14 APRIL 2016
RUNSHEET BHPT SURVEY
PETROLEUM ENGINEERING SUBANG FIELD
Report Required by : Tubing 2-7/8" 1763.45 Meter Packer 1753.87 Meter
Well No. : CLT-02 GLV Perforasi 2330 - 2333 Meter
Type of Test : Gradient Flowing
Start : 14/04/2016
End : 15/04/2016
On Bottom : 14/04/2016
Off Bottom : 15/04/2016 Date : 14/04/2016 Date : 15/04/2016
Duration : Running In Hole Pull Out Of Hole
Depth Stage Start Time Stop Time Depth Stage Start Time Stop Time
Meter HH:MM:SS HH:MM:SS Meter HH:MM:SS HH:MM:SS
0 16:17:00 16:24:00 1753 16:21:00
Battery Information 200 16:26:00 16:31:00
Gauge S/N Battery S/N Voltage Ah Remaining 400 16:33:00 16:38:00
PPS 25 3.37 600 16:40:00 16:45:00
800 16:47:00 16:52:00
1000 16:54:00 16:59:00
14/04/2016 1200 17:01:00 17:06:00
10.30 - 17.22 - Rig up unit wireline. 1400 17:08:00 17:13:00
- Running sinker 2.25" s.d 1753 m (packer), lancar. 1600 17:15:00 17:20:00
Lakukan pull up test tiap 250 m, beban normal. 1753 17:22:00 0 6:48:00 6:58:00
- RIH EMR ukur gradient flowing tiap 200 m/5 menit s.d 1753 m.
17.22 - 24.00 Gantung EMR di 1753 m.
15/04/2016
00.00 - 06.21 Lanjut gantung EMR di 1753 m.
06.21 - 07.55 - POOH EMR s.d permukaan.
- Rig down unit wireline.
PE Subang Field
Hafandi Riyma P
- Agus Ibnul Hami
- Dwi Aneka
- Kusuma Ekananto
GRADIENT TEKANAN FLOWING
SUMUR : CLT-02
Keterangan :
Packer : 1753.87 mku
UR : 1763 mku
Perforasi : 2330 - 2333; 1860 - 1863 mku
Lapisan : TAF (Z-2170 & Z-1800)