Sei sulla pagina 1di 15

Document Number Rev.

Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 1 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

METHOD STATEMENT
FOR
PILECAP CONSTRUCTION

OWNER Approval: PKT


Name:
Date (DD-MMM-YY):
Signature:

A 1-NOV-17 IFR - Issued for Review KHAIRUN C.S LIM YM YAP


DATE
RE CHECKED APPROVED
DD-MMM- STATUS REVISION MEMO WRITTEN BY
V. BY BY
YY
Sections changed in last revision are identified by a vertical line in the margin.
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 2 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

Table of Contents
1.0 PURPOSE
2.0 SCOPE OF WORK..................................................................................................................................3
2.1 Resources.......................................................................................................................... ......3
2.1.1 Plant, Equipment or Tools...................................................................................................... 3
2.1.2 Manpower................................................................................................................................. 4
2.1.3 Material...................................................................................................................................... 4
2.1.4 Work Sequence........................................................................................................................4
2.2 Site Prepartion..........................................................................................................................5
2.3 Work Methodology...................................................................................................................6
3.0 DEFINATIONS ......................................................................................................................8
4.0 RESPONSIBILITIES............................................................................................................................... 9
5.0 PERMIT TO WORK REQUIREMENT.................................................................................................. 9
6.0 EQUIPMENT AND PPE.......................................................................................................................... 9
6.0 WELFARE FACILITIES........................................................................................................................11
7.0 SAFETY & HEALTH............................................................................................................................. 10
7.1 Safety At Site..........................................................................................................................10
7.2 Protective & Safety Equipment............................................................................................10
8.0 WELFARE FACILITIES........................................................................................................................11
9.0 TECHNICAL SPECIFICATIONS.........................................................................................................11
10.0 EMERGENCY RESPONSE................................................................................................................ 11
11.0 EMERGENCY EQUIPMENT AND FACILITIES..............................................................................12
12.0 CONTACTS........................................................................................................................................... 12
13.0 APPENDIX ........................................................................................................................................ 12
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 3 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

GENERAL

Ban Lee Hin Engineering & Construction Sdn. Bhd is appointed by PKT Logistic Group
Sdn Bhd(The Owner) as the Contractor for Engineering, Procurement, Construction and
Commissioning (EPCC) For The Ship Campus located in Batu Kawan , Penang ,Malaysia.

All employees will comply with this method statement and the requirements of the Health and
Safety at Work Act 1974, and other relevant health and safety legislation, together with any
specific site rules as where applicable, the requirements from contractors safety policy and
construction phase health and safety plan.

1.0 PURPOSE

This Method Statement is to describe the general procedures for in-situ concreting works
for pilecap at the project site and also describing about all the preventive actions to be
taken in order to achieve good quality and safety.

2.0 SCOPE OF WORK

This Method Of Statement is defined the site concreting procedure for the pileca
construction works.

2.1 Resources

2.1.1 Plant, Equipment or Tools

The following Plant & Equipment will be utilized as and when necessary to assist in the
works

Item Plant & Equipment Purpose


1 Measuring tools Measuring dimension
2. Hand tools Drilling, screwing, cutting and hammering.
3. Generator Source of electricity for hand tools
4. Crane For concreting works
5. Mobile crane Lifting equipment / material
6. Lorry / trailer Transporting material
7. Concrete mixer Transporting concrete
truck
8. Survey equipment Surveying construction alignment / boundary
9. Air compressor Cleaning surface for concreting work area
10. Concreting bucket Placing concrete
11. Concrete vibrator Vibrating and compacting concrete
12 Backhoe Excavation/backfilling/concreting
13 Excavator Excavation/backfilling
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 4 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

2.1.2 Manpower

The following manpower will be involved in the construction works. The number of
manpower shall be based on the needs at site, and as where required
No. Indirect Manpower Quantity
1. Project Manager
2. Assistant Project Manager
3. Senior Project Engineer
4. Project/Site Engineer
As required
5. Site Supervisor
6. Surveyor
7. Safety Officer
8 Safety Supervisor

No. Direct Manpower Quantity


1. General Workers
2. Signal Man
As required
3. Skilled Worker
4. Machines Operator

2.1.3 Material

The following as the major materials will be utilized at site to complete the installation
works. The dimension, capacity and type of materials shall be as per construction
drawings.

1. Steel Bar
2. Concrete

2.1.4 Work Sequence

Sequence of the works described herein can be as the following.

1. Mobilization of tools, equipment and material


2. Preparation and construction of pilecap with dimension as stated in the drawings.
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 5 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

2.2 Site Preparation

Check For Existing Services


Before construction works start, whatever existing services available , it
needs to be reroute or protected so that it will not effect site activities.

