PERHITUNGAN BESI BETON

NO JENIS BESI UKURAN KOEFISIEN PANJANG 1 PANJANG 2 PANJANG 3 HARGA 1

1 BAJA BULAT 6 0.22 12 Rp 22,500


8 0.393 12 12 Rp 35,500
10 0.62 12 12 Rp 52,000
12 0.887 12 12 Rp 77,500
13 1.034 12 Rp 79,000
14 1.209
15 1.37
16 1.578

2 BATANG ULIR 10 0.56


13 0.995 0 12 Rp -
16 1.56 0 12 Rp -
19 2.25 0 12 Rp -
22 3.04
25 3.98
29 5.04

HARGA RATA-RATA PER KG


TON

HARGA 2 HARGA 3 HARGA PER KG

Rp 8,523
Rp 40,100 Rp 8,015
Rp 62,000 Rp 7,661
Rp 89,250 Rp 7,833
Rp 6,367

Rp 107,350 Rp 8,991
Rp 162,650 Rp 8,689
Rp 229,000 Rp 8,481

Rp 8,070
DAFTAR HARGA SATUAN BA
BULAN MARET TAHU
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN


1 2 3

FINISHING
1 Amplas lbr
2 Cat besi kg
3 Cat dasar kg
4 Cat emco kg
5 Cat menie besi kg
6 Cat menie kayu kg
7 Cat tembok Decolith kg
8 Cat tembok Dulux kg
9 Cat tembok Emco kg
10 Cat tembok Paragon kg
11 Cat tembok Toyopaint kg
12 Cat tembok Vinilex kg
13 Cat tembok Vinippaint kg
14 Dempul ltr
15 Kuas bh
16 Mild zak
17 Minyak cat ltr
18 Plamir kayu kg
19 Plamir tembok kg
20 Politur ultra ltr
21 Politur vernis ltr
22 Thiner A Bonanza ltr
23 Thiner B Spesial ltr

PENUTUP ATAP
24 Alang-alang panjang 2,4 meter lbr
25 Alluminium foil m2
26 Asbes Bubungan lbr
27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr
28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr
29 Asbes Rata 2 m x 1 m x 4 mm lbr
28 Atap metal Toratora 1 x 4 Extra m2
29 Atap metal Toratora 1 x 4 Premium m2
30 Atap metal Toratora 2 x 4 Extra m2
31 Atap metal Toratora 2 x 4 Premium m2
32 Atap metal Toratora 3 x 4 Extra m2
33 Atap metal Toratora 3 x 4 Premium m2
34 Atap metal Toratora 4 x 4 Extra m2
35 Atap metal Toratora 4 x 4 Premium m2
36 Bentala paras bh
37 Bentala tanah liat bh
38 Besi profil WF kg
39 Besi strip kg
40 Bubungan Biasa bj

Harga Barang dan Upah Hal. 3


NO NAMA BARANG SATUAN
1 2 3
41 Bubungan Karang Pilang (glazur) isi 3,5/m bj
42 Bubungan Karang Pilang isi 3,5/m bj
43 Bubungan Ngalayur isi 3,5/m bj
44 Bubungan Plentong bj
45 Bubungan Utama isi 3,5/m bj
46 Genteng Kanmuri (glazur) isi 14/m2 bj
47 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
48 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
49 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
50 Genteng Morando Abadi isi 18/m2 bj
51 Genteng Morando Jatiwangi isi 18/m2 bj
52 Genteng Morando Ngalayur isi 20/m2 bj
53 Genteng Plentong bj
54 Genteng plentong dicat bj
55 Genteng Plentong Jatiwangi isi 24/m2 bj
56 Ijuk kg
57 Ikut celedu paras bh
58 Ikut celedu tanah liat bh
59 Murda paras bh
60 Murda tanah liat bh
61 Seng BJLS 0,20 gelombang lbr
62 Seng BJLS 0,25 gelombang lbr
63 Seng BJLS 0,28 gelombang lbr
64 Seng BJLS 0,32 gelombang lbr
65 Seng Plat 3" x 6" BJLS 28 lbr
66 Sirap Jati bh
67 Tali Ijuk kg
68 Tali pengikat alang-alang ikat

PENGGANTUNG
69 Engsel kupu-kupu ps
70 Engsel nylon ps
71 Espagnoleth set
72 Grendel biasa bh
73 Grendel hararo bh
74 Kaca 3 mm bening m2
75 Kaca 5 mm bening m2
76 Kaca 6 mm bening m2
77 Kaca 8 mm bening m2
78 Kaca 10 mm bening m2
79 Kaca 12 mm bening m2
80 Kaca Es/Kapur 3 mm m2
81 Kaca Es/Kapur 5 mm m2
82 Kaca nako daun
83 Kaca nako teralis bening m2
84 Kaca ryben 3 mm m2
85 Kaca ryben 5 mm m2
86 Kait angin biasa bh
87 Kunci pintu TOP bh
88 Kunci pintu Union bh
89 Kunci pintu Vanesa bh
90 Kunci pintu Yale bh

Harga Barang dan Upah Hal. 4


NO NAMA BARANG SATUAN
1 2 3
91 Kunci pintu YURI bh
92 Kunci slot bh
93 Kunci tanam 2 slag bh

KAYU DAN PLAFOND


94 Bambu besar btg
95 Bambu sedang btg
96 Bambu kecil btg
97 Celling teak (0,62 x 2,40) m2 lbr
98 Eternit lbr
99 Formika lbr
100 Gedeg kulit kelas I m2
101 Gypsum Old lbr
102 Hard board MDF lbr
103 Kalsiboard 4,5 mm lbr
104 Kayu bekesting m3
105 Kayu bingkirai m3
106 Kayu bingkirai papan m3
107 Kayu dolken (pekerjaan sementara) btg
108 Kayu jati m3
109 Kayu jati papan m3
110 Kayu kamper balok m3
111 Kayu kamper usuk/reng m3
112 Kayu kamper papan m3
113 Kayu kruing balok m3
114 Kayu kruing usuk/reng m3
115 Kayu kruing papan m3
116 Kayu meranti balok m3
117 Kayu meranti usuk/reng m3
118 Kayu meranti papan m3
119 Kayu merbau m3
120 Kayu merbau papan m3
121 Kayu profil m1
122 Kayu seseh balok m3
123 Kayu seseh dolken m3
124 Lem Aibond kg
125 Lem Kayu ltr
126 List Gypsum standar m'
127 Minyak bekisting ltr
128 Multiplek 12 mm lbr
129 Multiplek 18 mm lbr
130 Multiplek 6 mm lbr
131 Multiplek 9 mm lbr
132 Plywood 12 mm lbr
133 Plywood 3 mm lbr
134 Plywood 4 mm lbr
135 Plywood 6 mm lbr
136 Plywood 9 mm lbr
137 Plywood aluminium lbr
138 Teak wood (0,9x2,00) m2 lbr
139 Teak wood (1,20x2,40) m2 lbr

Harga Barang dan Upah Hal. 5


NO NAMA BARANG SATUAN
1 2 3
KERAMIK
IKAD
140 Ikad (Keramik) Kw. I 10 x 20 cm m2
141 Ikad (Keramik) Kw. I 20 x 20 cm m2
142 Ikad (Keramik) Kw. I 20 x 30 cm m2
143 Ikad (Keramik) Kw. I 30 x 30 cm m2
144 Ikad (Keramik) Kw. I 40 x 40 cm m2
145 Ikad (Keramik) Kw. II 10 x 20 cm m2
146 Ikad (Keramik) Kw. II 20 x 20 cm m2
147 Ikad (Keramik) Kw. II 20 x 30 cm m2
148 Ikad (Keramik) Kw. II 30 x 30 cm m2
149 Ikad (Keramik) Kw. II 40 x 40 cm m2

INESA
150 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2
151 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
152 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2
153 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2
154 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2
155 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2
156 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2
157 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
158 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2
159 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2
160 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2

ESSENZA
161 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2
162 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2
163 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
164 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
165 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
166 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2
167 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
168 Keramik Kelas I Domus m2
169 Keramik Kelas I Granity Imperiali m2
170 Keramik Kelas I Lavagna m2
171 Keramik Kelas I Mountain Peak m2

GARUDA
172 Keramik 20 x 20 kelas I Emboss Dasar Muda m2
173 Keramik 20 x 20 kelas I Emboss Dasar Tua m2
174 Keramik 20 x 20 kelas I Tesia m2
175 Keramik 20 x 20 kelas II Emboss Dasar Muda m2
176 Keramik 20 x 20 kelas II Emboss Dasar Tua m2
177 Keramik 20 x 20 kelas II Tesia m2
178 Keramik 20 x 25 kelas I Motif Dasar Medium m2
179 Keramik 20 x 25 kelas I Motif Dasar Muda m2
180 Keramik 20 x 25 kelas I Nuri Dark m2
181 Keramik 20 x 25 kelas I Polos m2
182 Keramik 30 x 30 kelas I Granity m2

Harga Barang dan Upah Hal. 6


NO NAMA BARANG SATUAN
1 2 3
183 Keramik 30 x 30 kelas I Motif Embose m2
184 Keramik 30 x 30 kelas II Granity m2
185 Keramik 30 x 30 kelas II Motif Embose m2
186 Keramik 40 x 40 kelas I Motif Dasar Muda m2
187 Keramik 40 x 40 kelas I Motif Dasar Muda m2
188 Keramik 40 x 40 kelas I Motif Embose m2
189 Keramik 40 x 40 kelas I Motif Granity Tua m2
190 Keramik 40 x 40 kelas I Motif Medium Color m2
191 Keramik 40 x 40 kelas I Motif Spesial Color m2
192 Keramik 50 x 50 kelas I m2

ASIA
193 Keramik 10 x 20 kelas I warna muda m2
194 Keramik 20 x 20 kelas I warna muda m2
195 Keramik 20 x 20 kelas I warna tua m2
196 Keramik 20 x 25 kelas I warna tua m2
197 Keramik 20 x 30 kelas I warna muda m2
198 Keramik 30 x 30 kelas I warna muda m2
199 Keramik 30 x 30 kelas I warna tua m2
200 Keramik 40 x 40 kelas I warna muda m2
201 Keramik 10 x 20 kelas II m2
202 Keramik 20 x 20 kelas II m2
203 Keramik 20 x 30 kelas II m2
204 Keramik 30 x 30 kelas II m2
205 Keramik 40 x 40 kelas II m2

MULIA
206 Keramik 10 x 20 cm kelas I m2
207 Keramik 20 x 20 cm kelas I m2
208 Keramik 20 x 30 cm kelas I m2
209 Keramik 30 x 30 cm kelas I m2
210 Keramik 40 x 40 cm kelas I m2
211 Keramik 10 x 20 cm kelas II m2
212 Keramik 20 x 20 cm kelas II m2
213 Keramik 20 x 30 cm kelas II m2
214 Keramik 30 x 30 cm kelas II m2
215 Keramik 40 x 40 cm kelas II m2

SANITAIR
201 Bak mandi fibre glass 70x70x66 cm bh
202 Bak mandi keramik bh
203 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
204 Floor drain plastik bh
205 Floor drain stainless bh
206 Kloset duduk INA bh
207 Kloset duduk Amerika Standar bh
208 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh
209 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh
210 Kloset duduk " TOTO Type AVANTE CW 823 J bh
211 Kloset duduk " TOTO Type CW 660J bh
212 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
213 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh

Harga Barang dan Upah Hal. 7


NO NAMA BARANG SATUAN
1 2 3
214 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh
215 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
216 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
217 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
218 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
219 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
220 Kloset porselin jongkok Kia (standar) bh
221 Kloset porselin jongkok Ina (standar) bh
222 Kran biasa bh
223 Kran SunEi bh
224 Kran TOTO T 205 LCSC bh
225 Kran TOTO T 205 MC bh
226 Kran TOTO T 23 B13 bh
227 Kran TOTO T 23 B13V7N bh
228 Kran TOTO T 26 - 13 bh
229 Kran TOTO TX 109 LH bh
230 Penyekat Urinoir " TOTO " Type A 100 " bh
231 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh
232 Soap holder " TOTO " Type S 6 N " bh
233 Seal tape bh
234 Urinoir " TOTO U 57 M bh
235 Urinoir " TOTO U 57 M BODI bh
236 Urinoir " TOTO UW 447 JT 1 " bh
237 Urinoir " TOTO UW 447 JT 1 BODI bh
238 Urinoir " TOTO UW 447 JT 1,M " bh
239 Urinoir " TOTO UW 447 JT 1,M "BODI bh
240 Wastagel KIA Standard bh
241 Wastagel KIA Warna bh
242 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh
243 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh

PAKU
244 Paku 10 cm kg
245 Paku kalsiboard kg
246 Paku list SQ kg
247 Paku pancing 60 x 230 kg
248 Paku reng/usuk SQ kg
249 Paku seng kg
250 Paku seng import bj
251 Paku skrup 1/2" kg
252 Paku skrup 2" kg
253 Paku skrup 3.5" kg
254 Paku sumbat 1/2" kg

PASIR, BATU, KERIKIL, BATA DAN PARAS


255 Bata gosok ex Tulikup bj
256 Bata pasang klas I bj
257 Batako kelas I bj
258 Batu kali m3
259 Batu karang m3
260 Batu lahar Singaraja m3
261 Batu pecah 5-7 cm (manual) m3

Harga Barang dan Upah Hal. 8


NO NAMA BARANG SATUAN
1 2 3
262 Batu pipih Singaraja m3
263 Glass block bj
264 Kerawang bh
265 Koral Beton m3
266 Limestone m3
267 Paras Batik bh
268 Paras Buahan bh
269 Paras Karang Bukit bh
270 Paras Kerobokan bh
271 Paras Malem bh
272 Paras Putih Bukit bh
273 Paras Silakarang tebal bh
274 Paras Silakarang tipis bh
275 Paras untuk pondasi bh
276 Pasir beton m3
277 Pasir pasang m3
278 Pasir urug m3
279 Sirtu m3
280 Tanah urug m3

PIPA
281 Pipa Galvanis 1/2" m1
282 Pipa Galvanis 3/4" m1
283 Pipa Galvanis 1 1/4" m1
284 Pipa Galvanis 1 1/2" m1
285 Pipa Galvanis 1" m1
286 Pipa Galvanis 1,5 BSA m1
287 Pipa Galvanis 2" m1
288 Pipa Galvanis 3" m1
289 Pipa Maspion AW 1 ljr
290 Pipa Maspion AW 1/2 ljr
291 Pipa Maspion AW 10 ljr
292 Pipa Maspion AW 1-1/2 ljr
293 Pipa Maspion AW 1-1/4 ljr
294 Pipa Maspion AW 12 ljr
295 Pipa Maspion AW 14 ljr
296 Pipa Maspion AW 16 ljr
297 Pipa Maspion AW 2 ljr
298 Pipa Maspion AW 2-1/2 ljr
299 Pipa Maspion AW 3 ljr
300 Pipa Maspion AW 3/4 ljr
301 Pipa Maspion AW 4 ljr
302 Pipa Maspion AW 5 ljr
303 Pipa Maspion AW 6 ljr
304 Pipa Maspion AW 8 ljr
305 Pipa Maspion C 1 ljr
306 Pipa Maspion C 1-1/2 ljr
307 Pipa Maspion C 1-1/4 ljr
308 Pipa Maspion C 2 ljr
309 Pipa Maspion C 2-1/2 ljr
310 Pipa Maspion C 3 ljr
311 Pipa Maspion C 3/4 ljr

Harga Barang dan Upah Hal. 9


NO NAMA BARANG SATUAN
1 2 3
312 Pipa Maspion C 4 ljr
313 Pipa Maspion C 5/8 ljr
314 Pipa Maspion D 10 ljr
315 Pipa Maspion D 1-1/2 ljr
316 Pipa Maspion D 1-1/4 ljr
317 Pipa Maspion D 12 ljr
318 Pipa Maspion D 14 ljr
319 Pipa Maspion D 16 ljr
320 Pipa Maspion D 2 ljr
321 Pipa Maspion D 2-1/2 ljr
322 Pipa Maspion D 3 ljr
323 Pipa Maspion D 4 ljr
324 Pipa Maspion D 5 ljr
325 Pipa Maspion D 6 ljr
326 Pipa Maspion D 8 ljr

SEMEN
327 Semen Bosowa 50 kg zak
328 Semen Gresik 40 kg zak
329 Semen Gresik 50 kg zak
330 Semen Tiga Roga 50 kg zak
331 Semen Tonasa 50 kg zak
332 Semen warna/semen grouting kg

BESI BETON DAN PAGAR


333 Besi beton kg
334 Kawat berduri roll
335 Kawat beton RRT kg
336 Pagar BRC asli T.120 diameter 6mm m'
337 Pagar BRC asli T.150 diameter 6mm m'
338 Pagar BRC asli T.175 diameter 7mm m'
339 Pagar BRC asli T.190 diameter 7mm m'
340 Pagar BRC asli T.90 diameter 6mm m'
341 Pagar HotDip Galvanized T.120 diameter 6mm m'
342 Pagar HotDip Galvanized T.150 diameter 7mm m'
343 Pagar HotDip Galvanized T.175 diameter 7mm m'
344 Pagar HotDip Galvanized T.190 diameter 7mm m'
345 Pagar HotDip Galvanized T.90 diameter 6mm m'
346 Tiang BRC asli T. 120 diameter 1 1/2" bh
347 Tiang BRC asli T. 150 diameter 2" bh
348 Tiang BRC asli T. 175 diameter 2" bh
349 Tiang BRC asli T. 190 diameter 2" bh
350 Tiang BRC asli T. 90 diameter 1 1/2" bh
351 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh
352 Tiang HotDip Galvanized T. 150 diameter 2" bh
353 Tiang HotDip Galvanized T. 175 diameter 2" bh
354 Tiang HotDip Galvanized T. 190 diameter 2" bh
355 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh

BAHAN LISTRIK
356 Saklar (Broco) bh
357 Stop Kontak bh

Harga Barang dan Upah Hal. 10


NO NAMA BARANG SATUAN
1 2 3
358 Fitting bh
359 Steker bh
360 Coaxial cable 5C - 75 ohm commscof m1
361 Kabel NYM 3 x 2.5 mm ex. Supreme m1
362 Kabel NYM 4 mm m1
363 Kabel telephone m1
364 Lampu pijar 10 Watt (Philip) bh
365 Lampu pijar 15 Watt (Philip) bh
366 Lampu pijar 25 Watt (Philip) bh
367 Lampu TL 10 Watt (10 Watt) bh
368 Lampu TL 20 Watt (10 Watt) bh
369 Lampu TL 25 Watt (10 Watt) bh
370 Pipa clipsal 20 mm bt
371 Pipa flexible clipsal 20 mm m1
372 Sock clipsal 20 mm bj
373 Tee dos clipsal 20 mm bh
374 Klem clipsal 20 mm bj
375 Inbow dos plastik clipsal E 157 P bj

BUIS BETON
376 Buis beton 10 x 75 bh
377 Buis beton 15 x 75 bh
378 Buis beton 20 x 75 bh
379 Buis beton 25 x 75 bh
380 Buis beton 30 x 75 bh
381 Buis beton 50 x 75 bh

PAVING
382 Paving 10 x 20 cm tebal 6 cm K225 m2
383 Paving 10 x 20 cm tebal 6 cm K300 m2
384 Paving 10 x 20 cm tebal 6 cm standard m2
385 Paving 10 x 20 cm tebal 8 cm K225 m2
386 Paving 10 x 20 cm tebal 8 cm K300 m2
387 Paving 10 x 20 cm tebal 8 cm standard m2
388 Paving Tiga Berlian tebal 6 cm K225 m2
389 Paving Tiga Berlian tebal 8 cm K225 m2
390 Kanstein Bulat 15x20x50 cm K225 m1
391 Kanstein Jumbo 15x30x50 cm K225 m1
392 Kanstein Super 17x25x60 cm K225 m1
393 Grass Block m2
394 Koral sikat zak

LAIN-LAIN
395 Dugul batu hitam 50 x 50 x 200 unit
396 Dugul batu hitam 60 x 70 x 250 unit
397 Dugul batu hitam 70 x 70 x 250 unit
398 Padmasari batu hitam 50 x 50 x 200 unit
399 Padmasari batu hitam 70 x 70 x 250 unit
400 Padmasari batu hitam 65 x 75 x 225 unit

Harga Barang dan Upah Hal. 11


NO NAMA BARANG SATUAN
1 2 3

Denpasar, April 201


Kepala Dinas Cipta Ka
Kabupaten Badung

Ir. I Dewa Made Apraman


Pembina Tk. I
NIP. 195904211987111

Harga Barang dan Upah Hal. 12


A SATUAN BAHAN DAN UPAH
MARET TAHUN 2012

HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA


4

Harga Barang dan Upah Hal. 13


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 14


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 15


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 16


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 17


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 18


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 19


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 20


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Harga Barang dan Upah Hal. 21


HARGA 1 HARGA 2 HARGA 3 HARGA 4 HARGA 5 RATA-RATA
4

Denpasar, April 2010


Kepala Dinas Cipta Karya
Kabupaten Badung

Dewa Made Apramana, MM


Pembina Tk. I
NIP. 195904211987111002

Harga Barang dan Upah Hal. 22


DAFTAR HARGA SATUAN BAHAN DAN UPAH
BULAN MARET 2012
A. Harga Satuan Bahan

NO NAMA BARANG
1 2

FINISHING
1 Amplas
2 Cat besi
3 Cat dasar
4 Cat emco
5 Cat menie besi
6 Cat menie kayu
7 Cat tembok Decolith
8 Cat tembok Dulux
9 Cat tembok Emco
10 Cat tembok Paragon
11 Cat tembok Toyopaint
12 Cat tembok Vinilex
13 Cat tembok Vinippaint
14 Dempul
15 Kuas
16 Mild
17 Minyak cat
18 Plamir kayu
19 Plamir tembok
20 Politur ultra
21 Politur vernis
22 Thiner A Bonanza
23 Thiner B Spesial

PENUTUP ATAP
24 Alang-alang panjang 2,4 meter
25 Alluminium foil
26 Asbes Bubungan
27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm
28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm
29 Asbes Rata 2 m x 1 m x 4 mm
28 Atap metal Toratora 1 x 4 Extra
29 Atap metal Toratora 1 x 4 Premium
30 Atap metal Toratora 2 x 4 Extra
31 Atap metal Toratora 2 x 4 Premium
32 Atap metal Toratora 3 x 4 Extra
33 Atap metal Toratora 3 x 4 Premium
34 Atap metal Toratora 4 x 4 Extra
35 Atap metal Toratora 4 x 4 Premium
36 Bentala paras
37 Bentala tanah liat
38 Besi profil WF
39 Besi strip
40 Bubungan Biasa

Harga Barang dan Upah Hal. 23


NO NAMA BARANG
1 2
41 Bubungan Karang Pilang (glazur) isi 3,5/m
42 Bubungan Karang Pilang isi 3,5/m
43 Bubungan Ngalayur isi 3,5/m
44 Bubungan Plentong
45 Bubungan Utama isi 3,5/m
46 Genteng Kanmuri (glazur) isi 14/m2
47 Genteng Kodok Karang Pilang (Bambe) isi 20/m2
48 Genteng Kodok Karang Pilang (Bisma) isi 20/m2
49 Genteng Kodok Karang Pilang (Good Year) isi 20/m2
50 Genteng Morando Abadi isi 18/m2
51 Genteng Morando Jatiwangi isi 18/m2
52 Genteng Morando Ngalayur isi 20/m2
53 Genteng Plentong
54 Genteng plentong dicat
55 Genteng Plentong Jatiwangi isi 24/m2
56 Ijuk
57 Ikut celedu paras
58 Ikut celedu tanah liat
59 Murda paras
60 Murda tanah liat
61 Seng BJLS 0,20 gelombang
62 Seng BJLS 0,25 gelombang
63 Seng BJLS 0,28 gelombang
64 Seng BJLS 0,32 gelombang
65 Seng Plat 3" x 6" BJLS 28
66 Sirap Jati
67 Tali Ijuk
68 Tali pengikat alang-alang

