Al Nasr Development, Cairo, Egypt Current Stage: Stage 2 - Design Current Phase: Concept Design Consultants: Project Developer:

Risk Register Start Date: 12-Dec-16 Start Date: 12-Dec-16 Khatib & Alamai, Cairo Aspen Consultancy & Development
Last update: 27-Dec-16 End Date: 13-Jun-17 End Date: 29-Jan-17 BroadwayMalyan, Abu Dhabi Abu Dhabi, United Arab Emirates

Risk ID Category Description Date Identified Trigger Owner Status Date Response Impact Probab. Score Scale
0
0

Definitions:

ID: Category: Status: Impact: Probab. Scale


A Unknown Active The threat is existing and will pssibly impact, unless corrective/preventive 1 0.1 V. Low Minor impact on secondary functions
B Bylaws action is taken ASAP (level of certainty HIGH). 3 0.3 Low Minor impact on overall functions
C Cost Observe The threat is not active until additional investigations done to assess the 5 0.5 Med Some impact on key functions
D Design probability of occurance and level of impact (level of certainity MEDIUM). 7 0.7 High Considerable impact on overall functionality
S Scope Dormant The threat is not active, but will become active in the future (level of 9 0.9 V. High Significant impact on overall functionality
T Time certainty LOW). Nil The risk hase been retired
Q Quality Retired The threat is no longer exist, corrective/preventive action taken.

Risk Owners:
Ahmed Kotb K&A, Project Manager ahmed.kotb@khatibalami.com
Hany Shahin K&A, Regional Manager hany.shahin@khatibalami.com
Matthew Hollingworth DGJ, Director mahollingworth@dgjonesme.com
Mohamed Abdel-Ghany El Sayed K&A, Project Manager mohamed.abdelghany@khatibalami.com
Wael Abd El Razik K&A, Sr. Project Engineer wael.abdelrazek@khatibalami.com
Marwa Taher K&A, Sr. Project Engineer marwa.taher@khatibalami.com
Shadi Abd ElSalam BM, Associate s.abdelsalam@broadwaymalyan.com
Barbara George K&A, Section Manager barbara.guerguis@khatibalami.com
Hazem Mohamed K&A, Senior Manager hazem.mohamed@khatibalami.com