1 1 2 1 +1 2
2 (2 ) = (1 2 + 2 (1 2 ) ) (7) 12 = 22 [ 1+2 ] + 2 [ ]+ [1 +
1 +2 1 2 1 +2
1 ( )2
2 4 (1 +2 ) ] (GLPC of previous 2 wells)
Recalling Eq. (4), the author gets allocation for the 1 2
rest of the wells, in this case this is the first well:\ 3 = 3 32 + 3 3 + 3 (GLPC of 3rd well)
1 = 2 2 (8) 2 12
1 1 = (11)
2 12
with limitation such as :
2 2
GLPC is quadratic polynomial
= ( + ( ) )(Optimum
+ 2 of GLPC is more than 95 %
allocation for 2nd well) Positive sloped section of GLPC is used
2 1 +1 2
12 = 22 [ 1+2 ] + 2 [ 1 +2
]+ [1 + For the next explanation, the author calls the model
1 2
1 (1 2)2 the Ricky Model.
2 ]
4 (1 +2 )
ALGORITHM OF THE MODEL
Then, using the summary above, the gas allocation
method for 3 wells to be conducted in a similar way Let us say that there are n wells in the field with total
as the following: Simplify the 3 wells problem into a gas injection rate, , using Eq. (10) optimum gas lift
2 wells problem - 1 well is 3rd well and another is the allocation for well, , as function of gas
result from previous calculation of 2 wells gas lift injection rate for n wells, can be obtained. Then
using Eq. (11) obtaining the rest rate of gas supply to production will not be used as it is not efficient
be injected to (n-1) wells, 1 , after some gas has anymore.
been injected to well. Then using Eq. (10) again,
obtaining optimum gas lift allocation for ( 1) The result of the Ricky model is shown in the table
well, 1 , as function of gas supply for (n-1) wells, 2.
1 . Then the procedure continues repeating until
allocations for all wells are obtained. Thus, all From the table 2, with total gas injection rate 4
allocations should satisfy the equation . MMSCFD and certain GLPC of each well as shown
in the figure 4, the author obtained optimum
allocation for each well which would produce
=1 = (12) maximum oil production rate of 10226.9 BOPD.
The algorithm of the Ricky model is shown . Sensitivity to Gas Injection Allocation
SUGGESTIONS
Well 1 Well 2
Qg Qo Qg Qo
MMSCFD BOPD MMSCFD BOPD
2.84 1420 2.62 1310
1.66 1660 1.42 1420
1.34 1680 1.14 1430
1.02 1700 0.85 1415
0.66 1660 0.53 1330
0.34 1330 0.16 800
Well 3 Well 4
Qg Qo Qg Qo
MMSCFD BOPD MMSCFD BOPD
3.32 1660 3.9 1755
1.85 1850 1.99 1990
1.5 1875 1.57 1960
1.13 1880 1.14 1900
0.74 1840 0.7 1750
0.27 1330 0.24 1200
Well 5 Well 6
Qg Qo Qg Qo
MMSCFD BOPD MMSCFD BOPD
3.51 1755 3.7 1850
1.83 1830 2.25 2250
1.47 1835 1.85 2310
1.07 1790 1.43 2380
0.68 1700 0.96 2390
0.22 1120 0.37 1850
TABLE 2
Qg Qo
MMSCFD BOPD
Well 1 0.579 1567.4
Well 2 0.592 1302.7
