Sei sulla pagina 1di 4

NGI-15-790 CONSTRUCTION OF New HAS Internation School Building IN SUR

Master Query List

Date : 30.05.2016 Query No.3 Clarification No.

SN Company Tender Doc Document/ Meeting ref Query Description Query Answer

1 Hussain Drawing No. 150063-NEO-SB-403-001 Please issue us the details regarding the ON Coil / OFF Coil temperature for all AHUs, Heat MEP Design
Fadhil Recovery Wheel and FCUs.

2 Hussain Drawing No. 150063-NEO-SB-403-001 Please confirm whether the External Static Head mentioned in the drawing is in mm or MEP Design
Fadhil Pascal.

3 Hussain Drawing No. 150063-NEO-SB-403-001 Please confirm whether the Return Air or Extract Air mentioned (for FAHU-TR-01 to TR- MEP Design
Fadhil 03) in the schedule in roof area is correct. Also, please confirm which value to be
considered.

Hussain Drawing No. 150063-NEO-SB-403-001 Please confirm the return air flow rate for AHUs mentioned in the drawing. MEP Design
4 Fadhil

5 Galfar For jogging track surrounding the the soccer pitch will be same color like soccer pitch or Different Colour - Beige
Engineering different color ?

6 Galfar Artificial grass soccer pitch should be installed with infill or without infill ? Like with silica With rubber infill - Please refer detailed specifications
Engineering sand & rubber granules or without .

7 Galfar Please provide the specification of Geotextiles. BOQ - QS Dept.


Engineering

8 Al Subhiah Roof water proofing membrane in BOQ is described as "1.6mm thick flexible prefomed BOQ - QS Dept.
self-adhesive bituminous membrane waterproofing system" where as architectural
specification section G item 02.2,thickness is mentioned as 4 mm thick. Please confirm the
correct thickness

Oman BOQ page 2/26 item B Drawing No.150063- The size of Door type DG-01 in BOQ is 11000x2700mm whereas drawing shows the same BOQ - QS Dept.
9 Shapoorji LNG-A-802 as 8000x2700mm. Please confirm which will prevail. Please update BOQ as per the drawing.

10 Oman BOQ page 2/27 item A & B Drawing No. BOQ states door type DG-03 & DG 04 as steel framed doors whereas drawing states the BOQ - QS Dept.
Shapoorji 150063-LNG-A-802 same as Aluminum framed door. Please confirm which will prevail. Please update BOQ as per the drawing.

11 Oman Drawing No.150063-LNG-A-201,150063-LNG-A- Please provide specification, drawing & type (Perforated Box Screen or Cast Aluminum) Please refer Specification E.1/I - E.1/11 - Non-
Shapoorji 202, Drawing no.150063-LNG-A-203, 150063- for the "Screen SCR01" structural Metal Works for specifications. Also refer
LNG-A-204, BOQ page 2/30 Item B drawings No. 150063-LNG-A-905.

12 Oman BOQ Page 2/30 Item A-Cladding Please provide details , sections and drawings for ACP Cladding Please refer Specification E.1/I - E.1/11 - Non-
Shapoorji structural Metal Works for specifications. Also refer
drawings No. 150063-LNG-A-905.

13 Oman BOQ page 2/124, item A-Kitchen Equipments Please provide drawings/schedule/specification /details of kitchen equipments Kitchen is not part of this contract. However, please
Shapoorji note that all the provisions shall be made as per the
MEP Design drawings.

14 Oman Drawing No.150063-LNG-A-201,150063-LNG-A- We have noticed that "Sign Board" shown in elevational drawings but not measured in BOQ - QS Dept.
Shapoorji 202, BOQ.W epresume that it is not under ourscope of work. Please confirm.

15 Oman Drawing no.150063-LNG-A-201, 150063-LNG-A- We have noticed that "Screen SCR 01" shown in elevational drawings but not measured in BOQ - QS Dept.
Shapoorji 202, Drawing No.150063-LNG-A-203, 150063- BOQ. Please clarify.
LNG-A-204,
NGI-15-790 CONSTRUCTION OF New HAS Internation School Building IN SUR

Master Query List

Date : 30.05.2016 Query No.3 Clarification No.

SN Company Tender Doc Document/ Meeting ref Query Description Query Answer
16 Oman Drawing no.150063-LNG-A-202, Drawing We have noticed that "Screen WL 05" shown in elevational drawings but not measured in BOQ - QS Dept.
Shapoorji no.150063-LNG-A-203, in BOQ. Pleae clarify.

