Sei sulla pagina 1di 7

UNIVERSIDAD NACIONAL DEL CENTRO DEL PERU ______________________

______________________ INGENIERIA CIVIL

DATOS MTODO DE THEIS


CALCULO DE T Y S (conocidos abatimientos)
FORMULAS
r1 100 m
r2 200 m
Q 1000 m3/dia

t (dias) 0.001 0.005 0.01 0.05 0.1 0.5 1 5 10


Zr1 (m) 0.083 0.196 0.250 0.376 0.431 0.559 0.614 0.742 0.797
Zr2 (m) 0.017 0.097 0.145 0.267 0.321 0.449 0.504 0.632 0.687

PROCEDIMIENTO

r1 (m) r2 (m)
t (dias)
Zr (m) r2/t (m2/d) u Wu Zr (m) r2/t (m2/d) u Wu
0.001 0.083 1E+07 0.24231 1.0687 0.017 4E+07 0.9692 0.2311
0.005 0.196 2E+06 0.04846 2.4977 0.097 8E+06 0.1938 1.2483
0.01 0.250 1E+06 0.02423 3.1670 0.145 4E+06 0.0969 1.8513
0.05 0.376 2E+05 0.00485 4.7572 0.267 8E+05 0.0194 3.3854
0.1 0.431 1E+05 0.00242 5.4479 0.321 4E+05 0.0097 4.0689
0.5 0.559 2E+04 0.00048 7.0554 0.449 8E+04 0.0019 5.6706
1 0.614 1E+04 0.00024 7.7483 0.504 4E+04 0.0010 6.3628
5 0.742 2E+03 0.00005 9.3576 0.632 8E+03 0.0002 7.9714
10 0.797 1E+03 0.00002 10.0507 0.687 4E+03 0.0001 8.6645

DEL GRAFICO Zr 0.181 0.179 POR LO TANTO


Wu 2.275 2.249 T 1000.2
u 0.063 S 0.0001
r2/t 2600000

1E+00
Zr (m)

r1=10
1E-01 0

1E-02
1E+03 1E+04 1E+05 1E+06 1E+07 1E+08
r2/t (m2/dia)

Hidrologia General
UNIVERSIDAD NACIONAL DEL CENTRO DEL PERU ______________________
______________________ INGENIERIA CIVIL
1E-02
1E+03 1E+04 1E+05 1E+06 1E+07 1E+08
r2/t (m2/dia)

Hidrologia General
UNIVERSIDAD NACIONAL DEL CENTRO DEL PERU ______________________
______________________ INGENIERIA CIVIL

ABATIMIENTO (Zr)
ABATIMIENTO CON EL TIEMPO
0.900
0.800
0.700
0.600
0.500 r1=1
0.400 00
0.300
0.200
0.100
0.000
0 2 4 6 8 10 12
TIEMPO (t)

1E+02

1E+01
Wu

r1=10
0

1E+00

1E-01
0.00001 0.00010 0.00100 0.01000 0.10000 1.00000
u
CURVA r^2/t, Zr ENCIMA DE LA CURVA u, Wu.
1E+02

1E+00
1E+01
Wu

r1=1
00
Zr (m)

r2=2
00

r1=1
1E-01 00
1E+00

1E-01
0.00001 1E-020.00010 0.00100 0.01000 0.10000 1.00000
1E+03 1E+04 1E+05 1E+06 1E+07 1E+08
ur2/t (m2/dia)

Hidrologia General
UNIVERSIDAD NACIONAL DEL CENTRO DEL PERU ______________________
______________________ INGENIERIA CIVIL

Hidrologia General
FLUJO NO PERMANENTE - ACUIFEROS CONFINADOS
ECUACION DE JACOB

FORMULAS
CONDICION:

t= tiempo en das desde la iniciacin del bombeo


S= constante de almacenamiento del acufero
Q= caudal en m/da
T= transmisibilidad en m/da/m, como producto del Coeficiente de Permeabilidad por el
espesor (e) del acufero
Z= depresin o abatimiento de un pozo de observacin a una distancia r del pozo de bombeo

