAL)
100
QMS 19
0 EMS 14
10. Outsourcing, Procurement 11. OHS Performance 12. OHS management systems
& Constructors Evaluation Requirements with guidance
for use
Key Changes 1 : New common high level Structure
(same as ISO 9001, 14001)
Aims to facilitate the implementation process and the
Forward integration of several management systems in a harmonized,
Introduction structured and efficient manner.
0.1 Background
0.2 Aims of OH&S MS
0.3 Success Factor 7. Support
1. Scope 8. Operation
2. Normative Reference 9. Performance Evaluation
3. Term and Definition 10. Improvement
4. Context of the organization Annex A : Guidance on Use of this ISO
5. Leadership & Worker Participation Bibliography
6. Planning Alphabetical Index of Terms
Key Changes 2. Organizational context
Use context review to
- Understand / determine scope and issue
- establish, implement, maintain and continually improve its OH&S management
system.
Internal and external issues that can affect the OH&S MS, can result in risk and
opportunities
a) External issues, such as: b) Internal issues, such as:
1) cultural, social, political, legal, economic and 1) organizational structure, roles and accountabilities;
market competition, 2) policies, objectives and the strategies that are in place to
2) new competitors, technologies, law and new achieve them;
competition 3) Standard, guideline: contractual relationship
3) relationships with, and perceptions and
values of, its external interested parties;
Key Changes 3 : understanding needs of
interested parties (clause 4)
Some needs and expectations are mandatory, e.g. incorporated into laws and regulations.
Some are voluntarily agree to, or adopt, other needs and expectations (e.g. abiding by the
collective agreements or subscribing to a voluntary initiative).
Once adopted, they are to be addressed when planning and establishing the OH&S
management system.
Undesired effects can include work related injury and/or ill health, non-compliance with legal
requirements and other requirements or damage to reputation.
Planning considers the relationships and interactions between the activities and requirements for
the management system as a whole.
opportunities to improve OH&S performance:
opportunities to improve the OH&S management system:
Key Change 8 : need to prevent ill-health / injury
(Clause 6)
ISO 45001 requires organizations to take into account how suppliers and
contractors are managing their risks.
When outsourcing the organisation needs to have control of the outsourced
process(es) to achieve the intended outcome(s) of the OH&S management
system.
Where is 45001 now?
PC283 and ISO recognition :
Nearly 70 countries (in the PC 283) are involve in the development of ISO 45001
(termasuk Malaysia)
Status : DISO 45001.2 [2nd draft]
From DISO to FDISO/ISO with more than 1500 comments to be discussed in SOCSO
Melaka Rehab Center, Malaysia on 18 to 23 September 2017.
Hopefully Malaysia would be the final stage to establish the ISO 45001:2017
standard.
If not, it will be turned to Technical Specification
Are we ready for ISO 45001
Coordinate with
1 Become informed Certification Body for 6
transition arrangement
3 Develop implementation
plan
Provide training &
awareness for all parties
4
TERIMA KASIH
saifulazhar mohd said
DOSH Johor