OBRA : "INFRAESTRUCTURA DE LA CAPACITACION, INSTRUCCION, ALMACENAMIENTO Y ENTRENAMIENTO EN TECNICAS DE FUERZAS ESPECIALES RELACIONADAS AL AMBITO MILITAR"
M MANO DE OBRA INC. LEYES SOCIALES 47 0.235 100.000% 415.58 427.68 0.242 448.29 0.253
A ACERO DE CONSTRUCCION CORRUGADO 02 0.156 100.000% 518.90 580.78 0.175 570.55 0.172
C CEMENTO PORTLAND TIPO I 21 0.136 75.700% 329.31 332.68 0.138 332.68 0.138
AGREGADO GRUESO 05 24.300% 206.82 211.27 211.00
E MAQUINARIA Y EQUIPO NACIONAL 48 0.057 100.000% 334.06 332.12 0.057 330.88 0.056
M MADERA TERCIADA PARA ENCOFRADO 45 0.106 100.000% 317.24 313.14 0.105 313.14 0.105
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.310 100.000% 352.39 362.65 0.319 365.52 0.322
K = 0.383*(Mr / Mo) + 0.050*(Cr /Co) + 0.099*(Br /Bo) + 0.040*(Pr /Po) + 0.049(Co/Cr) + 0.078(Mr/Mo) + 0.301(Ir/Io)
M MANO DE OBRA INC. LEYES SOCIALES 47 0.383 100% 415.58 427.68 0.394 448.29 0.413
C CEMENTO PORTLAND TIPO I 21 0.050 100% 329.31 332.68 0.051 332.68 0.051
B BLOQUE Y LADRILLO 17 0.099 100% 658.34 654.44 0.098 653.60 0.098
P PINTURA LATEX 54 0.040 100% 329.54 336.45 0.041 339.04 0.041
C CERAMICA ESMALTADA Y SIN ESMALTAR 24 0.049 100% 269.21 275.14 0.050 273.32 0.050
M MADERA TERCIADA PARA CARPINTERIA 44 0.078 100% 345.73 342.24 0.077 342.23 0.077
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.301 100% 352.39 362.65 0.310 365.52 0.312
FORMULA POLINOMICA N 03
K = 0.071*(Jr / Jo) + 0.328*(GGr / GGo) + 0.171*(ATr / ATo) + 0.197*(Dr / Do) + 0.152*(APAr / APAo) + 0.081*(Mr / Mo)
J MANO DE OBRA INC. LEYES SOCIALES 47 0.071 100.000% 415.58 427.68 0.073 448.29 0.077
GG INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.328 100.000% 352.39 362.65 0.338 365.52 0.340
AT ALAMBRE Y CABLE TIPO TW Y THW 07 0.171 91.813% 557.44 637.310 0.194 637.73 0.194
TUBERIA DE PVC 72 8.187% 334.03 349.42 347.86
D DOLAR (GENERAL PONDERADO) 30 0.197 100.000% 360.86 363.98 0.199 360.57 0.197
ACERO DE CONSTRUCCION CORRUGADO 03 0.152 2.632% 514.15 575.46 0.150 565.32 0.149
APA ARTEFACTO DE ALUMBRADO INTERIOR 12 90.789% 284.69 279.73 277.94
POSTE DE CONCRETO 62 6.579% 392.11 405.86 403.43
M MAQUINARIA Y EQUIPO IMPORTADO 49 0.081 100.000% 243.50 239.68 0.080 238.23 0.079
FORMULA POLINOMICA N 04
K = 0.382*(MOr / MOo) + 0.086*(Tr / To) + 0.240*(ASNr / ASNo) + 0.101*(Dr / Do) + 0.191*(GGr / GGo)
MO MANO DE OBRA INC. LEYES SOCIALES 47 0.382 100.000% 415.58 415.58 0.382 448.29 0.412
T TUBERIA DE PVC PARA AGUA 72 0.086 100.000% 334.03 334.03 0.086 347.86 0.090
ASN APARATO SANITARIO CON GRIFERIA 10 0.240 100.000% 319.47 319.47 0.240 334.97 0.252
D DOLAR (GENERAL PONDERADO) 30 0.101 100.000% 360.86 360.86 0.101 360.57 0.101
GG INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.191 100.000% 352.39 352.39 0.191 365.52 0.198
0.000 0.000
0.000 0.000
0.000 0.000
0.000
0.000
0.000
0.000
0.000 Kr = 0.000
Set 11 Oct-11
K Ir REAJ.
