Revision List

Page 1 of 1

Project :MGC Eocene and Ratawi Flare Stack Air Blowers


Client : Wafra Joint Operations
Sign Date
Prepared by PAWA 20-Jul-2013
Checked by WALN 20-Jul-2013
Approved by WALN 20-Jul-2013

Doc./DWG No.: JO-WP-FE133-CA-6001 Rev. No: B

No. Para. / Section No. Items Explanation / Reason


1 XXXXXXXXXXXXX
2 Reinforcement calculation added
Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

CONTENTS

1.0 SCOPE 4

2.0 BASIC INFORMATION 4


2.1 Codes, Standards and References
2.2 Specifications
2.2 Basic Data

3.0 EQUIPMENT DATA (Refer Annexure 8.1) 5


3.1 Equipment Loading Data (Refer Annexure 8.1)

4.0 METHOD OF CALCULATION 6


4.1 Geometry of Tank Foundation
4.2 Properties of Tank Foundation

5.0 LOADING CALCULATION 7


5.1 Loading Calculation
5.2 Applied Loads on Top of Ring Beam and Footing
5.3 bb
Load Combinations

6.0 DESIGN OF FOUNDATION 9


6.1 Bearing pressure Check under ring beam foundation
6.2 Stability check
6.3 Reinforcement Design
6.4 Check for Reinforcement Around Anchor Bolt

7.0 CONCLUSION 17

8.0 ANNEXURES 18
8.1 Equipment data sheet for produced water tank. (JO-WP-MP1062-DS-2018)
8.2 Loading for wind and seismic forces for tank 20T-003A

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page2+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

1.0 SCOPE
The purpose of this calculation note is to design foundation for Tank No.
20T-003A Produced Water Tank.

2.0 BASIC INFORMATION

2.1 Codes, Standards and References


1. BS 8110 Part 1 and 2 Structural use of concretePart 1, 1999 &
2. ACI 318 Building code requirement for structural concrete.
3. API 650 Welded tank for oi storage

2.2 Specifications
1. JO-WP-MP1062-SP-6001 Specification for concrete works
2 KOC-C-006 KOC / JO Standard for concrete work, material and construction.
3 KOC-C-026 KOC / JO Standard for storage tank foundation.
4 Geotechnical Investigation at SC 20, 40,41 and 42
(Service order No. SC/290/SO-249)
2.3 Basic Data
Location of Tank - SC-20
Reference Grade Elevation - 100.00
Concrete
Concrete Design Strength, f'c - 30.00 MPa
Unit weight gc - 24.00 kN/m3
Reinforcement
Yield Strength, fy - 410.0 MPa
Concrete cover to reinforcement - 75.00 mm

Soil
Unit weight gs - 18.00 kN/m3
Friction coefficient Fc - 0.40 (Coefficient between foundation and soil)
Passive earth coefficient for
lateral resistance - Not considered
Design ground water Level :
a) Wind load combinations - At Grade level
b) Other than Wind load combinations - 3.0 m from ground level (Soil Report)
Max.Net allowable soil Bearing capacity - 200.0 KPa
Allowable increase in Soil bearing capacity, (Assumed Bearing capacity for ring beam foundation)
a) For wind conditions - 25 %
hb)b For earthquake conditions - 25 %
c) For test conditions - 0 %
Factor of safety
a) Factor of safety against overturning - 2
b) Factor of safety against sliding - 2

Seismic loads are as per UBC. Hence seismic loads are divided by 1.4 to get unfactored loads.

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page3+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

3.0 EQUIPMENT DATA (Refer Annexure 8.1)


Diameter, ID, D = 15.03 m
Height, H = 12.749 m
Shell Plate Thickness, ts = 10 mm
Bottom Plate Thickness, tb = 12 mm
Design Specific Gravity of the Liquid (gp) = 1.01 t/m3
Height of the Liquid = 12.749 m
Bolt circle diameter, BCD = 15.3 m
Diameter of Anchor bolts = M32
No. of Anchor bolts = 24
Height of pedestal above Ref. Grade Elevation, h = 1000 mm

D= 15030
12749
H=

tb= 12

15030
tf

tf and bf are wherever applicable


All dimensions are in mm

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page4+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

