Sei sulla pagina 1di 16

Loop 375

Transmountain West
Texas Department of Transportation
People of The State of Texas
City of El Paso

People of The State of Texas

City of El Paso

Project Layout
Project Let: December, 2010
Estimate: $79.8 million
Beg. Construction: Spring 2010
Construction Time: 24 Months
Zoning Map with Project Layout
Texas Department of Transportation
Texas Department of
Eastbound
Westbound
I10

Begin Roadway
Construction

Texas Department of Transportation


Northwestern Drive
I10

Loop 375

Northwestern

Texas Department of Transportation


Resler Drive

RESLER Dr.

Texas Department of Transportation


EPNG

Plexxar Drive City of El Paso

PLEXAR Dr.

Texas Department of Transportation


Paseo Del Norte Drive
Paseo del Norte Dr.

Texas Department of Transportation


City of El Paso State Park

Texas Department of Transportation


Franklin Mountain State Park
Entrance

End Roadway
Construction

Texas Department of Transportation


Resler Dr and Transmountain Intersection

Existing Median Bullnose to be


affected
Loose Aggregate: Franklin Red and Grey
Stamped Colored Concrete: Ashlar Slate
Pattern
Vegetation: Oleander, Golden Euonymous,
Rosemary and Lantana
Tress: None
Monument Plaques: To be relocated
Existing Area Vegetation
Tress: Texas Honey Mesquite, Chitalpa,
Bradford Pear, Palo Verde, Afghan Pine,
Chinese Pistachio, Texas Red Oak and
Live Oak
Vegetation:
Oleander, Golden Euonymous, Dalea,
Bird of Paradise, Yucca, Rosemary, Tam
Juniper, Turpentine Bush, Texas Sage,
Fountain Grass, Ocotillo, Sotol, Cactus,
Coyote Bush and Lantana
Proposed Landscape at Hike and Bike Trail

Planting schemes at parkway


areas
Loose Aggregate: Franklin Red and Grey
Boulders: Franklin Red color
Vegetation: Rosemary, Texas Sage, Yuccas,
Sotol, Ocotillo, Tam Juniper, Cassia
Tress: Texas Honey Mesquite, Chitalpa, Palo
Verde

* Future vegetation and driveways by


developers
Proposed State Park Entry Sign
(Optional)
Approx Dimensions 4’ x 8’
U CHANNEL MULTIPLE CORTEN STEEL TUBE CAP
FRAME PANELS MOUNTAIN SHAPES
WELDED TO U CHANNEL

4” DIA TUBE

FINISHED GRADE
STAINLESS STEEL
LETTERS

CONCRETE
FOOTINGS

Existing Metal Structures


Throughout El Paso

Potrebbero piacerti anche