commercial operation
Deliver products/services
Plan the intuitive for 2015 and conduct feasibility studies for the same
Note : Only on the controllable factors. Factors such as CEB power & SLT leased
line cannot consider
Planning On Call Roster One Week Before the New Month and Share With INOC
Based on Log Sheets and preventive maintenance, give the feedback of the spares
requirement to region Manager/engineer for the annual plan
Study all the repetitive faults and identify the root cause and plan mitigation actions
and escalations to the Line Manager
Note : Only on the controllable factors. Factors such as CEB power & SLT leased
line cannot consider
Note : 75% total accumulated alarms in the region under purview of the regional
Manager/engineer
Participating for the PAT as per the given guidance by Line Manger without disturbing
to day today operation activities
Participating to verify TSSR document as per the given guidance by Line Manger
without disturbing to day today operation activities
Note: SLA which cannot meet due to uncontrollable factors need to exclude.
Summarizing the records, activities, and log books including New Assets and Assets
Transfers and handing over to Region Manager every Month 25th Day