Sei sulla pagina 1di 84
4 > The speed on a road in Doha is 60 mph ond the density estimated at that speed is 16 vphpl the approximate flow rate on that section is Select one ‘A. 1200 vphpl 8, 4.00 vphp! © seovphol v/- D. 900 vphpi L60k%)D 2- Consider the following statements 1, Shape factor Z length of the beam & type of loading 4. yield strength of material Which of these affect the influence length plastic hinge in a beam? Select one a, Lonly 3 vez and 3} 7 nda 3+ Which of the following statement (8) is true? Select one [A. Project managements becoming a standard way of doing business 8. Project management is replacing middle management as a way to get things done. . Project management is use primarily with large projects. D. Both A and B are true E. Both A Band Carealltrue // 4 The mast important and state of project initiation is: Select one ‘A. Management assigns a project manager B, Management provides the budget required C. Management agrees to the details of works to be done D. Management approves the project charter E, none of the above 5+ theultimate compression capacity-of alle in clay is glven by Qu =9 Ap Cac (r DL) Where C= cohesion , Ap= cross section aréa atthe pllé tip , a= skin frlction factor D=plle diameter and L=length ‘The ultimate tension capacity of the pile shown below is approximately (take D=0.4m and ‘Ignore the effect of ple weight: ‘Medium silt day y=18.1 kim? -—— (C60 knym? a7 Select one A. S95 KN € swaY (MewDLY e coe a oh Abo FHKE NHS 2 O2A-46 Compaction in backlngs used fr: Select one: A Crushing of ol particles, 8. Reducing of water content Reducing of air content. D. None of the above, Inrelnforced conerete design. Select one: [A Concrete in tension side has major effect. Concrete in resist the tension testes, Concrete inthe tension side neglected. . Concrete cannot resist the compressive stresses. Shear spans defined asthe zone where Select one AA Bending moment i zero B. Shen force tse / ©. Shear forces constant D. Bending moment is constant Sand drain ae used to: Select one: Help in compacting sand layers increase hearing capacity of cry baci Enhance the permeability of rock masses, Accelerate the consolidation process Consider the follwing activites: Select one: Pouring of concrete Erection of formwork Caring of eonerete Removal of formwork What the correct sequente a network of there activites? A 1234 B 2143, c 2434, b. 1324 ( eeNe gone ® re . 1L1- For the shown below , use the virtual work method to find the following ( take E=250 Gpa {250 X 10%6 kN/m?} and A=350mm? forall members) Ino loads act on the truss and member AB is 3mm short. Then the vertical Displacement of joint Cis: ate J © Som com 0. “3mm 12: Design / Build means that Select one: ‘A. One company is responsible for both design and construction 8. Construction begins hefore design is complete The project is technically complex 6, Both (Aand B) 413- Consider the following statement n work breakdown structure: 1. Itisgraphical representation of entire programmer. 2. ‘The Top - Down approach to planning is adopted. 3. The-Down--Top approach to planning Is adopted. 4. Itissultable for complex projects. Which of the above statement is/are correct? Select one: A tonly B. 2and4 © Aonly D. 3and4 14 What is proctor compattion test? Select one: ‘A. To check maximum dry density B. To check minimum dry density © Tocheck normal dry density J D. Tocheck high density 15- Based on an experiment, itis determined that the average liner flow velocity of an aquifer is Am/day when the hyydraulle gradient is 0.0004. A sample of the aquifer is tested and found to have a porasity of 15% Estimate the hydraulic conductivity of this aquifer. Select one: A. 400m/day B, 0,027 m/day C375 m/day D. 0.00006 m/day :16- What would an initial investment of 1 milion QR after 5 years ifthe APR=9% accumulated ‘monthly? F=P(1+l)"'n Select one: A 1,565,681 0R 8. 1,538,6240R / C 4,711,867 OR D, 1,450,000 0R 117- The slope at C (the mid — span of the beam)for the beam shown below Is: Select on A. Zero 8. 2946.66/E1 Cc. 16666.57/8) D. 3333.33/61 ve ‘The hearing capacity of soll is a function of: Select on A. Soilshear strength parameters B._Unitweight of sol C._Foundation dimensions D. Allofthe above 19+ Ifa specification is incontlit with a note the drawings, which statement is correct? Select one: ‘A. Details take precedence over notes. B._ Details take precedence over drawings. C._ Specifications take precedence over drawings. . Drawings note take precedence over Specifications. 20- Inthe limit state method, balanced design of a reinforced concrete beam gives, Select one: ‘A. Smallest concrete section and maximum area of reinforcement. 