3.1 Equipment Loading Data (Refer Annexure 8.1)


Loadings from the mechanical data sheet are considered for design as they are critical.
Load Weight Shear Moment Design Values
bf
Condition kN kN kNm kN
Empty/Dress-up 1112.00 1223.20
Operation 22967.00 25263.70
Test 22967.00 25263.70 (For wind and seismic
Wind 197.50 5755.00 forces calculation refer
Earthquake 842.14 6023.57 Annexure 8.2)

4.0 METHOD OF CALCULATION

1 Horizontal reinforcement of ringwall is designed to take the entire hoop tension.


2 The Empty, Operating and Test weights are increased as below to account for platforms, piping etc
Empty weight by 10 %
Operating weight by 10 %
Test weight by 10 %
3 Earthquake shear / moment by 10 %

4.1 Geometry of Tank Foundation

Provide Width of ring beam = bb = 0.70 m


Width of ring footing = bf = 0.70 m
Thickness of ring footing base = tf (if applicable) = 0.00 m Not Applicable
Depth of footing below ground level hf = 1.00 m
(Assuming the difference between NGL and FGL to be maximum 500mm)
Height of ring beam = hb = 2.000 m
Inner diameter of ring beam = Dib = 14.33 m
Outer diameter of ring beam = Dob = 15.73 m
Inner diameter of footing base = Dif (if applicable) = 14.33 m
Outer diameter of footing base = Dof (if applicable) = 15.73 m

4.2 Properties of Tank Foundation

Area of ring foundation base = Af = p (Dof2 - Dif2) / 4 = 33.0527 m2


Area of ring beam = Ab = p (Dob - Dib ) / 4
2 2
= 33.0527 m2
Weight of ring foundation = gc {(Af tf) + (Ab hb)} = 1586.53 kN
Area of soil enclosed by ring beam, A1 = p Dib / 4
2
= 161.281 m2
Area of soil enclosed by ring footing base, A 2 = p Dif / 4
2
= 161.281 m2
Area enclosed by tank, A3 = p D2 / 4 = 177.422 m2
Section Modulus, Z = p (Dof4 - Dif4) / Dof /32 = 118.926 m3

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page5+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

5.0 LOADING CALCULATION


5.1 Loading Calculation

5.1.1 Loads on Ring Beam and Footing

% of load to ring beam p1 = (A3 - A1) / A3 x 100 = 9.10 %


% of load to ring footing p2 = (A3 - A2) / A3 x 100 = 0.00 %
Shell loads to ring beam, W1 = We - p D2 / 4 x tb x 78.5 = 1056 kN
Tank bottom plate loads to ring beam, W 2 = p1 (We-W1) = 15.21 kN
Tank bottom plate loads to footing,W3=p2 (We-W1) -W2 = 0.00 kN
Operating loads to ring beam, Wob = p1 (Wo-We) = 2187 kN
Operating loads to footing,Wof = p2 (Wo-We) -Wob = 0 kN
Test loads to ring beam, Wtr = p1 (Wt-We) = 2187 kN
Test loads to footing,Wtf = p2 (Wt-We) -Wtr = 0 kN

5.1.2 Calculation of Dead & Soil Load (SW)

Weight of ring beam,Wrb = Ab x hb x gc = 1586.53 kN


Weight of ring footing,Wrf = Af x tf x gc = 0.00 kN
Weight of soil to inside footing,Wsif = 0.5(Af -Ab)xhbxgs = 0.00 kN
Weight of soil to outside footing,Wsof =0.5(Af - Ab)xhfxgs = 0.00 kN

5.1.3 Calculation of Buoyancy Load (BL) Not Applicable

(With water level at grade 104.200 applied for applicable wind load combinations when checking overturning)
Shape of foundation = Circular Ring Beam
Unit weight of ground water gw = 10.00 kN/m3 0
BL to ring beam base, BLb = Ab x hf x gw = 0.00 kN
BL to footing base, BLf = (Af - Ab) x hf x gw = 0.00 kN
BL to tank base excluding footing, BLt = 0.00 kN

5.2 Applied Loads on Top of Ring Beam and Footing


Legend:
SW - Self Weight / Deadweight of foundation & soil
BL - Load due to buoyancy(for applicable wind load conditions - Only for stability check)
Emp(EmpL) - Equipment weight (Dress-up) in empty condition.
Oper (OL) - Equipment Operating load
Test (TL) - Test Load
WL - Wind Load (full)
EQ-Oper - Earthquake Load - Operating condition