PENGGANTUNG
69 Engsel kupu-kupu
70 Engsel nylon
71 Espagnoleth
72 Grendel biasa
73 Grendel hararo
74 Kaca 3 mm bening
75 Kaca 5 mm bening
76 Kaca 6 mm bening
77 Kaca 8 mm bening
78 Kaca 10 mm bening
79 Kaca 12 mm bening
80 Kaca Es/Kapur 3 mm
81 Kaca Es/Kapur 5 mm
82 Kaca nako
83 Kaca nako teralis bening
84 Kaca ryben 3 mm
85 Kaca ryben 5 mm
86 Kait angin biasa
87 Kunci pintu TOP
88 Kunci pintu Union
89 Kunci pintu Vanesa
90 Kunci pintu Yale

Harga Barang dan Upah Hal. 24


NO NAMA BARANG
1 2
91 Kunci pintu YURI
92 Kunci slot
93 Kunci tanam 2 slag

KAYU DAN PLAFOND


94 Bambu besar Ukuran 4 m
95 Bambu sedang Ukuran 4 m
96 Bambu kecil Ukuran 4 m
97 Celling teak (0,62 x 2,40) m2
98 Eternit
99 Formika
100 Gedeg kulit kelas I
101 Gypsum Old
102 Hard board MDF
103 Kalsiboard 4,5 mm
104 Kayu bekesting
105 Kayu bingkirai
106 Kayu bingkirai papan
107 Kayu dolken (pekerjaan sementara)
108 Kayu jati
109 Kayu jati papan
110 Kayu kamper balok
111 Kayu kamper usuk/reng
112 Kayu kamper papan
113 Kayu kruing balok
114 Kayu kruing usuk/reng
115 Kayu kruing papan
116 Kayu meranti balok
117 Kayu meranti usuk/reng
118 Kayu meranti papan
119 Kayu merbau
120 Kayu merbau papan
121 Kayu profil
122 Kayu seseh balok
123 Kayu seseh dolken
124 Lem Aibond
125 Lem Kayu
126 List Gypsum standar
127 Minyak bekisting
128 Multiplek 12 mm
129 Multiplek 18 mm
130 Multiplek 6 mm
131 Multiplek 9 mm
132 Plywood 12 mm
133 Plywood 3 mm
134 Plywood 4 mm
135 Plywood 6 mm
136 Plywood 9 mm
137 Plywood aluminium
138 Teak wood (0,9x2,20) m2
139 Teak wood (1,20x2,40) m2

Harga Barang dan Upah Hal. 25


NO NAMA BARANG
1 2
KERAMIK
IKAD
140 Ikad (Keramik) Kw. I 10 x 20 cm
141 Ikad (Keramik) Kw. I 20 x 20 cm
142 Ikad (Keramik) Kw. I 20 x 30 cm
143 Ikad (Keramik) Kw. I 30 x 30 cm
144 Ikad (Keramik) Kw. I 40 x 40 cm
145 Ikad (Keramik) Kw. II 10 x 20 cm
146 Ikad (Keramik) Kw. II 20 x 20 cm
147 Ikad (Keramik) Kw. II 20 x 30 cm
148 Ikad (Keramik) Kw. II 30 x 30 cm
149 Ikad (Keramik) Kw. II 40 x 40 cm

INESA
150 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P)
151 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP)
152 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P)
153 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP)
154 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R)
155 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P)
156 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P)
157 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP)
158 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P)
159 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP)
160 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P)

ESSENZA
161 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P)
162 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP)
163 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P)
164 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP)
165 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P)
166 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP)
167 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P)
168 Keramik Kelas I Domus
169 Keramik Kelas I Granity Imperiali
170 Keramik Kelas I Lavagna
171 Keramik Kelas I Mountain Peak

GARUDA
172 Keramik 20 x 20 kelas I Emboss Dasar Muda
173 Keramik 20 x 20 kelas I Emboss Dasar Tua
174 Keramik 20 x 20 kelas I Tesia
175 Keramik 20 x 20 kelas II Emboss Dasar Muda
176 Keramik 20 x 20 kelas II Emboss Dasar Tua
177 Keramik 20 x 20 kelas II Tesia
178 Keramik 20 x 25 kelas I Motif Dasar Medium
179 Keramik 20 x 25 kelas I Motif Dasar Muda
180 Keramik 20 x 25 kelas I Nuri Dark
181 Keramik 20 x 25 kelas I Polos
182 Keramik 30 x 30 kelas I Granity

Harga Barang dan Upah Hal. 26


NO NAMA BARANG
1 2
183 Keramik 30 x 30 kelas I Motif Embose
184 Keramik 30 x 30 kelas II Granity
185 Keramik 30 x 30 kelas II Motif Embose
186 Keramik 40 x 40 kelas I Motif Dasar Muda
187 Keramik 40 x 40 kelas I Motif Dasar Muda
188 Keramik 40 x 40 kelas I Motif Embose
189 Keramik 40 x 40 kelas I Motif Granity Tua
190 Keramik 40 x 40 kelas I Motif Medium Color
191 Keramik 40 x 40 kelas I Motif Spesial Color
192 Keramik 50 x 50 kelas I

Harga Barang dan Upah Hal. 27


NO NAMA BARANG
1 2
ASIA
193 Keramik 10 x 20 kelas I warna muda
194 Keramik 20 x 20 kelas I warna muda
195 Keramik 20 x 20 kelas I warna tua
196 Keramik 20 x 25 kelas I warna tua
197 Keramik 20 x 30 kelas I warna muda
198 Keramik 30 x 30 kelas I warna muda
199 Keramik 30 x 30 kelas I warna tua
200 Keramik 40 x 40 kelas I warna muda
201 Keramik 10 x 20 kelas II
202 Keramik 20 x 20 kelas II
203 Keramik 20 x 30 kelas II
204 Keramik 30 x 30 kelas II
205 Keramik 40 x 40 kelas II

MULIA
206 Keramik 10 x 20 cm kelas I
207 Keramik 20 x 20 cm kelas I
208 Keramik 20 x 30 cm kelas I
209 Keramik 30 x 30 cm kelas I
210 Keramik 40 x 40 cm kelas I
211 Keramik 10 x 20 cm kelas II
212 Keramik 20 x 20 cm kelas II
213 Keramik 20 x 30 cm kelas II
214 Keramik 30 x 30 cm kelas II
215 Keramik 40 x 40 cm kelas II

SANITAIR
201 Bak mandi fibre glass 70x70x66 cm
202 Bak mandi keramik 50x50
203 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange "
204 Floor drain plastik
205 Floor drain stainless
206 Kloset duduk INA Komplit
207 Kloset duduk Amerika Standar
208 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT
209 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT
210 Kloset duduk " TOTO Type AVANTE CW 823 J
211 Kloset duduk " TOTO Type CW 660J
212 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT
213 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA
214 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT
215 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT
216 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT
217 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT
218 Kloset jongkok " TOTO Type CE 6 COMPLIT
219 Kloset jongkok " TOTO Type CE 7 COMPLIT
220 Kloset porselin jongkok Kia (standar)
221 Kloset porselin jongkok Ina (standar)
222 Kran biasa
223 Kran SunEi
224 Kran TOTO T 205 LCSC

Harga Barang dan Upah Hal. 28


NO NAMA BARANG
1 2
225 Kran TOTO T 205 MC
226 Kran TOTO T 23 B13
227 Kran TOTO T 23 B13V7N
228 Kran TOTO T 26 - 13
229 Kran TOTO TX 109 LH
230 Penyekat Urinoir " TOTO " Type A 100 "
231 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory )
232 Soap holder " TOTO " Type S 6 N "
233 Seal tape
234 Urinoir " TOTO U 57 M
235 Urinoir " TOTO U 57 M BODI
236 Urinoir " TOTO UW 447 JT 1 "
237 Urinoir " TOTO UW 447 JT 1 BODI
238 Urinoir " TOTO UW 447 JT 1,M "
239 Urinoir " TOTO UW 447 JT 1,M "BODI
240 Wastagel KIA Standard
241 Wastagel KIA Warna
242 Wastafel Komplit " TOTO Tx " Type L 521V1A "
243 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 "

Harga Barang dan Upah Hal. 29


NO NAMA BARANG
1 2
PAKU
244 Paku 10 cm
245 Paku kalsiboard
246 Paku list SQ
247 Paku pancing 60 x 230
248 Paku reng/usuk SQ
249 Paku seng
250 Paku seng import
251 Paku skrup 1/2"
252 Paku skrup 2"
253 Paku skrup 3.5"
254 Paku sumbat 1/2"

PASIR, BATU, KERIKIL, BATA DAN PARAS


255 Bata gosok ex Tulikup
256 Bata Merah 5 x 11 x 22 cm
257 Batako kelas I
258 Batu kali /batu bulat 15/20 cm
259 Batu karang
260 Batu lahar Singaraja
261 Batu pecah 5-7 cm (manual)
262 Batu pipih Singaraja
263 Glass block
264 Roster Keramik
265 Koral Beton
266 Limestone
267 Paras Batik
268 Paras Buahan
269 Paras Karang Bukit
270 Paras Kerobokan Tebal 5
271 Paras Malem
272 Paras Putih Bukit
273 Paras Silakarang tebal
274 Paras Silakarang tipis
275 Paras untuk pondasi
276 Pasir beton
277 Pasir pasang
278 Pasir urug
279 Sirtu
280 Tanah urug

PIPA
281 Pipa Galvanis 1/2"
282 Pipa Galvanis 3/4"
283 Pipa Galvanis 1 1/4"
284 Pipa Galvanis 1 1/2"
285 Pipa Galvanis 1"
286 Pipa Galvanis 1,5 BSA
287 Pipa Galvanis 2"
288 Pipa Galvanis 3"
289 Pipa Maspion AW 1
290 Pipa Maspion AW 1/2

Harga Barang dan Upah Hal. 30


NO NAMA BARANG
1 2
291 Pipa Maspion AW 10
292 Pipa Maspion AW 1-1/2
293 Pipa Maspion AW 1-1/4
294 Pipa Maspion AW 12
295 Pipa Maspion AW 14
296 Pipa Maspion AW 16
297 Pipa Maspion AW 2
298 Pipa Maspion AW 2-1/2
299 Pipa Maspion AW 3
300 Pipa Maspion AW 3/4
301 Pipa Maspion AW 4
302 Pipa Maspion AW 5
303 Pipa Maspion AW 6
304 Pipa Maspion AW 8
305 Pipa Maspion C 1
306 Pipa Maspion C 1-1/2
307 Pipa Maspion C 1-1/4
308 Pipa Maspion C 2
309 Pipa Maspion C 2-1/2
310 Pipa Maspion C 3
311 Pipa Maspion C 3/4
312 Pipa Maspion C 4
313 Pipa Maspion C 5/8
314 Pipa Maspion D 10
315 Pipa Maspion D 1-1/2
316 Pipa Maspion D 1-1/4
317 Pipa Maspion D 12
318 Pipa Maspion D 14
319 Pipa Maspion D 16
320 Pipa Maspion D 2
321 Pipa Maspion D 2-1/2
322 Pipa Maspion D 3
323 Pipa Maspion D 4
324 Pipa Maspion D 5
325 Pipa Maspion D 6
326 Pipa Maspion D 8

SEMEN
327 Semen Bosowa 50 kg
328 Semen Gresik 40 kg
329 Semen Gresik 50 kg
330 Semen Tiga Roga 50 kg
331 Semen Tonasa 50 kg
332 Semen warna/semen grouting

BESI BETON DAN PAGAR


333 Besi beton
334 Kawat berduri
335 Kawat beton RRT
336 Pagar BRC asli T.120 diameter 6mm
337 Pagar BRC asli T.150 diameter 6mm
338 Pagar BRC asli T.175 diameter 7mm

Harga Barang dan Upah Hal. 31


NO NAMA BARANG
1 2
339 Pagar BRC asli T.190 diameter 7mm
340 Pagar BRC asli T.90 diameter 6mm
341 Pagar HotDip Galvanized T.120 diameter 6mm
342 Pagar HotDip Galvanized T.150 diameter 7mm
343 Pagar HotDip Galvanized T.175 diameter 7mm
344 Pagar HotDip Galvanized T.190 diameter 7mm
345 Pagar HotDip Galvanized T.90 diameter 6mm
346 Tiang BRC asli T. 120 diameter 1 1/2"
347 Tiang BRC asli T. 150 diameter 2"
348 Tiang BRC asli T. 175 diameter 2"
349 Tiang BRC asli T. 190 diameter 2"
350 Tiang BRC asli T. 90 diameter 1 1/2"
351 Tiang HotDip Galvanized T. 120 diameter 1 1/2"
352 Tiang HotDip Galvanized T. 150 diameter 2"
353 Tiang HotDip Galvanized T. 175 diameter 2"
354 Tiang HotDip Galvanized T. 190 diameter 2"
355 Tiang HotDip Galvanized T. 90 diameter 1 1/2"

BAHAN LISTRIK
356 Saklar (Broco)
357 Stop Kontak
358 Fitting
359 Steker
360 Coaxial cable 5C - 75 ohm commscof
361 Kabel NYM 3 x 2.5 mm ex. Supreme
362 Kabel NYM 4 mm
363 Kabel telephone
364 Lampu pijar 10 Watt (Philip)
365 Lampu pijar 15 Watt (Philip)
366 Lampu pijar 25 Watt (Philip)
367 Lampu TL 10 Watt (10 Watt)
368 Lampu TL 20 Watt (10 Watt)
369 Lampu TL 25 Watt (10 Watt)
370 Pipa clipsal 20 mm
371 Pipa flexible clipsal 20 mm
372 Sock clipsal 20 mm
373 Tee dos clipsal 20 mm
374 Klem clipsal 20 mm
375 Inbow dos plastik clipsal E 157 P

Harga Barang dan Upah Hal. 32


NO NAMA BARANG
1 2
BUIS BETON
376 Buis beton 10 x 75
377 Buis beton 15 x 75
378 Buis beton 20 x 75
379 Buis beton 25 x 75
380 Buis beton 30 x 75
381 Buis beton 50 x 75

PAVING
382 Paving 10 x 20 cm tebal 6 cm K225
383 Paving 10 x 20 cm tebal 6 cm K350
384 Paving 10 x 20 cm tebal 8 cm K225
385 Paving 10 x 20 cm tebal 8 cm K350
386 Paving 10 x 20 cm tebal 8 cm K425
387 Paving 20 x 20 cm tebal 6 cm K225
388 Paving 20 x 20 cm tebal 6 cm K350
389 Paving 20 x 20 cm tebal 8 cm K225
389 Paving 20 x 20 cm tebal 8 cm K350
390 Paving 20 x 20 cm tebal 8 cm K425
391 Paving 20 x 20 cm tebal 10 cm K225
392 Paving 20 x 20 cm tebal 10 cm K350
393 Paving 20 x 20 cm tebal 10 cm K425
394 Paving Tiga Berlian tebal 6 cm K225
395 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225)
396 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
397 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)
398 Grass Block 36 X 54 cm tebal 9 cm K 225
399 Koral Sikat

LAIN-LAIN
Dugul batu hitam 50 x 50 x 200
1 Dugul batu hitam 60 x 70 x 250
2 Dugul batu hitam 70 x 70 x 250
3 Padmasari batu hitam 50 x 50 x 200
4 Padmasari batu hitam 65 x 75 x 255
5 Padmasari batu hitam 70 x 70 x 250

Mangupura, 1 Mare
Kepala Dinas Cipta
Kabupaten Badu

Ir. Ni Luh Putu Dessy Dha


Pembina Tk.I
NIP. 196110101994

Harga Barang dan Upah Hal. 33


N BAHAN DAN UPAH
RET 2012

SATUAN HARGA SATUAN


3 4

lbr 3,800.00
kg 45,000.00
kg 20,000.00
kg 45,500.00
kg 20,000.00
kg 47,100.00
kg 26,000.00
kg 23,500.00
kg 38,000.00
kg 20,000.00
kg 18,500.00
kg 17,000.00
kg 17,000.00
ltr 29,000.00
bh 9,000.00
zak 12,000.00
ltr 26,000.00
kg 30,000.00
kg 30,000.00
ltr 47,000.00
ltr 35,000.00
ltr 22,000.00
ltr 8,000.00

lbr 12,500.00
m2 29,000.00
lbr 24,000.00
lbr 28,000.00
lbr 36,000.00
lbr 50,000.00
m2 84,000.00
m2 125,000.00
m2 74,000.00
m2 108,500.00
m2 72,000.00
m2 105,000.00
m2 70,000.00
m2 105,000.00
bh 68,000.00
bh 52,000.00
kg 15,000.00
kg 8,000.00
bj 2,700.00

Harga Barang dan Upah Hal. 34


SATUAN HARGA SATUAN
3 4
bj 7,200.00
bj 10,000.00
bj 6,000.00
bj 6,000.00
bj 4,200.00
bj 6,500.00
bj 3,000.00
bj 2,800.00
bj 3,100.00
bj 2,800.00
bj 2,900.00
bj 2,800.00
bj 1,300.00
bj 1,500.00
bj 1,350.00
kg 2,500.00
bh 62,000.00
bh 49,000.00
bh 75,000.00
bh 61,000.00
lbr 43,500.00
lbr 42,000.00
lbr 42,500.00
lbr 47,000.00
lbr 46,500.00
bh 8,500.00
kg 34,000.00
ikat 9,500.00

ps 49,000.00
ps 27,000.00
set 100,000.00
bh 15,500.00
bh 22,000.00
m2 97,000.00
m2 102,000.00
m2 167,000.00
m2 212,000.00
m2 305,000.00
m2 375,000.00
m2 87,000.00
m2 117,000.00
daun 15,000.00
m2 117,000.00
m2 122,000.00
m2 127,000.00
bh 22,000.00
bh 45,000.00
bh 72,000.00
bh 109,000.00
bh 115,000.00

Harga Barang dan Upah Hal. 35


SATUAN HARGA SATUAN
3 4
bh 132,000.00
bh 100,000.00
bh 105,000.00

btg 10,000.00
btg 8,500.00
btg 7,000.00
lbr 67,000.00
lbr 47,000.00
lbr 80,000.00
m2 22,000.00
lbr 63,500.00
lbr 107,000.00
lbr 72,000.00
m3 2,250,000.00
m3 12,000,000.00
m3 12,000,000.00
btg 90,000.00
m3 20,000,000.00
m3 30,000,000.00
m3 8,300,000.00
m3 6,500,000.00
m3 9,000,000.00
m3 5,000,000.00
m3 5,000,000.00
m3 6,000,000.00
m3 4,000,000.00
m3 4,000,000.00
m3 6,000,000.00
m3 13,000,000.00
m3 13,000,000.00
m1 12,250.00
m3 2,264,750.00
m3 2,750,000.00
kg 33,000.00
ltr 12,500.00
m' 17,000.00
ltr 15,000.00
lbr 126,000.00
lbr 172,000.00
lbr 58,000.00
lbr 83,000.00
lbr 127,000.00
lbr 36,000.00
lbr 47,000.00
lbr 67,000.00
lbr 105,500.00
lbr 75,000.00
lbr 56,000.00
lbr 62,000.00

Harga Barang dan Upah Hal. 36


SATUAN HARGA SATUAN
3 4

m2 51,500.00
m2 42,000.00
m2 52,000.00
m2 40,000.00
m2 48,000.00
m2 38,000.00
m2 40,000.00
m2 47,000.00
m2 38,000.00
m2 46,000.00

m2 191,000.00
m2 154,000.00
m2 180,000.00
m2 143,000.00
m2 165,000.00
m2 209,000.00
m2 209,000.00
m2 160,000.00
m2 197,000.00
m2 149,000.00
m2 248,500.00

m2 165,000.00
m2 122,100.00
m2 150,700.00
m2 107,800.00
m2 222,900.00
m2 194,900.00
m2 273,500.00
m2 286,500.00
m2 262,500.00
m2 249,900.00
m2 337,000.00

m2 43,000.00
m2 45,000.00
m2 45,000.00
m2 43,000.00
m2 44,000.00
m2 43,000.00
m2 46,000.00
m2 46,000.00
m2 48,000.00
m2 40,000.00
m2 45,000.00

Harga Barang dan Upah Hal. 37


SATUAN HARGA SATUAN
3 4
m2 45,000.00
m2 43,000.00
m2 43,000.00
m2 48,000.00
m2 48,000.00
m2 50,050.00
m2 55,000.00
m2 45,000.00
m2 44,550.00
m2 70,000.00

Harga Barang dan Upah Hal. 38


SATUAN HARGA SATUAN
3 4

m2 50,000.00
m2 35,000.00
m2 37,000.00
m2 40,000.00
m2 55,500.00
m2 35,000.00
m2 39,000.00
m2 41,000.00
m2 45,000.00
m2 35,000.00
m2 37,000.00
m2 37,000.00
m2 40,000.00

m2 41,000.00
m2 43,000.00
m2 56,000.00
m2 40,000.00
m2 48,000.00
m2 38,500.00
m2 40,000.00
m2 53,500.00
m2 36,500.00
m2 46,000.00

bh 230,000.00
bh 170,000.00
bh 225,000.00
bh 15,000.00
bh 45,000.00
bh 1,300,000.00
bh 955,000.00
bh 1,500,000.00
bh 5,610,000.00
bh 5,600,000.00
bh 610,000.00
bh 1,365,000.00
bh 1,491,000.00
bh 670,000.00
bh 2,800,000.00
bh 2,200,000.00
bh 1,800,000.00
bh 355,000.00
bh 165,000.00
bh 145,000.00
bh 135,000.00
bh 18,000.00
bh 110,500.00
bh 220,500.00

Harga Barang dan Upah Hal. 39


SATUAN HARGA SATUAN
3 4
bh 165,000.00
bh 140,000.00
bh 142,000.00
bh 187,000.00
bh 410,000.00
bh 835,000.00
bh 235,000.00
bh 48,000.00
bh 2,600.00
bh 1,052,000.00
bh 849,000.00
bh -
bh -
bh -
bh -
bh 185,000.00
bh 235,000.00
bh 1,135,000.00
bh 735,000.00

Harga Barang dan Upah Hal. 40


SATUAN HARGA SATUAN
3 4

kg 14,000.00
kg 24,000.00
kg 17,000.00
kg 20,000.00
kg 13,000.00
kg 21,000.00
bj 45,000.00
kg 18,000.00
kg 18,000.00
kg 26,500.00
kg 15,000.00

bj 1,980.00
bj 1,300.00
bj 2,000.00
m3 180,000.00
m3 131,000.00
m3 140,000.00
m3 150,000.00
m3 155,000.00
bj 20,000.00
bh 50,000.00
m3 125,000.00
m3 85,000.00
bh 17,000.00
bh 10,000.00
bh 8,500.00
bh 9,500.00
bh 13,000.00
bh 4,000.00
bh 14,500.00
bh 12,000.00
bh 12,500.00
m3 141,000.00
m3 158,000.00
m3 100,000.00
m3 110,000.00
m3 80,000.00

m1 27,125.00
m1 35,000.00
m1 70,625.00
m1 81,125.00
m1 38,000.00
m1 58,000.00
m1 77,500.00
m1 175,000.00
ljr 32,000.00
ljr 22,000.00

Harga Barang dan Upah Hal. 41


SATUAN HARGA SATUAN
3 4
ljr 112,000.00
ljr 56,000.00
ljr 43,000.00
ljr 1,550,000.00
ljr 1,900,000.00
ljr 2,400,000.00
ljr 89,000.00
ljr 103,000.00
ljr 140,000.00
ljr 25,000.00
ljr 225,000.00
ljr 373,000.00
ljr 494,000.00
ljr 768,000.00
ljr 14,700.00
ljr 19,500.00
ljr 16,500.00
ljr 35,000.00
ljr 45,000.00
ljr 50,000.00
ljr 10,000.00
ljr 63,000.00
ljr 5,500.00
ljr 784,000.00
ljr 32,000.00
ljr 28,000.00
ljr 1,270,000.00
ljr 1,650,000.00
ljr 1,877,568.00
ljr 42,000.00
ljr 62,000.00
ljr 86,000.00
ljr 120,000.00
ljr 209,000.00
ljr 254,000.00
ljr 449,000.00

zak 60,000.00
zak 51,500.00
zak 62,500.00
zak 61,500.00
zak 60,000.00
kg 11,000.00

kg 8,270.00
roll 85,000.00
kg 16,000.00
m' 170,000.00
m' 178,000.00
m' 251,000.00

