1. SCOPE:
This specification covers the design, manufacture, assembly, testing at
manufacturer’s works before dispatch, supply and delivery FOR destination of 350MVA, 11KV
Vacuum type switchgear panels with 11KV capacitors control panel.
2. STANDARDS:
The Switchgear panels shall comply in all respects the requirement laid down in the
latest editions of IS-3427, IS-3231, IS: 2705, IS: 3156 & IS-13118-199.
3. CLIMATIC CONDITIONS:
The 11KV Switchgear panels shall comprise of 11KV Vacuum Type circuit breakers,
control relay panel, instrument panel and instrument transformers (complete in all respect) etc.,
suitable for indoor use. The equipment shall be totally enclosed in metal clad cubical, dust and
vermin proof with necessary isolation arrangement. Each panel shall be easily extensible on either
side and should be complete with necessary internal copper connections, small wiring, L.T. fuses
and supporting framework with bolts to secure it to the floor. Each panel shall be provided with
space heater, door switch with lamps and 15 - Ampere power receptacle.
3
5. GENERAL DESIGN OF SWITCHGEAR PANELS:
The vacuum type circuit breaker shall be trip free and the breaker control shall be
draw out type. The VCBs shall be suitable for operation from 24 DC auxiliary supply. The
operating mechanism shall be motor operated spring charged type. There shall be provision (s) for
manual charging of closing spring and emergency hand trip. The motor used for the purpose will
be suitable for 240 V AC. All auxiliaries shall be supplied from AC and arrangement shall be made
for automatic switch over to DC in case of AC supply failure. The operating mechanism shall
works satisfactorily between 85 -110% of rated supply voltage.
Each unit shall have its own instrument panel provided at the top & complete with
small wiring connections from relays, instrument transformers, metering instruments, indicating
instruments, selector switches & circuit breaker control switch. All wiring shall be carried out by
using stranded single annealed copper conductor, insulated with poly vinyl chloride insulation
suitable for 650 V service and in accordance with IS: 732 - 1963. CT/PT circuits shall use wire of
not less than 2.5 mm² cross - sectional area whereas control/alarm/supervision circuit shall use
wire of not than 1.5 mm² cross - sectional area. All wires will be continuous from one terminal to
the other and also will have no T - Junction enroute. The connections shall be securely made with
the help of suitable connecting lugs duly crimped on the copper conductor. The meters and relays
shall be mounted in a convenient position so as these are readily accessible for inspection or
repair. The terminal board provided in the instrument panel of VCBs will be made of molded
dielectric having brass studs, washers, holding nuts & locking nuts. All holding nuts shall be
secured by locking nuts. The connection studs shall project 6 mm from the lock nut surface. No
OTHTER TYPE OF TERMINAL BORAD IS ACCEPTABLE. The panels shall have a degree of
protection of IP - 4X. The leads from the metering CTs shall be directly terminated at TTB and
there from at the KWH meter with a provision to seal TTB and KWH meter. The said CT leads will
be effectively concealed to prevent their tempering enroute as well as at TTB. Similarly PT leads
from secondary box of the PT to TTB & there from to energy meter, including inter panel PT leads,
will also be effectively concealed to prevent their tempering. The mode and extent of concealing
the metering leads of CTs & PTs, to prevent their tempering (by unscrupulous operating
personnel), will be discussed and mutually agreed upon with the successful bibber (s). TTB, used
on the instrument panel, should be suitable for front connections.
Earthing of current free metallic parts or metallic bodies of the relays switches
mounted on the instrument panel and metal enclosed switchgear shall be done by a suitable sized
copper conductor. Earth bus made of 25 X 3 mm bare copper flat will be extended through entire
length of 11KV switch-board with suitable provision to connect it to the sub-station earth at the
extremities. The earthing arrangement will meet with the requirements laid down in IS: 3427, read
with its latest amendments.
The secondary voltage & current rating of the instrument transformers shall
match with the metering and protective equipment. The CTs shall have ratio & accuracy class as
mentioned in the schedule of requirement. The CTs shall be wound/ring type in accordance with
their ratings. The terminal boards, associated with REF CTs & Over Current / Earth Fault
Protection CTS will be of disconnecting type, having short circuiting facility & thus facilitate
secondary testing of concerned protective relay without disturbing the associated small wiring.