0.000
0.000
0.000
0.000 Kr = 0.000
Set 11 Oct-11
K Ir REAJ.
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 Kr = 0.000
Set 11 Oct-11
K Ir REAJ.
0.000 0.000
0.000 0.000
0.000 0.000
0.000
0.000
0.000 Kr = 0.000
CALCULO DE GASTOS GENERALES
LICITACION : AMC N 012-2009-EPSASA-CE
OBRA : IMPLEMENTACIN DEL SISTEMA DE AGUA POTABLE, SISTEMA DE ALCANTARILLADO Y TRATAMIENTO DE AGUAS RESIDUALES DE LAS LOCALIDADES DE
HUASCAHURA, MOLLEPATA Y ANEXOS, SUB PROYECTO III.
UBICACIN : COMUNIDADES DE HUASCAHURA, MOLLEPATA Y ANEXOS
PROPIETARIO : ENTIDAD PRESTADORA DE SERVICIOS DE SANEAMIENTO AYACUCHO S.A. - EPSASA
CONTRATISTA : CONSORCIO HUASCAHURA
SUPERVISION : HIDROINGENIERIA S.R.L.
FECHA : 15/03/2010
I. Gastos Generales no relacionados con el tiempo de ejecucin de obra S/. 31,373.07 0.5700%
II. Gastos Generales relacionados con el tiempo de ejecucin de obra S/. 386,955.40 7.0300%
Incidencia aplicable a la valorizacin N 01 S/. 260,955.40 4.74%
a) Gastos de Administracin de obra S/. 209,067.50
Sueldos, bonificaciones y beneficios sociales del personal Tcnico Administ S/. 147,200.00
Viticos y hospedaje del personal tcnico administrativo y obrero calificado S/. 7,500.00
Gastos por traslado del personal S/. 4,300.00
Seguro de accidentes del personal Tcnico Administrativo S/. 11,194.00
Seguro contra todo riesgo para contratistas S/. 3,800.00
Papelera y tiles de escritorio S/. 800.00
Copias de documentos y duplicado de planos S/. 800.00
Presentacin de informes (fotografas, copias, otros) S/. 800.00
Equipos de comunicacin S/. 1,000.00
Utiles de Limpieza S/. 673.50
Botiqun S/. 500.00
Pruebas y ensayos S/. 1,500.00
Camioneta S/. 28,000.00
Costo de oficina en obra (Mobiliario, Luz, agua, telefono/fax, mantenim.) S/. 1,000.00
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
VALORIZACION N 02
#REF!
FORMULA POLINOMICA N 01
D=
A . D.
C
xVx
K
Ka
1 [ ]
VALORIZACION AMORTIZACION DEL DEDUCCION
VAL No MES A/C K Ka
EJECUTADA ADELANTO EFECTIVA
AREA GEOGRAFI : 2
D.S. N 017-79-VC
donde :
ESTRUCTURAS
Adelanto
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Deflactado c.i. x Valoriz. Monto utilizado
Adel.Otorg. x
N Mes Valoriz, (S/,) material (SIN IGV) Dic .2004 Junio .2004 Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 Jul-11 #REF! 0.169 #REF! 565.32 517.58 514.15 #REF! #REF! #REF!
2 Aug-11 #REF! 0.169 565.32 517.58 514.15 #REF! #REF! #REF!
3 Set 11 0.169 565.32 517.58 #REF! 0.00 0.00
4 Oct-11 0.169 565.32 517.58 #REF! 0.00 0.00
5 Nov-11 0.169 565.32 517.58 #REF! 0.00 0.00
TOTAL #REF! #REF! #REF!
Adelanto
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Deflactado c.i. x Valoriz. Monto utilizado
Adel.Otorg. x
N Mes Valoriz, (S/,) material (SIN IGV) Dic .2004 Junio .2004 Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 Jul-11 #REF! 0.209 #REF! 565.32 517.58 514.15 #REF! #REF! #REF!
2 Aug-11 #REF! 0.209 565.32 517.58 514.15 #REF! #REF! #REF!
3 Set 11 0.209 565.32 517.58 #REF! 0.00 0.00
4 Oct-11 0.209 565.32 517.58 #REF! 0.00 0.00
5 Nov-11 0.209 565.32 517.58 #REF! 0.00 0.00
TOTAL #REF! #REF! #REF!
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 #REF! 0.041 2 591.60 160.11 160.11 160.04 2 590.47 #REF! #REF!
