COMETA

(Conexin Mediterrnea de Transporte de Alta Tensin)


Estacin conversora de Morvedre
Morvedre converter station
Puerto de Sagunto (VALENCIA)

Proyecto y Direccin de obra: Project and Work Management:


SIEMENS S.A. SIEMENS S.A.

Promotor: Promotor
RED ELCTRICA DE ESPAA, S.A. RED ELCTRICA ESPAOLA S.A.

Descripcin del proyecto: Project Description:


Seis edificios prefabricados de Six precast concrete buildings,
hormign, cimentaciones para foundations for transformers, rolling
transformadores, viales de rodadura, road, slabs HIS, oil tank and pump
losas HIS, depsito de aceite y caseta house for fire protection system, in an
de bombeo para sistema proteccin area of 18,100 m2 built-up action,
contra incendios, en una zona de forming the converter station. This
actuacin urbanizada de 18.100 m2, work is part of the COMETA project,
formando la estacin conversora. Esta linking underwater power transmission
obra, forma parte del proyecto between the Iberian peninsula and Isle
COMETA, enlace submarino de of Mallorca, through two converter
transporte de energa elctrica entre la stations.
pennsula Ibrica y la Isla de Mallorca,
mediante dos estaciones conversoras.
Caractersticas Tcnicas:
Seis edificios prefabricados de entre 6,5 y
16,5 metros de altura, y de cubierta plana
transitable.
Pavimentos de hormign fratasado con
cuarzo corindn.
Conjunto de redes de instalaciones para la
urbanizacin.
Vallado perimetral.
Plazos de ejecucin:
Fecha de inicio: Junio 2009
Fecha de terminacin: Febrero 2011
Datos del Proyecto:
Volumen excavacin: 10.000 m
Volumen relleno de zahorras: 14.000 m
Volumen hormign: 7.000 m
Superficie de pavimentos: 4.000 m
Acero B-500 SD: 430 Tn.
Panel Prefabricado: 9.000 m
Lmina protectora tipo Cladding (formando
Jaula de Faraday): 2.000 m
Superficie asfalto viales: 2.000 m

Technical Characteristics:
Six precast buildings of between 6.5 and 16.5
meters high, and with transitable flat roof.
Trowelled concrete flooring with quartz
corundum.
Set of nets for urbanization installations.
Perimetral Fence.

Execution terms:
Starting date: June 2009
Foreseen completion date: February 2011

Project Information:
Estacin conversora de Excavation volume: 10,000 m
Morvedre (Valencia) Ballast filling volume: 14,000 m
Concrete Volume: 7,000 m
Pavement Surface: 4,000 m
Steel B-500 SD: 430 tons.
Precast Panel: 9,000 m
Cladding type protective film (forming Faraday
cage): 2,000 m
Asphalt road surface: 2,000 m

Vehculo de control
Estacin remoto para seguimiento
conversora de de la colocacin del cable
Santa Ponsa
(Mallorca)

Equipo para la zanja para el


cable en fondos de sustratos Vehculo para el soterramiento
compactos del cable con agua a presin en
fondos arenosos

Mallorca,22 43005 TARRAGONA


Tels: 977 21 53 04 Fax: 977 21 97 37