Interchangeability of housing of CTS, from one panel to another, must be ensured. A resin cast
potential transformer of ratio (11000√3)/(110√3) volts, having 100 VA output per phase with
4
accuracy class 0.5 as per ISS: 3156 (Part-II) – 1965, shall be provided on the incoming side of
each panel set and shall be star / star connected. It shall be provided with HT and LT fuses.
All the panels shall be provided with insulated copper bus bar of 800 Amps
current rating for all switch boards. These shall be connected in a separate moisture and vermin
proof sheet metal chamber. The bus - bar connection & insulator supports shall be mechanically
strong & rigidly supported so as to withstand the stresses, generated by vibrations, variation in
temperature and severe short circuits. The bus - bar should be in horizental formations to enable
DHBVN to connect with existing Circuit Breaker Panel Board without any difficulty in matching.
The Adopter Panel, if required to match the loose panel with the existing panels, shall be prepared
/ fabricated as per site conditions by the Nigam at its own cost.
The bus - bar shall be supported on insulator at short intervals, keeping adequate
clearance between the bus bar and earth. The bus - bar chamber shall be provided with inspection
cover with gaskets & bus bar shutters. Provision shall be made for future extension of bus bar &
switch board.
The temperature rise, of current carrying parts, shall not exceed the permissible
limits above the ambient temperature as per relevant standards (latest edition).
These shall comply with latest version of IS: 2099 in all respects.
All disconnector’s (isolators) of 11KV VCBs & interlocks between different pieces
of apparatus, provided for reasons of safety & for convenience of operation of switchgear, shall
meet with the requirement of IS: 3427 - 1969 read with its latest amendment.
Each 11 KV incoming VCBs shall be provided with cable boxes, complete with
jointing kits & sealing material for receiving 3 Core, 11 KV XLPE type outer PVC sheathed cable of
size 630 mm² (Panel with CT ratio 400 - 200/5 – 5 – 5 A). The outgoing 11KV VCBs, including
11KV capacitor controlling VCB, shall be provided with cable boxes suitable to receive 3 Core, 11
KV XLPE type outer PVC sheathed cables of size up to 300 mm² (Panel with CT ratio 300 - 150/5
- 5A). The 11 KV station transformer VCB shall be provided with cable boxes ( Epoxy Resin Type )
suitable to receive 3 Core, 11KV XLPE type outer PVC sheathed cables of size up to 50 mm²
(Panel with CT ratio 60 - 30/5 - 5A). Each cable box shall have vertical entry from below. These
cable boxes shall be complete in all respects, including cable glands of requisite size. It is clarified
that one jointing kit/cable box is required to connect one 11KV XLPE cable with one 11KV VCBs.
No separate (extra) jointing kit is required.
5
5.9 RELAYS:
All the relays, except the relays for DC failure alarm, supervision alarm,
annunciation scheme, shall be draw out type and mounted on the front of each circuit breaker
control panel in a flush pattern case. All relays shall be provided with testing facilities. In case the
same can not be provided within the relay, a separate test block and test plugs shall be provided.
The relay adjustment devices shall be easily accessible when the relays have been mounted on
the panels.
The relays shall conform to the latest edition of IS: 3231. The relays shall not
operate at a current equal to or less than the setting. The minimum operating current shall not
exceed 110% of the setting. The coils & CT circuit of the relay should be suitable to withstand the
minimum operating current continuously, in case the minimum operating current is around 110%.
The relays covers and cases shall be dust tight, moisture and vermin proof. Operation Indicators
shall be provided on all relays and on their immediate auxiliaries for indication, regarding type of
fault and phase involved. It shall be possible to reset the operation indicator, without opening the
relays covers. All relays shall be tested at manufacturer’s works and test certificates got approved,
before dispatch of material. The bidder shall submit the descriptive and pictorial literature, in
quadruplicate, in respect of each relay proposed, along with the tender. All relays in the
specification shall be suitable for 24 V DC auxiliary voltages.
The incoming feeder panel shall be provided with one alarm bell and alarm
indicating auxiliary relays. It shall indicate tripping of circuit breaker, under fault conditions, with the
help of auto trip lamp and alarm. It shall be complete with the indicating lamp and push button
switches for “Accepts” and “Resets” alarm.