Harga Barang dan Upah Hal. 42


SATUAN HARGA SATUAN
3 4
m' 268,000.00
m' 137,000.00
m' 140,000.00
m' 191,000.00
m' 205,000.00
m' 220,000.00
m' 120,000.00
bh 167,000.00
bh 215,000.00
bh 245,000.00
bh 250,000.00
bh 140,000.00
bh 147,000.00
bh 172,000.00
bh 190,000.00
bh 200,000.00
bh 127,000.00

bh 12,700.00
bh 16,000.00
bh 5,000.00
bh 6,000.00
m1 6,000.00
m1 12,000.00
m1 6,000.00
m1 4,000.00
bh 6,000.00
bh 7,000.00
bh 8,000.00
bh 27,500.00
bh 35,000.00
bh 34,000.00
bt 12,000.00
m1 10,500.00
bj 2,000.00
bh 7,000.00
bj 750.00
bj 10,000.00

Harga Barang dan Upah Hal. 43


SATUAN HARGA SATUAN
3 4

bh 31,000.00
bh 39,000.00
bh 40,000.00
bh 43,000.00
bh 54,000.00
bh 75,000.00

m2 52,000.00
m2 60,000.00
m2 67,000.00
m2 75,000.00
m2 80,500.00
m2 52,500.00
m2 60,500.00
m2 60,500.00
m2 75,500.00
m2 81,500.00
m2 70,500.00
m2 80,000.00
m2 87,500.00
m2 60,000.00
m1 65,000.00
m1 64,000.00
m1 69,000.00
m2 52,000.00
zak/10 kg 35,000.00

unit 2,850,000.00
unit 3,800,000.00
unit 3,850,000.00
unit 2,700,000.00
unit 2,850,000.00
unit 3,350,000.00

Mangupura, 1 Maret 2012


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk.I
NIP. 196110101994032001

Harga Barang dan Upah Hal. 44


DAFTAR HARGA SATUAN UPAH
BULAN MARET TAHUN 2012
HARGA
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.)
1 2 3 4 5

1 Mandor Hari 68,000.00


2 Kepala Tukang Hari 60,000.00
3 Tukang Politur Hari 42,000.00
4 Tukang Batu Hari 45,000.00
5 Tukang kayu Hari 55,000.00
6 Tukang Besi Hari 50,000.00
7 Tukang cat Hari 40,000.00
8 Tukang gali Hari 40,000.00
9 Tukang Listrik Hari 45,000.00
10 Tukang Pipa/ Tukang Ledeng Hari 50,000.00
11 Tukang Aspal Hari 43,000.00
12 Tukang masak Aspal Hari 44,000.00
13 Pekerja Hari 40,000.00
14 Tukang Ukir Hari 75,000.00
15 Operator Hari 50,000.00
16 Pembantu Operator Hari 40,000.00
17 Mekanik Hari 50,000.00
18 Pembantu Mekanik Hari 45,000.00
19 Pasang Atap Alang-Alang Hari 45,000.00
20 Pasang Bata Gosok Dua Muka M2 270,000.00
21 Pasang Bata Gosok Satu Muka M2 145,000.00
22 Pasang Batu Paras Diukir M2 288,500.00
23 Pasang Patu Paras Siap Diukir M2 250,000.00
24 Tukang Bongkar Begesting Hari 40,000.00

Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).

Mangupura, 1 Maret 2012


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001
DAFTAR ANALISA PEKERJAAN
BULAN MARET TAHUN 2012
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1
1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
1.2500 btg Bambu Sedang 8,500.00
2.5000 kg Semen Portland 1,250.00
1.2000 lbr Seng gelombang 3" - 5" 43,500.00
0.0050 m3 Pasir Beton 141,000.00
0.0090 m3 Koral beton 125,000.00
0.0720 m3 Kayu Meranti Usuk 5/7 4,000,000.00
0.0600 kg Paku biasa 2" - 5" 13,000.00
0.4500 kg Meni Besi 20,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0200 oh Mandor 68,000.00 1,360.00
Total : 29,560.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 4,000,000.00
0.0200 kg Paku Biasa 2" - 5" 13,000.00
0.0070 m3 Kayu Papan Meranti 3/20 6,000,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0050 oh Mandor 68,000.00 340.00
Total : 10,440.00

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu 8 - 10/4m 90,000.00
0.1800 m3 Kayu Meranti 4,000,000.00
0.8500 kg Paku Biasa 2" - 5" 13,000.00
1.1000 kg Besi Strip 8,000.00
35.0000 kg Semen Portland 1,250.00
0.1500 m3 Pasir Pasang 158,000.00
0.1000 m3 Pasir Beton 141,000.00
0.1500 m3 Koral Beton 125,000.00
30.0000 bh Bata Merah 1,300.00
0.2500 lbr Seng Plat 46,500.00
2.0000 bh Jendela Nako 15,000.00
0.0800 m2 Kaca Polos 102,000.00
0.1500 bh Kunci Tanam 105,000.00
0.0600 lbr Plywood 4 mm 47,000.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
1.0000 oh Tukang Batu 45,000.00 45,000.00
2.0000 oh Pekerja 40,000.00 80,000.00
0.3000 oh Kepala Tukang 60,000.00 18,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 256,400.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 8,500.00
0.2100 m3 Kayu Meranti 4,000,000.00
0.3000 kg Paku Biasa 2" - 5" 13,000.00
10.5000 kg Semen Portland 1,250.00
0.0300 m3 Pasir Beton 141,000.00
0.0500 m3 Koral Beton 125,000.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
1.0000 oh Pekerja 40,000.00 40,000.00
0.2000 oh Kepala Tukang 60,000.00 12,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 165,400.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 8,500.00
0.2760 m3 Kayu Meranti 4,000,000.00
0.7000 kg Paku biasa 2" - 5" 13,000.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
1.5000 oh Tukang Kayu 55,000.00 82,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.1500 oh Kepala Tukang 60,000.00 9,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 134,900.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 7,400.00

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 8,500.00
0.1860 m3 Kayu Meranti 4,000,000.00
0.3000 kg Paku Biasa 2" - 5" 13,000.00
18.0000 kg Semen Portland 1,250.00
0.0300 m3 Pasir Beton 141,000.00
0.0500 m3 Koral Beton 125,000.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
1.3500 lbr Plywood 4 mm 47,000.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.2000 oh Kepala Tukang 60,000.00 12,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 165,400.00

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang 4,000,000.00
0.0800 kg Paku Biasa 2" - 5" 13,000.00
1.0000 btg Kaso 5/7 84,000.00
0.3000 oh Tukang kayu 55,000.00 16,500.00
0.0015 oh Mandor 68,000.00 102.00
Total : 16,602.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu 7,000.00
0.2500 kg Tali Ijuk 34,000.00
0.0170 oh Tukang Kayu 55,000.00 935.00
0.0020 oh Pekerja 40,000.00 80.00
0.2500 oh Kepala Tukang 60,000.00 15,000.00
0.0130 oh Mandor 68,000.00 884.00
16,899.00

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20 180,000.00
0.0900 m3 Batu Pecah 5 - 7 150,000.00
0.0100 m3 Pasir Pasang 158,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 43,400.00

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 40,000.00 266,680.00
0.3330 oh Mandor 68,000.00 22,644.00
Total : 289,324.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja 40,000.00 266,680.00
0.0330 oh Mandor 68,000.00 2,244.00
Total : 268,924.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja 40,000.00 30,000.00
0.0250 oh Mandor 68,000.00 1,700.00
Total : 31,700.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.9000 oh Pekerja 40,000.00 36,000.00
0.0450 oh Mandor 68,000.00 3,060.00
Total : 39,060.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 40,000.00 42,000.00
0.0670 oh Mandor 68,000.00 4,556.00
Total : 46,556.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja 40,000.00 40,000.00
0.0320 oh Mandor 68,000.00 2,176.00
Total : 42,176.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 40,000.00 60,000.00
0.0600 oh Mandor 68,000.00 4,080.00
Total : 64,080.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja 40,000.00 48,000.00
0.0450 oh Mandor 68,000.00 3,060.00
Total : 51,060.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 40,000.00 2,000.00
0.0050 oh Mandor 68,000.00 340.00
Total : 2,340.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 40,000.00 13,200.00
0.0100 oh Mandor 68,000.00 680.00
Total : 13,880.00

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja 40,000.00 20,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 23,400.00

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 100,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.0100 oh Mandor 68,000.00 680.00
Total : 12,680.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk 2,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 7,020.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 110,000.00
0.2500 oh Pekerja 40,000.00 10,000.00
0.0250 oh Mandor 68,000.00 1,700.00
Total : 11,700.00

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug 80,000.00
0.5000 oh Pekerja 40,000.00 20,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 23,400.00
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone 85,000.00
0.2500 oh Pekerja 40,000.00 10,000.00
0.0250 oh Mandor 68,000.00 1,700.00
Total : 11,700.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
202.0000 kg Semen Portland 1,250.00
0.4850 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0750 oh Kepala Tukang 60,000.00 4,500.00
0.0750 oh Mandor 68,000.00 5,100.00
Total : 103,350.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
163.0000 kg Semen Portland 1,250.00
0.5200 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
0.0750 oh Kepala Tukang 60,000.00 4,500.00
0.0750 oh Mandor 68,000.00 5,100.00
Total : 103,350.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
136.0000 kg Semen Portland 1,250.00
0.5440 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
0.0750 oh Kepala Tukang 60,000.00 4,500.00
0.0750 oh Mandor 68,000.00 5,100.00
Total : 103,350.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
117.0000 kg Semen Portland 1,250.00
0.5610 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
0.0750 oh Kepala Tukang 60,000.00 4,500.00
0.0750 oh Mandor 68,000.00 5,100.00
Total : 103,350.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
91.0000 kg Semen Portland 1,250.00
0.5840 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
0.0750 oh Kepala Tukang 60,000.00 4,500.00
0.0750 oh Mandor 68,000.00 5,100.00
Total : 103,350.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 180,000.00
194.0000 kg Semen Portland 1,250.00
0.3120 m3 Pasir Beton 141,000.00
0.4680 m3 Koral Beton 125,000.00
126.0000 kg Besi Beton 8,270.00
1.8000 kg Kawat Beton 16,000.00
3.4000 oh Pekerja 40,000.00 136,000.00
0.8500 oh Tukang Batu 45,000.00 38,250.00
0.0850 oh Kepala Tukang 60,000.00 5,100.00
0.1700 oh Mandor 68,000.00 11,560.00
190,910.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 180,000.00
194.0000 kg Semen Portland 1,250.00
0.3120 m3 Pasir Beton 141,000.00
0.4680 m3 Koral Beton 125,000.00
2.4000 oh Pekerja 40,000.00 96,000.00
0.8000 oh Tukang Batu 45,000.00 36,000.00
0.0800 oh Kepala Tukang 60,000.00 4,800.00
0.1190 oh Mandor 68,000.00 8,092.00
Total : 144,892.00

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 180,000.00
0.4320 m3 Pasir Urug 100,000.00
0.7800 oh Pekerja 40,000.00 31,200.00
0.3900 oh Tukang Batu 45,000.00 17,550.00
0.0390 oh Kepala Tukang 60,000.00 2,340.00
0.0390 oh Mandor 68,000.00 2,652.00
Total : 53,742.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

IV PEKERJAAN DINDING (SNI 6897 : 2008)

1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
43.5000 kg Semen Portland 1,250.00
0.0800 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0300 oh Mandor 68,000.00 2,040.00
36,240.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
32.9500 kg Semen Portland 1,250.00
0.0910 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0300 oh Mandor 68,000.00 2,040.00
36,240.00

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
26.5500 kg Semen Portland 1,250.00
0.0930 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0300 oh Mandor 68,000.00 2,040.00
36,240.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
22.2000 kg Semen Portland 1,250.00
0.1020 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0300 oh Mandor 68,000.00 2,040.00
36,240.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.5000 kg Semen Portland 1,250.00
0.1220 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0300 oh Mandor 68,000.00 2,040.00
36,240.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.9500 kg Semen Portland 1,250.00
0.0380 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
18,120.00

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
14.3700 kg Semen Portland 1,250.00
0.0400 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,120.00

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
11.5000 kg Semen Portland 1,250.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0430 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,120.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
9.6800 kg Semen Portland 1,250.00
0.0450 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,120.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
8.3200 kg Semen Portland 1,250.00
0.0490 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,120.00

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
6.5000 kg Semen Portland 1,250.00
0.0500 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,120.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako 2,000.00
7.5000 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
1.9500 kg Besi Beton 8 mm 8,270.00
0.3200 oh Pekerja 40,000.00 12,800.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,920.00

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako 2,000.00
7.5000 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
0.3200 oh Pekerja 40,000.00 12,800.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,920.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik 50,000.00
11.0000 kg Semen Portland 1,250.00
0.0350 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,120.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I 22,000.00
0.0140 m3 Kayu kamper usuk/reng 6,500,000.00
0.0120 kg Paku Biasa 13,000.00
0.0030 m3 List Kayu 2/4 6,500,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
0.0050 oh Kepala Tukang 60,000.00 300.00
0.0020 oh Mandor 68,000.00 136.00
Total : 7,186.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM
15.5040 kg Semen Portland 1,250.00
0.0160 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland 1,250.00
0.0200 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland 1,250.00
0.0230 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland 1,250.00
0.0240 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland 1,250.00
0.0260 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland 1,250.00
0.0290 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0220 oh Mandor 68,000.00 1,496.00
Total : 27,696.00

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland 1,250.00
0.0310 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0220 oh Mandor 68,000.00 1,496.00
Total : 27,696.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM
8.3200 kg Semen Portland 1,250.00
0.0320 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0220 oh Mandor 68,000.00 1,496.00
Total : 27,696.00
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland 1,250.00
0.0350 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0220 oh Mandor 68,000.00 1,496.00
Total : 27,696.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland 1,250.00
0.0360 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0220 oh Mandor 68,000.00 1,496.00
Total : 27,696.00

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland 1,250.00
0.0130 m3 Pasir Pasang 158,000.00
0.0800 oh Pekerja 40,000.00 3,200.00
0.4000 oh Tukang Batu 45,000.00 18,000.00
0.0400 oh Kepala Tukang 60,000.00 2,400.00
0.0040 oh Mandor 68,000.00 272.00
Total : 23,872.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 1,250.00
0.0060 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,120.00

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland 1,250.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0750 oh Tukang Batu 45,000.00 3,375.00
0.0080 oh Kepala Tukang 60,000.00 480.00
0.0080 oh Mandor 68,000.00 544.00
Total : 10,399.00

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8


M')
1.6000 kg Semen Portland 1,250.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0350 oh Tukang Batu 45,000.00 1,575.00
0.0040 oh Kepala Tukang 60,000.00 240.00
0.0040 oh Mandor 68,000.00 272.00
Total : 4,887.00

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland 1,250.00
0.0120 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 20,670.00

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 1,250.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.1000 oh Tukang Labur/Cat 40,000.00 4,000.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0100 oh Mandor 68,000.00 680.00
Total : 5,280.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU


KELAS I
1.1000 m3 Balok Kayu Kamper 8,300,000.00
1.2500 Kg Paku 10 Cm 14,000.00
1.0000 Kg Lem Kayu 12,500.00
7.0000 oh Pekerja 40,000.00 280,000.00
21.0000 oh Tukang Kayu 55,000.00 1,155,000.00
2.1000 oh Kepala Tukang 60,000.00 126,000.00
0.3500 oh Mandor 68,000.00 23,800.00
Total : 1,584,800.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU


KELAS II/III
1.2000 m3 Balok Kayu kruing 5,000,000.00
1.2500 Kg Paku 10 Cm 14,000.00
1.0000 Kg Lem Kayu 12,500.00
6.0000 oh Pekerja 40,000.00 240,000.00
18.0000 oh Tukang Kayu 55,000.00 990,000.00
1.8000 oh Kepala Tukang 60,000.00 108,000.00
0.3000 oh Mandor 68,000.00 20,400.00
Total : 1,358,400.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper 9,000,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00
0.3500 oh Pekerja 40,000.00 14,000.00
1.0500 oh Tukang Kayu 55,000.00 57,750.00
0.1050 oh Kepala Tukang 60,000.00 6,300.00
0.0180 oh Mandor 68,000.00 1,224.00
Total : 79,274.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU


KELAS III
0.0400 m3 Papan Kayu Kruing 6,000,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00
0.3500 oh Pekerja 40,000.00 14,000.00
1.0500 oh Tukang Kayu 55,000.00 57,750.00
0.1050 oh Kepala Tukang 60,000.00 6,300.00
0.0180 oh Mandor 68,000.00 1,224.00
Total : 79,274.00

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS


I/II
0.0400 m3 Papan Kayu Kamper 9,000,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 55,000.00 165,000.00
0.3000 oh Kepala Tukang 60,000.00 18,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 226,400.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU


KELAS I/II
0.0240 m3 Papan Kayu Kamper 9,000,000.00
0.3000 Kg Lem Kayu 12,500.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
0.2400 oh Kepala Tukang 60,000.00 14,400.00
0.0400 oh Mandor 68,000.00 2,720.00
Total : 181,120.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU


KELAS I/II
0.0640 m3 Papan Kayu Kamper 9,000,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 55,000.00 165,000.00
0.3000 oh Kepala Tukang 60,000.00 18,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 226,400.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA
TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Plywood 4 mm 47,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 55,000.00 165,000.00
0.3000 oh Kepala Tukang 60,000.00 18,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 226,400.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE,


KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Plywood 4 mm 47,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
0.2400 oh Kepala Tukang 60,000.00 14,400.00
0.0400 oh Mandor 68,000.00 2,720.00
Total : 181,120.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Kamper 9,000,000.00
0.1500 Kg Paku 1-2,5 Cm 14,000.00
0.6700 oh Pekerja 40,000.00 26,800.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
0.2000 oh Kepala Tukang 60,000.00 12,000.00
0.3350 oh Mandor 68,000.00 22,780.00
Total : 171,580.00

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
0.2400 oh Kepala Tukang 60,000.00 14,400.00
0.0400 oh Mandor 68,000.00 2,720.00
Total : 181,120.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.8000 Kg Lem Kayu 12,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.5000 Lbr Formika 80,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
0.2400 oh Kepala Tukang 60,000.00 14,400.00
0.0400 oh Mandor 68,000.00 2,720.00
Total : 181,120.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU


KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper 8,300,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
5.6000 Kg Paku 12 Cm 14,000.00
4.0000 oh Pekerja 40,000.00 160,000.00
12.0000 oh Tukang Kayu 55,000.00 660,000.00
1.2000 oh Kepala Tukang 60,000.00 72,000.00
0.2000 oh Mandor 68,000.00 13,600.00
Total : 905,600.00

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I

1.2000 m3 Balok Kayu Kamper 8,300,000.00


15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
5.6000 Kg Paku 12 Cm 14,000.00
6.7000 oh Pekerja 40,000.00 268,000.00
20.1000 oh Tukang Kayu 55,000.00 1,105,500.00
2.0100 oh Kepala Tukang 60,000.00 120,600.00
0.3350 oh Mandor 68,000.00 22,780.00
Total : 1,516,880.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper 8,300,000.00


15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
3.0000 Kg Paku 12 Cm 14,000.00
2.4000 oh Pekerja 40,000.00 96,000.00
7.2000 oh Tukang Kayu 55,000.00 396,000.00
0.7200 oh Kepala Tukang 60,000.00 43,200.00
0.1200 oh Mandor 68,000.00 8,160.00
Total : 543,360.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00


0.0036 m3 Reng ( 2 x 3 ) Cm 6,500,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0050 oh Mandor 68,000.00 340.00
Total : 10,440.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00


0.0072 m3 Reng ( 2 x 3 ) Cm 6,500,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0050 oh Mandor 68,000.00 340.00
Total : 10,440.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper 8,300,000.00


0.2000 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1200 oh Pekerja 40,000.00 4,800.00
0.1200 oh Tukang Kayu 55,000.00 6,600.00
0.0120 oh Kepala Tukang 60,000.00 720.00
0.0060 oh Mandor 68,000.00 408.00
Total : 12,528.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS


II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00
0.2000 Kg Paku 7 Cm dan 10 Cm 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.3000 oh Tukang Kayu 55,000.00 16,500.00
0.0300 oh Kepala Tukang 60,000.00 1,800.00
0.0750 oh Mandor 68,000.00 5,100.00
Total : 29,400.00

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS


II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00
0.2500 Kg Paku 7 Cm dan 10 Cm 14,000.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.3000 oh Tukang Kayu 55,000.00 16,500.00
0.0300 oh Kepala Tukang 60,000.00 1,800.00
0.0100 oh Mandor 68,000.00 680.00
Total : 26,980.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

0.0108 m3 Papan Kayu Kamper 9,000,000.00


0.1000 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0050 oh Mandor 68,000.00 340.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 16,540.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

0.0110 m3 Papan Kayu Kamper 9,000,000.00


0.0500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0050 oh Mandor 68,000.00 340.00
Total : 16,540.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU


KELAS II/III
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4500 oh Tukang Kayu 55,000.00 24,750.00
0.0450 oh Kepala Tukang 60,000.00 2,700.00
0.0080 oh Mandor 68,000.00 544.00
Total : 33,994.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP,


RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.5600 Kg Lem Kayu 12,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4500 oh Tukang Kayu 55,000.00 24,750.00
0.0450 oh Kepala Tukang 60,000.00 2,700.00
0.0080 oh Mandor 68,000.00 544.00
Total : 33,994.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP,


RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 47,000.00
0.5600 Kg Lem Kayu 12,500.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.6000 oh Tukang Kayu 55,000.00 33,000.00
0.0600 oh Kepala Tukang 60,000.00 3,600.00
0.0100 oh Mandor 68,000.00 680.00
Total : 45,280.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper 9,000,000.00


0.1000 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1500 Kg Paku Skrup 10 cm 18,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
1.8000 oh Tukang Kayu 55,000.00 99,000.00
0.1800 oh Kepala Tukang 60,000.00 10,800.00
0.0300 oh Mandor 68,000.00 2,040.00
Total : 135,840.00

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X


240) CM
0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 47,000.00
0.0500 Kg Paku 1 Cm dan 2.5 Cm 14,000.00
0.0250 oh Pekerja 40,000.00 1,000.00
0.0750 oh Tukang Kayu 55,000.00 4,125.00
0.0080 oh Kepala Tukang 60,000.00 480.00
0.0010 oh Mandor 68,000.00 68.00
Total : 5,673.00

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
218.0000 kg Semen Portland 1,250.00
0.5200 m3 Pasir Beton 141,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.8700 m3 Koral Beton 125,000.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.0250 oh Kepala Tukang 60,000.00 1,500.00
0.0800 oh Mandor 68,000.00 5,440.00
84,190.00

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland 1,250.00
0.5200 m3 Pasir Beton 141,000.00
0.7800 m3 Koral Beton 125,000.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.0250 oh Kepala Tukang 60,000.00 1,500.00
0.0800 oh Mandor 68,000.00 5,440.00
Total : 84,190.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland 1,250.00
0.4500 m3 Pasir Beton 141,000.00
0.9000 m3 Koral Beton 125,000.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.0250 oh Kepala Tukang 60,000.00 1,500.00
0.0800 oh Mandor 68,000.00 5,440.00
Total : 84,190.00