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page6+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

Top of Ring Beam Top of Footing


Load Load case Axial Shear Moment Axial Shear Moment Remarks
No. Load in in Load in in
kN kN kNm kN kN kN
1 SW 1586.53 0.00
2 BL 0.00 0.00
3 Empty 1071.27 0.00
4 Oper 2187.16 0.00
5 Test 2187.16 0.00
6 WL 197.50 5755.00
7 EQ-Oper 842.14 6023.57

5.3 Load Combinations


5.3.1 Combinations for Serviciability
(For bearing capacity and stability check)

1 - 1.0 SW + 1.0 Oper


2 - 1.0 SW + 1.0 Test
3 - 0.9 Emp + 1.0 SW + 1.0 WL
4 -1.0 SW + 1.0 Oper + 1.0 WL
5 -1.0 SW + 1.0 Test + 0.5 WL
6 -1.0 SW + 1.0 Oper + 1.0 EQ
7 -1.0 SW + 1.0 BL + 1.0 Empty + 1.0WL (only for stability check)

5.3.2 Combinations for Strength Design - (For design of concrete)

1 - 1.4 SW + 1.4 Oper


2 - 1.4 SW + 1.4 Test
3 - 1.0 SW + 1.0 Emp + 1.4 WL
4 - 1.2 SW + 1.2 Emp + 1.2 WL
5 - 1.4 SW + 1.4 Oper + 1.4 WL
6 - 1.4 SW + 1.4 Test + 0.7 WL
7 - 1.4 SW + 1.4 Oper + 1.4 EQ

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page7+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

6.0 DESIGN OF FOUNDATION

6.1 Bearing pressure Check under ring beam foundation (For Serviciability Combinations)

Load Combination: 1 - 1.0 SW + 1.0 Oper


Max. bearing pressure (Under RB) = p max = Pmax / Af = 146.58 kN/m2 OK
Max. bearing pressure (Under Tank) = p min = 10gpHL+gs (hb+tf) = 164.76 kN/m2 OK

Load Combination: 2 - 1.0 SW + 1.0 Test


Max. bearing pressure (Under RB) = p max = Pmax / Af = 146.58 kN/m2 OK
Max. bearing pressure (Under Tank) = p min = 10*1*HL+gs (hb+tf) = 163.49 kN/m2 OK
As per Keller's report (Annexure-3)the allowable bearing pressure at NGL is approximately 1000kN/m 2 and
hence a pressure of 273kN/m2 in dead + test condition is satisfied.

Load Combination: 3 - 0.9 Emp + 1.0 SW + 1.0 WL


Max. bearing pressure = pmax = Pmax/Af+Mw/Z+Fw(Hb+tf)/Z = 128.88 kN/m2 OK
Min. bearing pressure = pmin = Pmax / Af - Mw / Z-Fw(Hb+tf)/Z = 25.46 kN/m 2
OK

Load Combination: 4 -1.0 SW + 1.0 Oper + 1.0 WL


Max. bearing pressure = pmax = Pmax/Af+Mw/Z+Fw(Hb+tf)/Z = 198.30 kN/m2 OK
Min. bearing pressure = pmin = Pmax / Af - Mw / Z-Fw(Hb+tf)/Z = 94.87 kN/m2 OK

Load Combination: 5 -1.0 SW + 1.0 Test + 0.5 WL


Max. bearing pressure = pmax = Pmax/Af+0.5*Mw/Z+0.5*Fw(Hb+tf)/Z = 172.44 kN/m2 OK
Min. bearing pressure = pmin = Pmax / Af - 0.5*Mw / Z-0.5*Fw(Hb+tf)/Z = 120.73 kN/m 2
OK

Load Combination: 6 -1.0 SW + 1.0 Oper + 1.0 EQ


Max. bearing pressure = pmax = Pmax/Af+Mw/Z+Fw(Hb+tf)/Z = 211.40 kN/m2 OK
Min. bearing pressure = pmin = Pmax / Af - Mw / Z-Fw(Hb+tf)/Z = 81.77 kN/m2 OK