11KV switches panels, covered by this specification, shall be provided with the
following lamp indication:
For monitoring the trip circuit healthy conditions, both in open and close position
of the circuit breaker, 1 No. trip circuit supervision relay is proposed. In case of trip circuit being
faulty, the operation of this relay shall be accompanied by audio - visual annunciation. It shall be
possible to silence the buzzer by pressing the accept push button but the lamp shall continue to
glow till the fault has been attended.
The 11 KV Incoming VCB will be provided with a digital Voltmeter along with a
selector switch. The selector switch shall facilitate the measurement of Phase - Phase and Phase
- Neutral voltage, one by one. The static voltmeter shall be rated for 110 V (Phase – Phase
Voltages). The instrument shall be static type of industrial grade “A” classification with accuracy
class 1.0 & shall confirm to IS: 1248 (1968).
6
Each of the 11 KV VCB Panel will be provided with a suitably sealed digital
ammeter, rated for 5Amp (additional dials; if any, required to cover all the taps of the CTs, shall be
included at the time of bidding) & a selector switch, facilitating measurement of phase currents.
The instrument shall be of static type, industrial grade “A” classification, having accuracy class 1.0
& shall conform to IS: 1248 (1968)
Each of the 11 KV VCB, except the 11 KV capacitor VCB, will be equipped with a
three phase four wire static trivector meter (Confirming to Technical Specification no. S – 45 / SE /
P & D / XEN / DD – II; Static CT / PT Operated Trivector Meter for 11 KV Feeders) & suitable for
three phase four wire unbalanced load conditions with accuracy class 0.5 and having RS – 232,
RS – 485 Port for Data – Logging / Data -Downloading facility . The trivector meter shall be rated
for 5 Amp CT secondary and 110/√3 V (phase to neutral), available from 11 KV PT mounted on
the incoming VCB.
Each of the 11KV VCB will be provided with a static power factor meter. The
static PF meter, having range of 0.5 lag – one - 0.5 lead, shall be of static type; suitable for use on
three phase three wire unbalanced system. It shall be rated for 5A CT secondary & 110 Volts
(Phase – Phase Voltage), having accuracy class 1.0 with digital display.
NOTE: Routine test certificates of all the indicating & integrating instruments will be submitted
along with the routine test certificates of 11 KV switchgear.
5.13 PADLOCK:
In addition to the auxiliary contacts required for normal operation, each circuit
breaker shall be provided with 2 NO & 2NC spare auxiliary contacts duly wired up to terminal
block.
7
installed for Phase & Earth Fault , indicating the Phase or Earth Fault involved
10 Breaker has not tripped with the operation of Master Trip Relay (Applicable for 11
KV VCB only)
11 Bus Bar is charged (Not applicable for 11 KV Incoming VCB)
Suitable arrangement should be provided to make it possible for the Nigam to trip
11 KV VCB from the remote end, through a communication system to be provided by the Nigam,
in case the breaker is on & certain preset conditions, to be decided later on.
6. PROTECTION SHEMES:
Each incoming panel shall be provided with a single pole restricted earth fault
relay, suitable for 5 Amps C.T. Secondary, with a setting range of 10% to 40% of 5 Amp (strictly in
steps of 5%). The relay shall be housed in draw out flush pattern case.
The back up protection shall be in the form of combined over current and earth
fault relay, consisting of two over current & one earth fault unit which shall be triple pole having
inverse definite minimum time (I.D.M.T.) characteristics with a 3/10 time current curve i.e. the relay
operating time shall be 3 Second at 10 times the plug setting with T.M.S = 1. The two outer
elements of the relay shall be arranged for over current protection and shall have a setting range
of 50 - 200% of 5 Amps, adjustable in suitable equal steps by means of plug boards. The central
element shall be used for earth fault protection with a setting range of 20 - 80% of 5 Amps,
adjustable in suitable equal steps by means of a plug board. Each of the three elements shall be
fitted with shunt reinforcing unit with hand reset operation indicator.
Two nos. over current high set instantaneous elements, having setting range of
500 - 2000% of 5A and one no. earth fault high set instantaneous element, having setting range of
200 -800% of 5A and adjustable in suitable steps, shall be wired in series with the IDMT type over
current and earth fault relay respectively . The high set instantaneous element shall have low
transient over reach with a high pickup / drop out ratio. The high set instantaneous element shall
8
be so wired so as to take this element (instantaneous) out of circuit, if so desired by the Nigam, at
any time during the operation of equipment.