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) 8,270.00
0.1500 kg Kawat Beton 16,000.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0700 oh Tukang Besi 50,000.00 3,500.00
0.0070 oh Kepala Tukang 60,000.00 420.00
0.0040 oh Mandor 68,000.00 272.00
Total : 6,992.00

5 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III 4,000,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00
0.1000 ltr Minyak Bekisting 15,000.00
0.5200 oh Pekerja 40,000.00 20,800.00
0.2600 oh Tukang Kayu 55,000.00 14,300.00
0.0260 oh Kepala Tukang 60,000.00 1,560.00
0.0260 oh Mandor 68,000.00 1,768.00
Total : 38,428.00

6 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III 4,000,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00
0.1000 ltr Minyak Bekisting 15,000.00
0.5200 oh Pekerja 40,000.00 20,800.00
0.2600 oh Tukang Kayu 55,000.00 14,300.00
0.0260 oh Kepala Tukang 60,000.00 1,560.00
0.0260 oh Mandor 68,000.00 1,768.00
Total : 38,428.00

7 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 5,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4 m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
0.0330 oh Kepala Tukang 60,000.00 1,980.00
0.0330 oh Mandor 68,000.00 2,244.00
Total : 48,774.00

8 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0180 m3 Kayu Usuk 4/6 5,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
0.0330 oh Kepala Tukang 60,000.00 1,980.00
0.0330 oh Mandor 68,000.00 2,244.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 48,774.00

9 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 5,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
6.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
0.0330 oh Kepala Tukang 60,000.00 1,980.00
0.0330 oh Mandor 68,000.00 2,244.00
Total : 48,774.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

10 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III 4,000,000.00
0.4000 Kg Paku Biasa 5' - 12' 13,000.00
0.2000 Ltr Minyak Bekisting 15,000.00
0.0200 M3 Kayu Usuk 4/6 5,000,000.00
0.3500 Lbr Plywood 9 mm 105,500.00
3.0000 Btng Dolken Kayu 8" - 10"/4m 90,000.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00
0.6600 Oh Pekerja 40,000.00 26,400.00
0.3300 Oh Tukang Kayu 55,000.00 18,150.00
0.0330 Oh Kepala Tukang 60,000.00 1,980.00
0.0330 Oh Mandor 68,000.00 2,244.00
48,774.00

11 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.1500 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 5,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
0.0330 oh Kepala Tukang 60,000.00 1,980.00
0.0330 oh Mandor 68,000.00 2,244.00
Total : 48,774.00

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan) 4,000,000.00
0.6000 kg Paku Biasa 5' - 12' 13,000.00
0.5000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
0.0050 oh Kepala Tukang 60,000.00 300.00
0.0080 oh Mandor 68,000.00 544.00
Total : 9,594.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III 4,000,000.00
1.5000 kg Paku Biasa 5' - 12' 13,000.00
0.4000 ltr Minyak Bekisting 15,000.00
157.0000 kg Besi Beton 8,270.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.3000 oh Tukang Kayu 55,000.00 71,500.00
1.0500 oh Tukang Besi 50,000.00 52,500.00
0.2620 oh Kepala Tukang 60,000.00 15,720.00
0.2650 oh Mandor 68,000.00 18,020.00
Total : 382,115.00

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III 4,000,000.00
2.0000 kg Paku Biasa 5' - 12' 13,000.00
0.6000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,270.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
5.6500 oh Pekerja 40,000.00 226,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.5600 oh Tukang Kayu 55,000.00 85,800.00
1.4000 oh Tukang Besi 50,000.00 70,000.00
0.3230 oh Kepala Tukang 60,000.00 19,380.00
0.2830 oh Mandor 68,000.00 19,244.00
Total : 432,799.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III 4,000,000.00
4.0000 kg Paku Biasa 5' - 12' 13,000.00
2.0000 ltr Minyak Bekisting 15,000.00
315.0000 kg Besi Beton 8,270.00
4.5000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1500 m3 Kayu Kelas II balok 5,000,000.00
3.5000 lbr Plywood 9 mm 105,500.00
20.0000 btg Dolken Kayu 8" /4 m 90,000.00
7.0500 oh Pekerja 40,000.00 282,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.6500 oh Tukang Kayu 55,000.00 90,750.00
2.1000 oh Tukang Besi 50,000.00 105,000.00
0.4030 oh Kepala Tukang 60,000.00 24,180.00
0.3530 oh Mandor 68,000.00 24,004.00
Total : 538,309.00

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III 4,000,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,270.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1400 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
16.0000 btg Dolken Kayu 8" /4 m 90,000.00
6.3500 oh Pekerja 40,000.00 254,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.6500 oh Tukang Kayu 55,000.00 90,750.00
1.4000 oh Tukang Besi 50,000.00 70,000.00
0.3330 oh Kepala Tukang 60,000.00 19,980.00
0.3180 oh Mandor 68,000.00 21,624.00
Total : 468,729.00
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING

0.3200 m3 Kayu Kelas III 4,000,000.00


3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
157.5000 kg Besi Beton 8,270.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1200 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
32.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.3000 oh Tukang Kayu 55,000.00 71,500.00
1.0500 oh Tukang Besi 50,000.00 52,500.00
0.2650 oh Kepala Tukang 60,000.00 15,900.00
0.2650 oh Mandor 68,000.00 18,020.00
382,295.00
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.2400 m3 Kayu Kelas III 4,000,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
157.0000 kg Besi Beton 8,270.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1600 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
24.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.3000 oh Tukang Kayu 55,000.00 71,500.00
1.0500 oh Tukang Besi 50,000.00 52,500.00
0.2620 oh Kepala Tukang 60,000.00 15,720.00
0.2650 oh Mandor 68,000.00 18,020.00
382,115.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Kelas III 4,000,000.00
3.0000 kg Paku Biasa 5' - 12' 13,000.00
1.2000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,270.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1050 m3 Kayu Kelas II balok 5,000,000.00
2.5000 lbr Plywood 9 mm 105,500.00
14.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.6500 oh Pekerja 40,000.00 226,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.5600 oh Tukang Kayu 55,000.00 85,800.00
1.4000 oh Tukang Besi 50,000.00 70,000.00
0.3230 oh Kepala Tukang 60,000.00 19,380.00
0.2830 oh Mandor 68,000.00 19,244.00
432,799.00

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)

0.0020 m3 Kayu Kelas III 4,000,000.00


0.0100 kg Paku Biasa 5' - 12' 13,000.00
3.0000 kg Besi Beton 8,270.00
0.0450 kg Kawat Beton 16,000.00
4.0000 kg Semen Portland 1,250.00
0.0060 m3 Pasir Beton 141,000.00
0.0090 m3 Koral Beton 125,000.00
0.1800 oh Pekerja 40,000.00 7,200.00
0.0200 oh Tukang Batu 45,000.00 900.00
0.0200 oh Tukang Kayu 55,000.00 1,100.00
0.0200 oh Tukang Besi 50,000.00 1,000.00
0.0060 oh Kepala Tukang 60,000.00 360.00
0.0090 oh Mandor 68,000.00 612.00
Total : 11,172.00
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

0.0030 m3 Kayu Kelas III 4,000,000.00


0.0200 kg Paku Biasa 5' - 12' 13,000.00
3.6000 kg Besi Beton 8,270.00
0.0500 kg Kawat Beton 16,000.00
5.5000 kg Semen Portland 1,250.00
0.0090 m3 Pasir Beton 141,000.00
0.0150 m3 Koral Beton 125,000.00
0.2970 oh Pekerja 40,000.00 11,880.00
0.0330 oh Tukang Batu 45,000.00 1,485.00
0.0330 oh Tukang Kayu 55,000.00 1,815.00
0.0330 oh Tukang Besi 50,000.00 1,650.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 18,450.00

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong 1,300.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0600 oh Tukang Kayu 55,000.00 3,300.00
0.0060 oh Kepala Tukang 60,000.00 360.00
0.0080 oh Mandor 68,000.00 544.00
Total : 10,204.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
25.0000 bh Genteng Plentong Dicat 1,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0600 oh Tukang Kayu 55,000.00 3,300.00
0.0060 oh Kepala Tukang 60,000.00 360.00
0.0080 oh Mandor 68,000.00 544.00
Total : 10,204.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong 6,000.00
8.0000 kg Semen Portland 1,250.00
0.0320 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0020 oh Mandor 68,000.00 136.00
Total : 28,336.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 28,000.00
0.1200 kg Paku Pancing 60 x 230 20,000.00
0.1400 oh Pekerja 40,000.00 5,600.00
0.0700 oh Tukang Kayu 55,000.00 3,850.00
0.0070 oh Kepala Tukang Kayu 60,000.00 420.00
0.0070 oh Mandor 68,000.00 476.00
Total : 10,346.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang 24,000.00
6.0000 kg Paku Skrup 3,5" 26,500.00
0.0840 oh Pekerja 40,000.00 3,360.00
0.1250 oh Tukang Kayu 55,000.00 6,875.00
0.0130 oh Kepala Tukang 60,000.00 780.00
0.0040 oh Mandor 68,000.00 272.00
Total : 11,287.00
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap 8,500.00
0.2000 kg Paku Biasa 1/2" - 1" 14,000.00
0.1660 oh Pekerja 40,000.00 6,640.00
0.2500 oh Tukang Kayu 55,000.00 13,750.00
0.0250 oh Kepala Tukang 60,000.00 1,500.00
0.0080 oh Mandor 68,000.00 544.00
Total : 22,434.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 46,500.00
0.0600 kg Paku biasa 1/2" - 1" 14,000.00
0.0500 kg Paku biasa 2" - 5" 13,000.00
0.0040 m3 Kayu papan 3 cm 9,000,000.00
0.1250 oh Pekerja 40,000.00 5,000.00
0.2500 oh Tukang kayu 55,000.00 13,750.00
0.0250 oh Kepala Tukang 60,000.00 1,500.00
0.0080 oh Mandor 68,000.00 544.00
Total : 20,794.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang 12,500.00
0.5000 glg Tali pengikat 9,500.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.0100 oh Mandor 68,000.00 680.00
Total : 8,680.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 42,500.00
0.0200 kg Paku Biasa 1/2" - 1" 14,000.00
0.1200 oh Pekerja 40,000.00 4,800.00
0.0600 oh Tukang Kayu 55,000.00 3,300.00
0.0060 oh Kepala Tukang 60,000.00 360.00
0.0060 oh Mandor 68,000.00 408.00
Total : 8,868.00

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil 29,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
0.0050 oh Kepala Tukang 60,000.00 300.00
0.0080 oh Mandor 68,000.00 544.00
Total : 9,594.00

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 46,500.00
0.0400 kg Paku biasa 1/2" - 1" 14,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.1500 oh Pekerja 40,000.00 6,000.00
0.0700 oh Tukang Kayu 55,000.00 3,850.00
0.0080 oh Kepala Tukang 60,000.00 480.00
0.0060 oh Mandor 68,000.00 408.00
Total : 10,738.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM
DAN 6 MM
1.1000 lbr Asbes semen 47,000.00
0.0100 kg Paku Biasa 1/2" - 1" 14,000.00
0.0300 oh Pekerja 40,000.00 1,200.00
0.0700 oh Tukang Kayu 55,000.00 3,850.00
0.0070 oh Kepala Tukang 60,000.00 420.00
0.0040 oh Mandor 68,000.00 272.00
Total : 5,742.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS 47,000.00
0.0300 kg Paku Biasa 1/2" - 1" 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0050 oh Mandor 68,000.00 340.00
Total : 10,440.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan 9,000,000.00
0.0100 kg Paku Biasa 1/2" - 1" 14,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
0.8000 oh Tukang Kayu 55,000.00 44,000.00
0.0800 oh Kepala Tukang 60,000.00 4,800.00
0.0400 oh Mandor 68,000.00 2,720.00
Total : 83,520.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil 12,250.00
0.1000 kg Paku list SQ 15,840.00
0.0500 oh Pekerja 40,000.00 2,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
0.0050 oh Kepala Tukang 60,000.00 300.00
0.0030 oh Mandor 68,000.00 204.00
Total : 5,254.00

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm 9,000,000.00
0.0600 kg Paku Biasa 2" - 5" 15,840.00
1.1000 lbr Asbes 47,000.00
0.1800 oh Pekerja 40,000.00 7,200.00
0.3200 oh Tukang Kayu 55,000.00 17,600.00
0.0320 oh Kepala Tukang 60,000.00 1,920.00
0.0090 oh Mandor 68,000.00 612.00
Total : 27,332.00

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup 18,000.00
0.3640 lbr Gypsum Board (120x240x9) 63,500.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
0.0050 oh Kepala Tukang 60,000.00 300.00
0.0050 oh Mandor 68,000.00 340.00
Total : 7,390.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup 18,000.00
0.3640 lbr Kalsiboard 4.5 mm 72,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
0.0050 oh Kepala Tukang 60,000.00 300.00
0.0050 oh Mandor 68,000.00 340.00
Total : 7,390.00

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok 1,365,000.00
6% x harga kloset Perlengkapan
3.3000 oh Pekerja 40,000.00 132,000.00
1.1000 oh Tukang batu 45,000.00 49,500.00
0.0010 oh Kepala Tukang 60,000.00 60.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.1600 oh Mandor 68,000.00 10,880.00
Total : 192,440.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen 135,000.00
6.0000 kg Semen Portland 1,250.00
0.0100 m3 Pasir Pasang 158,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
1.5000 oh Tukang batu 45,000.00 67,500.00
1.5000 oh Kepala Tukang 60,000.00 90,000.00
0.1600 oh Mandor 68,000.00 10,880.00
Total : 208,380.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir 1,052,000.00
6% x harga Urin Perlengkapan
6.0000 kg Semen Portland 1,250.00
0.0100 m3 Pasir Pasang 158,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
1.0000 oh Tukang batu 45,000.00 45,000.00
0.1000 oh Kepala Tukang 60,000.00 6,000.00
0.1000 oh Mandor 68,000.00 6,800.00
Total : 97,800.00

4 MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel 185,000.00
12% x harga wast Perlengkapan
6.0000 kg Semen Portland 1,250.00
0.0100 m3 Pasir Pasang 158,000.00
1.2000 oh Pekerja 40,000.00 48,000.00
1.4500 oh Tukang batu 45,000.00 65,250.00
0.1500 oh Kepala Tukang 60,000.00 9,000.00
0.1000 oh Mandor 68,000.00 6,800.00
Total : 129,050.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 230,000.00
18% x harga wast Perlengkapan
1.8000 oh Pekerja 40,000.00 72,000.00
2.7000 oh Tukang batu 45,000.00 121,500.00
0.5400 oh Kepala Tukang 60,000.00 32,400.00
0.1100 oh Mandor 68,000.00 7,480.00
Total : 233,380.00

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


1.2000 m1 Pipa galvanis 38,000.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 40,000.00 2,160.00
0.0900 oh Tukang Pipa 50,000.00 4,500.00
0.0090 oh Kepala Tukang 60,000.00 540.00
0.0270 oh Mandor 68,000.00 1,836.00
Total : 9,036.00

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


1.2000 M' Pipa galvanis 175,000.00
35% x harga pipa Perlengkapan
0.1080 Oh Pekerja 40,000.00 4,320.00
0.1800 Oh Tukang Pipa 50,000.00 9,000.00
0.0180 Oh Kepala Tukang 60,000.00 1,080.00
0.0054 Oh Mandor 68,000.00 367.20
Total : 14,767.20

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


1.2000 m1 Pipa PVC 14,000.00
35% x harga pipa Perlengkapan
0.0360 oh Pekerja 40,000.00 1,440.00
0.0600 oh Tukang Pipa 50,000.00 3,000.00
0.0060 oh Kepala Tukang 60,000.00 360.00
0.0018 oh Mandor 68,000.00 122.40
Total : 4,922.40

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC 22,250.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 40,000.00 2,160.00
0.0900 oh Tukang Pipa 50,000.00 4,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0090 oh Kepala Tukang 60,000.00 540.00
0.0027 oh Mandor 68,000.00 183.60
Total : 7,383.60

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC 56,250.00
35% x harga pipa Perlengkapan
0.0810 oh Pekerja 40,000.00 3,240.00
0.1350 oh Tukang Pipa 50,000.00 6,750.00
0.0135 oh Kepala Tukang 60,000.00 810.00
0.0041 oh Mandor 68,000.00 278.80
Total : 11,078.80
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air 18,000.00
0.0250 bh Seal tape 2,600.00
0.0100 oh Pekerja 40,000.00 400.00
0.1000 oh Tukang Pipa 50,000.00 5,000.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0050 oh Mandor 68,000.00 340.00
Total : 6,340.00

XI PEKERJAAN BESI DAN ALUMINIUM (SNI


7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 15,000.00
0.0060 oh Pekerja 40,000.00 240.00
0.0600 oh Tukang besi 50,000.00 3,000.00
0.0060 oh Kepala Tukang 60,000.00 360.00
0.0003 oh Mandor 68,000.00 20.40
Total : 3,620.40

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako 117,000.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 18,000.00
7.0000 m' Besi strip 8,000.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.2000 oh Tukang besi 50,000.00 10,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0010 oh Mandor 68,000.00 68.00
Total : 19,268.00

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat 46,500.00
0.0150 kg Paku biasa 0,5" - 1" 18,000.00
0.0190 m3 Kayu papan kelas II/III 9,000,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4000 oh Tukang besi 50,000.00 20,000.00
0.0250 oh Kepala Tukang 60,000.00 1,500.00
0.0013 oh Mandor 68,000.00 88.40
Total : 27,588.40

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa 105,000.00
0.0100 oh Pekerja 40,000.00 400.00
0.5000 oh Tukang besi 50,000.00 25,000.00
0.0100 oh Kepala Tukang 60,000.00 600.00
0.0050 oh Mandor 68,000.00 340.00
Total : 26,340.00

2 1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu 27,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 50,000.00 7,500.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0008 oh Mandor 68,000.00 54.40
Total : 9,054.40

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela 49,000.00
0.0100 oh Pekerja 40,000.00 400.00
0.1000 oh Tukang besi 50,000.00 5,000.00
0.0100 oh Kepala Tukang 60,000.00 600.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0005 oh Mandor 68,000.00 34.00
Total : 6,034.00

4 1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin 22,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 50,000.00 7,500.00
oh Kepala Tukang 60,000.00 #VALUE!
0.0008 oh Mandor 68,000.00 54.40
Total : #VALUE!

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot 100,000.00
0.0200 oh Pekerja 40,000.00 800.00
0.2000 oh Tukang besi 50,000.00 10,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0010 oh Mandor 68,000.00 68.00
Total : 12,068.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca 102,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 50,000.00 7,500.00
0.0150 oh Kepala Tukang 60,000.00 900.00
0.0008 oh Mandor 68,000.00 54.40
Total : 9,054.40

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI


7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm 3,545.45
10.0000 kg Semen Portland 1,250.00
0.0450 m3 Pasir Pasang 158,000.00
1.5000 kg Semen warna/semen grouting 11,000.00
0.7000 oh Pekerja 40,000.00 28,000.00
0.3500 oh Tukang batu 45,000.00 15,750.00
0.0350 oh Kepala Tukang 60,000.00 2,100.00
0.0350 oh Mandor 68,000.00 2,380.00
Total : 48,230.00

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm 1,400.00
10.4000 kg Semen Portland 1,250.00
0.0450 m3 Pasir Pasang 158,000.00
1.6200 kg Semen warna/semen grouting 11,000.00
0.7000 oh Pekerja 40,000.00 28,000.00
0.3500 oh Tukang batu 45,000.00 15,750.00
0.0350 oh Kepala Tukang 60,000.00 2,100.00
0.0350 oh Mandor 68,000.00 2,380.00
Total : 48,230.00

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm 3,545.45
1.1400 kg Semen Portland 1,250.00
0.0030 m3 Pasir Pasang 158,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 40,000.00 3,600.00
0.0900 oh Tukang batu 45,000.00 4,050.00
0.0090 oh Kepala Tukang 60,000.00 540.00
0.0050 oh Mandor 68,000.00 340.00
Total : 8,530.00
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm 1,400.00
9.3000 kg Semen Portland 1,250.00
0.0180 m3 Pasir Pasang 158,000.00
1.9400 kg Semen warna/semen grouting 11,000.00
0.9000 oh Pekerja 40,000.00 36,000.00
0.4500 oh Tukang batu 45,000.00 20,250.00
0.0450 oh Kepala Tukang 60,000.00 2,700.00
0.0450 oh Mandor 68,000.00 3,060.00
Total : 62,010.00

5 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II 9,000,000.00
0.0500 kg Paku sekrup 3,5' 26,500.00
0.1200 oh Pekerja 40,000.00 4,800.00
0.1200 oh Tukang kayu 55,000.00 6,600.00
0.0120 oh Kepala Tukang 60,000.00 720.00
0.0060 oh Mandor 68,000.00 408.00
Total : 12,528.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 47,100.00
0.1500 kg Dempul 29,000.00
0.1700 kg Cat dasar 20,000.00
0.2600 kg Cat Penutup 2x 45,500.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0090 oh Tukang cat 40,000.00 360.00
0.0060 oh Kepala Tukang 60,000.00 360.00
0.0025 oh Mandor 68,000.00 170.00
Total : 3,690.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis 35,000.00
0.0500 kg Dempul 29,000.00
0.1000 lbr Amplas 3,800.00
0.0100 bh Kuas 9,000.00
0.1600 oh Pekerja 40,000.00 6,400.00
0.1600 oh Tukang cat 40,000.00 6,400.00
0.0160 oh Kepala Tukang 60,000.00 960.00
0.0025 oh Mandor 68,000.00 170.00
Total : 13,930.00
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 30,000.00
0.1000 kg Cat dasar 20,000.00
0.2600 kg Cat Penutup 2x 17,000.00
0.0200 oh Pekerja 40,000.00 800.00
0.0630 oh Tukang cat 40,000.00 2,520.00
0.0063 oh Kepala Tukang 60,000.00 378.00
0.0025 oh Mandor 68,000.00 170.00
Total : 3,868.00

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar 20,000.00
0.1800 kg Cat Penutup 2x 17,000.00
0.0280 oh Pekerja 40,000.00 1,120.00
0.0420 oh Tukang cat 40,000.00 1,680.00
0.0042 oh Kepala Tukang 60,000.00 252.00
0.0025 oh Mandor 68,000.00 170.00
Total : 3,222.00

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi 20,000.00
0.0100 lbr Kuas 9,000.00
0.0200 oh Pekerja 40,000.00 800.00
0.2000 oh Tukang cat 40,000.00 8,000.00
0.0200 oh Kepala Tukang 60,000.00 1,200.00
0.0100 oh Mandor 68,000.00 680.00
Total : 10,680.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi 45,000.00
0.0060 oh Pekerja 40,000.00 240.00
0.0600 oh Tukang cat 40,000.00 2,400.00
0.0120 oh Kepala Tukang 60,000.00 720.00
0.0060 oh Mandor 68,000.00 408.00
Total : 3,768.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur 47,000.00
2.0000 lbr Amplas 3,800.00
0.0600 oh Pekerja 40,000.00 2,400.00
0.0600 oh Tukang cat 40,000.00 2,400.00
0.0160 oh Kepala Tukang 60,000.00 960.00
0.0025 oh Mandor 68,000.00 170.00

Total : 5,930.00

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok 1,980.00
8.4000 kg Semen 50 Kg 1,250.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Upah Kerja ( Lumpsum) 270,000.00 270,000.00
Total : 270,000.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan 9,500.00
8.4000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan 1,980.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras 12,000.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,000.00
5.2500 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 288,500.00 288,500.00
Total : 288,500.00

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras 12,000.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 288,500.00 288,500.00
Total : 288,500.00

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,000.00
5.2500 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 280,000.00 280,000.00
Total : 280,000.00