Load Combination: 7 -1.0 SW + 1.0 BL + 1.0 Empty + 1.0WL


Max. bearing pressure = pmax = Pmax/Af+Mw/Z+Fw(Hb+tf)/Z = 132.12 kN/m2 OK
Min. bearing pressure = pmin = Pmax / Af - Mw / Z-Fw(Hb+tf)/Z = 28.70 kN/m2 OK

Critical Max.Gross Allowable Gross


Status
Load Comb. Bearing pressure Bearing pressure
kPa kPa*
6 211.40 268 OK

* Note on gross soil bearing capacity

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page8+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

=
Gross SBC in test condition (LC:2) - Net SBC + gs x hf 218 kN/m2
Gross SBC in wind condition (LC:4 &LC:5) - Net SBC x 1.25 + gs x hf = 268 kN/m2
Gross SBC in earthquake condition(LC:6) - Net SBC x 1.25 + gs x hf = 268 kN/m2
Gross SBC in operating and other - Net SBC + gs x hf = 218 kN/m2
conditions (LC:1 & 3)
where,
gs is unit weight of soil
hf is depth of bottom of foundation from grade

6.2 Stability check (For Serviciability Combinations)

a) For Overturning

Load Combination: 1 - 1.0 SW + 1.0 Oper

Overturning Moment = OM = 0.00 kNm


Restoring Force = RF = (SW+Wo)Dof/2 = 38105.60 kNm
Factor of Safety = FOS = RM/OM = inf OK

Load Combination: 2 - 1.0 SW + 1.0 Test

Overturning Moment = OM = 0.00 kNm


Restoring Moment = RM = (SW+Wt)Dof/2 = 38105.60 kNm
Factor of Safety = FOS = RM/OM = inf OK

Load Combination: 3 - 0.9 Emp + 1.0 SW + 1.0 WL

Overturning Moment = OM = M w + Fw(hb+tf) = 6150.00 kNm


Restoring Moment = RM = (SW+We)Dof/2 = 20061.06 kNm
Factor of Safety = FOS = RM/OM = 3.26 OK

Load Combination: 4 -1.0 SW + 1.0 Oper + 1.0 WL

Overturning Moment = OM = Mw + Fw(hb+tf) = 6150.00 kNm


Restoring Moment = RM = (SW+Wo)Dof/2 = 38105.60 kNm
Factor of Safety = FOS = RM/OM = 6.20 OK

Load Combination: 5 -1.0 SW + 1.0 Test + 0.5 WL

Overturning Moment = OM = 0.5Mw + 0.5Fw(h b+tf) = 3075.00 kNm


Restoring Moment = RM = (SW+Wt)Dof/2 = 38105.60 kNm
Factor of Safety = FOS = RM/OM = 12.39 OK

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page9+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

Load Combination: 6 -1.0 SW + 1.0 Oper + 1.0 EQ

Overturning Moment = OM = M eqo + Feqo(hb+tf) = 7707.86 kNm


Restoring Moment = RM = (SW+Wo)Dof/2 = 38105.60 kNm
Factor of Safety = FOS = RM/OM = 4.94 OK

Load Combination: 7 -1.0 SW + 1.0 BL + 1.0 Empty + 1.0WL

Overturning Moment = OM = M eqo + Feqo(hb+tf) = 6150.00 kNm


Restoring Moment = RM = (SW+Wo)Dof/2 = 20903.62 kNm
Factor of Safety = FOS = RM/OM = 3.40 OK

Load comb. Critical Allowable


FOS Status
(See Note) comb. FOS
a 3 3.26 2.00 OK
b 6 4.94 2.00 OK

b) Check for Uplift during empty condition

Internal Gas Pressure as per load data p = 2.00 kN/m2


Uplift due to internal gas pressure p x TankArea(A3) = 354.84 kN
Uplift due to BL (Water Table assumed at grade) BL = 0.00 kN
Resisting Force = RF = (SW+W e) RF = 2657.80 kN
Factor of Safety = FOS = RF / SF = 7.49 > 1.1 OK

c) For Sliding

Load Combination: 1 - 1.0 SW + 1.0 Oper

Sliding Force = SF = 0.00 kN


Restoring Force = RF = (SW+Wo)Fc + A2(hb+tf)gs*Fc = 4260.42 kN
Factor of Safety = FOS = RF/SF = inf OK