Well 3 0.655 1736.7
Well 4 0.709 1676.4
Well 5 0.705 1668.1
Well 6 0.760 2275.5
Total 4.000 10226.9
TABLE 3
Case 1 Case 2
Qg Qo Qg Qo
MMSCFD BOPD MMSCFD BOPD
Well
0.71 1650.5 0.58 1567.8
1
Well
0.59 1302.7 0.71 1380.7
2
Well
0.65 1736.7 0.65 1736.7
3
Well
0.58 1573.2 0.59 1581.7
4
Well
0.71 1668.1 0.71 1668.1
5
Well
0.76 2275.5 0.76 2275.5
6
Total 4.00 10206.8 4.00 10210.6
Case 3 Case 4
Qg Qo Qg Qo
MMSCFD BOPD MMSCFD BOPD
0.58 1567.8 0.77 1679.5
0.59 1301.2 0.71 1380.7
0.76 1807.4 0.76 1807.4
0.59 1581.7 0.59 1581.7
0.71 1668.1 0.59 1572.4
0.77 2283.2 0.58 2112.7
4.00 10209.4 4.00 10134.4
TABLE 4
Qg Qo
MMSCFD BOPD
Well 1 1.04 1738.4
Well 2 1.07 1483.4
Well 3 1.18 1931.8
Well 4 1.62 2015.7
Well 5 1.22 1861.3
Well 6 1.18 2433.8
Total 7.31 11464.4
TABLE 6
TABLE 9
Last test
Well String FTHP, Qg, Qo,
Ref Date
psig MMscfd BOPD
X-107 LS 2/17/2015 140 0.5 101
X-147 LS 2/19/2016 90 0.5 187
X-148 LS 4/27/2016 155 0.341 50
X-157 LS 11/22/2015 100 0.5 604
X-170 SS 3/16/2016 150 0.207 201
X-172 LS 7/13/2015 85 0.35 50
X-175 LS 9/10/2015 110 0.28 86
X-175 SS 2/2/2016 125 0.25 528
X-189 SS 4/16/2016 220 0.402 367
X-905 SS 3/27/2016 140 0.6 245
X-916 SS 2/8/2016 140 0.3 432
X-919 LS 4/14/2016 60 0.528 230
X-938 LS 2/1/2016 110 0.5 346
X-940 LS 4/8/2016 200 0.89 432
TABLE 11
Well GLPC : + +
X-107 -75.133 x2 + 150.82 x+ 40.122
X-147 -1209.3 x2 + 610.79 x+ 106.53
X-148 -23.86 x2 + 37.138 x+ 42.265
X-157 -96.188 x2 + 185.64 x+ 461.74
X-170 -6.8712 x2 + 10.092 x+ 18.208
X-172 -22.039 x2 + 39.388 x+ 47.717
X-175 LS -148.7 x2 + 188.97 x+ 719.56
X-175 SS -685 x2 + 409.2 x+ 1244.1
X-189 -197.96 x2 + 334.9 x+ 352.06
X-905 -13.549 x2 + 30.012 x+ 104.11
X-916 -301.89 x2 + 338.67 x+ 1535.6
X-919 -158.51 x2 + 256.19 x+ 105
X-938 -90.977 x2 + 168.3 x+ 258.84
X-940 -127.83 x2 + 213.16 x+ 439.69
TABLE 13
TABLE 15
FTHP GLPC R2
50 y = -925.3x2 + 1629.9x + 1264.8 0.983
70 y = -936.57x2 + 1678.7x + 1177.3 0.983
90 y = -969.37x2 + 1738.1x + 1090.8 0.983
110 y = -977.51x2 + 1761.5x + 1011.9 0.981
130 y = -987.08x2 + 1780.6x + 937.2 0.98
150 y = -1002.2x2 + 1804x + 863.34 0.98
170 y = -1012.8x2 + 1822.5x + 790.25 0.98
190 y = -1018x2 + 1829.8x + 723.13 0.978
210 y = -1020.2x2 + 1833.9x + 656.21 0.977
TABLE 16
Case 1 Case 2
2000
Qo (BOPD)
1500
1500
Gradient (BOPD/MMSCFD)
1250
1000
750
500
250
0
0.0 0.5 1.0 1.5 2.0
Qg (MMSCFD)
900
800
700
600
500
400
300
200
100
0
2.0 3.0 4.0 5.0 6.0 7.0 8.0
Total Qg (MMSCFD)
X-107
1600
X-147
X-148
1400
X-157
1200 X-170
X-172
Qo, BOPD
1000
X-175 EE
800 X-175 FF
X-189
600 X-905
X-916
400
X-919
200 X-938
X-940
0
0 0.5 1 1.5 2