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 52,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.0250 oh Kepala Tukang 60,000.00 1,500.00
0.5000 oh Pekerja 40,000.00 20,000.00
0.0250 oh Mandor 68,000.00 1,700.00
Total : 34,450.00
2 Paving 10 x 20 cm tebal 6 cm K350 60,000.00 34,450.00
4 Paving 10 x 20 cm tebal 8 cm K225 67,000.00 34,450.00
5 Paving 10 x 20 cm tebal 8 cm K350 75,000.00 34,450.00
5 Paving 10 x 20 cm tebal 8 cm K425 80,500.00 34,450.00
7 Paving 20 x 20 cm tebal 6 cm K225 52,500.00 34,450.00
8 Paving 20 x 20 cm tebal 6 cm K350 60,500.00 34,450.00
10 Paving 20 x 20 cm tebal 8 cm K225 60,500.00 34,450.00
11 Paving 20 x 20 cm tebal 8 cm K350 75,500.00 34,450.00
12 Paving 20 x 20 cm tebal 8 cm K425 81,500.00 34,450.00
14 Paving 20 x 20 cm tebal 10 cm K225 70,500.00 34,450.00
15 Paving 20 x 20 cm tebal 10 cm K350 80,000.00 34,450.00
16 Paving 20 x 20 cm tebal 10 cm K425 87,500.00 34,450.00
18 Paving Tiga Berlian tebal 6 cm K225 60,000.00 34,450.00

20 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block 52,000.00
0.0690 m3 Pasir Urug 100,000.00
0.5000 oh Tukang Batu 45,000.00 22,500.00
0.0500 oh Kepala Tukang 60,000.00 3,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
0.0500 oh Mandor 68,000.00 3,400.00
Total : 68,900.00

21 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat 35,000.00
9.2800 zak Semen 1,250.00
0.2000 m3 Pasir pasang 158,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0100 oh Kepala Tukang 60,000.00 600.00
0.6250 oh Pekerja 40,000.00 25,000.00
0.0310 oh Mandor 68,000.00 2,108.00
Total : 38,958.00
22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 69,000.00
0.4500 zak Semen 50 Kg 1,250.00
0.0023 m3 Pasir Pasang 158,000.00
0.3500 oh Tukang Batu 45,000.00 15,750.00
0.0350 oh Kepala Tukang 60,000.00 2,100.00
0.9500 oh Pekerja 40,000.00 38,000.00
0.0950 oh Mandor 68,000.00 6,460.00
Total : 62,310.00
23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 52,000.00 62,310.00
24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) 69,000.00 62,310.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 45,000.00
0.0710 kg Thiner 8,000.00
0.0300 oh Tukang Cat 40,000.00 1,200.00
0.0030 oh Kep. Tukang 60,000.00 180.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0150 oh Mandor 68,000.00 1,020.00
Total : 8,400.00

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 12,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 7,000.00
15.0000 bj Klem clipsal 20 mm hitam 750.00
3.0000 bj Sock clipsal 20 mm hitam 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 12,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 7,000.00
15.0000 bj Klem clipsal 20 mm hitam 750.00
4.0000 bj Sock clipsal 20 mm hitam 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 10,500.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone 4,000.00
8.0000 bt Pipa Clipsal 20 mm putih 12,000.00
1.0000 bh Tee dos clipsal 20 mm putih 7,000.00
25.0000 bj Klem clipsal 20 mm putih 750.00
5.0000 bj Sock clipsal 20 mm putih 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof 6,000.00
6.0000 bt Pipa Clipsal 20 mm putih 12,000.00
2.0000 bh Tee dos clipsal 20 mm putih 7,000.00
20.0000 bj Klem clipsal 20 mm putih 750.00
6.0000 bj Sock clipsal 20 mm putih 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

Kepala Dina
Kabupate

Ir. Ni Luh Putu Dess


Pembi
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
NIP. 1961101
N

HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

10,625.00
3,125.00
52,200.00
705.00
1,125.00
288,000.00
780.00
9,000.00

365,560.00 395,120.00

48,000.00
260.00
42,000.00

90,260.00 100,700.00

112,500.00
720,000.00
11,050.00
8,800.00
43,750.00
23,700.00
14,100.00
18,750.00
39,000.00
11,625.00
30,000.00
8,160.00
15,750.00
2,820.00

1,060,005.00 1,316,405.00

14,450.00
840,000.00
3,900.00
13,125.00
4,230.00
6,250.00
63,750.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

945,705.00 1,111,105.00

25,500.00
1,104,000.00
9,100.00
63,750.00

1,202,350.00 1,337,250.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

7,400.00

10,625.00
744,000.00
3,900.00
22,500.00
4,230.00
6,250.00
63,750.00
63,450.00

918,705.00 1,084,105.00

144,000.00
1,040.00
84,000.00

229,040.00 245,642.00

7,000.00
8,500.00

15,500.00 32,399.00

27,000.00
13,500.00
1,580.00

42,080.00 85,480.00

289,324.00

268,924.00

31,700.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

39,060.00

46,556.00

42,176.00

64,080.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

51,060.00

2,340.00

13,880.00

23,400.00

120,000.00

120,000.00 132,680.00

15,000.00

15,000.00 22,020.00

132,000.00

132,000.00 143,700.00

96,000.00

96,000.00 119,400.00

102,000.00

102,000.00 113,700.00

216,000.00
252,500.00
76,630.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

545,130.00 648,480.00

216,000.00
203,750.00
82,160.00

501,910.00 605,260.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

216,000.00
170,000.00
85,952.00

471,952.00 575,302.00

216,000.00
146,250.00
88,638.00

450,888.00 554,238.00

216,000.00
113,750.00
92,272.00

422,022.00 525,372.00

86,400.00
242,500.00
43,992.00
58,500.00
1,042,020.00
28,800.00

1,502,212.00 1,693,122.00

81,000.00
242,500.00
43,992.00
58,500.00

425,992.00 570,884.00

216,000.00
43,200.00

259,200.00 312,942.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

182,000.00
54,375.00
12,640.00

249,015.00 285,255.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

182,000.00
41,187.50
14,378.00

237,565.50 273,805.50

182,000.00
33,187.50
14,694.00

229,881.50 266,121.50

182,000.00
27,750.00
16,116.00

225,866.00 262,106.00

182,000.00
23,125.00
19,276.00

224,401.00 260,641.00

91,000.00
23,687.50
6,004.00

120,691.50 138,811.50

91,000.00
17,962.50
6,320.00

115,282.50 133,402.50

91,000.00
14,375.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
6,794.00

112,169.00 130,289.00

91,000.00
12,100.00
7,110.00

110,210.00 128,330.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

91,000.00
10,400.00
7,742.00

109,142.00 127,262.00

91,000.00
8,125.00
7,900.00

107,025.00 125,145.00

25,000.00
9,375.00
4,266.00
16,126.50

54,767.50 73,687.50

25,000.00
9,375.00
4,266.00

38,641.00 57,561.00

1,500,000.00
13,750.00
5,530.00

1,519,280.00 1,537,400.00

33,000.00
91,000.00
156.00
19,500.00

143,656.00 150,842.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

19,380.00
2,528.00

21,908.00 42,578.00

12,780.00
3,160.00

15,940.00 36,610.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

9,720.00
3,634.00

13,354.00 34,024.00

7,800.00
3,792.00

11,592.00 32,262.00

6,480.00
4,108.00

10,588.00 31,258.00

5,520.00
4,266.00

9,786.00 30,456.00

4,320.00
4,582.00

8,902.00 29,572.00

17,040.00
4,266.00

21,306.00 49,002.00

12,960.00
4,898.00

17,858.00 45,554.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

10,400.00
5,056.00

15,456.00 43,152.00

8,640.00
5,530.00

14,170.00 41,866.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

7,360.00
5,688.00

13,048.00 40,744.00

625.00
2,054.00

2,679.00 26,551.00

5,400.00
948.00

6,348.00 24,468.00

3,885.00

3,885.00 14,284.00

2,000.00

2,000.00 6,887.00

7,925.00
1,896.00

9,821.00 30,491.00

4,062.50

4,062.50 9,342.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

9,130,000.00
17,500.00
12,500.00

9,160,000.00 10,744,800.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

6,000,000.00
17,500.00
12,500.00

6,030,000.00 7,388,400.00

360,000.00
700.00

360,700.00 439,974.00

240,000.00
700.00

240,700.00 319,974.00

360,000.00
6,250.00

366,250.00 592,650.00

216,000.00
3,750.00

219,750.00 400,870.00

576,000.00
6,250.00

582,250.00 808,650.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

225,000.00
420.00
6,250.00
47,000.00

278,670.00 505,070.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

230,400.00
420.00
6,250.00
47,000.00

284,070.00 465,190.00

540,000.00
2,100.00

542,100.00 713,680.00

230,400.00
420.00
6,250.00
56,000.00

293,070.00 474,190.00

225,000.00
420.00
10,000.00
56,000.00
40,000.00

331,420.00 512,540.00

9,130,000.00
120,000.00
78,400.00

9,328,400.00 10,234,000.00

9,960,000.00
120,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
78,400.00

10,158,400.00 11,675,280.00

9,130,000.00
120,000.00
42,000.00

9,292,000.00 9,835,360.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

56,000.00
23,400.00
3,500.00

82,900.00 93,340.00

56,000.00
46,800.00
3,500.00

106,300.00 116,740.00

1,369,500.00
2,800.00

1,372,300.00 1,384,828.00

61,600.00
2,800.00

64,400.00 93,800.00

65,200.00
3,500.00

68,700.00 95,680.00

97,200.00
1,400.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
98,600.00 115,140.00

99,000.00
700.00

99,700.00 116,240.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

232,400.00
2,100.00

234,500.00 268,494.00

232,400.00
2,100.00
48,160.00
7,000.00

289,660.00 323,654.00

232,400.00
2,100.00
40,420.00
7,000.00

281,920.00 327,200.00

63,000.00
1,400.00
2,700.00

67,100.00 202,940.00

18,800.00
700.00

19,500.00 25,173.00

272,500.00
73,320.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
108,750.00

454,570.00 538,760.00

290,000.00
73,320.00
97,500.00

460,820.00 545,010.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

350,000.00
63,450.00
112,500.00

525,950.00 610,140.00

86,835.00
2,400.00

89,235.00 96,227.00

160,000.00
3,900.00
1,500.00

165,400.00 203,828.00

160,000.00
3,900.00
1,500.00

165,400.00 203,828.00

160,000.00
5,200.00
3,000.00
75,000.00
36,925.00
180,000.00

460,125.00 508,899.00

160,000.00
5,200.00
3,000.00
90,000.00
36,925.00
180,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
475,125.00 523,899.00

160,000.00
5,200.00
3,000.00
75,000.00
36,925.00
540,000.00

820,125.00 868,899.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

120,000.00
5,200.00
3,000.00
100,000.00
36,925.00
270,000.00
8,000.00

543,125.00 591,899.00

120,000.00
5,200.00
2,250.00
75,000.00
36,925.00
180,000.00

419,375.00 468,149.00

105,600.00
7,800.00
45,000.00

158,400.00 167,994.00

800,000.00
19,500.00
6,000.00
1,298,390.00
36,000.00
420,000.00
76,140.00
101,250.00

2,757,280.00 3,139,395.00

1,080,000.00
26,000.00
9,000.00
1,736,700.00
48,000.00
420,000.00
76,140.00
101,250.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

3,497,090.00 3,929,889.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,600,000.00
52,000.00
30,000.00
2,605,050.00
72,000.00
420,000.00
76,140.00
101,250.00
750,000.00
369,250.00
1,800,000.00

7,875,690.00 8,413,999.00

1,280,000.00
41,600.00
24,000.00
1,736,700.00
48,000.00
420,000.00
76,140.00
101,250.00
700,000.00
295,400.00
1,440,000.00

6,163,090.00 6,631,819.00

1,280,000.00
41,600.00
24,000.00
1,302,525.00
36,000.00
420,000.00
76,140.00
101,250.00
600,000.00
295,400.00
2,880,000.00

7,056,915.00 7,439,210.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
960,000.00
41,600.00
24,000.00
1,298,390.00
36,000.00
420,000.00
76,140.00
101,250.00
800,000.00
295,400.00
2,160,000.00

6,212,780.00 6,594,895.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,000,000.00
39,000.00
18,000.00
1,736,700.00
48,000.00
420,000.00
76,140.00
101,250.00
525,000.00
263,750.00
1,260,000.00

5,487,840.00 5,920,639.00

8,000.00
130.00
24,810.00
720.00
5,000.00
846.00
1,125.00

40,631.00 51,803.00

12,000.00
260.00
29,772.00
800.00
6,875.00
1,269.00
1,875.00

52,851.00 71,301.00

32,500.00

32,500.00 42,704.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

37,500.00

37,500.00 47,704.00

30,000.00
10,000.00
5,056.00

45,056.00 73,392.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

21,000.00
2,400.00

23,400.00 33,746.00

57,600.00
159,000.00

216,600.00 227,887.00

510,000.00
2,800.00

512,800.00 535,234.00

18,600.00
840.00
650.00
36,000.00

56,090.00 76,884.00

81,250.00
4,750.00

86,000.00 94,680.00

29,750.00
280.00

30,030.00 38,898.00

30,450.00

30,450.00 40,044.00

13,950.00
560.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

14,510.00 25,248.00

51,700.00
140.00

51,840.00 57,582.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

17,625.00
420.00

18,045.00 28,485.00

135,000.00
140.00

135,140.00 218,660.00

12,862.50
1,584.00

14,446.50 19,700.50

108,000.00
950.40
51,700.00

160,650.40 187,982.40

1,980.00
23,114.00

25,094.00 32,484.00

1,980.00
26,208.00

28,188.00 35,578.00

1,365,000.00
81,900.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,446,900.00 1,639,340.00

135,000.00
7,500.00
1,580.00

144,080.00 352,460.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,052,000.00
63,120.00
7,500.00
1,580.00

1,124,200.00 1,222,000.00

185,000.00
22,200.00
7,500.00
1,580.00

216,280.00 345,330.00

230,000.00
41,400.00

271,400.00 504,780.00

45,600.00
13,300.00

58,900.00 67,936.00

210,000.00
61,250.00

271,250.00 286,017.20

16,800.00
4,900.00

21,700.00 26,622.40

26,700.00
7,787.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

34,487.50 41,871.10

67,500.00
19,687.50

87,187.50 98,266.30
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

18,000.00
65.00

18,065.00 24,405.00

17,250.00

17,250.00 20,870.40

128,700.00
180,000.00
56,000.00

364,700.00 383,968.00

48,825.00
270.00
171,000.00

220,095.00 247,683.40

105,000.00

105,000.00 131,340.00

27,000.00

27,000.00 36,054.40

49,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

49,000.00 55,034.00

22,000.00

22,000.00 #VALUE!

100,000.00

100,000.00 112,068.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

112,200.00

112,200.00 121,254.40

42,084.55
12,500.00
7,110.00
16,500.00

78,194.55 126,424.55

37,100.00
13,000.00
7,110.00
17,820.00

75,030.00 123,260.00

11,806.36
1,425.00
474.00
1,100.00

14,805.36 23,335.36

37,100.00
11,625.00
2,844.00
21,340.00

72,909.00 134,919.00

27,000.00
1,325.00

28,325.00 40,853.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

9,420.00
4,350.00
3,400.00
11,830.00

29,000.00 32,690.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

5,250.00
1,450.00
380.00
90.00

7,170.00 21,100.00

3,000.00
2,000.00
4,420.00

9,420.00 13,288.00

2,400.00
3,060.00

5,460.00 8,682.00

2,000.00
90.00

2,090.00 12,770.00

13,500.00

13,500.00 17,268.00

24,534.00
7,600.00

32,134.00 38,064.00

217,800.00
10,500.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

228,300.00 498,300.00

130,625.00
10,500.00

141,125.00 286,125.00

108,900.00
5,250.00

114,150.00 259,150.00

220,000.00
5,250.00

225,250.00 370,250.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

108,900.00
53,900.00
6,562.50

169,362.50 314,362.50

108,900.00
5,250.00

114,150.00 402,650.00

220,000.00
5,250.00

225,250.00 513,750.00

108,900.00
53,900.00
6,562.50

169,362.50 449,362.50

52,000.00

52,000.00 86,450.00
60,000.00 94,450.00
67,000.00 101,450.00
75,000.00 109,450.00
80,500.00 114,950.00
52,500.00 86,950.00
60,500.00 94,950.00
60,500.00 94,950.00
75,500.00 109,950.00
81,500.00 115,950.00
70,500.00 104,950.00
80,000.00 114,450.00
87,500.00 121,950.00
60,000.00 94,450.00

52,000.00
6,900.00

58,900.00 127,800.00

42,000.00
11,600.00
31,600.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

85,200.00 124,158.00

69,000.00
562.50
363.40

69,925.90 132,235.90
95,200.00 157,510.00
112,200.00 174,510.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

12,780.00
568.00

13,348.00 21,748.00

96,000.00
36,000.00
14,000.00
11,250.00
6,000.00
10,000.00

173,250.00 198,250.00

120,000.00
36,000.00
7,000.00
11,250.00
8,000.00
10,000.00
10,500.00
25,000.00
227,750.00 252,750.00

100,000.00
96,000.00
7,000.00
18,750.00
10,000.00
10,000.00

241,750.00 266,750.00

120,000.00
72,000.00
14,000.00
15,000.00
12,000.00
10,000.00

243,000.00 268,000.00

Kepala Dinas Cipta Karya


Kabupaten Badung

Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
NIP. 196110101994032001
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
BULAN MARET TAHUN 2012

NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
7 1 M2 PEMBUATAN BEDENG BURUH
8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM
9 1 M2 PEMBUATAN STEGGER DARI BAMBU
10 1 M2 PEMBUATAN JALAN SEMENTARA
11 1 M3 BONGKARAN BETON BERTULANG
12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER
4 1 M3 GALIAN TANAH KERAS DALAM 1METER
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER
8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER
9 1 M3 URUGAN KEMBALI
10 1 M3 PEMADATAN TANAH ( Per 20 Cm )
11 1 M3 URUGAN PASIR
12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM
13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
15 1 M3 URUGAN LIMESTONE PADAT

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU KALI CAMP. 1 PC : 3 PS
2 1 M3 BATU KALI CAMP. 1 PC : 4 PS
3 1 M3 BATU KALI CAMP. 1 PC : 5 PS
4 1 M3 BATU KALI CAMP. 1 PC : 6 PS
NO URAIAN PEKERJAAN
1 2
5 1 M3 BATU KALI CAMP. 1 PC : 8 PS
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M
8 1 M3 PASANGAN BATU KOSONG

IV PEKERJAAN DINDING (SNI 6897 : 2008)


1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS
3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS
4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS
5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS
12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)
13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI
14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM
15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM
7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM
8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM
13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')
NO URAIAN PEKERJAAN
1 2
17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
18 1 M2 PEKERJAAN ACIAN

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU
KELAS II (Lebar Sampai 90 Cm)
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU
KELAS II
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III
Bentang 6 M'

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I


15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II
22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II
23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III
MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA
24 KAYU KELAS II
MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA
25 KAYU KELAS II

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
NO URAIAN PEKERJAAN
1 2
2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
5 1 M2 PASANG BEKISTING UNTUK PONDASI
6 1 M2 PASANG BEKISTING UNTUK SLOOF
7 1 M2 PASANG BEKISTING UNTUK KOLOM
8 1 M2 PASANG BEKISTING UNTUK BALOK
9 1 M2 PASANG BEKISTING UNTUK LANTAI
10 1 M2 PASANG BEKISTING UNTUK DINDING
11 1 M2 PASANG BEKISTING UNTUK TANGGA
12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON
13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)
14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)
15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)
16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)
20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
6 1 M2 PEKERJAAN ATAP SIRAP
7 1 M2 PEKERJAAN ATAP NOK SIRAP
8 1 M2 PASANG ATAP ALANG-ALANG 3 M1
9 1 M2 PEKERJAAN ATAP SENG GELOMBANG
10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL
11 1 M1 PASANG NOK SENG GELOMBANG

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL
NO URAIAN PEKERJAAN
1 2
5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA
6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM
7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
3 MEMASANG 1 BUAH URINOIR
4 MEMASANG 1 BUAH WASHTAFEL KIA
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


1 1 KG PASANG RANGKA ATAP BAJA
2 1 M2 PASANG JENDELA NAKO
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
2 1 PS PASANG ENGSEL PINTU
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU
4 1 BH PASANG KAIT ANGIN
5 1 BH PASANG KUNCI SLOT
6 1 M2 PASANG KACA, TEBAL 3 - 5 MM

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM
2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
5 1 M1 PASANG PLIN KAYU 2 X 10 CM

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
NO URAIAN PEKERJAAN
1 2
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR
NO URAIAN PEKERJAAN
1 2
XV PEKERJAAN TETEMPELAN STYLE BALI
1 1 M2 PASANGAN BATA GOSOK 2 MUKA
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA
3 1 M2 PASANGAN BATA GOSOK 1 MUKA
4 1 M2 PASANGAN PARAS 1 MUKA
5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA
6 1 M2 PASANGAN BATA GOSOK DIUKIR
7 1 M2 PASANGAN PARAS DIUKIR
8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

XVI PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
2 Paving 10 x 20 cm tebal 6 cm K350
3 Paving 10 x 20 cm tebal 8 cm K225
4 Paving 10 x 20 cm tebal 8 cm K350
5 Paving 20 x 20 cm tebal 6 cm K225
6 Paving 20 x 20 cm tebal 6 cm K350
7 Paving 20 x 20 cm tebal 8 cm K225
8 Paving 20 x 20 cm tebal 8 cm K350
9 Paving 20 x 20 cm tebal 8 cm K425
10 Paving 20 x 20 cm tebal 10 cm K225
11 Paving 20 x 20 cm tebal 10 cm K350
12 Paving 20 x 20 cm tebal 10 cm K425
13 Paving Tiga Berlian tebal 6 cm K225
14 1 M2 PASANGAN GRASS BLOCK
15 1 M2 PASANGAN KORAL SIKAT
16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
17 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)
19 1 M2 PENGECATAN KANSTEIN

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
2 1 TITIK INSTALASI AC
3 1 TITIK INSTALASI TELEPHONE
4 1 TITIK INSTALASI MATV

Kepala Dinas Cipta Karya


NO URAIAN PEKERJAAN
1 2
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001
ERJAAN

HARGA
3

Rp. 395,120.00
Rp. 100,700.00
Rp. 1,316,405.00
Rp. 1,111,105.00
Rp. 1,337,250.00
Rp. 7,400.00
Rp. 1,084,105.00
Rp. 245,642.00
Rp. 32,399.00
Rp. 85,480.00
Rp. 289,324.00
Rp. 268,924.00

Rp. 31,700.00
Rp. 39,060.00
Rp. 46,556.00
Rp. 42,176.00
Rp. 64,080.00
Rp. 51,060.00
Rp. 2,340.00
Rp. 13,880.00
Rp. -
Rp. 23,400.00
Rp. 132,680.00
Rp. 22,020.00
Rp. 143,700.00
Rp. 119,400.00
Rp. 113,700.00

Rp. 648,480.00
Rp. 605,260.00
Rp. 575,302.00
Rp. 554,238.00
HARGA
3
Rp. 525,372.00
Rp. 1,693,122.00
Rp. 570,884.00
Rp. 312,942.00

Rp. 285,255.00
Rp. 273,805.50
Rp. 266,121.50
Rp. 262,106.00
Rp. 260,641.00
Rp. 138,811.50
Rp. 133,402.50
Rp. 130,289.00
Rp. 128,330.00
Rp. 127,262.00
Rp. 125,145.00
Rp. 73,687.50
Rp. 57,561.00
Rp. 1,537,400.00
Rp. 150,842.00

Rp. 42,578.00
Rp. 36,610.00
Rp. 34,024.00
Rp. 32,262.00
Rp. 31,258.00
Rp. 30,456.00
Rp. 29,572.00
Rp. 49,002.00
Rp. 45,554.00
Rp. 43,152.00
Rp. 41,866.00
Rp. 40,744.00
Rp. 26,551.00
Rp. 24,468.00
Rp. 14,284.00
Rp. 6,887.00
HARGA
3
Rp. 30,491.00
Rp. 9,342.50