Load Combination: 2 - 1.0 SW + 1.0 Test

Sliding Force = SF = 0.00 kN


Restoring Force = RF = (SW+Wt)Fc + A2(hb+tf)gs*Fc = 4260.42 kN
Factor of Safety = FOS = RF/SF = inf OK

Load Combination: 3 - 0.9 Emp + 1.0 SW + 1.0 WL

Sliding Force = SF = Fw = 197.50 kN

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page10+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

Restoring Force = RF = (SW+We)Fc + A2(hb+tf)gs*Fc = 3342.71 kN


Factor of Safety = FOS = RF/SF = 16.93 OK

Load Combination: 4 -1.0 SW + 1.0 Oper + 1.0 WL

Sliding Force = SF = Fw = 197.50 kN


Restoring Force = RF = (SW+Wo)Fc + A2(hb+tf)gs*Fc = 4260.42 kN
Factor of Safety = FOS = RF/SF = 21.57 OK

Load Combination: 5 -1.0 SW + 1.0 Test + 0.5 WL

Sliding Force = SF = 0.5Fw = 98.75 kN


Restoring Force = RF = (SW+Wt)Fc + A2(hb+tf)gs*Fc = 4260.42 kN
Factor of Safety = FOS = RF/SF = 43.14 OK

Load Combination: 6 -1.0 SW + 1.0 Oper + 1.0 EQ

Sliding Force = SF = Feqo = 842.14 kN


Restoring Force = RF = (SW+W0)Fc + A2(hb+tf)gs*Fc = 13551.81 kN
Factor of Safety = FOS = RF/SF = 16.09 OK

Load Combination: 7 -1.0 SW + 1.0 BL + 1.0 Empty + 1.0WL

Sliding Force = SF = Fw = 197.50 kN


Restoring Force = RF = (SW+W0)Fc + A2(hb+tf)gs*Fc = 3385.56 kN
Factor of Safety = FOS = RF/SF = 17.14 OK

Load comb. Critical Allowable


FOS Status
(See Note) comb. FOS
a 3 16.93 2.00 OK
b 6 16.09 2.00 OK

6.3 Reinforcement Design


6.3.1 Horizontal Reinforcement Design
Angle of internal friction of soil F = = 35.00
A tank wall is a relatively unyielding structure and therefore, the horizontal earth pressure on the wall
will be represented by "Earth pressure coefficient at rest" k o = 0.43 (ko=1-sin F)
Horizontal Force due to soil pressure Fsoil = 0.5 ko gsoil (hb+tf)2 = 15.35 kN/m of ring footing
Hz. Force due to Operating sur. Fsuroper = ko (Wo/A3)(hb+tf) = 121.44 kN/m of ring footing
Hz. Force due to Test surcharge Fsurtest = ko (Wt/A3)(hb+tf) = 121.44 kN/m of ring footing
Hoop Tension Tuoper = (1.4 Fsuroper+1.4Fsoil) D /2 = 1439.18 kN
Hoop Tension Tutest = (1.4 Fsurtest+1.4Fsoil) D /2 = 1439.18 kN
Design Hoop Tension Tu = max (Tuoper, Tutest) = 1439.18 kN
Area of reinforcement required Ast = Tu / (f fy) = 4034.70 mm2 (f is 0.87)

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page11+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)
Min. Ast = 0.45 x bb x (hb+tf) = 6300.00 mm2
The required area of steel Ast = = 6300.00 mm2
Provide dia of rebar = 20 mm
Total No. of bars required for both faces = 32 nos
The available spacing for each bar = 123.33 mm
Hence, Provided spacing of 20 ###dia bars = 150 mm

Calculation for torsional moment and check for torsion is performed as per ACI code as the checks
are more elaborate and also performed as per BS 8110
6.3.3 Calculation of Torsional Moment
Torsion due to eccentricity of Horizontal Forces (soil and surcharge components):
(Projection of ring footing base is neglected for torsional rigidity calculation)
C.G. of soil hoop force Fsoil from base = ysoil = (hb+tf)/3 = 0.67 m
C.G. of surcharge hoop force Fsur from base = ysur = (hb+tf)/2 = 1.00 m
C.G. = y = (Fsoil(hb+tf)/3+Fsuroper(hb+tf)/2)/(Fsoil+Fsuroper) = 0.96 m
Eccentricity of force = eh = ((hb+tf) / 2) - y = 0.04 m
Torsion = Th = (1.4 Fsuroper + 1.4 Fsoil) x eh = 7.16 kNm/m of ring footing

