HCMC, Sep 17
Rosneft Vietnam
1
LAN DO HYDRATE FORMATION CURVE
System conditions
90
Temperature Deg C 13
Pressure bar 90
Water TDS added (chloride 17,500 ppm) Deionized Water
Hydrate formation temperature Deg C 14.2 15.6
Hydrates Type II Type II
Sub-cooling Deg C 1.2 2.6
2
LAB TEST RESULTS
Batch 01: Pressure 90 barg, Temp. 13 Deg C Duration 07 days
Fail Hydrate Forming
- At 90 barg and 11.5C hydrate readily forms with all blank cells (both rocking and static).
- 0.5 vol%: passed no hydrate form in 3 cells
- 0.3 vol%: 01 cell recorded hydrate formation
- 0.1 vol%: 03 cells recorded hydrate formation
4
ASSESSMENT OF UNCERTAINTIES
Seabed temperature measurement: Each Lan Do well are fitted with 02 TTs. The
lowest value among the 04 TTs is used for study. Thus, uncertainties in seabed
temperature are considered low.
Hydrate formation curve: The hydrate curve generated by Multiflash software has been
verified by HET test in Laboratory so the hydrate curve has a low level of uncertainty
Hydrate predicted for Lan Do is Type II which is made of Propane, i-butane, n-butane
6
ASSESSMENT OF UNCERTAINTIES
KHI injection quantity measurement: by tank level and the calibration pot on pump.
LT on Tank: accuracy 0.5% while 1% level is equal to 148 liters. The error is 74 liters
almost equal to injection rate.
Calibration pot: 200ml with 10ml division => uncertainty could be 5 ml due to
difference in angle of sight. Current practice is measure 55ml/min => error could be
7.2 liter/d ~ 9%
Uncertainty is relatively low with consideration to install new KHI flow-meter on IRCD
(FCP required).
7
Calibration Pot
ASSESSMENT OF UNCERTAINTIES
8
Recommendations - Option 1
Keep the current 0.5vol% dosing rate .No further reduction will be made.
Concerns : NO
14.5
Deg C 0.3vol% KHI
Seabed Temp.
< 14.5
Deg C 0.5vol% KHI
Concerns associated:
Normal operations: More complex in operations which might lead to human error on
not injecting the required rate
Planned Shut-down: increase injection rate to 0.5vol% prior to shut-down
Un-planned shut-down: it is not possible to increase the KHI if sea-bed temperature
decrease during the shut-down period. In this case, depressurization is required after 2
days.
10
Recommendations - Option 2
14.5
Deg C NO KHI
Seabed Temp.
< 14.5
Deg C 0.5vol% KHI
Concerns associated:
Normal operation: More complex in operations which might lead to human error on
not injecting the required rate
12
Recommendations - Option 3
1. Further reduce KHI injection from 0.5vol% to 0.3vol% with below notes FCP to be
processed by Dec 17
Planned shut-down: increase injection rate prior to shut-down
Unplanned shut-down: the effectiveness duration of KHI is reduced from 7 days to
3.5 days. Depressurization is required after 2 days of shut-down.
15
BACK UP
18
BACK UP
20
BACK UP
Seawater Temp. at LD-P2: TI11218
21