Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Punch list for CM2 and cement transport from CM2 to cement silo 1 and packing machine 1&2
1-There is no label on All electrical junction box & PLC panels in the station according to the
typical drawing and the numbering for terminals & terminal block in junction box and PLC
panels not numbered according to the technical specification.
Engineering & Management BMIC
2-there is no labels and I/O address for all PLC modules in the PLC panel according to the typical
drawing.
3-tag name for motor power and control box is not identical to the actual.
5-there is no tag labels for the instrument & LCP panel in the field .
Engineering & Management BMIC
Software required
3-Windows XP.
5-Microsoft office .