Sei sulla pagina 1di 4

MORADABAD INSTITUTE OF TECHNOLOGY

DEPARTMENT OF MECHANICAL ENGINEERING


Ram Ganga Vihar, Phase II, Moradabad-244001 (U.P)

SEMINAR REPORT

E-CALL

Submitted in the partial fulfillment of the requirements of the Degree of

BACHELOR OF TECHNOLOGY

In

MECHANICAL ENGINEERING

Submitted to Submitted by
Mr. Rakesh Kumar Gangwar Jitin Kumar
Mr. Vikas Rastogi Roll No-1508240063
(Assistant Professor)

Session: 2017-2018

i
CERTIFICATE

This is to certify that report entitled E-Call which is submitted by us in partial fulfillment

of the requirement for the award of Degree in Mechanical Engineering, MIT, Moradabad is

a record of his own work under my supervision.

SEMINAR INCHARGE SEMINAR GUIDE


Mr. Rakesh Kumar Mr. Rakesh Kumar
Mr. Vikas Rastogi Assistant Professor
Assistant Professor

ii
ACKNOWLEDGEMENT

On the very outset of this report we would like to extend our sincere and artful obligation

towards Mr. Rakesh Kumar Gangwar, Assistant Professor, seminar incharge Mr. Rakesh

Kumar Gangwar & Mr. Vikas Rastogi who have helped us in this internship. Without their

active guidance, help, cooperation & encouragement we would not have made headway in

the training report.

Our heartfelt gratitude goes to all faculty members and staff of Mechanical Engineering

Department, who with their encouraging and caring words and most valuable suggestions

have contributed, directly or indirectly, in a significant way towards completion of this

internship training report.

We indebted to all our classmates for taking interest in discussing our problem and

encouraging us.

We owe a debt of gratitude to our parents for their consistent support, sacrifice, candid views,

and meaningful suggestion given to us at different stages of this work.

Last but not the least we are thankful to the Almighty who gave us the strength and health for

completing our project report.

Signature......................
Name.............................
Roll No..........................
Date...............................

iii
TABLE OF CONTENT

Chapter 1 Introduction 1
Chapter 2 Relevance 2-6
2.1 Need To Reduce The Accident Response Time 3
2.2 ARDWARES Required 3
2.3 Elements in E-call 4
2.3.1 PSAP (Public Service Access Point) 4
2.3.2 MDS (Minimum Data Set) 4
2.3.3 Emergency Call Number E112 5
2.4 Principle 5
2.5 Working 6
Chapter 3 Future Scope 7-15
3.1. E-Call IVS 8
3.2 Implementation 9
3.2.1 Crash Sensor 10
3.2.2 ECALL Box 10
3.3 Design Considerations For An IVS 11
3.4 Types Of Sending MDS 12
3.4.1 DTMF Messaging 12
3.4.2 UUS-Messaging 12
3.4.3 USSD-Messaging 12
3.5 Steps Involved In Detection Of Accident 14
3.5.1 Pre-Certification 14
3.5.2 Application Tests 15
3.5.3 Environmental Tests 15
Chapter 4 Benefit And Draw Backs 16
Chapter 5 Conclusion 17
References 18

iv

Potrebbero piacerti anche