2 ENERO.05 14 793.02 0.041 161.60 160.91 160.04 606.55 606.55
3 FEB.05 0.00 0.041 160.75 160.91 160.04 0.00 0.00
4 MARZO.05 0.00 0.041 160.34 160.91 160.04 0.00 49.55
TOTAL #REF! #REF! #REF!
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 32 935.39 0.150 9 480.88 323.63 323.63 323.63 9 480.88 4 940.31 4 940.31
2 ENERO.05 14 793.02 0.150 323.63 323.63 323.63 2 218.95 2 218.95
3 FEB.05 14 241.63 0.150 323.63 323.63 323.63 2 136.24 2 136.24
4 MARZO.05 1 235.80 0.150 323.63 323.63 323.63 185.37 185.37
TOTAL 63 205.84 9 480.87 9 480.87
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes Valoriz, (S/,) material (SIN IGV) Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 #REF! 0.034 2 067.28 367.52 367.52 382.02 2 148.84 #REF! #REF!
2 ENERO.05 14 793.02 0.034 365.19 368.23 382.02 502.93 502.93
3 FEB.05 0.00 0.034 362.41 368.23 382.02 0.00 0.00
4 MARZO.05 0.00 0.034 362.18 368.23 382.02 0.00 0.00
TOTAL #REF! #REF! #REF!
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 #REF! 0.073 4 591.16 363.50 363.50 365.29 4 613.77 #REF! #REF!
2 ENERO.05 14 793.02 0.073 365.33 364.91 365.29 1 079.83 1 079.83
3 FEB.05 0.00 0.073 368.21 364.91 365.29 0.00 0.00
4 MARZO.05 0.00 0.041 369.48 364.91 365.29 0.00 90.21
TOTAL #REF! #REF! #REF!
ARQUITECTURA
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 968.46 0.222 50 977.61 250.84 250.84 254.41 51 703.13 215.00 215.00
2 ENERO.05 68 994.61 0.222 248.72 249.76 254.41 15 316.80 15 316.80
3 FEB.05 92 778.66 0.222 248.49 249.76 254.41 20 596.86 20 596.86
4 MARZO.05 70 155.25 0.222 245.24 249.76 254.41 15 574.47 15 574.47
TOTAL 232 896.98 51 703.13 51 703.13
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 968.46 0.017 3 955.76 325.37 325.37 318.35 3 870.41 16.45 16.45
2 ENERO.05 68 994.61 0.017 331.72 330.74 318.35 1 171.87 1 171.87
3 FEB.05 92 778.66 0.017 331.61 330.74 318.35 1 575.85 1 575.85
4 MARZO.05 70 155.25 0.017 331.94 330.74 318.35 1 191.59 1 106.24
TOTAL 232 896.98 3 955.76 3 870.41
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 968.46 0.039 8 719.71 272.02 272.02 283.36 9 083.22 37.77 37.77
2 ENERO.05 68 994.61 0.039 267.86 269.38 283.36 2 690.86 2 690.86
3 FEB.05 92 778.66 0.039 265.98 269.38 283.36 3 618.46 3 618.46
4 MARZO.05 70 155.25 0.039 265.26 269.38 283.36 2 736.12 2 736.12
TOTAL 232 896.98 9 083.22 9 083.22
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 968.46 0.374 83 800.50 367.52 367.52 382.02 87 106.73 362.22 362.22
2 ENERO.05 68 994.61 0.374 365.19 368.23 382.02 25 804.95 25 804.95
3 FEB.05 92 778.66 0.374 362.41 368.23 382.02 34 700.52 34 700.52
4 MARZO.05 70 155.25 0.374 362.18 368.23 382.02 26 239.05 26 239.05
TOTAL 232 896.98 87 106.73 87 106.73
INSTALACIONES SANITARIAS
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 1 099.98 0.466 4 642.27 297.84 297.84 295.79 4 610.32 512.59 512.59
2 ENERO.05 7 464.79 0.466 297.00 296.60 295.79 3 478.59 3 478.59
3 FEB.05 732.17 0.466 292.72 296.60 295.79 341.19 341.19
4 MARZO.05 31 836.80 0.466 291.68 296.60 295.79 14 835.95 277.95
TOTAL 41 133.74 19 168.32 4 610.32
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 1 099.98 0.080 766.71 367.52 367.52 382.02 796.96 88.00 88.00
2 ENERO.05 7 464.79 0.080 365.19 368.23 382.02 597.18 597.18