The back up protection shall be in the form of combined over current and earth
fault relay, consisting of two over current & one earth fault unit which shall be triple pole having
inverse definite minimum time (I.D.M.T.) characteristics with a 3/10 time current curve i.e. the relay
operating time shall be 3 Second at 10 times the plug setting with T.M.S = 1. The two outer
elements of the relay shall be arranged for over current protection and shall have a setting range
of 50 - 200% of 5 Amps, adjustable in suitable equal steps by means of plug boards. The central
element shall be used for earth fault protection with a setting range of 20 - 80% of 5 Amps,
adjustable in suitable equal steps by means of a plug board. Each of the three elements shall be
fitted with shunt reinforcing unit with hand reset operation indicator.
Two nos. over current high set instantaneous elements, having setting range of
500 - 2000% of 5A and one no. earth fault high set instantaneous element, having setting range of
200 -800% of 5A and adjustable in suitable steps, shall be wired in series with the IDMT type over
current and earth fault relay respectively . The high set instantaneous element shall have low
transient over reach with a high pickup / drop out ratio. The high set instantaneous element shall
be so wired so as to take this element (instantaneous) out of circuit, if so desired by the Nigam, at
any time during the operation of equipment.
The back up protection shall be in the form of combined over current and earth
fault relay, consisting of two over current & one earth fault unit which shall be triple pole having
inverse definite minimum time (I.D.M.T.) characteristics with a 3/10 time current curve i.e. the relay
operating time shall be 3 Second at 10 times the plug setting with T.M.S = 1. The two outer
elements of the relay shall be arranged for over current protection and shall have a setting range
of 20 - 80% of 5 Amps, adjustable in suitable equal steps by means of plug boards. The central
element shall be used for earth fault protection with a setting range of 10 - 40% of 5 Amps,
adjustable in suitable equal steps by means of a plug board. Each of the three elements shall be
fitted with shunt reinforcing unit with hand reset operation indicator.
Two nos. over current high set instantaneous elements, having setting range of
200 - 800% of 5A and one no. earth fault high set instantaneous element, having setting range of
100 - 400% of 5A and adjustable in suitable steps, shall be wired in series with the IDMT type over
current and earth fault relay respectively . The high set instantaneous element shall have low
transient over reach with a high pickup / drop out ratio. The high set instantaneous element shall
be so wired so as to take this element (instantaneous) out of circuit, if so desired by the Nigam, at
any time during the operation of equipment.
The 11KV capacitor control panel shall be provided with the following protection.
6.4.1 The back up protection shall be in the form of combined over current
and earth fault relay, consisting of two over current & one earth fault unit which shall be triple pole
having inverse definite minimum time (I.D.M.T.) characteristics with a 3/10 time current curve i.e.
the relay operating time shall be 3 Second at 10 times the plug setting with T.M.S = 1. The two
outer elements of the relay shall be arranged for over current protection and shall have a setting
range of 50 - 200% of 5 Amps, adjustable in suitable equal steps by means of plug boards. The
central element shall be used for earth fault protection with a setting range of 20 - 80% of 5 Amps,
9
adjustable in suitable equal steps by means of a plug board. Each of the three elements shall be
fitted with shunt reinforcing unit with hand reset operation indicator.
6.4.2 For the protection of the bank against unbalancing, an inverse time
Neutral Voltage displacement relay having setting 5.4, 7.5, 12.5 and 20 volts and suitable for 190
V AC operation shall be provided. The relay will be fed from the open delta connected secondary
of residual voltage transformer (Discharge coil) and shall have suitable setting range to afford
adequate protection to the capacitor bank against unbalancing.
6.4.3 For over voltage protection of the capacitor bank, over voltage relay;
having setting range of 110% to 170% in steps of 10% & rated for 110 Volts A.C. supply,
obtainable from the secondary of 11KV Bus P.T’s mounted on 11KV Incoming Panel shall be
provided.
6.4.4 For under voltage protection of the capacitor bank, under voltage relay;
having setting range of 50% to 90% in steps of 10% & rated for 110 Volts A.C. supply, obtainable
from the secondary of 11KV Bus P.T’s mounted on 11KV Incoming Panel shall be provided.