17 Oman Drawing no.150063-LNG-A-206, Drawing We have notice that " LED Screen & Fabric Screen" shown in elevational drawings but not BOQ - QS Dept.
Shapoorji no.150063-LNG-A-2012, measured in BOQ. Please clarify

18 Oman Drawing No.150063-LNG-A-2015 We have notice that "Score Board" shown in drawing but not measured in BOQ. Please BOQ - QS Dept.
Shapoorji clarify.

19 Oman BOQ page 6/9 Item C-Rubbe floor Please provide specification / details of Rubber Floor Please refer section J.7 of the specifications.
Shapoorji

20 Oman BOQ page 2/33 item A-Metal Lockers Please provide specification /details of Metal lockers BOQ - QS Dept.
Shapoorji Metal lockers are part of FF&E. Please remove from
the bill.

Urbacon There is no drawing issued for Flag Pole. Please clarfy and provide the same.
21 Trading

Urbacon As per Drawing No.LNG-S-2004, beam details of beam B5A are not provided in the beam Strucutural Dept.
22 Trading schedule. Please clarify and provide the same.

Urbacon As per Drawing No.LNG-S-2007, slab details of slab S3 are not provided in the slab Strucutural Dept.
23 Trading schedule . Please clarify and provide the same.

Urbacon Drawing No.150063-NEO-SB-303-03C,150063-NEO-SB-307-004 and 150063-NEO-SB-307- MEP Design


24 Trading 005 are not provided. Please clarify the same.

Urbacon You have provided us with Ground Floor Plan LPG Layout Drawing No.150063-NEO-SB- MEP Design
Trading 700-001 and First Floor Plan LPG Layout Drawing No.150063-NEO-SB-700-002. But you
have mentioned School Building Ground Floor Overall Plan LPG Layout Drawing
25 No.150063-NEO-SB-700-003 in the list of Drawings. Please clarify whether those drawings
are same or not. If they are different, please provide School Building Ground Floor Overall
Plan LPG Layout Drawing No.150063-NEO-SB-700-003 drawing

Urbacon There are no details and sectional view for wall W3 Column Axis Layout Drawings No.LNG- Strucutural Dept.
26 Trading S-2001. Please clarify and provide the same.

Urbacon Please clarify and provide the type of door which is missed out in Ground Floor Plan-Part-2
27 Trading Drawing No.LNG-A-106.

Autocad drawings Only Architectural drawings (Floor Plans , sections and Elevations) are available. Please The same cannot be issued in AutoCAD format.
Hussain issue us the Structural, Electrical, Plumbing and HVAC tender drawings (revised) in However, the drawings are to scale when printed in
28 Autocad format A1 size.
Fadhil

BOQ Page No. 6/16 Item A&Drawing No. The reply to Query-2 of Tender Query No. 5 was not answered. The BOQ indicates BOQ - QS Dept.
150063-LNG-A-651, 150063-LNG-S-MSC-002 Structural Steel Work and drawing indicates RCC structure for the Outdoor Bleacher. We
Hussain request you to kindly change the BOQ Item description. We wait for your instructions.
29
Fadhil

BOQ Page No. 6/16 Item A&Drawing No. In Tender Clarification No. 2 Item 26, it is mentioned that outdoor bleacher is in steel. Strucutural Dept.
150063-LNG-A-651, 150063-LNG-S-MSC-002 Please follow the quantity as indicated in BOQ. But the drawing issued for the outdoor
Hussain bleacher is RCC only. Please issue the drawings for the outdoor bleacher with structural
30
Fadhil steel section. Please advice.
NGI-15-790 CONSTRUCTION OF New HAS Internation School Building IN SUR

Master Query List

Date : 30.05.2016 Query No.3 Clarification No.

SN Company Tender Doc Document/ Meeting ref Query Description Query Answer

Ref drawing no. LNG-A-670-Standard details -Floor Details. The ref drawing shows
concrete screed under the floor finish. But, general practice is cement sand screed. Please
31 Adhi Oman re-confirm the requirement

Ref Drawing no. LNG-A-900-Finishes schedule. The re finishes schedule describes SK-02 BOQ - QS Dept.
32 Adhi Oman as a porcelain skirting. But ref BOQ/2/43-B reads granite skirting. Please clarify.

Ref drawing LNG-A-101-Ground Floor Plan. The ref drawing shows score boards, BOQ - QS Dept.
separator net at the sport hall and fabric curtains at the Multipurpose hall. Our
33 Adhi Oman understanding is that these spot equipment will be carried out by the client. Please
confirm

Ref drawing LNG-A-214-Section J-J Parts. The ref drawing shows Fabric screen.We
34 Adhi Oman presume this is not part of our scope. Please advice.