Survey Setting Out


All the detailed setting out and level of the structure shall carried out as per
approved construction drawings
Formwork
The timber were used as formwork shall be fabricated and prepared at the
carpentry yard. The prefabricated formwork shall be taken to the work place
for construction
The formwork shall be rigid to maintain the forms in correct position, shape
and dimensions until done with pouring, ramming, vibration and setting of the
concrete.
Concrete
Concrete mix design for the specific strength shall be submitted for approval.
Trial mix shall be carried out as per concrete mix design
Concrete grade shall be as specified on the construction drawings
Steel Reinforcement
All reinforcement bar (rebar) raw material shall be jointly inspected by client
or client representative and mill certificate shall be submitted
Rebar shall be cut and bent as stated in construction drawings
Rebar is to be transferred to job site when required
All reinforcement bar shall be tied with binding wires
Used spacer block as supports for the reinforcements to create gap in
between reinforcement and concrete and to prevent from sagging during
concreting works.
Links shall be tied to the longitudinal bars using tie wire
For rebar which required to be laid in layers, e.g. reinforcement mesh, then it
shall be rigidly supported on mild steel chair to prevent sagging during
concreting works
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 6 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

Spacer Blocks
The dense concrete spacer or equally approved shall be used in between the
reinforcement, bottom and sides to ensure correct cover concrete over the
rebar

2.3 Work Methodology

The works shall be supervised by supervisor and safety supervisor; they shall be present
at all time to ensure the safety at site is not compromised. All the required certificates
must be submitted before work commencement

Excavation Works
Setting out and mark the location for excavation works.
The Depth of the excavation will be refer to the construction drawing as a
reference.

Cut Off Piles


Piles shall only be cut-off after securing the directive and acceptance by the
site S.O. This is to ensure that any re-driving work that would be required
can still be carriet when such situations warrant.
The value for pile cut-off level must be formally agreed and any piles that
need to be brought up to the required cut-off level must meet the S.O.s
agreement and guidelines. Where pile cut-off levels are below ground,
excavation sides shall either be sloped or protected by an earth retaining
structure to prevent collapse of the excavated pit.
Where pile cut-off levels are below water level, suitable enclosing structures
(e.g. cofferdams) shall be installed to exclude water from the works

Fabrication Of Pile Plugs


Stripping of piles and fabrication of pile heads for concrete piles shall be
carried out in accordance to the Drawings. The lengths of stripping and
reinforcement to be provided shall be adequate to anchor the pile into the pile
cap to be constructed.
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 7 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

Lean Concrete
Before pour lean concrete ,dewatering should be done and the water to be
discharge at existing drainage.
The thickness and grade of lean concrete will be base on construction
drawings.

Installation Formwork
The postion of the pilecap will be mark and formwork will be install

Installation Rebar
The Rebar will be install base on construction drawings and spacer
block will be use as supports for the reinforcements to create gap in between
reinforcement and concrete and to prevent from sagging during concreting
works

Placing Of Concrete
Concrete shall be poured by direct pouring by using crane direct pour.
Placement of fresh concrete shall be carried out as soon as concrete is
discharged from truck. It has to be vibrated thoroughly by using mechanical
vibration.
Where required, approved admixture shall be used to prolong concrete
setting time
Placing concrete shall comply with BS 8110-1 clause 6.2.2.
When water table is high or after heavy rain, dewatering pump shall be used
to ensure the excavated trench always in dry condition during excavation and
construction of pipes/cables bedding.

Compaction
The concrete shall be compacted thoroughly by vibration to form a dense
homogenous mass free form voids
Vibrations shall be carried out continuously until the expulsion of air has
ceased. The compaction shall be deemed completed when mortar appears to
be annulus (in a circle) around the vibrator
Compaction of concrete shall comply with BS 8110-1 clause 6.3.
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 8 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

Protection And Curing


When the concreting works is completed, concrete shall be protected from rain
or any disturbance that likely to interfere the process of setting.
Concrete surface shall be make good covered with damped hessian cloth or
curing compound or with an absorbing material which is kept damped by
frequent watering.Reference can be made in accordance with BS 8110-1
clause 6.2.3.

Removal Of Formworks
Formwork shall be removed in the way of not including any damages to the
concrete.
Minimum period required to remove side formwork is 12 hours after casting.
Reference shall be made in accordance with BS 8110-1 clause 6.2.6.

Back filling Works


Soil will be backfill back and will be compacted every 300mm depth.