6.4.5 10 minute adjustable timer contact shall be wired in series with the
closing circuit so as to ensure that the capacitor bank is fully discharged, once it has been
switched OFF.
7. FREQUENCY OF OPERATION:
Mostly the VCB panels are expected to be used for feeding heavily concentrated
load. As such they are expected to be subjected to frequent tripping due to overload & earth fault.
Any specific design features, adopted or proposed to be provided, by the bidder in the switchgear
on this account should be indicated clearly in the tender.
8. TESTS:
All type tests & routine tests shall be carried out in accordance with IS: 13118
/1991 (Latest version thereof).
The type test certificate shall be supplied as per IS: 13118 / 1991, in
quadruplicate along with the tender to judge the adequacy of the equipment offered. In case the
offered equipment varies in its details vis-à-vis the certified copy of the drawing annexed with the
Type Test Report, the bidder (s) will be required to submit the fresh Type Test Reports. The date
of Type Test Report shall be within five years from the date of opening of the bids against this
specification. The following Type Tests in respect of VCBs are required to be submitted along with
the tender.
The tenders, without Type Test Certificates of the offered equipment, are liable to
be rejected. The Type Test Certificates for CTs & PTs, as stipulated in the latest version of IS:
10
3156 & IS: 2705, can be supplied by the successful Bidder after placement of the purchase order,
being bought out items.
The PT’s and CT’s shall be subjected to routine tests, as specified in the latest
version of relevant ISS in the presence of purchaser - authorized representative, if so desired by
the purchaser. The routine test certificates of the bought out component such as relays, switches,
indicating instruments & KWH metering will also be presented to DHBVN’s authorized inspecting
officer who will forward the same to the purchaser along with his inspection report for the main
equipment. All test reports should be got approval from purchaser before dispatch of equipment.
In addition to any other drawing, which the bidder may like to furnish to explain
the merits of his proposal, following drawings shall be submitted along with the tender in
quadruplicate:-
The bidder shall separately quote for a set of special tools, if so required, for
erection and maintenance of the switchgear panels.
Should the tender wish to deviate from the provisions of the specifications, either
on account of manufacturing practice or any other reasons, he shall draw attention to the
proposed point of deviation in the tender and submit such full information, drawing and
specification so that merits of his proposal may be fully understood. The specification shall be held
binding unless the deviations have been fully accepted as requested.
11
12. TRAINING FACILITIES:
These particulars shall be furnished strictly as per Annexure ‘A’ in duplicate. Any
deviation from this specification shall clearly be brought out separately.
The bidder shall state the place of manufacture, testing and name of the
manufacturer of the various items, included in his tender.
16. INSPECTION:
The purchaser has the right to have the tests carried out, at cost of supplier, by
an independent Govt. Agency wherever there is a dispute regarding the quality of material
supplied.
The supplier shall be responsible for suitable packing of all the material and
marking on the consignment so as to avoid any damage during the transport and storage and to
ensure correct dispatch to the destination.
The vacuum bottles should be capable of withstanding minimum 100 full short
circuit operations as per test duty 1 to 5 of IEC-56. The vacuum bottles, capable of withstanding
less than 100 full short circuit faults, would not be considered and therefore should not be offered.
12
A manufacture’s type test reports / literature for vacuum bottles, may, therefore be supplied along
with tender in duplicate.
20. INTERLOCKING:
20.1 It should be possible to lower / withdraw the breaker only after the circuit breaker has
been opened.
20.2 It should be possible to raise or lower the circuit breaker when it is in the fully home
position as well as it is in the isolated position.
20.3 It should not be possible to remove the circuit breaker until the moveable plug unit
having secondary connections has been with drawn.
20.4 It should not be possible to replace, in position, moveable plug unit & unless the
breaker has been racked in.
20.5 Provision of shutters or lock off doors with locks shall be made to prevent access to
the bus bar chamber and receptacles when the circuit breaker is withdrawn.
20.6 Provision should be made for locking the circuit breaker closing mechanism in the
open position & locks provided.