School main building-MEP BOQ. The page numbers are not corect according to the sub BOQ - QS Dept.
35 Adhi Oman summary. Please issue BOQ with correct page numbers.

Tender clarification no 01-S NO.15-Multipurpose hall stage. The ref response reads that BOQ - QS Dept.
the stage is measured in the BOQ page 2/8 R1. But we are unable to identify this item in
36 Adhi Oman the above BOQ page. Please advice.

Please provide On Coil/ Off coil temperature conditions for all AHU/FCU MEP Design
37 Al Subhiah

Please provide total CFM of each AHU/FCU MEP Design


38 Al Subhiah

ESP of all AHU and FCU is mentioned as 100mm of water Column which is MEP Design
39 Al Subhiah 1000Pa.Normally we take 100 Pa ESP. So please confirm the same.

Please provide the electrical KW load for all AHU, FCU and FANS MEP Design
40 Al Subhiah

BOQ Page No. 2/19R2 Item M & Drawing Please issue us the details regarding the Chandelier Light Fixtures mentioned in the BOQ MEP Design
Hussain No. 150063-NEO-SB-301-001 R1 & Drawing. The schedule of the light fixtures does not include this light fixture. Also
41 indicate the fixing detail for the same.
Fadhil

BOQ Page No. 2/19R2 Item K & L; Drawing Please confirm whether the 21 sunlight dome and the 2x39.1W LED unit will perform as MEP Design
No. 150063-NEO-SB-301-001 R1 single light fixture unit. We understand that the daytime light is harvested by sunlight
Hussain dome and during night / overcast / cloudy conditions it is utilizes the LED unit for lighting.
42
Fadhil Please confirm.

Please issue us the MEP and Structural drawings in AutoCAD format inorder to take out Please refer clarification to query No. 28 of this
Hussain
43 the quantities. schedule.
Fadhil

Galfar LNG-A-671, LNG-A-101,102 & 103 Drg LNG -A-671shows different type / thickness of masonry. But, in the floor plan LNG- A-
Engineering 101,LNG-A-102 & LNG-A-103 masonry type not show. Please provide mark up drawing
44 showing wall type.
NGI-15-790 CONSTRUCTION OF New HAS Internation School Building IN SUR

Master Query List

Date : 30.05.2016 Query No.3 Clarification No.

SN Company Tender Doc Document/ Meeting ref Query Description Query Answer
Galfar LNG-A-500,501,502 No false ceiling height above FFL in RCP drg LNG-A-500,501& 502, please provide. We The false ceiling height is 3.0 mtrs. across all aeras
45 Engineering presume based on section drawings is 3.0m. Please confirm except the multi-purpose hall.

Galfar Please provide the equivalent proposed level of ground floor level ( structure top +or- Strucutural Dept.
46 Engineering 0.00) for proposed buildings.(School, GH & Service yard)

Galfar LNG-S-2001 In drg LNG-S-2001-R0 in between grid 7-15/A RC wall type W3 are shown. Please provide Strucutural Dept.
47 Engineering structural details

Galfar LNG-A-105 & LNG-A-217 Aluminium screen not shown in between grid L/22-26,29-37/L in the drawings LNG-A-105. 3D views are for reference purposes only. Please
Engineering Whereas LNG-A-217 3D View Al screen are shown at the same grids. Please clarify and follow the design drawings and quote accordingly.
48 provide the screen specific details.

Galfar LNG-A-105 & LNG-A-217 In LNG-A-214-R0 shows RC upstand+1000mm high masonry parapet+200mm RC coping. Strucutural Dept.
49 Engineering But RC upstand / coping structural detail not available. Please provide

Galfar LNG-A-103 In drg LNG-GH-A-103 RCP layout, Guard room (Room no.1) false ceiling ht not specified. There isno false ceiling in the Guard Rooms, Driver
Engineering Please provide Rooms & Service Yard. Please refer to revised
50 drawings issued vide previous addendum.

Galfar LNG-A-101 In drg LNG-GH-A-101 RCP layout, Guard room (Room no.04) false ceiling ht not specified. There isno false ceiling in the Guard Rooms, Driver
Engineering Please provide Rooms & Service Yard. Please refer to revised
51 drawings issued vide previous addendum.

Galfar Please provide the external finish type for guard house 1& 2 The external finish of Guard Houses and other
Engineering ancillary building shall match the main building
51 finishes.