3.0 DEFINATIONS

PROJECT : Cadangan Pembangunan Institusi Pengajian Tinggi


Swasta Di Atas PT5894,Taman Perindustrian Batu
Kawan,Mukim 13, Seberang Perai Selatan, Pulau
Pinang.
OWNER : PKT Logistics (M) Sdn Bhd
Consultant : SG Tan Associates
CONTRACTOR : Ban Lee Hin Engineering & Construction Sdn Bhd
Subcontractor : Subcontractors hired by CONTRACTORs working for this
PROJECT.
WORK : Each part of the Building to be designed, engineered,
procured, constructed, erected, commissioned and
tested, and each other activity performed or to be
performed by the CONTRACTOR under and in
accordance with the CONTRACT.
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 9 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

4.0 RESPONSIBILITIES

ite
Position Responsibilities
m
Project / Site Responsible for overall planning and ensure sufficient
1
Engineer resources are available and adequate to complete this work
Responsible for daily planning and ensure all plants,
Construction
2 materials and manpower are available and adequate to
Supervisor
complete this work
Work with construction team to ensure safe working
3 Safety Supervisor
environment
4 Surveyor To establish a boundary line and mark a required level
5 Skilled Workers To assist the works task
6 General Workers To assist the works task

5.0 PERMIT TO WORK REQUIREMENT

Cold Work Lifting Operation


/ /
Hazardous Environment
Hot Work

Hazardous Material Handling


Working at Height

Line Break
Excavation /

Electrical Isolation Consider Confine Space Work


Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 10 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

6.0 EQUIPMENT AND PPE

The following equipment / PPE as identified following the completion of the Site/Task
Specification Risk Assessment and Method Statement need to be taken to site and used

Basic PPE Additional Required PPE


Hard hat, Safety glasses
Safety Boots, Gloves
Safety Hardness

7.0 SAFETY & HEALTH

7.1 Safety at site

All employees and subcontractors will be made aware during daily site tool box talk of
any risks their work can expose themselves and others in the vicinity. Safety Supervisor
and Site supervisor will liaise with the principle contractor on the matter of safety to
ensure safe working environment
Site supervisor and safety supervisor shall be present at all time to make sure worker
working at height and the installation method carried out is safe and as described in
the method statement. Safety kit shall be available near to the working area, in the
event of injury

Work will only commence when adequate protection is in place. Safety measures for
the working at height (equal or higher than 1.8m above ground level), fall protection
shall be implemented in accordance to MEB HSSE Plan, to ensure safe construction. It
shall be as follows, but not limited to:
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 11 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

7.2 Protective and Safety Equipments

All workers engaged in the job site shall wear appropriate p.p.e and provide emergency
medical facilities or kit in accordance to the hsse plan as below :-

1. Rubber boots (for concreting works only

2. Gloves (semi- leather)

3. First aid: first aid kit(s) will be available in the shelter area and in the
vehicles. For major injuries isos will be contacted (019-2962787). This
service is available 24 hours 7 days. All injuries and incident will be
reported to the Blh hses in timely manner.

8.0 WELFARE FACILITIES

The list of welfare facilities will be provided in the construction site as below.

1 Drinking facilities
x
2 Rest facilities x
3 Toilet (portable/permanent) x
4 Smoking area x

Remark: These welfare facilities will maintain throughout the life of the project

9.0 TECHNICAL SPECIFICATIONS

N/A

10.0 EMERGENCY RESPONSE

1. Established temporary assembly point

2. For first aid treatment, inform safety supervisor, Two first aid boxes are to be provided

3. For serious injuries, inform safety supervisor personnel to get ambulance

4. For any emergency refer to Emergency Response Plan


Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 12 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

11.0 EMERGENCY EQUIPMENT AND FACILITIES

First Aid Boxes, Fire Extinguisher

12.0 CONTACTS

The relevant contact telephone numbers are as below:


Position Name Contact No.
Senior Project Mohammad Khairun Bin Tel 018-2223562
Engineer Ahmad Fhozi
Site Supervisor Tan Ching Hwa Tel 011-36492439
HSSE Shamaran Tel 012-4609179
Personnel
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 13 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

13.0 APPENDICES

APPENDIX A - JOB HAZARDS ANALYSIS


APPENDIX B - SEQUENCE DRAWINGS
Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 14 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

APPENDIX A: JOB HAZARDS ANALYSIS


Document Number Rev. Page
Disciplin
Project Originator Doc. Type Unit No. Serial No.
e

The Ship BLH C&S MST 0001 0001 A 15 / 15

The Ship Campus Batu Kawan Penang.

METHOD STATEMENT Pilecap Construction

APPENDIX B: SEQUENCE DRAWINGS

Potrebbero piacerti anche