3 FEB.05 732.17 0.080 362.41 368.23 382.02 58.57 58.57
4 MARZO.05 31 836.80 0.080 362.18 368.23 382.02 2 546.94 53.21
TOTAL 41 133.74 3 290.69 796.96
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 1 099.98 0.051 508.06 303.80 303.80 250.40 418.76 56.10 56.10
2 ENERO.05 7 464.79 0.051 297.00 296.60 250.40 380.70 362.66
3 FEB.05 732.17 0.051 323.94 296.60 250.40 37.34 0.00
4 MARZO.05 31 836.80 0.051 324.49 296.60 250.40 1 623.68 0.00
TOTAL 41 133.74 2 097.82 418.76
INSTALACIONES ELECTRICAS
Material : Alambre y cable de cobre desnudo ( I.U. = 06 )
Valorizacion Monto c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes Valoriz, (S/,) material (SIN IGV) Nov.2004 Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 20 704.39 0.063 11 270.29 489.51 489.51 500.19 11 516.18 1 304.50 1 304.50
2 ENERO.05 43 539.91 0.063 494.68 491.26 500.19 2 743.27 2 743.27
3 FEB.05 50 142.22 0.063 495.04 491.26 500.19 3 159.25 3 159.25
4 MARZO.05 110 788.73 0.063 497.58 491.26 500.19 6 980.33 6 980.33
TOTAL 225 175.25 14 187.35 14 187.35
Valorizacion Monto Valoriz. c.i. Monto Otorg. Imr Ima Imo Adelanto Deflactado c.i. x Valoriz. Monto utilizado
N Mes S/. material (SIN IGV) Nov.2004 Nov.2004 Mayo.2004 Adel.Otorg. x Imo/Ima para la deduccin
a b c d e f g=cxf/e h=axb j
1 DIC.04 20 704.39 0.080 7 585.24 330.45 330.45 340.16 7 808.13 1 656.23 1 656.23
2 ENERO.05 43 539.91 0.080 331.68 331.62 340.16 3 482.94 3 482.94
3 FEB.05 50 142.22 0.080 330.55 331.62 340.16 4 011.09 2 668.96
4 MARZO.05 110 788.73 0.080 334.44 331.62 340.16 8 862.46 0.00
TOTAL 225 175.25 18 012.72 7 808.13
Deduccin
k = j x (d -e)/f
#REF!
#REF!
#REF!
Deduccin
k = j x (d -e)/f
#REF!
#REF!
#REF!
Deduccin
k = j x (d -e)/f
#REF!
#REF!
#REF!
Deduccin
k = j x (d -e)/f
#REF!
2.62
0.00
- 0.18
#REF!
Deduccin
k = j x (d -e)/f
0.00
0.00
0.00
0.00
0.00
Deduccin
k = j x (d -e)/f
#REF!
- 4.00
0.00
0.00
#REF!
Deduccin
k = j x (d -e)/f
#REF!
1.24
0.00
1.13
#REF!
Deduccin
k = j x (d -e)/f
0.00
- 62.61
- 102.82
- 276.71
- 442.14
Deduccin
k = j x (d -e)/f
0.00
3.61
4.31
4.17
12.09
Deduccin
k = j x (d -e)/f
0.00
- 14.43
- 43.42
- 39.78
- 97.63
Deduccin
k = j x (d -e)/f
0.00
- 205.35
- 528.66
- 415.54
-1 149.55
Deduccin
k = j x (d -e)/f
0.00
4.70
- 4.48
- 4.62
- 4.40
Deduccin
k = j x (d -e)/f
0.00
- 4.75
- 0.89
- 0.84
- 6.48
Deduccin
k = j x (d -e)/f
0.00
0.58
0.00
0.00
0.58
Deduccin
k = j x (d -e)/f
0.00
18.76
23.87
88.20
130.83
Deduccin
k = j x (d -e)/f
0.00
0.61
- 8.40
0.00
- 7.79
- 644.17
CONSORCIO LAS PALMAS
AREA GEOGRAFICA :2
OBRA : "INFRAESTRUCTURA DE LA CAPACITACION, INSTRUCCION, ALMACENAMIENTO Y ENTRENAMIENTO EN TECNICAS DE FUERZAS ESPECIALES RELACIONADAS AL AMBITO MILITAR"
UBICACIN : LAS PALMAS - SURCO
PROPIETARIO : FUERZA AEREA DEL PERU - SERVICIO DE INGENIERIA
CONTRATISTA : CONSORCIO LAS PALMAS
INSPECTOR : ING. FLORENCIA CHANG CHANG
AREA GEOGRAFICA :2
OBRA : "INFRAESTRUCTURA DE LA CAPACITACION, INSTRUCCION, ALMACENAMIENTO Y ENTRENAMIENTO EN TECNICAS DE FUERZAS ESPECIALES RELACIONADAS AL AMBITO MILITAR"
UBICACIN : LAS PALMAS - SURCO
PROPIETARIO : FUERZA AEREA DEL PERU - SERVICIO DE INGENIERIA
CONTRATISTA : CONSORCIO LAS PALMAS
INSPECTOR : ING. FLORENCIA CHANG CHANG
AREA GEOGRAFICA :2
#REF!