DATOS

CALCULO DE ABATIMIENTOS (conocidos T y S)

r1 100 m T 1000 m2/dia


r2 200 m S 0.0001
t 10 dias Q 1000 m3/dia

PROCEDIMIENTO

r1 (m) r2 (m)
t (dias)
u Zr (m) R (m) u Zr (m) R (m)
0.001 0.25 ERROR 0.065 150.000 1 ERROR -0.046 150.000
0.005 0.05 ERROR 0.193 335.410 0.2 ERROR 0.082 335.410
0.01 0.025 ERROR 0.248 474.342 0.1 ERROR 0.137 474.342
0.05 0.005 ADELANTE 0.376 1060.660 0.02 ERROR 0.265 1060.660
0.1 0.0025 ADELANTE 0.431 1500.000 0.01 ERROR 0.321 1500.000
0.5 0.0005 ADELANTE 0.559 3354.102 0.002 ADELANTE 0.449 3354.102
1 0.00025 ADELANTE 0.614 4743.416 0.001 ADELANTE 0.504 4743.416
5 0.00005 ADELANTE 0.742 10606.602 0.0002 ADELANTE 0.632 10606.602
10 0.000025 ADELANTE 0.797 15000.000 0.0001 ADELANTE 0.687 15000.000
ABATIMIENTO CON EL TIEMPO
abatimiento (m)

0.900

0.800

0.700

0.600

0.500
r1=10
0.400 0
0.300

0.200

0.100

0.000
0 2 4 6 8 10 12
tiempo (dias)

RADIO DE INFLUENCIA CON EL TIEMPO


abatimiento (m)

16000

14000

12000

10000

8000 r1=1
00
6000

4000

2000

0
0 2 4 6 8 10 12

tiempo (dias)
UNIVERSIDAD NACIONAL DEL CENTRO DEL PERU ______________________ INGENIERIA CIVIL

MTODO DE DUPUIT -
FORCHHEIMER
ECUACION:
Q = (*K *(H2 Hw2)/Ln(R/rw)

TERMINOS :
H= Carga piezomtrica del acufero antes del bombeo
Hw = Carga piezomtrica en la cara del pozo
K= permeabilidad
Q= caudal en m3/dia
Zr = abatimiento
rw = radio de pozo
R= radio de influencia
Para un acufero libre con H = 15m, radio del pozo 0.1 m y K = 0.0005 m/s, determinar la tasa mxima
de bombeo para crear un abatimiento de 2 m.
Aplicando la ecuacin de descarga de Dupuit Fochheimer, se llega a:

R K H Hw rw H2 Hw2 Q
10 0.0005 15.00 13.00 0.1 56 0.01910
20 0.0005 15.00 13.00 0.1 56 0.01660
30 0.0005 15.00 13.00 0.1 56 0.01542
40 0.0005 15.00 13.00 0.1 56 0.01468
50 0.0005 15.00 13.00 0.1 56 0.01415
60 0.0005 15.00 13.00 0.1 56 0.01375
70 0.0005 15.00 13.00 0.1 56 0.01343
80 0.0005 15.00 13.00 0.1 56 0.01316
90 0.0005 15.00 13.00 0.1 56 0.01293
100 0.0005 15.00 13.00 0.1 56 0.01273

Solucin:
MTODO DE DUPUIT
Datos:
H= 20 m 0.02000
rw = 0.1 m 0.01900
K= 0.0003 m/s 0.01800
0.01700
Zr = 2m
0.01600
Q (m3/s)

0.01500 METODO DE DUPUIT -


0.01400 FORCHEIMER
0.01300
0.01200
0.01100
0.01000
0 20 40 60 80 100 120
Radio de Influencia (m)

Hidrologia General

Potrebbero piacerti anche