Torsion due to eccentricty of Vertical Forces (Fluid load, Shell edge load & Anchor Bolt components):
Shell edge load on ring beam (Vs) = 22.366 kN/m of ring footing
Eccentricity of shell edge on ring beam=evs=(bb/2-(ID-Dib)/2) = 0.000 m
Uniform fluid load on inside hz. projection of ring beam(V b) = 47.425 kN/m of ring footing
Width of Uniform fluid load on ring beam = wb=(ID-Dib)/2 = 0.350 m
Eccentricity of fluid load on inside ring beam=e vb=(bb/2-wb/2) = 0.175 m
Uniform fluid load on inside hz. projection of footing(Vf) = 0.000 kN/m of ring footing
Width of Uniform fluid load on ring footing = w f=(Dib-Dif)/2 = 0.000 m
Eccentricity of fluid load on inside ring footing=evf=(bf/2-wf/2) = 0.350 m
Torsion = Tv = 1.4 (Vb x evb + Vf x evf) = = 11.619 kNm/m of ring footing
Total torsional force (Tv+Th) = = 18.783 kNm/m of ring footing
As the ring beam is fully supported on ground the Torsion moment for per m is considered in calculation

6.3.4 Check for Torsion (as per ACI requirements)

The Negligible Torsion = Tneg = = ACl.11.6.1 (a)


Area enclosed by outside perimeter of concrete A cp = 1400000 mm2
Outside perimeter of the concrete cross section P cp = 5400 mm
The Negligible Torsion = Tneg = 141 kNm
Calculation for transverse reinforcement. Since
Actual Torsion is < Negligible Torsion, Hence Torsion effect can be Negleted
However following calculation is prepared for transverse reinforcement.
The transverse reinforcement for Torsion ACl.11.6.3.6

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page12+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

Ao =shall be determined by analysis except that it shall be permitted to take Ao=0.85Aoh


Aoh =area enclosed by centerline of the outermost closed transverse torsional reinforcement
At =Area of one leg of closed stirrup resisting torsion
fyv =yield strength of closed transverse torsional reinforcement
fyl =yield strength of longitudinal torsional reinforcement
s =spacing of shear or torsion reinf in direction paralled to long reinf
q =shall not be taken < than 30 deg nor < than 60 deg. It shall be permitted to take equal to 45 deg.
ph =perimeter of centre line of outermost closed transverse torsional reinf
Provide transverse reinforcement for torsion = 16 mm
Aoh = 979356 mm2
Ao = 0.85Aoh = 832453 mm2
At = 201 mm2
fyv = 410 N/mm2
The min spacing of transverse reinforcement for torsion Sreq = 7307 mm

Provided spacing for transverse reinforcement Sprov = 200 mm


The torsional strength due to torsional reinforcement fT n = 686 kNm
The additional longitudinal reinforcement required for torsion

ACl.11.6.3.8

ph = 4736 mm2
fyv = fyt = 410 N/mm2
Al = 130 mm2
Total area of steel required = 6430
Provided steel = 8373
Provided longitudinal steel is 20
### dia bars at spacing of 150 mm c/c

Check for Torsion (as per BS 8110 requirements)


Torsional shear stress = vt = 2T/(bb2(hb+t-bb/3)) = 0.043 mPa
Vtmin = 0.400
Vtu = 5.000
Vt<Vtmin<Vtu
Torsional reinforcement is not required

6.3.2 Vertical Reinforcement Design


Shear in beam
Provide minimum shear reinforcement = Asv = 0.4bsv/(0.95fy)
Provide 20 dia bars 2 legged stirupps
Required spacing sv = Asv*0.87fy/(0.4*average width)
= 402*0.87*460/(0.4*800)
= 502.75125
Provide spacing = 150 mm
Hence provide 16 dia 2 legged stirrups at 150 mm c/c

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page13+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

6.4 Check for Reinforcement Around Anchor Bolt


( Anchor bolt check is performed based on ASCE - Wind loads and anchor bolt design
for petrochemical facilities)
E
RC
FO
N
IO
NS
TE

D
Cover
PJC
T.O.C

L LD LDR
W
45

T/2

LD/3 LD/3

section

Anchor Bolt
Reinforcement

LD/3+W/2

(LD/3+W/2) AREA
(EFFECTIVE AREA)

plan

Fig.
1

A: The area of the reinforcement provided in the effective area.