21. MARKING:
The switchgear panels shall have nameplate carrying the following data indelibly
marked:-
13
GUARANTEED AND OTHER TECHNICAL PARTICLATS FOR 11KV
SWITCHGEAR PANELS
A. CIRCUIT BREAKERS:
1. Maker’s name and country of manufacture.
2. Type
3. Nominal system voltage
4. Highest system voltage
5. Frequency
6. Nominal current rating
6.1 At Ref. Ambient temp. as per relevant standard
6.2 At site conditions
7. Symmetrical breaking capacity (KA and MVA)
8. Asymmetrical breaking capacity (KA)
8.1 Symmetrical breaking current
8.2 Short time current rating for 1 sec.
9. Making capacity (peak KA)
10 1.2/50 microsecond impulse wave withstand test voltage
11 One minute power frequency withstand test voltage
12 No. of poles
13 No. of breaks per pole
14 Length of breaks per phase
15 Opening time (ms)
16 Making time (ms)
17 Arc duration (ms)
18 Type and material of main contacts
19 Material and thickness of plating of contacts
20 Type of arcing contacts and /or arc control device
21 Whether the circuit breaker is trip free
22 Whether lock out mechanism for preventing closing provided
23 Closing coil voltage and power required to close the breaker
24 Minimum clearance in vacuum
24.1 Between phases
24.2 Between live parts & earth
25 Minimum clearance in Air
25.1 Between phases
25.2 Between live parts & earth
26 Short Circuit Type Tests: Certificate or report No. (Attach photocopy)
27 Normal/operating voltage of closing mechanism
28 Total weight of complete breaker ( Kg.)
29 Dimensions and mounting details
30 Standard to which conforms
31 Detail of reference drawing attached.
14
9. One minute power frequency withstand test voltage
10. 1.2/50 micro second impulse withstand voltage
11. Make of CT’s
C RELAYS
D BUS BAR
1. Material
2. Normal current rating in amp.
3. Normal area (mm2 )
4. Shape
5. Type of Insulation
E. VOLTAGE TRANSFORMER
1. Name of manufacture
2. Whether imported or indigenous
3. Manufacturer’s type, normal amps and rupturing capacity for vacuum bottles used for
Incoming panel
4. ---------------------do---------------------- for outgoing panels
5. ---------------------do---------------------- for capacitor control panel
6. Degree of vacuum inside the vacuum interrupters
7. Short time rating of vacuum bottles
8. Number of full short circuit operations as per test duly 1to 5 of IEC-56, which the vacuum
bottles offered can safely withstand
9. Whether the vacuum bottles used on incoming and outgoing panels are same or different.
10. Whether the operating mechanism is imported or indigenous.
15
Annexure-B
SCHEDULE OF REQUITEMENT
a. 1 No. Triple Pole, 350 MVA, 11KV 800 Amps circuit breaker fitted with arc control
device, interlocks, auxiliary switches, isolating contacts, emergency hand trip device,
mechanical ‘ON’ and ‘OFF’ indicator & motor operated spring charging mechanism.
b. One set of 3 phase 800 amps bus bars.
c. One set of isolating plug and sockets.
d. One set of single –phase cluster type isolating contacts.
e. 1 No. Trifurcating main cable boxes located at the rear of the unit for reception of 3-
core XLPE cables of up to 630-mm2 size and complete with wiping glands and
clamps.
2. A set of 3 core CT’s with ratio 400/200/5-5-5A :-
a. One core for REF protection having minimum knee point voltage of 90 X RCT on 400
Amps taps. It shall conform to accuracy class PS of ISS: 2705 (part-IV) and shall
have magnetizing current as low as possible but in no case exceeding the value
corresponding to class 5P of ISS: 2705 (part IV).
b. Second core for over current and earth fault protection with 15VA as out put burden-
having accuracy of 5P10.
c. Third core for metering with 15VA burden output and the class of accuracy as 0.5.
3. 1 No. 3 phase star/star connected bus bar type resin cast draw out voltage transformer of
ratio (11000/√3)/(110/√3) volts and 100 VA output per phase with class 1.0 accuracy as per
IS: 3516 (part-II)-1965 complete in all respect with HT and LT fuses, isolating plugs and
sockets for HT& LT copper connectors, current limiting resistances and first filling with
insulating oil.
a. 1 No. suitably sealed C.T’s operated static ammeter of 5 Amps. with digital display
b. 1 No. 3 way ON/OFF ammeter selector switch.
c. 1 No. 0 to 15 KV static voltmeter with digital display.
d. 1No. 3 way ON/Off voltmeter selector switch
e. 1 No. Static power factor meter for reading both the leading and lagging PF.
f. 1 No. 3 elements electronic KWH meter suitable for 3 phase 4 wire unbalanced load
conditions with accuracy class 0.5 (as per DHBVN specification) and with RS 485
port with MODBUS protocol for Data Logging/ Data-down-loading facility.
