PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT LIGHTING TRANSFORMERS


(150KVA)
IDCT PMCC

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 1 of 2


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date: 22-6-17

1. Board Details

1 STATION NAME/BOARD Unit 3 & 4


2 AREA/LOCATION IDCT PMCC
3 DRAWING NUMBER 6454 0307
4 RATING 150KVA

2. Verification of Name Plate Details

Pri Sec
Sl. No. Terminal Insulation
Make VA ( V) ( V) Type
Marking Class
179833/15 KALPA - - 415 415 F DYN11

Acceptance Criteria: Shall be as per approved Drg.

3. Verification Of ratio at all taps

Taps Reference Primary (V) Secondary (V) Results


R Y 404.1 437 OK
Tap-1 YB 405 436 OK
B-R 402.9 436 OK
R Y 402.5 423.7 OK
Tap-2 YB 402.8 425 OK
B-R 401.3 424.8 OK
R Y 406.6 406.6 OK
Tap-3 YB 407.3 407.4 OK
B-R 405.2 408.0 OK
R Y 404.4 395.3 OK
Tap-4 YB 403.2 392.7 OK
B-R 402.1 395.2 OK
R Y 407.1 380.4 OK
Tap-5 YB 407.4 381.1 OK
B-R 407.6 381.7 OK
Acceptance Criteria: Shall be +/-0.5 percent of the declared ratio

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. Rajesh S Testing Engr.
BGRESL Rathina Kumar D Dy.Manager
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION

TEST REPORT LIGHTING TRANSFORMERS


(150KVA)
IDCT PMCC

CLIENT ODHISHA POWER GENERATION CORPORATION LTD Page 2 of 2


EPC-BOP BGR ENERGY SYSTEMS LTD - POWER PROJECT DIVISION Date: 22-6-17

4. Measurement of Winding Resistance

Primary in (m) Secondary in (m)


Taps Results
R- Y Y-B B-R r-y 8.12

Tap 1 13.51 13.50 13.5 y-b 8.15 OK

Tap -2 13.75 13.71 13.72 br 8.13 OK

Tap 3 14.20 14.19 14.21 rn 4.08 OK

Tap -4 14.45 14.44 14.44 yn 4.01 OK

Tap - 5 14.92 14.93 14.89 bn 4.04 OK

Acceptance Criteria: Value shall be approximately equal to Factory value (Due to Temperature,
value might vary)

5. Measurement of IR Value

Time in Sec. Primary to Earth Secondary to Primary to


(M ) earth(M ) Secondary(M )
10 S >1G >1G >1G
60 S >1G >1G >1G

600 S >1G >1G >1G

Acceptance Criteria: Value shall be approximately equal to Factory value (Due Temperature value
might vary)

5. Remarks

Test results of all the Control Transformers in the board found satisfactory

NAME DESIGNATION SIGNATURE DATE


TEST ENGR. Rajesh S Testing Engr.
BGRESL Rathina Kumar D Dy.Manager
OPGCL

Potrebbero piacerti anche