FORMULA VAL. DEDUCCION AMORTIZACION
#REF!
01 01 - -
01 02 - -
01 03 - -
01 04 - -
01 05 #REF! 53,639.97
01 06 #REF! #REF!
01 07 #REF! #REF!
01 08 #REF! #REF!
01 09 #REF! #REF!
FORMULA POLINOMICA 01
July-11 01 #REF! #REF! 1.000 #REF! #REF! 01 #REF! #REF! 1.000 #REF! #REF! #REF! 0.00 0.00 0.00
August-11 02 #REF! #REF! 1.000 #REF! #REF! 02 #REF! #REF! 1.000 #REF! #REF! #REF! 0.00 0.00 #REF!
September-11 03 #REF! #REF! 1.000 #REF! #REF! 03 0.00 #REF! 1.000 0.00 #REF! 0.00 0.00 0.00 0.00
October-11 04 #REF! #REF! 1.000 #REF! #REF! 04 0.00 #REF! 1.000 0.00 #REF! 0.00 0.00 0.00 0.00
November-11 05 #REF! #REF! 1.000 #REF! #REF! 05 0.00 #REF! 1.000 0.00 #REF! 0.00 0.00 0.00 0.00
December-11 06 #REF! #REF! 1.000 #REF! #REF! 06 0.00 #REF! 1.000 0.00 #REF! 0.00 0.00 0.00 0.00
January-12 07 #REF! #REF! 1.000 #REF! #REF! 07 0.00 #REF! 1.000 0.00 #REF! 0.00 0.00 0.00 0.00
February-12 08 #REF! #REF! 1.000 #REF! #REF! 08 0.00 #REF! 1.000 0.00 #REF! 0.00 0.00 0.00 0.00
OBRA CONSTRUCCION MINIMARKET - CASA DEL ADMINISTRADOR "ALTO DEL PRADO - ASIA"
UBICACIN SAN ANTONIO, ASIA, CAETE
PROPIETARIO LOS PORTALES S.A.
SUPERVISION
Item Descripcin de Partidas Unidad Metrado P.U. (s/) Sub Total (s/) Total (s/)
19
03.03.08.04 CURADO m2 155.42
03.03.08.05 LADRILLO DE TECHO DE ARCILLA COCIDA und 1,296.00
03.03.09.00 LOSAS MACIZA e= 20 cm.
03.03.09.01 CONCRETO PREMEZCLADO LOSA MACIZA F'C=210 KG/ CM2 m3 0.29
03.03.09.02 ENCOFRADO Y DESENCOFRADO DE LOSAS MACIZAS m2 1.45
03.03.09.03 ACERO f'y=4200 kg/cm2 Kg 14.62
03.03.09.04 CURADO m2 1.45
03.03.10.00 ESCALERA
03.03.10.01 CONCRETO PREMEZCLADO ESCALERAS, F'C= 210 KG/CM2 m3 1.80
03.03.10.02 ENCOFRADO Y DESENCOFRADO DE ESCALERAS m2 11.21
03.03.10.03 ACERO f'y=4200 kg/cm2 Kg 179.97
03.03.10.04 CURADO m2 11.21
03.03.11.00 OTROS
03.03.11.01 JUNTAS DE CONTRACCION ml 80.00
03.03.11.02 JUNTAS DE DILATACION ml 69.00
04.00.00.00 ARQUITECTURA
20
RED SALIDA DE FUERZA EXTRACTOR DE AIRE EN COCINA pto 1.00
RED SALIDA DE FUERZA ELECTROBROMBAS pto 1.00
RED SALIDA DE FUERZA PARA COCINA ELECTRICA pto 1.00
RED SALIDA DE FUERZA PARA CALENTADOR ELECTRICO pto 1.00
LLAVE BIPOLAR 2X20A EMPOTRADA pto 1.00
ALIMENTADORES Y ACOMETIDAS
Red de alimentadore del medidor al TD1 (3-1x16mm2 LSOH 25mm PVC-P) m 10.00
Red de alimentador del tablero TD1 al Tablero de electrobombas TC-BA (2-1x4m m 8.00
Red de alimentador del tablero TD1 al Pozo puesta a tierra (1x10mm2(T) LSPH.25mm m 4.00