5. One set of triple pole combined over current and earth fault IDMTL relay with two outer
elements for over current protection with setting of 50-200% of 5 Amps and central element
for E/F protection with setting range of 20-80% of 5 Amps mounted in horizontal draw-out
type flush pattern case.
16
One set of high set instantaneous elements, consisting of two elements for over current,
having setting range of 500 - 2000% of 5A and one no. earth fault high set instantaneous
element, having setting range of 200 -800% of 5A and adjustable in suitable steps having
low transient over reach with a high pickup / drop out ratio. The high set instantaneous
element shall be so wired so as to take this element (instantaneous) out of circuit, if so
desired by the Nigam, at any time during the operation of equipment.
6. One No. single pole restricted E/F relay with setting of 10-40% of 5 Amps and complete
with a tuned 50c/s circuit and stabilizing resistance mounted in draw-out type flush pattern
case with a provision of inter-tripping the circuit breaker.
7. 4 No. 230 volt A.C. indicating lamps with fittings to indicate breaker open, breaker closed
auto trip and spring charged.
a. 1 indicating lamp with fitting and push button switch to indicate trip healthy. Trip
circuit supervision scheme and D.C. fail scheme as per foregoing specification.
8.1 1No. Triple pole 400 amps 350 MVA 11KV circuit breaker fitted with arc control
devices, interlock arrangement, auxiliary switches, isolating contacts, alarm
Contacts, emergency hand trip device, mechanism ON&OFF indicators and
spring charged closing mechanism operating at 240 V AC motors.
10.01 1 No. Triple pole 400 Amps, 350 MVA, 11KV circuit breaker fitted with arc
control device, interlock arrangement, auxiliary switches, isolating contacts,
alarm contacts, emergency hand trip device, mechanical ON & OFF indication
and under voltage release.
10.02 1 set of 800 A bus bars.
10.03 1set of isolating plugs & sockets.
10.04 1 set of single-phase cluster type isolating contacts.
10.05 1 No. Trifurcating main cable box for reception of 3 core XLPE up to 185 mm2
size and complete with wiping glands and clamps.
10.06 3 Nos. CTs of ratio 200-100-50-/5A with 15 VA output burden of 5 P 10
accuracy for protection 1 No. 230 V AC Panel Space heaters.
10.07 1 set vermin and dust proof fitment.
10.08 1 Instrument panel mounted on top and equipped as below:-
10.08.01 1 No. suitably sealed CT operated static Ammeter of 5 Amp., with digital
display.
10.08.02 1 No. 3-way ON/OFF Ammeter selector switch.
10.08.03 3 Nos. 230 VAC indicating lamps with fitting to indicate breaker open, breaker
closed and auto trip.
10.08.04 1 No. 24 VDC indicating lamps with fitting to indicate trip healthy.
10.08.05 1 No. Breaker control Switch.
10.08.06 1 set of triple pole combined over current & earth fault IDMT relay with two
outer elements for O/C protection having setting of 50-200% of 5 AMPS, and
central elements for earth fault protection with setting range of 20 to 80% of 5
amps mounted in drawn out type flush pattern case.
10.08.07 One Set of inverse time Neutral (Voltage) displacement relay suitable for 190
V AC operations for protection of the bank against unbalancing.
10.08.08 One set of over voltage relay with setting range 110% to 170% along with
auxiliary transformers (for external mounting) having ratio 121/115 to 127 (in
Steps of 1 Volt) to be used for compensating the error of over voltage relay.
10.08.09 One no. under Voltage Relay with setting range of 50% to 90%.
18
10.08.10 10 Minute adjustable timer to ensure that the capacitor bank is fully
discharged once it has been switched off before it can be switched ON again.
10.08.11 The capacitor controlling breaker should be suitable to meet all conditions
required for capacitor operation and should be suitable for controlling
capacitive current up to 400 Amps at 11 KV which is equivalent to 7.5 MVAR
approx 110V supply shall be available from existing (11000/√3) (110/√3) Volts
PT’s.
19