Rp. 10,744,800.00
Rp. 7,388,400.00
Rp. 439,974.00
Rp. 319,974.00
Rp. 592,650.00
Rp. 400,870.00
Rp. 808,650.00

Rp. 505,070.00

Rp. 465,190.00
Rp. 713,680.00
Rp. 474,190.00

Rp. 512,540.00

Rp. 10,234,000.00
Rp. 11,675,280.00
Rp. 9,835,360.00
Rp. 93,340.00
Rp. 116,740.00
Rp. 1,384,828.00
Rp. 93,800.00
Rp. 95,680.00
Rp. 115,140.00
Rp. 116,240.00
Rp. 268,494.00

Rp. 323,654.00

Rp. 327,200.00
Rp. 202,940.00
Rp. 25,173.00

Rp. 538,760.00
HARGA
3
Rp. 545,010.00
Rp. 610,140.00
Rp. 96,227.00
Rp. 203,828.00
Rp. 203,828.00
Rp. 508,899.00
Rp. 523,899.00
Rp. 868,899.00
Rp. 591,899.00
Rp. 468,149.00
Rp. 167,994.00
Rp. 3,139,395.00
Rp. 3,929,889.00
Rp. 8,413,999.00
Rp. 6,631,819.00
Rp. 7,439,210.00
Rp. 6,594,895.00
Rp. 5,920,639.00
Rp. 51,803.00
Rp. 71,301.00

Rp. 42,704.00
Rp. 47,704.00
Rp. 73,392.00
Rp. 33,746.00
Rp. 227,887.00
Rp. 535,234.00
Rp. 76,884.00
Rp. 94,680.00
Rp. 38,898.00
Rp. 40,044.00
Rp. 25,248.00

Rp. 57,582.00
Rp. 28,485.00
Rp. 218,660.00
Rp. 19,700.50
HARGA
3
Rp. 187,982.40
Rp. 32,484.00
Rp. 35,578.00

Rp. 1,639,340.00
Rp. 352,460.00
Rp. 1,222,000.00
Rp. 345,330.00
Rp. 504,780.00
Rp. 67,936.00
Rp. 286,017.20
Rp. 26,622.40
Rp. 41,871.10
Rp. 98,266.30
Rp. 24,405.00

Rp. 20,870.40
Rp. 383,968.00
Rp. 247,683.40

Rp. 131,340.00
Rp. 36,054.40
Rp. 55,034.00
Rp. #VALUE!
Rp. 112,068.00
Rp. 121,254.40

Rp. 126,424.55
Rp. 123,260.00
Rp. 23,335.36
Rp. 134,919.00
Rp. 40,853.00

Rp. 32,690.00
HARGA
3

Rp. 21,100.00
Rp. 13,288.00

Rp. 8,682.00
Rp. 12,770.00
Rp. 17,268.00
Rp. 38,064.00
HARGA
3

Rp. 498,300.00
Rp. 286,125.00
Rp. 259,150.00
Rp. 370,250.00
Rp. 314,362.50
Rp. 402,650.00
Rp. 513,750.00
Rp. 449,362.50

Rp. 86,450.00
Rp. 94,450.00
Rp. 101,450.00
Rp. 109,450.00
Rp. 86,950.00
Rp. 94,950.00
Rp. 94,950.00
Rp. 109,950.00
Rp. 115,950.00
Rp. 104,950.00
Rp. 114,450.00
Rp. 121,950.00
Rp. 94,450.00
Rp. 127,800.00
Rp. 124,158.00
Rp. 132,235.90
Rp. 157,510.00
Rp. 174,510.00
Rp. 21,748.00

Rp. 198,250.00
Rp. 252,750.00
Rp. 266,750.00
Rp. 268,000.00

ipta Karya
HARGA
3
Badung

Dharmayanty, M.T
Tk. I
994032001
DAFTAR HARGA SATUAN UPAH
BULAN MARET TAHUN 2012
HARGA
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.)
1 2 3 4 5

1 Tukang Politur Hari 42,000.00


2 Tukang Batu Hari 45,000.00
3 Tukang kayu Hari 55,000.00
4 Tukang Besi Hari 50,000.00
5 Tukang cat Hari 40,000.00
6 Tukang gali Hari 40,000.00
7 Tukang Listrik Hari 45,000.00
8 Tukang Pipa/ Tukang Ledeng Hari 50,000.00
9 Tukang Aspal Hari 43,000.00
10 Tukang masak Aspal Hari 44,000.00
11 Pekerja Hari 40,000.00
12 Tukang Ukir Hari 75,000.00
13 Operator Hari 50,000.00
14 Pembantu Operator Hari 40,000.00
15 Mekanik Hari 50,000.00
16 Pembantu Mekanik Hari 45,000.00
17 Pasang Atap Alang-Alang Hari 45,000.00
18 Pasang Bata Gosok Dua Muka M2 270,000.00
19 Pasang Bata Gosok Satu Muka M2 145,000.00
20 Pasang Batu Paras Diukir M2 288,500.00
21 Pasang Patu Paras Siap Diukir M2 250,000.00
22 Tukang Bongkar Begesting Hari 40,000.00

Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).

Mangupura, 1 Maret 2012


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001
DAFTAR ANALISA PEKERJAAN SWAKLOLA
BULAN MARET TAHUN 2012
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2
METER
1.2500 btg Bambu Sedang 8,500.00
2.5000 kg Semen Portland 1,250.00
1.2000 lbr Seng gelombang 3" - 5" 43,500.00
0.0050 m3 Pasir Beton 141,000.00
0.0090 m3 Koral beton 125,000.00
0.0720 m3 Kayu Meranti Usuk 5/7 4,000,000.00
0.0600 kg Paku biasa 2" - 5" 13,000.00
0.4500 kg Meni Besi 20,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
Total : 27,000.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 4,000,000.00
0.0200 kg Paku Biasa 2" - 5" 13,000.00
0.0070 m3 Kayu Papan Meranti 3/20 6,000,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
0.1000 oh Pekerja 40,000.00 4,000.00
Total : 9,500.00

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu 8 - 10/4m 90,000.00
0.1800 m3 Kayu Meranti 4,000,000.00
0.8500 kg Paku Biasa 2" - 5" 13,000.00
1.1000 kg Besi Strip 8,000.00
35.0000 kg Semen Portland 1,250.00
0.1500 m3 Pasir Pasang 158,000.00
0.1000 m3 Pasir Beton 141,000.00
0.1500 m3 Koral Beton 125,000.00
30.0000 bh Bata Merah 1,300.00
0.2500 lbr Seng Plat 46,500.00
2.0000 bh Jendela Nako 15,000.00
0.0800 m2 Kaca Polos 102,000.00
0.1500 bh Kunci Tanam 105,000.00
0.0600 lbr Plywood 4 mm 47,000.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
1.0000 oh Tukang Batu 45,000.00 45,000.00
2.0000 oh Pekerja 40,000.00 80,000.00
Total : 235,000.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 8,500.00
0.2100 m3 Kayu Meranti 4,000,000.00
0.3000 kg Paku Biasa 2" - 5" 13,000.00
10.5000 kg Semen Portland 1,250.00
0.0300 m3 Pasir Beton 141,000.00
0.0500 m3 Koral Beton 125,000.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
Total : 150,000.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 8,500.00
0.2760 m3 Kayu Meranti 4,000,000.00
0.7000 kg Paku biasa 2" - 5" 13,000.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
1.5000 oh Tukang Kayu 55,000.00 82,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 122,500.00

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 40,000.00 4,000.00
Total : 4,000.00

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 8,500.00
0.1860 m3 Kayu Meranti 4,000,000.00
0.3000 kg Paku Biasa 2" - 5" 13,000.00
18.0000 kg Semen Portland 1,250.00
0.0300 m3 Pasir Beton 141,000.00
0.0500 m3 Koral Beton 125,000.00
1.5000 lbr Seng gelombang BJLS 28 42,500.00
1.3500 lbr Plywood 4 mm 47,000.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
Total : 150,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang 4,000,000.00
0.0800 kg Paku Biasa 2" - 5" 13,000.00
1.0000 btg Kaso 5/7 84,000.00
0.3000 oh Tukang kayu 55,000.00 16,500.00
Total : 16,500.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu 7,000.00
0.2500 kg Tali Ijuk 34,000.00
0.0170 oh Tukang Kayu 55,000.00 935.00
0.0020 oh Pekerja 40,000.00 80.00
1,015.00

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20 180,000.00
0.0900 m3 Batu Pecah 5 - 7 150,000.00
0.0100 m3 Pasir Pasang 158,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
Total : 40,000.00

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 40,000.00 266,680.00
Total : 266,680.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja 40,000.00 266,680.00
Total : 266,680.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja 40,000.00 30,000.00
Total : 30,000.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
0.9000 oh Pekerja 40,000.00 36,000.00
Total : 36,000.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 40,000.00 42,000.00
Total : 42,000.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja 40,000.00 40,000.00
Total : 40,000.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 40,000.00 60,000.00
Total : 60,000.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja 40,000.00 48,000.00
Total : 48,000.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 40,000.00 2,000.00
Total : 2,000.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 40,000.00 13,200.00
Total : 13,200.00

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
10 1 M3 PEMADATAN TANAH ( Per 20 Cm )
0.5000 oh Pekerja 40,000.00 20,000.00
Total : 20,000.00

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 100,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
Total : 12,000.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk 2,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
Total : 6,000.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 110,000.00
0.2500 oh Pekerja 40,000.00 10,000.00
Total : 10,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
1.2000 m3 Tanah Urug 80,000.00
0.5000 oh Pekerja 40,000.00 20,000.00
Total : 20,000.00

14 1 M3 URUGAN LIMESTONE PADAT


1.2000 m3 Limestone 85,000.00
0.2500 oh Pekerja 40,000.00 10,000.00
Total : 10,000.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
202.0000 kg Semen Portland 1,250.00
0.4850 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
Total : 93,750.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
163.0000 kg Semen Portland 1,250.00
0.5200 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
Total : 93,750.00

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
136.0000 kg Semen Portland 1,250.00
0.5440 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
Total : 93,750.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
117.0000 kg Semen Portland 1,250.00
0.5610 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
Total : 93,750.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 180,000.00
91.0000 kg Semen Portland 1,250.00
0.5840 m3 Pasir Pasang 158,000.00
1.5000 oh Pekerja 40,000.00 60,000.00
0.7500 oh Tukang Batu 45,000.00 33,750.00
Total : 93,750.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 180,000.00
194.0000 kg Semen Portland 1,250.00
0.3120 m3 Pasir Beton 141,000.00
0.4680 m3 Koral Beton 125,000.00
126.0000 kg Besi Beton 8,270.00
1.8000 kg Kawat Beton 16,000.00
3.4000 oh Pekerja 40,000.00 136,000.00
0.8500 oh Tukang Batu 45,000.00 38,250.00
174,250.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 180,000.00
194.0000 kg Semen Portland 1,250.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.3120 m3 Pasir Beton 141,000.00
0.4680 m3 Koral Beton 125,000.00
2.4000 oh Pekerja 40,000.00 96,000.00
0.8000 oh Tukang Batu 45,000.00 36,000.00
Total : 132,000.00

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 180,000.00
0.4320 m3 Pasir Urug 100,000.00
0.7800 oh Pekerja 40,000.00 31,200.00
0.3900 oh Tukang Batu 45,000.00 17,550.00
Total : 48,750.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

IV PEKERJAAN DINDING (SNI 6897 : 2008)

1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
43.5000 kg Semen Portland 1,250.00
0.0800 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
33,000.00

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
32.9500 kg Semen Portland 1,250.00
0.0910 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
33,000.00

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
26.5500 kg Semen Portland 1,250.00
0.0930 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
33,000.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
22.2000 kg Semen Portland 1,250.00
0.1020 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
33,000.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.5000 kg Semen Portland 1,250.00
0.1220 m3 Pasir Pasang 158,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
33,000.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.9500 kg Semen Portland 1,250.00
0.0380 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
16,500.00

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
14.3700 kg Semen Portland 1,250.00
0.0400 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 16,500.00

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
11.5000 kg Semen Portland 1,250.00
0.0430 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 16,500.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
9.6800 kg Semen Portland 1,250.00
0.0450 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 16,500.00
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
8.3200 kg Semen Portland 1,250.00
0.0490 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 16,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
6.5000 kg Semen Portland 1,250.00
0.0500 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 16,500.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako 2,000.00
7.5000 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
1.9500 kg Besi Beton 8 mm 8,270.00
0.3200 oh Pekerja 40,000.00 12,800.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 17,300.00

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako 2,000.00
7.5000 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
0.3200 oh Pekerja 40,000.00 12,800.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 17,300.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik 50,000.00
11.0000 kg Semen Portland 1,250.00
0.0350 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 16,500.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I 22,000.00
0.0140 m3 Kayu kamper usuk/reng 6,500,000.00
0.0120 kg Paku Biasa 13,000.00
0.0030 m3 List Kayu 2/4 6,500,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
Total : 6,750.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland 1,250.00
0.0160 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland 1,250.00
0.0200 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland 1,250.00
0.0230 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
6.2400 kg Semen Portland 1,250.00
0.0240 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland 1,250.00
0.0260 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland 1,250.00
0.0290 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland 1,250.00
0.0270 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
Total : 25,000.00

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland 1,250.00
0.0310 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
Total : 25,000.00

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland 1,250.00
0.0320 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
Total : 25,000.00
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland 1,250.00
0.0350 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
Total : 25,000.00

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland 1,250.00
0.0360 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Batu 45,000.00 9,000.00
Total : 25,000.00

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland 1,250.00
0.0130 m3 Pasir Pasang 158,000.00
0.0800 oh Pekerja 40,000.00 3,200.00
0.4000 oh Tukang Batu 45,000.00 18,000.00
Total : 21,200.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 1,250.00
0.0060 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1000 oh Tukang Batu 45,000.00 4,500.00
Total : 16,500.00

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland 1,250.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0750 oh Tukang Batu 45,000.00 3,375.00
Total : 9,375.00

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE


(= 8 M')
1.6000 kg Semen Portland 1,250.00
0.0700 oh Pekerja 40,000.00 2,800.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0350 oh Tukang Batu 45,000.00 1,575.00
Total : 4,375.00

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland 1,250.00
0.0120 m3 Pasir Pasang 158,000.00
0.3000 oh Pekerja 40,000.00 12,000.00
0.1500 oh Tukang Batu 45,000.00 6,750.00
Total : 18,750.00

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 1,250.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.1000 oh Tukang Labur/Cat 40,000.00 4,000.00
Total : 4,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper 8,300,000.00
1.2500 Kg Paku 10 Cm 14,000.00
1.0000 Kg Lem Kayu 12,500.00
7.0000 oh Pekerja 40,000.00 280,000.00
21.0000 oh Tukang Kayu 55,000.00 1,155,000.00
Total : 1,435,000.00

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing 5,000,000.00
1.2500 Kg Paku 10 Cm 14,000.00
1.0000 Kg Lem Kayu 12,500.00
6.0000 oh Pekerja 40,000.00 240,000.00
18.0000 oh Tukang Kayu 55,000.00 990,000.00
Total : 1,230,000.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper 9,000,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00
0.3500 oh Pekerja 40,000.00 14,000.00
1.0500 oh Tukang Kayu 55,000.00 57,750.00
Total : 71,750.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing 6,000,000.00
0.0500 Kg Paku 5-7 Cm 14,000.00
0.3500 oh Pekerja 40,000.00 14,000.00
1.0500 oh Tukang Kayu 55,000.00 57,750.00
Total : 71,750.00

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper 9,000,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 55,000.00 165,000.00
Total : 205,000.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II
0.0240 m3 Papan Kayu Kamper 9,000,000.00
0.3000 Kg Lem Kayu 12,500.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
Total : 164,000.00

7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper 9,000,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
3.0000 oh Tukang Kayu 55,000.00 165,000.00
Total : 205,000.00

8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Plywood 4 mm 47,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
3.0000 oh Tukang Kayu 55,000.00 165,000.00
Total : 205,000.00

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Plywood 4 mm 47,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
Total : 164,000.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Kamper 9,000,000.00
0.1500 Kg Paku 1-2,5 Cm 14,000.00
0.6700 oh Pekerja 40,000.00 26,800.00
2.0000 oh Tukang Kayu 55,000.00 110,000.00
Total : 136,800.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.5000 Kg Lem Kayu 12,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
Total : 164,000.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper 9,000,000.00
0.0300 Kg Paku 1-2,5 Cm 14,000.00
0.8000 Kg Lem Kayu 12,500.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.5000 Lbr Formika 80,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
2.4000 oh Tukang Kayu 55,000.00 132,000.00
Total : 164,000.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper 8,300,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
5.6000 Kg Paku 12 Cm 14,000.00
4.0000 oh Pekerja 40,000.00 160,000.00
12.0000 oh Tukang Kayu 55,000.00 660,000.00
Total : 820,000.00

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000 m3 Balok Kayu Kamper 8,300,000.00
15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
5.6000 Kg Paku 12 Cm 14,000.00
6.7000 oh Pekerja 40,000.00 268,000.00
20.1000 oh Tukang Kayu 55,000.00 1,105,500.00
Total : 1,373,500.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper 8,300,000.00


15.0000 Kg Besi Strip Tebal 5 cm 8,000.00
3.0000 Kg Paku 12 Cm 14,000.00
2.4000 oh Pekerja 40,000.00 96,000.00
7.2000 oh Tukang Kayu 55,000.00 396,000.00
Total : 492,000.00

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00
0.0036 m3 Reng ( 2 x 3 ) Cm 6,500,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
Total : 9,500.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II

0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00


0.0072 m3 Reng ( 2 x 3 ) Cm 6,500,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 9,500.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper 8,300,000.00


0.2000 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1200 oh Pekerja 40,000.00 4,800.00
0.1200 oh Tukang Kayu 55,000.00 6,600.00
Total : 11,400.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00
0.2000 Kg Paku 7 Cm dan 10 Cm 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.3000 oh Tukang Kayu 55,000.00 16,500.00
Total : 22,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 4,000,000.00
0.2500 Kg Paku 7 Cm dan 10 Cm 14,000.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.3000 oh Tukang Kayu 55,000.00 16,500.00
Total : 24,500.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

0.0108 m3 Papan Kayu Kamper 9,000,000.00


0.1000 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
Total : 15,000.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

0.0110 m3 Papan Kayu Kamper 9,000,000.00


0.0500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
Total : 15,000.00

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU


KELAS II/III
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4500 oh Tukang Kayu 55,000.00 24,750.00
Total : 30,750.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 56,000.00
0.5600 Kg Lem Kayu 12,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4500 oh Tukang Kayu 55,000.00 24,750.00
Total : 30,750.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 8,300,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 14,000.00
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 47,000.00
0.5600 Kg Lem Kayu 12,500.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.6000 oh Tukang Kayu 55,000.00 33,000.00
Total : 41,000.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper 9,000,000.00


0.1000 Kg Paku 5 Cm dan 10 Cm 14,000.00
0.1500 Kg Paku Skrup 10 cm 18,000.00
0.6000 oh Pekerja 40,000.00 24,000.00
1.8000 oh Tukang Kayu 55,000.00 99,000.00
Total : 123,000.00

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X


240) CM
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 47,000.00
0.0500 Kg Paku 1 Cm dan 2.5 Cm 14,000.00
0.0250 oh Pekerja 40,000.00 1,000.00
0.0750 oh Tukang Kayu 55,000.00 4,125.00
Total : 5,125.00

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
218.0000 kg Semen Portland 1,250.00
0.5200 m3 Pasir Beton 141,000.00
0.8700 m3 Koral Beton 125,000.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
77,250.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
232.0000 kg Semen Portland 1,250.00
0.5200 m3 Pasir Beton 141,000.00
0.7800 m3 Koral Beton 125,000.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
Total : 77,250.00

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland 1,250.00
0.4500 m3 Pasir Beton 141,000.00
0.9000 m3 Koral Beton 125,000.00
1.6500 oh Pekerja 40,000.00 66,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
Total : 77,250.00

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) 8,270.00
0.1500 kg Kawat Beton 16,000.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0700 oh Tukang Besi 50,000.00 3,500.00
Total : 6,300.00

5 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III 4,000,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00
0.1000 ltr Minyak Bekisting 15,000.00
0.5200 oh Pekerja 40,000.00 20,800.00
0.2600 oh Tukang Kayu 55,000.00 14,300.00
Total : 35,100.00

6 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III 4,000,000.00
0.3000 kg Paku Biasa 5' - 10' 13,000.00
0.1000 ltr Minyak Bekisting 15,000.00
0.5200 oh Pekerja 40,000.00 20,800.00
0.2600 oh Tukang Kayu 55,000.00 14,300.00
Total : 35,100.00

7 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 5,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4 m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
Total : 44,550.00

8 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0180 m3 Kayu Usuk 4/6 5,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
Total : 44,550.00

9 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.2000 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 5,000,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.3500 lbr Plywood 9 mm 105,500.00
6.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
Total : 44,550.00

10 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III 4,000,000.00
0.4000 Kg Paku Biasa 5' - 12' 13,000.00
0.2000 Ltr Minyak Bekisting 15,000.00
0.0200 M3 Kayu Usuk 4/6 5,000,000.00
0.3500 Lbr Plywood 9 mm 105,500.00
3.0000 Btng Dolken Kayu 8" - 10"/4m 90,000.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00
0.6600 Oh Pekerja 40,000.00 26,400.00
0.3300 Oh Tukang Kayu 55,000.00 18,150.00
44,550.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

11 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III 4,000,000.00
0.4000 kg Paku Biasa 5' - 12' 13,000.00
0.1500 ltr Minyak Bekisting 15,000.00
0.0150 m3 Kayu Usuk 4/6 5,000,000.00
0.3500 lbr Plywood 9 mm 105,500.00
2.0000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.6600 oh Pekerja 40,000.00 26,400.00
0.3300 oh Tukang Kayu 55,000.00 18,150.00
Total : 44,550.00

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan) 4,000,000.00
0.6000 kg Paku Biasa 5' - 12' 13,000.00
0.5000 btg Dolken Kayu 8" - 10"/4m 90,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
Total : 8,750.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III 4,000,000.00
1.5000 kg Paku Biasa 5' - 12' 13,000.00
0.4000 ltr Minyak Bekisting 15,000.00
157.0000 kg Besi Beton 8,270.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.3000 oh Tukang Kayu 55,000.00 71,500.00
1.0500 oh Tukang Besi 50,000.00 52,500.00
Total : 348,375.00

14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III 4,000,000.00
2.0000 kg Paku Biasa 5' - 12' 13,000.00
0.6000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,270.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
5.6500 oh Pekerja 40,000.00 226,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.5600 oh Tukang Kayu 55,000.00 85,800.00
1.4000 oh Tukang Besi 50,000.00 70,000.00
Total : 394,175.00

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III 4,000,000.00
4.0000 kg Paku Biasa 5' - 12' 13,000.00
2.0000 ltr Minyak Bekisting 15,000.00
315.0000 kg Besi Beton 8,270.00
4.5000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1500 m3 Kayu Kelas II balok 5,000,000.00
3.5000 lbr Plywood 9 mm 105,500.00
20.0000 btg Dolken Kayu 8" /4 m 90,000.00
7.0500 oh Pekerja 40,000.00 282,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.6500 oh Tukang Kayu 55,000.00 90,750.00
2.1000 oh Tukang Besi 50,000.00 105,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 490,125.00

