TOROMOCHO PROJECT
Ceramic Lining
DISTRIBUTION A B C 0 1 2 3 4 5 6 7 8 9 10
Client
Procurement 5/03
Field
Internal Review
Note: Signed originals on file
Project No. C-560
Technical Specification 000-TS-M-296E
Ceramic Lining
Rev. 0
INDEX
PAGE
1 SCOPE ..................................................................................................................................3
5 EQUIPMENT DESCRIPTION................................................................................................4
Q:\Doc_Control\R0534200\01_Eng_Doc\06_Mec\03_Technical_Specifications\560-000-TS-M-296E_0.doc
2/7
Project No. C-560
Technical Specification 000-TS-M-296E
Ceramic Lining
Rev. 0
1 SCOPE
This specification covers the minimum requirements for furnishing labor, tools, materials,
equipment, supplies, services and transportation necessary to design, detail, furnish,
manufacturer, assemble, test and deliver Ceramic Lining, but specifically exclude work
listed in Section 2. All are part of the Toromocho Project, property of Minera Chinalco
Per S.A., located in central Peru in the Morococha Mining District, Yauli Province, Junin
Department.
Vendor shall furnish drawings, data and descriptive information in the detail and quantity
required by the Vendor Document Requirement Schedule (VDRS).
The Vendor's scope of supply shall include, but is not limited to all the items
stated in the Material Requisition N 560-000-MR-M-296E, Ceramic Lining.
Aker Solutions drawings included with this requisition are for reference only.
Vendor shall design and supply all molded rubber and ceramic lining and submit
approval drawings to Aker Solutions for review. These drawings will eventually
supersede the relevant Aker Solutions drawings.
Q:\Doc_Control\R0534200\01_Eng_Doc\06_Mec\03_Technical_Specifications\560-000-TS-M-296E_0.doc
3/7
Project No. C-560
Technical Specification 000-TS-M-296E
Ceramic Lining
Rev. 0
2 WORK EXCLUDED
Design shall comply with all standards and codes stated in this and attached
specifications (see Appendix A, Standard Technical and Site Data.) and local laws,
ordinances and regulations.
In the event of difference between codes and/or standards, the most stringent code or
standard shall apply. Whenever reference is made in an Equipment Specification to a
specific code or standard, it shall be understood that the latest edition of such reference,
as of the date of proposal, shall govern.
Site data, design conditions and general engineering requirements are specified in
Appendix A, Standard Technical and Site Data, Document No. 000-OT-M-001.
The components and assemblies supplied in accordance with this specification and all
attachments shall be suitable for outdoor installation, and the design of the equipment
shall be intended for continuous operation 24 hours per day, 7 days per week, and 365
days per year for 25 years, except for the liner material.
5 EQUIPMENT DESCRIPTION
5.1 General
Q:\Doc_Control\R0534200\01_Eng_Doc\06_Mec\03_Technical_Specifications\560-000-TS-M-296E_0.doc
4/7
Project No. C-560
Technical Specification 000-TS-M-296E
Ceramic Lining
Rev. 0
5.2.1 General
Corrocube and Corrotile wear liners are comprised of high density ceramic cubes
or tiles molded in a high-tensile strength rubber matrix mounted on a steel
backing plate.
Ceramic cubes or tiles shall be blue type; this means P95 ceramic, 95% Alumina
content to improve wear resistance.
For the Toromocho project, this type of liner shall be attached to the chute
platework by two alternate fixing methods. The selected method per area of
installation is indicated in the details drawings.
Fixed by Stud bolts: the liners shall be supplied with bolts attached by stud
welding to the backing plate.
Fixed by Unistrut type attachment: liners shall be attached by an intermediate
hold down liner. The hold down liner shall be bolted to the platework with the
assistance of low profile unistrut. The unistrut shall be located and welded in
the shop by the platework fabricator.
The geometry and backplate characteristics for each type of liner shall be
different as per the attachment method selected. The design drawings provided
by Aker Solutions indicate the fixing method per chute liners area.
Liners shall be complete including all the fixing hardware.
Q:\Doc_Control\R0534200\01_Eng_Doc\06_Mec\03_Technical_Specifications\560-000-TS-M-296E_0.doc
5/7
Project No. C-560
Technical Specification 000-TS-M-296E
Ceramic Lining
Rev. 0
6 TESTING
6.1 Testing
Prior to preparation for shipping, the equipment shall be assembled and tested in
accordance with the manufacturer's conditions which shall warrant the
equipment's performance upon proper assembly at the job site. The Bidder shall
notify the Buyer ten days in advance of the above scheduled tests. An
authorized representative of the Buyer shall have free entry to observe all tests
while they are in progress.
Testing shall include functional testing of the equipment items and of the system.
All items shall be provided with adequate lifting lugs to facilitate unloading and
handling prior to erection and shall be properly braced and supported for handling
and shipment. Lugs shall be painted yellow.
The roads in Per leading to the Toromocho Project jobsite in central Per
contain tunnels, bridges, underpasses and drop-offs that restrict the passage of
over dimensional and overweight loads.
For the size and weight limitations for all in-country overland (truck) shipments of
equipment and components being furnished by equipment Suppliers and
Contractors for the Project, see Appendix T, Transport Constraints (document no.
000-RP-R-001).
It is the responsibility of the individual Supplier or Contractor to review and
comply strictly with the information contained in above document.
Failure to comply with the load size restrictions shall impact the project
construction schedule. All costs incurred in correcting the situation caused by
non-compliance shall be for the account of the responsible Supplier or
Contractor.
Q:\Doc_Control\R0534200\01_Eng_Doc\06_Mec\03_Technical_Specifications\560-000-TS-M-296E_0.doc
6/7
Project No. C-560
Technical Specification 000-TS-M-296E
Ceramic Lining
Rev. 0
7 LIST OF ATTACHMENTS
The following documents are a part of this specification, and are included in the Material
Requisition N 000-MR-M-296E.
Q:\Doc_Control\R0534200\01_Eng_Doc\06_Mec\03_Technical_Specifications\560-000-TS-M-296E_0.doc
7/7