Red de alimentador del tablero TC-BA a la salida de fuerza electrobomba (2-1x4 m 3.00
Red de alimentador del tablero TD2 a la cocina electrica 2-1x4mm2 + 1x4mm2(T)LS m 6.50
Red de alimentador del tablero TD2 a la lavadora (2-1x4mm2 + 1x4mm2(T)LSOH 2 m 10.00
Red de alimentador del tablero TD2 a la secadora (2-1x4mm2 + 1x4mm2(T)LSOH 2 m 10.00
Red de alimentador del tablero TD2 al calentadore de agua (3-1x6mm2 + 1x6mm2(T m 10.00
TABLEROS ELECTRICOS
TABLERO TD-1 und 1.00
TABLERO TD-2 und 1.00
TABLERO DE CONTROL und 1.00
CAJA DE PASE FG
CAJA DE PASE F G 150X150X100 und 1.00
ALIMENTADORES Y ACOMETIDAS
ARTEFACTOS ELECTRICOS
LUZ DE EMERGENCIA und 4.00
LUMINARIA OFFISIMPLE ADOSABLE 236 MINIMARKET Y ALMACN und 17.00
LUMINARIA PLAFN LED 16 W 33CM. LUZ FRA LIGHTECH SALA Y KITCHENETTE und 5.00
LUMINARIA PLAFN LED 10 W 28CM. LUZ FRA LIGHTECH DORMITORIOS. und 2.00
SPOT ADOSABLE REDONDO BLANCO 2 LUCES SS.HH., PASADIZOS, TERRAZA, und 10.00
APLIQUE DE FIERRO VASO 1 LUZ CASA BONITA ESCALERAS und 9.00
21
04.01.00 FILTRACION 34,060.74
04.01.01 FILTRO DE ARENA HAYWARD S310S 4.91 Pies2 Diametro 31" unid 2.00 3847.20 7,694.40
04.01.02 SACO DE 40 Kg slica # 15 und 12.00 50.10 601.20
04.02.00 IMPULSION
04.02.01 BOMBA DE PISCINA HAYWARD Electrobomba Centrifuga trifsico 1.5 HP, 3600 unid 2.00 3250.00 6,500.00
04.03.00 DESINFECCION Y CONTROL QUIMICO
04.03.01 EQUIPO DE INJECTOR DE HIPOCLORITO DE CALCIO BlueWhite C630P 2.4 unid 1.00 2192.73 2,192.73
04.04.00 ILUMINACION SUBACUATICA, EXTERIOR, CM
04.04.01 REFLECTOR Hayward SP0580S15 incandescente 300 watts 12 V cable 15' unid 7.00 988.50 6,919.50
04.04.02 NICHO PVC Hayward SP0600U para reflector subacutico unid 7.00 111.36 779.52
04.04.03 KIT PARA Instalacin (caja de paso, transformador, cables, ductos, etc.) unid 7.00 222.72 1,559.04
04.05.00 CONTROL
04.05.01 EQUIPO PARA LLENADO AUTOMATICO 1-1/2" unid 1.00 831.52 831.52
04.05.02 BOMBA DE ACHIQUE DE 1/2HP unid 1.00 1902.00 1,902.00
04.05.03 VALVULA ESFERICA Y VALVULA CHECK para bomba de achique en 2" unid 1.00 852.00 852.00
04.06.00 EMPOTRAR
04.06.01 RETORNO DE PISO SP-1425S unid 8.00 88.35 706.80
04.06.02 REJILLA SUMIDERO DE FONDO WG 1032 de 12" unid 2.00 291.03 582.06
04.06.03 BOQUILLAS PARA ASPIRACION 2" unid 2.00 150.71 301.42
04.06.04 DRENAJE DE CANALETA Hayward SP1019 de 2" unid 8.00 68.00 544.00
04.07.00 VARIOS
04.07.01 EQUIPO DE LIMPIEZA 1 1/2" servicio pesado unid 1.00 2094.55 2,094.55