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III 4,000,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,270.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1400 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
16.0000 btg Dolken Kayu 8" /4 m 90,000.00
6.3500 oh Pekerja 40,000.00 254,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.6500 oh Tukang Kayu 55,000.00 90,750.00
1.4000 oh Tukang Besi 50,000.00 70,000.00
Total : 427,125.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III 4,000,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
157.5000 kg Besi Beton 8,270.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1200 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
32.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.3000 oh Tukang Kayu 55,000.00 71,500.00
1.0500 oh Tukang Besi 50,000.00 52,500.00
348,375.00
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
0.2400 m3 Kayu Kelas III 4,000,000.00
3.2000 kg Paku Biasa 5' - 12' 13,000.00
1.6000 ltr Minyak Bekisting 15,000.00
157.0000 kg Besi Beton 8,270.00
2.2500 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1600 m3 Kayu Kelas II balok 5,000,000.00
2.8000 lbr Plywood 9 mm 105,500.00
24.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.3000 oh Pekerja 40,000.00 212,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.3000 oh Tukang Kayu 55,000.00 71,500.00
1.0500 oh Tukang Besi 50,000.00 52,500.00
348,375.00
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Kelas III 4,000,000.00
3.0000 kg Paku Biasa 5' - 12' 13,000.00
1.2000 ltr Minyak Bekisting 15,000.00
210.0000 kg Besi Beton 8,270.00
3.0000 kg Kawat Beton 16,000.00
336.0000 kg Semen Portland 1,250.00
0.5400 m3 Pasir Beton 141,000.00
0.8100 m3 Koral Beton 125,000.00
0.1050 m3 Kayu Kelas II balok 5,000,000.00
2.5000 lbr Plywood 9 mm 105,500.00
14.0000 btg Dolken Kayu 8" /4 m 90,000.00
5.6500 oh Pekerja 40,000.00 226,000.00
0.2750 oh Tukang Batu 45,000.00 12,375.00
1.5600 oh Tukang Kayu 55,000.00 85,800.00
1.4000 oh Tukang Besi 50,000.00 70,000.00
394,175.00

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Kelas III 4,000,000.00
0.0100 kg Paku Biasa 5' - 12' 13,000.00
3.0000 kg Besi Beton 8,270.00
0.0450 kg Kawat Beton 16,000.00
4.0000 kg Semen Portland 1,250.00
0.0060 m3 Pasir Beton 141,000.00
0.0090 m3 Koral Beton 125,000.00
0.1800 oh Pekerja 40,000.00 7,200.00
0.0200 oh Tukang Batu 45,000.00 900.00
0.0200 oh Tukang Kayu 55,000.00 1,100.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0200 oh Tukang Besi 50,000.00 1,000.00
Total : 10,200.00
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15
CM)
0.0030 m3 Kayu Kelas III 4,000,000.00
0.0200 kg Paku Biasa 5' - 12' 13,000.00
3.6000 kg Besi Beton 8,270.00
0.0500 kg Kawat Beton 16,000.00
5.5000 kg Semen Portland 1,250.00
0.0090 m3 Pasir Beton 141,000.00
0.0150 m3 Koral Beton 125,000.00
0.2970 oh Pekerja 40,000.00 11,880.00
0.0330 oh Tukang Batu 45,000.00 1,485.00
0.0330 oh Tukang Kayu 55,000.00 1,815.00
0.0330 oh Tukang Besi 50,000.00 1,650.00
Total : 16,830.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong 1,300.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0600 oh Tukang Kayu 55,000.00 3,300.00
Total : 9,300.00

2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat 1,500.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0600 oh Tukang Kayu 55,000.00 3,300.00
Total : 9,300.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong 6,000.00
8.0000 kg Semen Portland 1,250.00
0.0320 m3 Pasir Pasang 158,000.00
0.4000 oh Pekerja 40,000.00 16,000.00
0.2000 oh Tukang Kayu 55,000.00 11,000.00
Total : 27,000.00
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 28,000.00
0.1200 kg Paku Pancing 60 x 230 20,000.00
0.1400 oh Pekerja 40,000.00 5,600.00
0.0700 oh Tukang Kayu 55,000.00 3,850.00
Total : 9,450.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang 24,000.00
6.0000 kg Paku Skrup 3,5" 26,500.00
0.0840 oh Pekerja 40,000.00 3,360.00
0.1250 oh Tukang Kayu 55,000.00 6,875.00
Total : 10,235.00
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap 8,500.00
0.2000 kg Paku Biasa 1/2" - 1" 14,000.00
0.1660 oh Pekerja 40,000.00 6,640.00
0.2500 oh Tukang Kayu 55,000.00 13,750.00
Total : 20,390.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 46,500.00
0.0600 kg Paku biasa 1/2" - 1" 14,000.00
0.0500 kg Paku biasa 2" - 5" 13,000.00
0.0040 m3 Kayu papan 3 cm 9,000,000.00
0.1250 oh Pekerja 40,000.00 5,000.00
0.2500 oh Tukang kayu 55,000.00 13,750.00
Total : 18,750.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang 12,500.00
0.5000 glg Tali pengikat 9,500.00
0.2000 oh Pekerja 40,000.00 8,000.00
Total : 8,000.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 42,500.00
0.0200 kg Paku Biasa 1/2" - 1" 14,000.00
0.1200 oh Pekerja 40,000.00 4,800.00
0.0600 oh Tukang Kayu 55,000.00 3,300.00
Total : 8,100.00

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil 29,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 8,750.00

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 46,500.00
0.0400 kg Paku biasa 1/2" - 1" 14,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.0700 oh Tukang Kayu 55,000.00 3,850.00
Total : 9,850.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5
MM DAN 6 MM
1.1000 lbr Asbes semen 47,000.00
0.0100 kg Paku Biasa 1/2" - 1" 14,000.00
0.0300 oh Pekerja 40,000.00 1,200.00
0.0700 oh Tukang Kayu 55,000.00 3,850.00
Total : 5,050.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS 47,000.00
0.0300 kg Paku Biasa 1/2" - 1" 14,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.1000 oh Tukang Kayu 55,000.00 5,500.00
Total : 9,500.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan 9,000,000.00
0.0100 kg Paku Biasa 1/2" - 1" 14,000.00
0.8000 oh Pekerja 40,000.00 32,000.00
0.8000 oh Tukang Kayu 55,000.00 44,000.00
Total : 76,000.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil 12,250.00
0.1000 kg Paku list SQ 15,840.00
0.0500 oh Pekerja 40,000.00 2,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
Total : 4,750.00

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm 9,000,000.00
0.0600 kg Paku Biasa 2" - 5" 15,840.00
1.1000 lbr Asbes 47,000.00
0.1800 oh Pekerja 40,000.00 7,200.00
0.3200 oh Tukang Kayu 55,000.00 17,600.00
Total : 24,800.00

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup 18,000.00
0.3640 lbr Gypsum Board (120x240x9) 63,500.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
Total : 6,750.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup 18,000.00
0.3640 lbr Kalsiboard 4.5 mm 72,000.00
0.1000 oh Pekerja 40,000.00 4,000.00
0.0500 oh Tukang Kayu 55,000.00 2,750.00
Total : 6,750.00

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok 1,365,000.00
6% x harga kloset Perlengkapan
3.3000 oh Pekerja 40,000.00 132,000.00
1.1000 oh Tukang batu 45,000.00 49,500.00
Total : 181,500.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen 135,000.00
6.0000 kg Semen Portland 1,250.00
0.0100 m3 Pasir Pasang 158,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
1.5000 oh Tukang batu 45,000.00 67,500.00
Total : 107,500.00

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir 1,052,000.00
6% x harga Urin Perlengkapan
6.0000 kg Semen Portland 1,250.00
0.0100 m3 Pasir Pasang 158,000.00
1.0000 oh Pekerja 40,000.00 40,000.00
1.0000 oh Tukang batu 45,000.00 45,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 85,000.00

4 MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel 185,000.00
12% x harga wast Perlengkapan
6.0000 kg Semen Portland 1,250.00
0.0100 m3 Pasir Pasang 158,000.00
1.2000 oh Pekerja 40,000.00 48,000.00
1.4500 oh Tukang batu 45,000.00 65,250.00
Total : 113,250.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 230,000.00
18% x harga wast Perlengkapan
1.8000 oh Pekerja 40,000.00 72,000.00
2.7000 oh Tukang batu 45,000.00 121,500.00
Total : 193,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


1.2000 m1 Pipa galvanis 38,000.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 40,000.00 2,160.00
0.0900 oh Tukang Pipa 50,000.00 4,500.00
Total : 6,660.00

7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"


1.2000 M' Pipa galvanis 175,000.00
35% x harga pipa Perlengkapan
0.1080 Oh Pekerja 40,000.00 4,320.00
0.1800 Oh Tukang Pipa 50,000.00 9,000.00
Total : 13,320.00

8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


1.2000 m1 Pipa PVC 14,000.00
35% x harga pipa Perlengkapan
0.0360 oh Pekerja 40,000.00 1,440.00
0.0600 oh Tukang Pipa 50,000.00 3,000.00
Total : 4,440.00

9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"


1.2000 m1 Pipa PVC 22,250.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 40,000.00 2,160.00
0.0900 oh Tukang Pipa 50,000.00 4,500.00
Total : 6,660.00

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC 56,250.00
35% x harga pipa Perlengkapan
0.0810 oh Pekerja 40,000.00 3,240.00
0.1350 oh Tukang Pipa 50,000.00 6,750.00
Total : 9,990.00

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air 18,000.00
0.0250 bh Seal tape 2,600.00
0.0100 oh Pekerja 40,000.00 400.00
0.1000 oh Tukang Pipa 50,000.00 5,000.00
Total : 5,400.00

XI PEKERJAAN BESI DAN ALUMINIUM (SNI


7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 15,000.00
0.0060 oh Pekerja 40,000.00 240.00
0.0600 oh Tukang besi 50,000.00 3,000.00
Total : 3,240.00

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako 117,000.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 18,000.00
7.0000 m' Besi strip 8,000.00
0.2000 oh Pekerja 40,000.00 8,000.00
0.2000 oh Tukang besi 50,000.00 10,000.00
Total : 18,000.00

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat 46,500.00
0.0150 kg Paku biasa 0,5" - 1" 18,000.00
0.0190 m3 Kayu papan kelas II/III 9,000,000.00
0.1500 oh Pekerja 40,000.00 6,000.00
0.4000 oh Tukang besi 50,000.00 20,000.00
Total : 26,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa 105,000.00
0.0100 oh Pekerja 40,000.00 400.00
0.5000 oh Tukang besi 50,000.00 25,000.00
Total : 25,400.00

2 1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu 27,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 50,000.00 7,500.00
Total : 8,100.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela 49,000.00
0.0100 oh Pekerja 40,000.00 400.00
0.1000 oh Tukang besi 50,000.00 5,000.00
Total : 5,400.00

4 1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin 22,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 50,000.00 7,500.00
Total : 8,100.00

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot 100,000.00
0.0200 oh Pekerja 40,000.00 800.00
0.2000 oh Tukang besi 50,000.00 10,000.00
Total : 10,800.00

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca 102,000.00
0.0150 oh Pekerja 40,000.00 600.00
0.1500 oh Tukang besi 50,000.00 7,500.00
Total : 8,100.00

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI


7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm 3,545.45
10.0000 kg Semen Portland 1,250.00
0.0450 m3 Pasir Pasang 158,000.00
1.5000 kg Semen warna/semen grouting 11,000.00
0.7000 oh Pekerja 40,000.00 28,000.00
0.3500 oh Tukang batu 45,000.00 15,750.00
Total : 43,750.00

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm 1,400.00
10.4000 kg Semen Portland 1,250.00
0.0450 m3 Pasir Pasang 158,000.00
1.6200 kg Semen warna/semen grouting 11,000.00
0.7000 oh Pekerja 40,000.00 28,000.00
0.3500 oh Tukang batu 45,000.00 15,750.00
Total : 43,750.00

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm 3,545.45
1.1400 kg Semen Portland 1,250.00
0.0030 m3 Pasir Pasang 158,000.00
0.1000 kg Semen warna/semen grouting 11,000.00
0.0900 oh Pekerja 40,000.00 3,600.00
0.0900 oh Tukang batu 45,000.00 4,050.00
Total : 7,650.00
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
26.5000 bh Keramik 20 x 20 cm 1,400.00
9.3000 kg Semen Portland 1,250.00
0.0180 m3 Pasir Pasang 158,000.00
1.9400 kg Semen warna/semen grouting 11,000.00
0.9000 oh Pekerja 40,000.00 36,000.00
0.4500 oh Tukang batu 45,000.00 20,250.00
Total : 56,250.00

5 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II 9,000,000.00
0.0500 kg Paku sekrup 3,5' 26,500.00
0.1200 oh Pekerja 40,000.00 4,800.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.1200 oh Tukang kayu 55,000.00 6,600.00
Total : 11,400.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 47,100.00
0.1500 kg Dempul 29,000.00
0.1700 kg Cat dasar 20,000.00
0.2600 kg Cat Penutup 2x 45,500.00
0.0700 oh Pekerja 40,000.00 2,800.00
0.0090 oh Tukang cat 40,000.00 360.00
Total : 3,160.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis 35,000.00
0.0500 kg Dempul 29,000.00
0.1000 lbr Amplas 3,800.00
0.0100 bh Kuas 9,000.00
0.1600 oh Pekerja 40,000.00 6,400.00
0.1600 oh Tukang cat 40,000.00 6,400.00
Total : 12,800.00
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 30,000.00
0.1000 kg Cat dasar 20,000.00
0.2600 kg Cat Penutup 2x 17,000.00
0.0200 oh Pekerja 40,000.00 800.00
0.0630 oh Tukang cat 40,000.00 2,520.00
Total : 3,320.00

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar 20,000.00
0.1800 kg Cat Penutup 2x 17,000.00
0.0280 oh Pekerja 40,000.00 1,120.00
0.0420 oh Tukang cat 40,000.00 1,680.00
Total : 2,800.00

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi 20,000.00
0.0100 lbr Kuas 9,000.00
0.0200 oh Pekerja 40,000.00 800.00
0.2000 oh Tukang cat 40,000.00 8,000.00
Total : 8,800.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi 45,000.00
0.0060 oh Pekerja 40,000.00 240.00
0.0600 oh Tukang cat 40,000.00 2,400.00
Total : 2,640.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur 47,000.00
2.0000 lbr Amplas 3,800.00
0.0600 oh Pekerja 40,000.00 2,400.00
0.0600 oh Tukang cat 40,000.00 2,400.00

Total : 4,800.00

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok 1,980.00
8.4000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 270,000.00 270,000.00
Total : 270,000.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan 9,500.00
8.4000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan 1,980.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00

4 1 M2 PASANGAN PARAS 1 MUKA


HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
18.3333 bh Batu paras 12,000.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,000.00
5.2500 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 288,500.00 288,500.00
Total : 288,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras 12,000.00
4.2000 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 288,500.00 288,500.00
Total : 288,500.00

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,000.00
5.2500 kg Semen 50 Kg 1,250.00
Upah Kerja ( Lumpsum) 280,000.00 280,000.00
Total : 280,000.00

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 67,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.5000 oh Pekerja 40,000.00 20,000.00
Total : 31,250.00
2 Paving 10 x 20 cm tebal 6 cm K350 60,000.00 31,250.00
4 Paving 10 x 20 cm tebal 8 cm K225 67,000.00 31,250.00
5 Paving 10 x 20 cm tebal 8 cm K350 75,000.00 31,250.00
7 Paving 20 x 20 cm tebal 6 cm K225 52,500.00 31,250.00
8 Paving 20 x 20 cm tebal 6 cm K350 60,500.00 31,250.00
10 Paving 20 x 20 cm tebal 8 cm K225 75,500.00 31,250.00
11 Paving 20 x 20 cm tebal 8 cm K350 75,500.00 31,250.00
12 Paving 20 x 20 cm tebal 8 cm K425 70,500.00 31,250.00
14 Paving 20 x 20 cm tebal 10 cm K225 80,000.00 31,250.00
15 Paving 20 x 20 cm tebal 10 cm K350 87,500.00 31,250.00
16 Paving 20 x 20 cm tebal 10 cm K425 60,000.00 31,250.00
18 Paving Tiga Berlian tebal 6 cm K225 65,000.00 31,250.00
19 Paving Tiga Berlian tebal 6 cm Standar 64,000.00 31,250.00

20 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block 52,000.00
0.0690 m3 Pasir Urug 100,000.00
0.5000 oh Tukang Batu 45,000.00 22,500.00
1.0000 oh Pekerja 40,000.00 40,000.00
Total : 62,500.00

21 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat 35,000.00
9.2800 zak Semen 1,250.00
0.2000 m3 Pasir pasang 158,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.6250 oh Pekerja 40,000.00 25,000.00
Total : 36,250.00
22 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 69,000.00
0.4500 zak Semen 50 Kg 1,250.00
0.0023 m3 Pasir Pasang 158,000.00
0.3500 oh Tukang Batu 45,000.00 15,750.00
0.9500 oh Pekerja 40,000.00 38,000.00
Total : 53,750.00
23 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 52,000.00 53,750.00
24 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) 69,000.00 53,750.00

25 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 45,000.00
0.0710 kg Thiner 8,000.00
0.0300 oh Tukang Cat 40,000.00 1,200.00
0.1500 oh Pekerja 40,000.00 6,000.00
Total : 7,200.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 12,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
2.0000 bh Tee dos clipsal 20 mm hitam 7,000.00
15.0000 bj Klem clipsal 20 mm hitam 750.00
3.0000 bj Sock clipsal 20 mm hitam 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 12,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 12,000.00
1.0000 bh Tee dos clipsal 20 mm hitam 7,000.00
15.0000 bj Klem clipsal 20 mm hitam 750.00
4.0000 bj Sock clipsal 20 mm hitam 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 10,500.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone 4,000.00
8.0000 bt Pipa Clipsal 20 mm putih 12,000.00
1.0000 bh Tee dos clipsal 20 mm putih 7,000.00
25.0000 bj Klem clipsal 20 mm putih 750.00
5.0000 bj Sock clipsal 20 mm putih 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof 6,000.00
6.0000 bt Pipa Clipsal 20 mm putih 12,000.00
2.0000 bh Tee dos clipsal 20 mm putih 7,000.00
20.0000 bj Klem clipsal 20 mm putih 750.00
6.0000 bj Sock clipsal 20 mm putih 2,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 10,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

Mengeta
Kepala Dinas C
Kabupaten B

Ir. Ni Luh Putu Dessy D


Pembina
NIP. 196110101
AKLOLA

HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

10,625.00
3,125.00
52,200.00
705.00
1,125.00
288,000.00
780.00
9,000.00

365,560.00 392,560.00

48,000.00
260.00
42,000.00

90,260.00 99,760.00

112,500.00
720,000.00
11,050.00
8,800.00
43,750.00
23,700.00
14,100.00
18,750.00
39,000.00
11,625.00
30,000.00
8,160.00
15,750.00
2,820.00

1,060,005.00 1,295,005.00

14,450.00
840,000.00
3,900.00
13,125.00
4,230.00
6,250.00
63,750.00

945,705.00 1,095,705.00

25,500.00
1,104,000.00
9,100.00
63,750.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
1,202,350.00 1,324,850.00

4,000.00

10,625.00
744,000.00
3,900.00
22,500.00
4,230.00
6,250.00
63,750.00
63,450.00

918,705.00 1,068,705.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

144,000.00
1,040.00
84,000.00

229,040.00 245,540.00

7,000.00
8,500.00

15,500.00 16,515.00

27,000.00
13,500.00
1,580.00

42,080.00 82,080.00

266,680.00

266,680.00

30,000.00

36,000.00

42,000.00

40,000.00

60,000.00

48,000.00

2,000.00

13,200.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

20,000.00

120,000.00

120,000.00 132,000.00

15,000.00

15,000.00 21,000.00

132,000.00

132,000.00 142,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

96,000.00

96,000.00 116,000.00

102,000.00

102,000.00 112,000.00

216,000.00
252,500.00
76,630.00

545,130.00 638,880.00

216,000.00
203,750.00
82,160.00

501,910.00 595,660.00

216,000.00
170,000.00
85,952.00

471,952.00 565,702.00

216,000.00
146,250.00
88,638.00

450,888.00 544,638.00

216,000.00
113,750.00
92,272.00

422,022.00 515,772.00

86,400.00
242,500.00
43,992.00
58,500.00
1,042,020.00
28,800.00

1,502,212.00 1,676,462.00

81,000.00
242,500.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
43,992.00
58,500.00

425,992.00 557,992.00

216,000.00
43,200.00

259,200.00 307,950.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

182,000.00
54,375.00
12,640.00

249,015.00 282,015.00

182,000.00
41,187.50
14,378.00

237,565.50 270,565.50

182,000.00
33,187.50
14,694.00

229,881.50 262,881.50

182,000.00
27,750.00
16,116.00

225,866.00 258,866.00

182,000.00
23,125.00
19,276.00

224,401.00 257,401.00

91,000.00
23,687.50
6,004.00

120,691.50 137,191.50

91,000.00
17,962.50
6,320.00

115,282.50 131,782.50

91,000.00
14,375.00
6,794.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
112,169.00 128,669.00

91,000.00
12,100.00
7,110.00

110,210.00 126,710.00

91,000.00
10,400.00
7,742.00

109,142.00 125,642.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

91,000.00
8,125.00
7,900.00

107,025.00 123,525.00

25,000.00
9,375.00
4,266.00
16,126.50

54,767.50 72,067.50

25,000.00
9,375.00
4,266.00

38,641.00 55,941.00

1,500,000.00
13,750.00
5,530.00

1,519,280.00 1,535,780.00

33,000.00
91,000.00
156.00
19,500.00

143,656.00 150,406.00

19,380.00
2,528.00

21,908.00 40,658.00

12,780.00
3,160.00

15,940.00 34,690.00

9,720.00
3,634.00

13,354.00 32,104.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
7,800.00
3,792.00

11,592.00 30,342.00

6,480.00
4,108.00

10,588.00 29,338.00

5,520.00
4,266.00

9,786.00 28,536.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

4,320.00
4,582.00

8,902.00 27,652.00

17,040.00
4,266.00

21,306.00 46,306.00

12,960.00
4,898.00

17,858.00 42,858.00

10,400.00
5,056.00

15,456.00 40,456.00

8,640.00
5,530.00

14,170.00 39,170.00

7,360.00
5,688.00

13,048.00 38,048.00

625.00
2,054.00

2,679.00 23,879.00

5,400.00
948.00

6,348.00 22,848.00

3,885.00

3,885.00 13,260.00

2,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

2,000.00 6,375.00

7,925.00
1,896.00

9,821.00 28,571.00

4,062.50

4,062.50 8,062.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

9,130,000.00
17,500.00
12,500.00

9,160,000.00 10,595,000.00

6,000,000.00
17,500.00
12,500.00

6,030,000.00 7,260,000.00

360,000.00
700.00

360,700.00 432,450.00

240,000.00
700.00

240,700.00 312,450.00

360,000.00
6,250.00

366,250.00 571,250.00

216,000.00
3,750.00

219,750.00 383,750.00

576,000.00
6,250.00

582,250.00 787,250.00

225,000.00
420.00
6,250.00
47,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

278,670.00 483,670.00

230,400.00
420.00
6,250.00
47,000.00

284,070.00 448,070.00

540,000.00
2,100.00

542,100.00 678,900.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

230,400.00
420.00
6,250.00
56,000.00

293,070.00 457,070.00

225,000.00
420.00
10,000.00
56,000.00
40,000.00

331,420.00 495,420.00

9,130,000.00
120,000.00
78,400.00

9,328,400.00 10,148,400.00

9,960,000.00
120,000.00
78,400.00

10,158,400.00 11,531,900.00

9,130,000.00
120,000.00
42,000.00

9,292,000.00 9,784,000.00

56,000.00
23,400.00
3,500.00

82,900.00 92,400.00

56,000.00
46,800.00
3,500.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
106,300.00 115,800.00

1,369,500.00
2,800.00

1,372,300.00 1,383,700.00

61,600.00
2,800.00

64,400.00 86,900.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

65,200.00
3,500.00

68,700.00 93,200.00

97,200.00
1,400.00

98,600.00 113,600.00

99,000.00
700.00

99,700.00 114,700.00

232,400.00
2,100.00

234,500.00 265,250.00

232,400.00
2,100.00
48,160.00
7,000.00

289,660.00 320,410.00

232,400.00
2,100.00
40,420.00
7,000.00

281,920.00 322,920.00

63,000.00
1,400.00
2,700.00

67,100.00 190,100.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
18,800.00
700.00