Asreq: The required area of reinforcement in the pedestal
Asreq=(tu*n)/(*Fy)
Ast: The required area of vertical reinforcement for tension per bolt (mm 2) tu/Fy
ar: The sectional area of one re-bar provided in the effective area (mm2)
BCD: bolt circle diameter (m)
D: The distance from the center of anchor to the nearest line of vertical reinforcement
D=((Pedestal size-BCD)/2)-(75+10+(using reinforcement size)/2)
DLreq: required development length (mm)DLreq=ldEre
d: anchor bolt diameter
dr: diameter of the vertical reinforcement
Ere: excess reinforcement (Ast/A)
LD: embedment length of anchor bolt (mm) LD=L-T/2-PJC
LD/3max : (LD/3+("nut"or"W")/2) nut: a nut
LDR: development length of reinforcement (mm)
LDR includes the bent length when LDR is within the effective area
ld: development length of deformed bar in tension(mm)
Le: effective length at reinforcement position
Le=2*SQRT((LD/3+W/2)2-D2)
lrp: pitch of reinforcement (mm)
n: anchor bolt number
P: average number of reinforcement in effective area. P=Le/lrp
Smax: maximum Working Shear
s: maximum shear for every anchor bolt (ton/bolt) s=Smax/n

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page14+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)
Tmax: maximum Working Tension
T'max: maximum factored Tension
t: maximum tension for every anchor bolt (ton/bolt) t=Tmax/n
tu: factored maximum tension force tu=T'max/n
W: anchor plate dimension
Z: section modulus Z=nBCD/4 (Anchor bolt in octagonal foundation)
: strength reduction factor

Anchor bolt data:


Anchor bolt
Section modulus: Z
n Size (inch) BCD (m)
24 1.92 15.3 91.800
Check Tension or Compression:
Maximum factored Tension per bolt (tu) 252.25 kN/bolt
Req. Area of vertical rebar for tension per bolt (Ast) 707.18 mm2/bolt

Calculate and Check Effective area:

Embedment length of anchor bolt LD = 720 mm


Anchor plate dimension W= 80 mm
Radius of effective area LD/3 + W/2 = 280.00 mm
The distance from center of Anchor to the
nearest vertical reinforcement D = 140.00 mm

STATUS (LD/3+W/2) >=D OK

Calculate and Check reinforcement in the effective area

Pedestal reinforcement
Asreq = CHECK CHECK
Rebar Pitch
(tun)/(FFy) (ar) Rebar Asreq < rebar pitch
Rebar dia(mm) Spacing As Provided (Irp)
(mm2) area(mm2) Asprov & diameter

16972 16 200 201.06 47469 OK 200 OK

Effective length of reinforcement position Le = 484.97 mm


Avearge number of rebar in effective area P=Le/Irp 2.42
Area of rebar provided in the effective area A = P x ar 487.55 mm2
Additional reinforcement around bolt of 12mm diameter two U pin bars = 452.39 mm2
Total reinforcement for bolt = 939.94 mm2

STATUS A > Ast OK

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page15+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

The development length of reinforcement LDR = 620 mm


The development length of deformed bar in tension ld= 118 mm
Excess reinforcement Ere = Ast/A 0.75
The required development length Dlreq=ld x Ere 88 mm

CHECK LDR > Dlreq OK

CHECK ALL CHECKS ARE OK ? OK

7.0 CONCLUSION
The size and design of the foundation is safe for all loading combinations considered.

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page16+2 of 32


Date : 30-Apr-2014 Calculation Note for Produced Water Tank JO-WP-MP1062-CA-6051
(20T-003A)

8.0 Appendix-1

8.1 Equipment data sheet

8.2 Loading for wind and seismic forces for tank 20T-003A

513/MH 2210 :JO-WP-MP1062-CA-6051 Rev A 30-Apr-14 Page17+17 of 32