Generator Audit Check List
PAGE 1 OF 6
Operation conditions
Ambient conditions
Temperature : 26 C Humidity : N/A % Altitude: N/A m
Power Battery
Load % V HZ A1 A2 A3
KW Volt
No Cylinders temperatures
Cylinders 1 2 3 4 5 6 7 8 9 10 11 12
Temp. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
DOC. REF.
PH IMS SP0-FR0
NO.
POWER HOUSE
REVISION 01/01
/ ISSUE
DATE 01-03-2016
Generator Audit Check List
PAGE 2 OF 6
POINT X Y Z
Evaluation:
11 No Firefighting System ..
Fire Alarm System is not completed and Not
12 ..
working.
DOC. REF.
PH IMS SP0-FR0
NO.
POWER HOUSE
REVISION 01/01
/ ISSUE
DATE 01-03-2016
Generator Audit Check List
PAGE 5 OF 6
22 No Cylinders temperatures. ..
23 No labels on gauges. ..