19,500.00 24,625.00

272,500.00
73,320.00
108,750.00

454,570.00 531,820.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

290,000.00
73,320.00
97,500.00

460,820.00 538,070.00

350,000.00
63,450.00
112,500.00

525,950.00 603,200.00

86,835.00
2,400.00

89,235.00 95,535.00

160,000.00
3,900.00
1,500.00

165,400.00 200,500.00

160,000.00
3,900.00
1,500.00

165,400.00 200,500.00

160,000.00
5,200.00
3,000.00
75,000.00
36,925.00
180,000.00

460,125.00 504,675.00

160,000.00
5,200.00
3,000.00
90,000.00
36,925.00
180,000.00

475,125.00 519,675.00

160,000.00
5,200.00
3,000.00
75,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
36,925.00
540,000.00

820,125.00 864,675.00

120,000.00
5,200.00
3,000.00
100,000.00
36,925.00
270,000.00
8,000.00

543,125.00 587,675.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

120,000.00
5,200.00
2,250.00
75,000.00
36,925.00
180,000.00

419,375.00 463,925.00

105,600.00
7,800.00
45,000.00

158,400.00 167,150.00

800,000.00
19,500.00
6,000.00
1,298,390.00
36,000.00
420,000.00
76,140.00
101,250.00

2,757,280.00 3,105,655.00

1,080,000.00
26,000.00
9,000.00
1,736,700.00
48,000.00
420,000.00
76,140.00
101,250.00

3,497,090.00 3,891,265.00

1,600,000.00
52,000.00
30,000.00
2,605,050.00
72,000.00
420,000.00
76,140.00
101,250.00
750,000.00
369,250.00
1,800,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
7,875,690.00 8,365,815.00

1,280,000.00
41,600.00
24,000.00
1,736,700.00
48,000.00
420,000.00
76,140.00
101,250.00
700,000.00
295,400.00
1,440,000.00

6,163,090.00 6,590,215.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,280,000.00
41,600.00
24,000.00
1,302,525.00
36,000.00
420,000.00
76,140.00
101,250.00
600,000.00
295,400.00
2,880,000.00

7,056,915.00 7,405,290.00

960,000.00
41,600.00
24,000.00
1,298,390.00
36,000.00
420,000.00
76,140.00
101,250.00
800,000.00
295,400.00
2,160,000.00

6,212,780.00 6,561,155.00

1,000,000.00
39,000.00
18,000.00
1,736,700.00
48,000.00
420,000.00
76,140.00
101,250.00
525,000.00
263,750.00
1,260,000.00

5,487,840.00 5,882,015.00

8,000.00
130.00
24,810.00
720.00
5,000.00
846.00
1,125.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

40,631.00 50,831.00

12,000.00
260.00
29,772.00
800.00
6,875.00
1,269.00
1,875.00

52,851.00 69,681.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

32,500.00

32,500.00 41,800.00

37,500.00

37,500.00 46,800.00

30,000.00
10,000.00
5,056.00

45,056.00 72,056.00

21,000.00
2,400.00

23,400.00 32,850.00

57,600.00
159,000.00

216,600.00 226,835.00

510,000.00
2,800.00

512,800.00 533,190.00

18,600.00
840.00
650.00
36,000.00

56,090.00 74,840.00

81,250.00
4,750.00

86,000.00 94,000.00

29,750.00
280.00

30,030.00 38,130.00

30,450.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
30,450.00 39,200.00

13,950.00
560.00

14,510.00 24,360.00

51,700.00
140.00

51,840.00 56,890.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

17,625.00
420.00

18,045.00 27,545.00

135,000.00
140.00

135,140.00 211,140.00

12,862.50
1,584.00

14,446.50 19,196.50

108,000.00
950.40
51,700.00

160,650.40 185,450.40

1,980.00
23,114.00

25,094.00 31,844.00

1,980.00
26,208.00

28,188.00 34,938.00

1,365,000.00
81,900.00

1,446,900.00 1,628,400.00

135,000.00
7,500.00
1,580.00

144,080.00 251,580.00

1,052,000.00
63,120.00
7,500.00
1,580.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
1,124,200.00 1,209,200.00

185,000.00
22,200.00
7,500.00
1,580.00

216,280.00 329,530.00

230,000.00
41,400.00

271,400.00 464,900.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

45,600.00
13,300.00

58,900.00 65,560.00

210,000.00
61,250.00

271,250.00 284,570.00

16,800.00
4,900.00

21,700.00 26,140.00

26,700.00
7,787.50

34,487.50 41,147.50

67,500.00
19,687.50

87,187.50 97,177.50

18,000.00
65.00

18,065.00 23,465.00

17,250.00

17,250.00 20,490.00

128,700.00
180,000.00
56,000.00

364,700.00 382,700.00

48,825.00
270.00
171,000.00

220,095.00 246,095.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

105,000.00

105,000.00 130,400.00

27,000.00

27,000.00 35,100.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

49,000.00

49,000.00 54,400.00

22,000.00

22,000.00 30,100.00

100,000.00

100,000.00 110,800.00

112,200.00

112,200.00 120,300.00

42,084.55
12,500.00
7,110.00
16,500.00

78,194.55 121,944.55

37,100.00
13,000.00
7,110.00
17,820.00

75,030.00 118,780.00

11,806.36
1,425.00
474.00
1,100.00

14,805.36 22,455.36

37,100.00
11,625.00
2,844.00
21,340.00

72,909.00 129,159.00

27,000.00
1,325.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

28,325.00 39,725.00

9,420.00
4,350.00
3,400.00
11,830.00

29,000.00 32,160.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

5,250.00
1,450.00
380.00
90.00

7,170.00 19,970.00

3,000.00
2,000.00
4,420.00

9,420.00 12,740.00

2,400.00
3,060.00

5,460.00 8,260.00

2,000.00
90.00

2,090.00 10,890.00

13,500.00

13,500.00 16,140.00

24,534.00
7,600.00

32,134.00 36,934.00

217,800.00
10,500.00

228,300.00 498,300.00

130,625.00
10,500.00

141,125.00 286,125.00

108,900.00
5,250.00

114,150.00 259,150.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
220,000.00
5,250.00

225,250.00 370,250.00

108,900.00
53,900.00
6,562.50

169,362.50 314,362.50

108,900.00
5,250.00

114,150.00 402,650.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

220,000.00
5,250.00

225,250.00 513,750.00

108,900.00
53,900.00
6,562.50

169,362.50 449,362.50

67,000.00

67,000.00 98,250.00
60,000.00 91,250.00
67,000.00 98,250.00
75,000.00 106,250.00
52,500.00 83,750.00
60,500.00 91,750.00
75,500.00 106,750.00
75,500.00 106,750.00
70,500.00 101,750.00
80,000.00 111,250.00
87,500.00 118,750.00
60,000.00 91,250.00
65,000.00 96,250.00
64,000.00 95,250.00

52,000.00
6,900.00

58,900.00 121,400.00

42,000.00
11,600.00
31,600.00

85,200.00 121,450.00

69,000.00
562.50
363.40

69,925.90 123,675.90
95,200.00 148,950.00
112,200.00 165,950.00

12,780.00
568.00

13,348.00 20,548.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

96,000.00
36,000.00
14,000.00
11,250.00
6,000.00
10,000.00

173,250.00 198,250.00

120,000.00
36,000.00
7,000.00
11,250.00
8,000.00
10,000.00
10,500.00
25,000.00
227,750.00 252,750.00

100,000.00
96,000.00
7,000.00
18,750.00
10,000.00
10,000.00

241,750.00 266,750.00

120,000.00
72,000.00
14,000.00
15,000.00
12,000.00
10,000.00

243,000.00 268,000.00

Mengetahui
Kepala Dinas Cipta Karya
Kabupaten Badung

Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN SWAKLOLA
BULAN MARET TAHUN 2012

NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
7 1 M2 PEMBUATAN BEDENG BURUH
8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM
9 1 M2 PEMBUATAN STEGGER DARI BAMBU
10 1 M2 PEMBUATAN JALAN SEMENTARA
11 1 M3 BONGKARAN BETON BERTULANG
12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER
4 1 M3 GALIAN TANAH KERAS DALAM 1METER
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER
8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER
9 1 M3 URUGAN KEMBALI
10 1 M3 PEMADATAN TANAH ( Per 20 Cm )
11 1 M3 URUGAN PASIR
12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM
13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
15 1 M3 URUGAN LIMESTONE PADAT

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU KALI CAMP. 1 PC : 3 PS
2 1 M3 BATU KALI CAMP. 1 PC : 4 PS
3 1 M3 BATU KALI CAMP. 1 PC : 5 PS
4 1 M3 BATU KALI CAMP. 1 PC : 6 PS
NO URAIAN PEKERJAAN
1 2
5 1 M3 BATU KALI CAMP. 1 PC : 8 PS
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M
8 1 M3 PASANGAN BATU KOSONG

IV PEKERJAAN DINDING (SNI 6897 : 2008)


1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS
3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS
4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS
5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS
12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)
13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI
14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM
15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM
7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM
8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM
13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')
NO URAIAN PEKERJAAN
1 2
17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
18 1 M2 PEKERJAAN ACIAN

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II
6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU
KELAS II (Lebar Sampai 90 Cm)
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU
KELAS II
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III
Bentang 6 M'

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I


15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II
22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II
23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III
MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA
24 KAYU KELAS II
MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA
25 KAYU KELAS II

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

VII PEKERJAAN BETON ( SNI 7394:2008)


1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
NO URAIAN PEKERJAAN
1 2
2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
5 1 M2 PASANG BEKISTING UNTUK PONDASI
6 1 M2 PASANG BEKISTING UNTUK SLOOF
7 1 M2 PASANG BEKISTING UNTUK KOLOM
8 1 M2 PASANG BEKISTING UNTUK BALOK
9 1 M2 PASANG BEKISTING UNTUK LANTAI
10 1 M2 PASANG BEKISTING UNTUK DINDING
11 1 M2 PASANG BEKISTING UNTUK TANGGA
12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON
13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)
14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)
15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)
16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING
18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)
19 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)
20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)
21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
6 1 M2 PEKERJAAN ATAP SIRAP
7 1 M2 PEKERJAAN ATAP NOK SIRAP
8 1 M2 PASANG ATAP ALANG-ALANG 3 M1
9 1 M2 PEKERJAAN ATAP SENG GELOMBANG
10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL
11 1 M1 PASANG NOK SENG GELOMBANG

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL
NO URAIAN PEKERJAAN
1 2
5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA
6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM
7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
3 MEMASANG 1 BUAH URINOIR
4 MEMASANG 1 BUAH WASHTAFEL KIA
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


1 1 KG PASANG RANGKA ATAP BAJA
2 1 M2 PASANG JENDELA NAKO
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
2 1 PS PASANG ENGSEL PINTU
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU
4 1 BH PASANG KAIT ANGIN
5 1 BH PASANG KUNCI SLOT
6 1 M2 PASANG KACA, TEBAL 3 - 5 MM

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM
2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM
3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM
5 1 M1 PASANG PLIN KAYU 2 X 10 CM

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
NO URAIAN PEKERJAAN
1 2
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

XV PEKERJAAN TETEMPELAN STYLE BALI


1 1 M2 PASANGAN BATA GOSOK 2 MUKA
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA
3 1 M2 PASANGAN BATA GOSOK 1 MUKA
4 1 M2 PASANGAN PARAS 1 MUKA
5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA
6 1 M2 PASANGAN BATA GOSOK DIUKIR
7 1 M2 PASANGAN PARAS DIUKIR
8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

XVI PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
2 Paving 10 x 20 cm tebal 6 cm K350
3 Paving 10 x 20 cm tebal 8 cm K225
4 Paving 10 x 20 cm tebal 8 cm K350
5 Paving 20 x 20 cm tebal 6 cm K225
6 Paving 20 x 20 cm tebal 6 cm K350
7 Paving 20 x 20 cm tebal 8 cm K225
8 Paving 20 x 20 cm tebal 8 cm K350
9 Paving 20 x 20 cm tebal 8 cm K425
10 Paving 20 x 20 cm tebal 10 cm K225
11 Paving 20 x 20 cm tebal 10 cm K350
12 Paving 20 x 20 cm tebal 10 cm K425
13 Paving Tiga Berlian tebal 6 cm K225
14 1 M2 PASANGAN GRASS BLOCK
15 1 M2 PASANGAN KORAL SIKAT
16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
17 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)
19 1 M2 PENGECATAN KANSTEIN
NO URAIAN PEKERJAAN
1 2

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
2 1 TITIK INSTALASI AC
3 1 TITIK INSTALASI TELEPHONE
4 1 TITIK INSTALASI MATV

Kepala Dinas Cipta Karya


Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001
AN SWAKLOLA

HARGA
3

Rp. 392,560.00
Rp. 99,760.00
Rp. 1,295,005.00
Rp. 1,095,705.00
Rp. 1,324,850.00
Rp. 4,000.00
Rp. 1,068,705.00
Rp. 245,540.00
Rp. 16,515.00
Rp. 82,080.00
Rp. 266,680.00
Rp. 266,680.00

Rp. 30,000.00
Rp. 36,000.00
Rp. 42,000.00
Rp. 40,000.00
Rp. 60,000.00
Rp. 48,000.00
Rp. 2,000.00
Rp. 13,200.00
Rp. -
Rp. 132,000.00
Rp. 132,000.00
Rp. 21,000.00
Rp. 142,000.00
Rp. 116,000.00
Rp. 112,000.00

Rp. 638,880.00
Rp. 595,660.00
Rp. 565,702.00
Rp. 544,638.00
HARGA
3
Rp. 515,772.00
Rp. 1,676,462.00
Rp. 557,992.00
Rp. 307,950.00

Rp. 282,015.00
Rp. 270,565.50
Rp. 262,881.50
Rp. 258,866.00
Rp. 257,401.00
Rp. 137,191.50
Rp. 131,782.50
Rp. 128,669.00
Rp. 126,710.00
Rp. 125,642.00
Rp. 123,525.00
Rp. 72,067.50
Rp. 55,941.00
Rp. 1,535,780.00
Rp. 150,406.00

Rp. 40,658.00
Rp. 34,690.00
Rp. 32,104.00
Rp. 30,342.00
Rp. 29,338.00
Rp. 28,536.00
Rp. 27,652.00
Rp. 46,306.00
Rp. 42,858.00
Rp. 40,456.00
Rp. 39,170.00
Rp. 38,048.00
Rp. 23,879.00
Rp. 22,848.00
Rp. 13,260.00
Rp. 6,375.00
HARGA
3
Rp. 28,571.00
Rp. 8,062.50

Rp. 10,595,000.00
Rp. 7,260,000.00
Rp. 432,450.00
Rp. 312,450.00
Rp. 571,250.00
Rp. 383,750.00
Rp. 787,250.00

Rp. 483,670.00

Rp. 448,070.00
Rp. 678,900.00
Rp. 457,070.00

Rp. 495,420.00

Rp. 10,148,400.00
Rp. 11,531,900.00
Rp. 9,784,000.00
Rp. 92,400.00
Rp. 115,800.00
Rp. 1,383,700.00
Rp. 86,900.00
Rp. 93,200.00
Rp. 113,600.00
Rp. 114,700.00
Rp. 265,250.00

Rp. 320,410.00

Rp. 322,920.00
Rp. 190,100.00
Rp. 24,625.00

Rp. 531,820.00
HARGA
3
Rp. 538,070.00
Rp. 603,200.00
Rp. 95,535.00
Rp. 200,500.00
Rp. 200,500.00
Rp. 504,675.00
Rp. 519,675.00
Rp. 864,675.00
Rp. 587,675.00
Rp. 463,925.00
Rp. 167,150.00
Rp. 3,105,655.00
Rp. 3,891,265.00
Rp. 8,365,815.00
Rp. 6,590,215.00
Rp. 7,405,290.00
Rp. 6,561,155.00
Rp. 5,882,015.00
Rp. 50,831.00
Rp. 69,681.00

Rp. 41,800.00
Rp. 41,800.00
Rp. 72,056.00
Rp. 32,850.00
Rp. 226,835.00
Rp. 533,190.00
Rp. 74,840.00
Rp. 94,000.00
Rp. 38,130.00
Rp. 39,200.00
Rp. 24,360.00

Rp. 56,890.00
Rp. 27,545.00
Rp. 211,140.00
Rp. 19,196.50
HARGA
3
Rp. 185,450.40
Rp. 31,844.00
Rp. 34,938.00

Rp. 1,628,400.00
Rp. 251,580.00
Rp. 1,209,200.00
Rp. 329,530.00
Rp. 464,900.00
Rp. 65,560.00
Rp. 284,570.00
Rp. 26,140.00
Rp. 41,147.50
Rp. 97,177.50
Rp. 23,465.00

Rp. 20,490.00
Rp. 382,700.00
Rp. 246,095.00

Rp. 130,400.00
Rp. 35,100.00
Rp. 54,400.00
Rp. 30,100.00
Rp. 110,800.00
Rp. 120,300.00

Rp. 121,944.55
Rp. 118,780.00
Rp. 22,455.36
Rp. 129,159.00
Rp. 39,725.00

Rp. 32,160.00
HARGA
3

Rp. 19,970.00
Rp. 12,740.00

Rp. 8,260.00
Rp. 10,890.00
Rp. 16,140.00
Rp. 36,934.00

Rp. 498,300.00
Rp. 286,125.00
Rp. 259,150.00
Rp. 370,250.00
Rp. 314,362.50
Rp. 402,650.00
Rp. 513,750.00
Rp. 449,362.50

Rp. 98,250.00
Rp. 91,250.00
Rp. 98,250.00
Rp. 106,250.00
Rp. 83,750.00
Rp. 91,750.00
Rp. 106,750.00
Rp. 106,750.00
Rp. 101,750.00
Rp. 111,250.00
Rp. 118,750.00
Rp. 91,250.00
Rp. 96,250.00
Rp. 121,400.00
Rp. 121,450.00
Rp. 123,675.90
Rp. 148,950.00
Rp. 165,950.00
Rp. 20,548.00
HARGA
3

Rp. 198,250.00
Rp. 252,750.00
Rp. 266,750.00
Rp. 268,000.00

ipta Karya
Badung

Dharmayanty, M.T
Tk. I
994032001
DAFTAR HARGA SATUAN BAHAN TAMBAHAN
BULAN APRIL TAHUN 2010
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN


1 2 3

BATU
Batu Candi
1 20x20x2 m2
2 15x30x2 m2
3 20x30x2 m2
4 20x40x2 m2
5 30x30x2 m2
6 40x40x2 m2
7 30x60x2 m2
8 20x40x3 m2
9 30x30x3 m2
10 30x30x5 m2
11 40x40x5 m2

Palimanan putih
1 20x20x2 m2
2 20x30x2 m2
3 20x40x2 m2
4 20x40x3 m2
5 30x30x3 m2

Palimanan Serat Kuning


1 20x30 m2
2 20x40 m2
3 15x30 m2

Palimanan Cirebon
1 15x30x2 m2
2 20x30x2 m2
3 20x40x2 m2
4 30x30x2 m2

Alur Bali Green Lurus


1 20x30 m2
2 20x40 m2

Alur Bali Green Cukil


1 20x30 m2
2 20x40 m2
3 20x20 m2

Batu Bali Green


1 15x30 m2
2 20x30 m2
3 20x40 m2

Harga Barang dan Upah Hal. 245


NO NAMA BARANG SATUAN
1 2 3
4 40x40 m2

PARAS
Paras Kerobokan
1 20x40x3 Bj
2 20x40x5 Bj

Paras Kelating
1 20x40x3 Bj
2 20x40x5 Bj

Alur Andesit Lurus


1 20x40 m3
2 30x60 m3

Alur and cukil


1 20x40 m2
2 15x30 m2

Alur And Gelombang m2


Alur And Gelombang lurus m2

Random Singaraja m2
Random Cirebon m2
Random Jember m2

Harga Barang dan Upah Hal. 246


AMBAHAN

HARGA SATUAN
4

78,000.00
78,000.00
78,000.00
80,000.00
80,000.00
105,000.00
115,000.00
135,000.00
135,000.00
165,000.00
185,000.00

65,000.00
67,000.00
68,000.00
110,000.00
110,000.00

75,000.00
75,000.00
75,000.00

72,000.00
73,000.00
75,000.00
80,000.00

105,000.00
105,000.00

105,000.00
105,000.00
105,000.00

75,000.00
75,000.00
75,000.00

Harga Barang dan Upah Hal. 247


HARGA SATUAN
4
80,000.00

6,000.00
8,000.00

6,000.00
8,000.00

135,000.00
140,000.00

135,000.00
135,000.00

140,000.00
140,000.00

25,000.00
65,000.00
45,000.00

Harga Barang dan Upah Hal. 248


LAMPIRAN
SUMBER DATA
NO KABUPATEN SUMBER DATA ALAMAT
1 Badung Utara - UD. Ubud Sari Jaya Jl. Raya Sangeh Petang
- UD. Surya Br. Plakan Sibang Kaja
- Dwi Putri Jl. Darmasaba - Lukluk

2 Badung Tengah - UD. Ron Anyar Jl. Raya Canggu, Kerobokan


- Mitra 10 Jl. Gatsu Barat
- PT. Budi Aluh Jl. Raya Kapal
- CV. Mertanadi Br. Perang Sempidi
- Karya Indah Jl. Raya Kapal

3 Badung Selatan - Indah Jaya Jl. Bay Pass Nusa Dua No. 69
- Dewa Brata Jl. Raya Kuta
- Mekar Abadi Bangunan Jl. Bay Pass Nusa Dua
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TAHUN 2009

NO NAMA BARANG SATUAN HARGA


1 2 4 5
1 Gedeg Klas I m2
2 Genteng Beton bj
3 Genteng Bubungan Lokal bj
4 Genteng Bubungan Beton bj
5 Genteng Bubungan Karang Pilang bj
6 Genteng Bubungan Plentong bj
7 Genteng Kaca bj
8 Genteng Kodok bj
9 Genteng Lokal bj
10 Genteng Plentong bj
11 Genteng Plentong Dicat bj
12 Batu Bata Pasangan Kelas I bh
13 Batu Belah 15-30 cm m3
14 Batu Karang m3
15 Batu Lahar Merah Singaraja m3
16 Batu Padas bh
17 Batu Pipih Singaraja m3
18 Batu Pecah 0.5 - 1 cm m3
19 Batu Pecah 1 - 2 cm m3
20 Batu Pecah 2 - 3 cm (Manual, Mesin) m3
21 Batu Pecah 3 - 5 cm (Manual, Mesin) m3
22 Batu Pecah 5 - 7 cm (Manual) m3
23 Batu Pecah 7 - 10 cm m3
24 Besi Beton kg
25 Kayu Albesia Balok m3
26 Kayu Albesia Papan / Usuk m3
27 Kayu Bingkirai Balok m3
28 Kayu Bingkirai Papan / Usuk / Reng m3
29 Kayu Dolken (Pekerjaan Sementara) btg
30 Kayu Jati Balok m3
31 Kayu Jati Papan m3
32 Kayu Kamper Balok m3
33 Kayu Kamper Papan/ Usuk / Reng m3
34 Kayu Kruing Balok m3
35 Kayu Kruing Papan / Usuk / Reng m3
36 Kayu Meranti Balok m3
37 Kayu Meranti Papan / Usuk / Reng m3
38 Kayu Merbau Balok m3
39 Kayu Merbau Papan m3
40 Kayu Perancah / Begesting m3
41 Kayu Profil m1
42 Pasir Beton m3
43 Pasir Pasang m3
44 Pasir Urug m3
45 Semen PC 40 Kg kg
46 Semen PC 50 Kg kg
47 Semen warna/semen grouting kg
1481900
5400000
28000000
399400
1890000
534000

37,705,300

5400