8. Largest conerete section and maximum area of reinforcement. €. Smale conceteseton and minim area freforeement: // D. Largest concrete section and minimum area of reinforcement. 21- Traffic counts were taken on a minor arterial street forfour consecutive 15-minutes periods dlring the street itis peak hour. The 15-minute counts were 230, 210, 80, and 350. The peak hour factor (PHF fr the minor artrlal is: Select one: A, 065 8 oss ©. 080 vb. 0.774) £120 22: What Is the “yield strength’ for most reinforcing bar? Select one: a, aooma VJ 3. 300MPs c. 600 MPa gt D. 100MPa eae 23+ Consider the following stipulations In designing @ laced column: 4. Single facing systems on opposite planes shall preferably be In the same direction so that one's the shadow of the other. 2. Lacing bar should be- flat section. 3, Theslenderaess ratios ofthe lacing bars for compression shell not exceed 180, 44 Laced compression members are tobe provided with tieplates at ends, ‘Which ofthe above observations is/are correct? Select one: A. only 8. anda c 2anda D. tanta ¥/ 24- If an isola footing with an area of :25 mls needed to carty .0.25m X0.8m column, the best footing shape would be : Select one: ‘A. Square with 1.5m width B._ Rectangular with dimensions of 2.25 m x1.80 m //” CC. Rectangular with dimensions of .0 m X2.25 m D._Greular with a dimensions of 2.7 m 25- Determine the total volatile solds(1V5)n g/ml based on the folowih data. Two hundred fifty rivers ofa wastewater sample was added to an evaporating dish. The weight of the empty ish was 24.5087 g the dish and sample were placed ina drying oven at 105°C and removed ater all of the water evaporated, Once the dish returned ta roam temperature; it was Resweighed and found to be 5.7894, then the dish was put ina furnace at SSO"C and removed after several hours. Once the dish returned to room temperature, it was re-welghed deat ‘And found to be 24.89%. % Select one: os A 0.0035 emt. v/ oe A D B. 0.0091 g/mL a9 © 0.0076 g/mt x ah D, 0.0252.6/mL. rr eg 1, The strength of material is defined as: a) Ability of material to resist external forces. g 1b) Ability of material to resist deformation. oO Ability of material to with stand external loads. oO @)_ None ofthe above a 2. stress means: Is the internal forces developed in materiai due to external forces. g 'b} Ability to resist external forces o )_ Deformation in material caused of external forces. oO d) Forces applied perpendicular to the longitudinat axis of a member. oO 3, The SPT-N values of Dense sandis equal to: a) 0-20 ga 20-40 gag ¢) Larger than 50 O d) 100 ag A 4s 4. In above truss. the temp of member BC changed by 100 F the cisplacement of point isequalto: LT 352mm Oo b) 9.83 mm } 83mm g } None ofthe above. 5 5. Gitgghpatn mea AG ensuite bina. Q Hib) Shortest sequence of activities path in a project. Go ) The path that have the maximum resources assigned, H d)_ The path with the longest tasks in project. 6 Add-Mixture are used in concrete for: 1. Increasing strength of concrete. 2. Reduce heat of concrete. 3. Toincrease workability of concrete. 4. Increase air content, a) 182 b) 283 BAG d) 184 CP pert chart the time estimate of activity is caleulated by: a) Normal. 8). Binomial Logarithmic None of the above, // 8, The value of concrete cube strength is given at: 2) 1 day. b) Bday. 28 days ‘d) 35 days. For simply supportes beam the shear and flexural stresses wll equalto Zero at a). Endsuppors. b) Middle of the span end above neutral axis. Xa Wide ofthe span and onthe nevtral as, )_ End Supports and below neutral axis, 10, The summation of internal angles of 6 sides polygon: a) 360, bl 540. 720, None of the above, 12. Ministry of urban planning need to construct an exibition center the location ofthis center should be next to a) Airport 8) Buses stations. ina high population area. d) In aremote area. 47 12. ASHGAL responsible for: a) Responsible of public housing. bb) Responsible of electrical and water services. ) Responsible of urban planning Ji None ofthe above 9000 0000 coop ocooo ooo o000 ooo 13. Compaction in backfilling is used For: a) Reducing water content in backfilled material J8 Reducing air content in backfilled material )_ Crushing of stones in backtilled material 1d) None of the above. Diss cangonen oats abide rotcn press a) Silica. b) Alumina, c) Calcium sulfate. 9 Nowwotie above. 7 15. Ultra sonic pulse testis: JI None destructive test 2). Used in smooth concrete surfaces 3) A destructive test 4), Used for testing of soll. 182 b) 3 only 384 @) None of the above. 46.1) Coneet pouring. (9) 2) Shutter striking. a 3) Shutter erection. 4) Curing. @ ‘The correct sequence of work for concrete works given by a) 41-23 wn 342 6) 3412 a) 2134 27, Sump testis used for

Potrebbero piacerti anche