Qg, MMscfd
0.9
0.8
Gas Allocation, MMscfd
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
X-107 X-147 X-148 X-157 X-170 X-172 X-175 X-175 X-189 X-905 X-916 X-919 X-938 X-940
LS SS
Actual GAP RM
Oil Production
700
600
Oil Production, STBd
500
400
300
200
100
Actual GAP RM
0
Actual GAP RM
Qg Total 6.148 3.676 3.674
Qo Total, STBD
4500
4000
3500
3000
2500
Dev = -0.71 %
2000
1500
1000
500
0
Actual GAP RM
Qo Total 3859 3980.4 3952.3
1
0.9
0.8
Gas Allocation, MMscfd
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
X-107 X-147 X-148 X-157 X-170 X-172 X-175 X-175 X-189 X-905 X-916 X-919 X-938 X-940
LS SS
GAP RM
Oil Production
700
600
Oil Production, STBd
500
400
300
200
100
0
X-107X-147X-148X-157X-170X-172X-175 X-175 X-189X-905X-916X-919X-938X-940
LS SS
GAP RM
4.5
3.5
2.5
1.5
0.5
0
GAP RM
Series1 4.434 4.434
Qo Total, STBD
4500
4000
3500
3000
2000
1500
1000
500
0
GAP RM
Series2 3924.4 3914
Figure 26 - Comparison of total oil production case 2
0.6
0.5
Gas Allocation, MMscfd
0.4
0.3
0.2
0.1
0
X-107 X-147 X-148 X-157 X-170 X-172 X-175 X-175 X-189 X-905 X-916 X-919 X-938 X-940
LS SS
GAP RM
700
600
500
Oil Production, STBd
400
300
200
100
0
X-107 X-147 X-148 X-157 X-170 X-172 X-175 X-175 X-189 X-905 X-916 X-919 X-938 X-940
LS SS
GAP RM
2.5
1.5
0.5
0
GAP RM
Qg Total 2.999 3
Qo Total, STBD
4500
4000
3500
3000
2500 Dev =
-1.77 %
2000
1500
1000
500
0
GAP RM
Qo Total 3994.8 3924.2
0.4
0.35
0.3
Gas Allocation, MMscfd
0.25
0.2
0.15
0.1
0.05
0
X-107 X-147 X-148 X-157 X-170 X-172 X-175 X-175 X-189 X-905 X-916 X-919 X-938 X-940
LS SS
GAP RM
Oil Production
700
600
Oil Production, STBd
500
400
300
200
100
0
X-107 X-147 X-148 X-157 X-170 X-172 X-175 X-175 X-189 X-905 X-916 X-919 X-938 X-940
LS SS
GAP RM
1.5
0.5
0
GAP RM
Qg Total 2.002 2
4000
3500
3000
2500 Dev =
-1.15 %
2000
1500
1000
500
0
GAP RM
Qo Total 3896.7 3851.9
2500
2000
1500
1000
500
-500
-1000
-1500
0 50 100 150 200 250
FTHP, psig
a b c -b/(2a)
Figure 36 - , , 2 vs FTHP
Figure 37 - Some section of field X
55
50
45
40
35
30
25
Well - X-114 Well - X-147 Well - X-196 Well - X-919
FTHP Case 1 59.47 28.77 67.65 69.7
FTHP Case 2 60.14 28.77 70 69.17
0.6
0.5
Qg, MMscfd
0.4
0.3
0.2
0.1
0
Well - X-114 Well - X-147 Well - X-196 Well - X-919
Qg Case 1 0.388 0.165 0.619 0.13
Qg Case 2 0.386 0.165 0.619 0.132
FTHP
70
65
60
55
FTHP, psig
50
45
40
35
30
25
Well - X-114 Well - X-147 Well - X-196 Well - X-919
Series1 54.13 28.61 61.74 63.52
Series2 54.77 28.61 64.04 63.07
0.5
0.4
Qg, MMscfd
0.3
0.2
0.1
0
Well - X-114 Well - X-147 Well - X-196 Well - X-919
Series1 0.264 0.132 0.539 0.028